CN102312600B - Multi-prism plug-in type steel pipe pole of power transmission line - Google Patents

Multi-prism plug-in type steel pipe pole of power transmission line Download PDF

Info

Publication number
CN102312600B
CN102312600B CN 201110086472 CN201110086472A CN102312600B CN 102312600 B CN102312600 B CN 102312600B CN 201110086472 CN201110086472 CN 201110086472 CN 201110086472 A CN201110086472 A CN 201110086472A CN 102312600 B CN102312600 B CN 102312600B
Authority
CN
China
Prior art keywords
pole
cross
mobile jib
steel pipe
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110086472
Other languages
Chinese (zh)
Other versions
CN102312600A (en
Inventor
王宗秋
孙钧华
吴克祥
高成明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINAN JUNENG IRON TOWER MANUFACTURING Co Ltd
Original Assignee
JINAN JUNENG IRON TOWER MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINAN JUNENG IRON TOWER MANUFACTURING Co Ltd filed Critical JINAN JUNENG IRON TOWER MANUFACTURING Co Ltd
Priority to CN 201110086472 priority Critical patent/CN102312600B/en
Publication of CN102312600A publication Critical patent/CN102312600A/en
Application granted granted Critical
Publication of CN102312600B publication Critical patent/CN102312600B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)
  • Jib Cranes (AREA)

Abstract

The invention discloses a multi-prism plug-in type steel pipe pole of a power transmission line, belonging to steel pipe poles. The multi-prism plug-in type steel pipe pole structurally comprises a master pole and a cross arm fixed on the master pole, wherein a bottom flange is arranged at the bottom of the master pole; the master pole is formed by connecting more than two sections of hollow tapered poles in a plug-in way, wherein the top of the lower section of tapered pole is inserted into the upper section of the tapered pole; a plug is arranged at the top of the master pole; a grounding electrode is arranged at the lower part of the master pole; the cross arm and the master pole are connected through a cross arm connecting plate; the cross arm connecting plate is fixed on the master pole; the cross arm and the cross arm connecting plate are connected through a bolt; and the cross section of the master pole is multi-prism-shaped. Compared with the prior art, the multi-prism plug-in type steel pipe pole of the power transmission line, disclosed by the invention, is convenient for installation of the cross arm and fixed easily; the master pole is in a sectional structure and has the characteristics of easiness in machining, convenience for construction, operation safety and reliability, less maintenance amount, and the like; and therefore the multi-prism steel pipe pole has favorable popularization and application values.

Description

Multi-prism plug-in type steel pipe pole of power transmission line
Technical field
The present invention relates to a kind of steel pipe pole, especially a kind of Multi-prism plug-in type steel pipe pole of power transmission line.
Background technology
The electric power transmission line steel pipe pole is a kind of equipment supporter that is widely used in the urban and rural power grids transmission line of electricity, compare with like product (cement pole, angle steel tower etc.), it is with good looking appearance, lightweight, floor space is little, can satisfy the load needs of multiloop large-section lead and angle pole and not establish the requirement of strength of backguy and used in a large number.Along with the sustained and rapid development of national economy, increasing to the demand of electric power, especially at present on the occasion of the peak period of urban network restructuring, the market demand of power transmission line steel pipe rod day by day increases, and will continue to have an optimistic view of in the market in future.
Present employed power transmission line steel pipe rod, cross-arm are directly fixed with mobile jib, install difficultly, are not easy to fix; Mobile jib is the integral type structure in addition, processing difficulties, and transportation is inconvenient, constructional difficulties, maintenance workload is large.At present, good solution is not also arranged.
Summary of the invention
Technical assignment of the present invention is to provide a kind of Multi-prism plug-in type steel pipe pole of power transmission line for above-mentioned deficiency of the prior art, and it is easy for installation that this Multi-prism plug-in type steel pipe pole of power transmission line has cross-arm, and is fixing easily; Mobile jib is segmentation structure, handling ease, and easy construction, safe and reliable to operation, safeguard that the worker measures few characteristics.
The technical solution adopted for the present invention to solve the technical problems is: it comprises mobile jib and the cross-arm that is fixed on the mobile jib, the bottom of mobile jib is provided with end flange, described mobile jib is formed by connecting by inserting mode by the above conical hollow bar of two joints, insert in the epimere tapered rod at the top of hypomere tapered rod, the top of described mobile jib is provided with plug, the mobile jib bottom is provided with earthing pole, link to each other by the cross-arm junction plate between described cross-arm and the mobile jib, described cross-arm junction plate is fixed on the mobile jib, cross-arm and cross-arm junction plate are bolted, and the cross section of described mobile jib is many prismatics.
Be provided with the cross-arm stiffened panel on the described cross-arm junction plate.
The end of described cross-arm is provided with hush panel.
The end end face of described cross-arm is provided with thread gripping-board, is provided with the hanging wire ring on the thread gripping-board, is provided with gold utensil on the described hanging wire ring.
Be provided with end flange stiffened panel on the flange of the described end, flange stiffened panel of the described end is a plurality of, evenly arranges along end flange.
Be provided with cat ladder on the described mobile jib.
Multi-prism plug-in type steel pipe pole of power transmission line of the present invention is compared with existing technology, and have following outstanding beneficial effect: cross-arm is fixed by cross-arm junction plate and mobile jib, and is easy for installation, and is fixing easily; Mobile jib is segmentation structure, handling ease, and easy construction, safe and reliable to operation, reduce labour intensity, it is few to safeguard that the worker measures; The segmentation mobile jib connects by inserting mode, obvious pressure reduction, good stability, the characteristics such as load-carrying properties are good, and are easy to use.
Description of drawings
Accompanying drawing 1 is the main TV structure schematic diagram of Multi-prism plug-in type steel pipe pole of power transmission line;
Accompanying drawing 2 is connection diagrams of the cross-arm shown in Fig. 1 and cross-arm junction plate;
Accompanying drawing 3 is that B shown in Figure 1 is to view;
Accompanying drawing 4 is that A shown in Figure 1 is to view;
Accompanying drawing 5 is partial enlarged views shown in Figure 1;
Accompanying drawing 6 is D-D views shown in Figure 1;
Accompanying drawing 7 is cat ladder scheme of installations shown in Figure 1;
Description of reference numerals: 1, thread gripping-board, 2, hush panel, 3, the hanging wire ring, 4, cross-arm, 5, the cross-arm junction plate, 6, the cross-arm stiffened panel, 7, epimere tapered rod, 8, the hypomere tapered rod, 9, plug, 10, cat ladder, 11, mobile jib, 12, end flange stiffened panel, 13, earthing pole, 14, stone bolt, 15, end flange, 16, bolt, 17, gold utensil.
The specific embodiment
Explain below 7 pairs of Multi-prism plug-in type steel pipe pole of power transmission lines of the present invention of accompanying drawing are done with reference to Figure of description 1.
Multi-prism plug-in type steel pipe pole of power transmission line of the present invention, its structure comprises mobile jib 11 and the cross-arm 4 that is fixed on the mobile jib 11, the bottom of mobile jib 11 is provided with end flange 15, mobile jib 11 is fixing by end flange 15 and basis, be provided with stone bolt 14 on the end flange 15, end flange 15 is fixing by stone bolt 14 and basis, described mobile jib 11 is formed by connecting by inserting mode by the above conical hollow bar of two joints, insert in the epimere tapered rod 7 at the top of hypomere tapered rod 8, the top of described mobile jib 11 is provided with plug 9, mobile jib 11 bottoms are provided with earthing pole 13, link to each other by cross-arm junction plate 5 between described cross-arm 4 and the mobile jib 11, the convenient installation, described cross-arm junction plate 5 is fixed on the mobile jib 11, cross-arm 4 is connected by bolt 16 with cross-arm junction plate 5, and the cross section of described mobile jib 11 is many prismatics, but the needs of to satisfy effectively working strength.
Be provided with cross-arm stiffened panel 6 on the described cross-arm junction plate 5.Increase the working strength of cross-arm junction plate 5.
The end of described cross-arm 4 is provided with hush panel 2.
The end end face of described cross-arm 4 is provided with thread gripping-board 1, is provided with hanging wire ring 3 on the thread gripping-board 1, is provided with gold utensil 17 on the described hanging wire ring 3, and gold utensil 17 is used for suspension insulator.
Be provided with end flange stiffened panel 12 on the flange of the described end 15, flange stiffened panel of the described end 12 is a plurality of, evenly arranges along end flange 15.Increased the working strength of mobile jib 11.
Be provided with cat ladder 10 on the described mobile jib 11.Being convenient to the staff keeps in repair.
Except the described technical characterictic of manual, be the known technology of those skilled in the art.

Claims (5)

1. Multi-prism plug-in type steel pipe pole of power transmission line, comprise mobile jib and the cross-arm that is fixed on the mobile jib, the bottom of mobile jib is provided with end flange, it is characterized in that: described mobile jib is formed by connecting by inserting mode by the above conical hollow bar of two joints, insert in the epimere tapered rod at the top of hypomere tapered rod, the top of described mobile jib is provided with plug, the mobile jib bottom is provided with earthing pole, link to each other by the cross-arm junction plate between described cross-arm and the mobile jib, described cross-arm junction plate is fixed on the mobile jib, cross-arm and cross-arm junction plate are bolted, and the cross section of described mobile jib is many prismatics, are provided with the cross-arm stiffened panel on the described cross-arm junction plate.
2. Multi-prism plug-in type steel pipe pole of power transmission line according to claim 1, it is characterized in that: the end of described cross-arm is provided with hush panel.
3. Multi-prism plug-in type steel pipe pole of power transmission line according to claim 1, it is characterized in that: the end end face of described cross-arm is provided with thread gripping-board, is provided with the hanging wire ring on the thread gripping-board, is provided with gold utensil on the described hanging wire ring.
4. Multi-prism plug-in type steel pipe pole of power transmission line according to claim 1, it is characterized in that: be provided with end flange stiffened panel on the flange of the described end, flange stiffened panel of the described end is a plurality of, evenly arranges along end flange.
5. Multi-prism plug-in type steel pipe pole of power transmission line according to claim 1 is characterized in that: be provided with cat ladder on the described mobile jib.
CN 201110086472 2011-04-07 2011-04-07 Multi-prism plug-in type steel pipe pole of power transmission line Expired - Fee Related CN102312600B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110086472 CN102312600B (en) 2011-04-07 2011-04-07 Multi-prism plug-in type steel pipe pole of power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110086472 CN102312600B (en) 2011-04-07 2011-04-07 Multi-prism plug-in type steel pipe pole of power transmission line

Publications (2)

Publication Number Publication Date
CN102312600A CN102312600A (en) 2012-01-11
CN102312600B true CN102312600B (en) 2013-03-13

Family

ID=45426138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110086472 Expired - Fee Related CN102312600B (en) 2011-04-07 2011-04-07 Multi-prism plug-in type steel pipe pole of power transmission line

Country Status (1)

Country Link
CN (1) CN102312600B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109140326B (en) * 2018-10-11 2024-04-02 中山市鼎亮照明电器有限公司 Lamp arm mounting structure and ceiling lamp
CN110067430B (en) * 2019-04-08 2020-10-13 福建省华舜水利水电工程有限公司 Movable antidetonation transmission tower

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2806659Y (en) * 2005-06-03 2006-08-16 宁波沪甬电力器材股份有限公司 Prestressed angle steel tower
US20080092478A1 (en) * 2006-10-24 2008-04-24 Kyung Won Min Friction type retrofitting device for steel tower structures
CN201635470U (en) * 2010-04-02 2010-11-17 石家庄艾博贸易有限公司 Steel-structured communication tower

Also Published As

Publication number Publication date
CN102312600A (en) 2012-01-11

Similar Documents

Publication Publication Date Title
CN102312601B (en) Steel pipe pole of power transmission line
CN106567603A (en) 750 kV wine glass composite cross arm tower
CN202017376U (en) Power transmission line steel pipe rod
CN102312599B (en) Multi-prism steel pipe pole of power transmission line
CN102777068B (en) Lattice insulation power transmission tower
CN103122723A (en) Novel wine glass composite material tower
CN102312600B (en) Multi-prism plug-in type steel pipe pole of power transmission line
CN102312606B (en) Multi-prism cross arm
CN104295147B (en) A kind of framework being applicable to transformer station's outlet
CN103422699A (en) Electric transmission line tower made of composite materials
CN202017378U (en) Multi-prismatic plug-in type steel tubular rod for power transmission line
CN102312605B (en) Square cross arm
CN202017377U (en) Multi-prismatic steel tubular rod for power transmission line
CN205677342U (en) A kind of cross-arm on electric pole
CN203081021U (en) Novel wine glass composite material tower
CN201771243U (en) Multi-loop common-tower common-frame iron tower
CN203160794U (en) Novel electric transmission line tower
CN104895391A (en) External inserted cross arm connecting device for steel pipe rods
CN201883728U (en) DC filter structural frame for converter station
CN202227763U (en) Tower in compact structure
CN202017386U (en) Polygonal cross arm
CN105064760A (en) Four tube-single tube switching joint for narrow-foundation steel tube poles
CN205039496U (en) Whole prefabricated cable support
CN204174995U (en) A kind of framework being applicable to transformer station's outlet
CN204928037U (en) Six split conductors of transmission line are to quadripartion wire jumper transition device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130313

Termination date: 20170407

CF01 Termination of patent right due to non-payment of annual fee