CN201158957Y - Pole cap of electric network cement pole - Google Patents

Pole cap of electric network cement pole Download PDF

Info

Publication number
CN201158957Y
CN201158957Y CNU200720158480XU CN200720158480U CN201158957Y CN 201158957 Y CN201158957 Y CN 201158957Y CN U200720158480X U CNU200720158480X U CN U200720158480XU CN 200720158480 U CN200720158480 U CN 200720158480U CN 201158957 Y CN201158957 Y CN 201158957Y
Authority
CN
China
Prior art keywords
pair
pole
plates
heightened
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200720158480XU
Other languages
Chinese (zh)
Inventor
陈惠民
王士勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LINYI ELECTRIC POWER Co
Hefei Lianxin Power Supply Co Ltd
Original Assignee
LINYI ELECTRIC POWER Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LINYI ELECTRIC POWER Co filed Critical LINYI ELECTRIC POWER Co
Priority to CNU200720158480XU priority Critical patent/CN201158957Y/en
Application granted granted Critical
Publication of CN201158957Y publication Critical patent/CN201158957Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to an electrified wire netting cerement pole top cap, which comprises a pair of heightened plates, wherein a pair of anchor ears are connected outside the lower end, a plurality of corresponding connecting holes are arranged on the two heightened plates, wherein a pair of middle anchor ears with holes are arranged outside a position which is corresponding to a first pair of connecting holes from the lower end, a supporting tube is arranged between other pairs of connecting holes, a long screw is threaded through to connect the two heightened plates, wherein diagonal tie connecting plates are arranged both on the long screw which is threaded through a second pair of corresponding holes from the upper end and outside the two heightened plates. The electrified wire netting cerement pole top cap has rational design, simple structure, little working capacity, few people, short time, low cost and short power off time, is used to heighten a net wire improved cerement pole, and does not need new occupied area and civil negotiation.

Description

Electrical network cement pole pole cap
Technical field:
The utility model belongs to the electric network reconstruction technical scope, relates to a kind of cement pole pole cap that is used for electric network reconstruction.
Background technology:
Along with socioeconomic continuous development, build a house, repair the roads, bridge formation, stringing become a kind of trend.So just often cause former transmission line of electricity and newly constructed facility scissors crossing section span deficiency.For ensureing reliable power supply of circuit and power supply safety, transposition section must be carried out and transform.In the prior art, the cross spider highway section carry out being transformed, all is the cement pole that two cement poles with the span deficiency are replaced with iron tower or increase usually.This scheme, the one, workload is big, and the time is long, and required expense height needs to have a power failure for a long time; The 2nd, need newly account for the soil, carry out civil negotiation, often reconcile relatively difficulty.
Summary of the invention:
The purpose of this utility model provides a kind of electrical network cement pole pole cap, increases the cement pole height easily, increases span, in order to overcome the above-mentioned drawback of existing in prior technology effectively.The purpose of this utility model realizes with following technical scheme: it has a pair of plate of increasing, its outside, lower end is connected with a pair of anchor ear, two tops of increasing plate are provided with some corresponding connecting holes, outside, wherein corresponding down several first pair of connecting hole position is provided with a pair of middle part anchor ear with holes, all the other each to all being provided with a stay pipe between connecting hole, and be installed with stay bolt and increase plate with two and connect; Wherein go up several second pair of connecting hole and wear on the stay bolt, two increase the plate outside all is provided with the diagonal member junction plate.During use, the utility model pole cap is holded up, made down several second pair of connecting hole and desire to increase the former drag link through-hole alignment in cement pole upper end, band anchor ear one is reinstated stay bolt and is connected and fixed, again two pairs of anchor ears are connected locking with bolt respectively, promptly finish increasing of a cement pole.With increase second cement pole with quadrat method.Then the stay bolt on last several second pair of connecting hole of two cement poles of increasing is taken off, band diagonal member junction plate places drag link together, connects diagonal member by the diagonal member junction plate; Loosening at last cross-arm bolt promotes cross-arm by diagonal member, makes a leap section span satisfy the administration of power networks requirement, and row is fixing again, promptly finishes the transformation of scissors crossing section power network line.
The utility model is reasonable in design, and is simple in structure, and the cement pole that is used for the netting twine transformation is increased, and workload is little, and personnel selection is few, and required time is short, and expense is low, and it is short for a long time to have a power failure; The 2nd, need not newly to account for the soil, need not carry out civil negotiation.
Description of drawings:
Fig. 1 is a front view of the present utility model
Fig. 2 is a lateral view of the present utility model
The specific embodiment:
Accompanying drawing has provided a specific embodiment of the present utility model, according to Fig. 1, shown in Figure 2,6 is to increase plate among the figure, constitute by a pair of channel-section steel, the outside, its lower end is welded with a pair of anchor ear 1, two increases the top of plate 6 and is provided with some corresponding connecting holes from top to bottom, and outside, wherein corresponding several down first pair of connecting hole position is provided with a pair of middle part anchor ear with holes 2, all the other each to all being provided with a stay pipe 5 between connecting hole, and be installed with stay bolt 4 and increase plate 6 with two and connect.Wherein go up on several second pair of stay bolt that connecting hole is worn 4, two increase plate 6 outsides all is provided with diagonal member junction plate 3.

Claims (1)

  1. A kind of electrical network cement pole pole cap, it is characterized in that it has a pair of plate (6) of increasing, its outside, lower end is connected with a pair of anchor ear (1), two tops of increasing plate (6) are provided with some corresponding connecting holes from top to bottom, outside, wherein corresponding down several first pair of connecting hole position is provided with a pair of middle part anchor ear with holes (2), all the other each to all being provided with a stay pipe (5) between connecting hole, and be installed with stay bolt (4) and increase plate (6) with two and connect; Wherein go up on several second pair of stay bolt that connecting hole is worn (4), two increase plate (6) outside all is provided with diagonal member junction plate (3).
CNU200720158480XU 2007-12-24 2007-12-24 Pole cap of electric network cement pole Expired - Fee Related CN201158957Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200720158480XU CN201158957Y (en) 2007-12-24 2007-12-24 Pole cap of electric network cement pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200720158480XU CN201158957Y (en) 2007-12-24 2007-12-24 Pole cap of electric network cement pole

Publications (1)

Publication Number Publication Date
CN201158957Y true CN201158957Y (en) 2008-12-03

Family

ID=40109546

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200720158480XU Expired - Fee Related CN201158957Y (en) 2007-12-24 2007-12-24 Pole cap of electric network cement pole

Country Status (1)

Country Link
CN (1) CN201158957Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285029A (en) * 2016-07-22 2017-01-04 国网山东省电力公司齐河县供电公司 Electric pole heightening device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285029A (en) * 2016-07-22 2017-01-04 国网山东省电力公司齐河县供电公司 Electric pole heightening device and method
CN106285029B (en) * 2016-07-22 2019-05-31 国网山东省电力公司齐河县供电公司 Electric pole heightening device and method

Similar Documents

Publication Publication Date Title
CN103362343B (en) A kind of with tower six circuit pole tower
CN103821075A (en) Large-span cable-stayed highway steel bridge
CN201924625U (en) Framework for converter transformer small busbars of +/-800kV converter substation
CN201158957Y (en) Pole cap of electric network cement pole
CN106013832A (en) Reinforcement and reconstruction method of communication pipe tower
CN103806373B (en) Oblique pull assembly type steel bridge on highway suspension cable anchor system
CN202099809U (en) EHV steel pipe plug-type foundation and EHV iron tower
CN208479112U (en) A kind of cable for built single time anchor support draws lower special pole
CN208299394U (en) A kind of shrunk type pendency strain insulator tangent tower used for transmission line
CN215119560U (en) Single-pin joint-frame wire inlet and outlet structure of 110kV power distribution device
CN209429647U (en) A kind of ultra-high-tension power transmission line based on cross-arm hierarchical design is bored across steel tube tower
CN103259234B (en) Electric transmission line rigid jumper asymmetric V-shaped insulator chain setting structure
CN103354319A (en) 220kV outdoor GIS double-dragonfly-type outlet wire arrangement structure
CN210032836U (en) Novel T of two circuit connects tower
CN203334760U (en) Same rod tower cross span abnormal tower
CN203412351U (en) F-shaped narrow-base triangular steel tube tower
CN102312600B (en) Multi-prism plug-in type steel pipe pole of power transmission line
CN201671392U (en) Single-circuit linear Y-shaped tower
CN205502703U (en) Transmission line pi connects tower
CN205399213U (en) Space cable face structure funicular system is transversely to drawing device
CN212453879U (en) Double-loop T-joint steel pipe rod
CN201874291U (en) Cement pole heightening device
CN221031765U (en) 220KV double-circuit short type cable terminal rod
CN206267615U (en) A kind of 110kV overhead transmission lines double back gate steel pipe tower
CN206329132U (en) A kind of 220kV overhead transmission lines height is across steel pipe tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081203

Termination date: 20100125