CN205399213U - Space cable face structure funicular system is transversely to drawing device - Google Patents

Space cable face structure funicular system is transversely to drawing device Download PDF

Info

Publication number
CN205399213U
CN205399213U CN201620188402.3U CN201620188402U CN205399213U CN 205399213 U CN205399213 U CN 205399213U CN 201620188402 U CN201620188402 U CN 201620188402U CN 205399213 U CN205399213 U CN 205399213U
Authority
CN
China
Prior art keywords
main push
towing rope
seat
pulling seat
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620188402.3U
Other languages
Chinese (zh)
Inventor
马亮
屈喜庆
郭坤
陈平
王刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201620188402.3U priority Critical patent/CN205399213U/en
Application granted granted Critical
Publication of CN205399213U publication Critical patent/CN205399213U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a space cable face structure funicular system is transversely to drawing device, it is including fixing many to the main push -towing rope to drawing the seat on the twice main push -towing rope respectively, each is to the main push -towing rope to drawing the stationary ladle to draw together along horizontal bridge to installing two main push -towing ropes on the twice main push -towing rope respectively to drawing the seat, each main push -towing rope is to drawing the seat to include the pedestal respectively, the symmetry opens respectively along the all alone hole that the level set up in the middle of the upper portion of pedestal and lower part, it restraints to wear be equipped with steel strand wires to the main push -towing rope to the suo kongzhong who draws the seat at each, do not be connected with the ground tackle each bundle punishing the outer wall that draws the seat the main push -towing rope of steel strand wires bundle both ends, the ground tackle is restrainted steel strand wires and is fixed at the main push -towing rope to on drawing the seat, in the middle of the outer wall of pedestal to the outside respectively the protrusion be provided with dull and stereotyped under with the horizontal plate that sails upstream, the pin joint hole that has along the setting of vertical orientation is opened to the coaxial line on sail upstream dull and stereotyped and horizontal plate down, the pin joint hole is used for connecting to cable clip otic placode on drawing seat and main push -towing rope in order being used in the main push -towing rope to drawing the seat. It is linear to adopt the linear bridge state that is close to into of this structure main push -towing rope.

Description

A kind of Spatial Cable face structural cables system is laterally to drawing device
Technical field
This utility model relates to laterally drawing device, particularly relates to Spatial Cable face structural cables system laterally to drawing device.
Background technology
Along with the development of suspension bridge construction technology, select in than process in the Longspan Bridge form such as valley, river of crossing over and more favor in earth anchored suspension bridge.Common rope-suspension bridge cable system adopts vertical curve linear, the inadaptable higher esthetic requirement that the outward appearance of Urban Bridge and scenic spot bridge is proposed.Spatial Cable face structural cables system configurations not only new in structure, and Spatial Cable face structural system also improves bridge self wind resisting stability energy, is selected by the famous Bridge Design in many places.Because main cable erection is in freely sagging horizontal alignment after completing in crossing over the Longspan Bridge Spatial Cable face such as valley, river structure construction procedure, make it to the linear a great problem transforming into work progress of bridge completion state at vacant state.According to past construction experiences select after the tight cable of main push-towing rope completes hoist engine, jack at span centre by freely sagging main push-towing rope laterally to drawing, but work progress is constantly in the process of groping, it does not have the construction method of a set of mature and reliable.
Summary of the invention
The purpose of this utility model is in that to overcome the shortcoming of prior art, a kind of simple in construction is provided, achieve multiple spot to apply laterally drawing active force, make main push-towing rope generation lateral shift, reaching the effect expected with multi-section-line replacement circular arc, main cable alignment is horizontal to drawing device close to the Spatial Cable face structural cables system that bridge completion state is linear.
This utility model be the technical scheme is that
nullA kind of Spatial Cable face of the present utility model structural cables system is laterally to drawing device,The multipair main push-towing rope that it includes being separately fixed on twice main push-towing rope is to pulling seat,Two main push-towing ropes that pulling seat is included being separately mounted on twice main push-towing rope along direction across bridge by every a pair main push-towing rope are to pulling seat,Pulling seat is included pedestal by each main push-towing rope respectively,Having along horizontally disposed rope hole of intermediate symmetry in the upper and lower of described pedestal,Every a pair main push-towing rope rope hole to pulling seat is equipped with steel wire bundle,At every a branch of steel wire bundle two ends, the outer wall place of pulling seat is connected to ground tackle by main push-towing rope,Steel wire bundle is fixed on main push-towing rope on pulling seat by ground tackle,Protrude respectively laterally in the middle of the outer wall of described pedestal and be provided with horizontal plate and lower horizontal board,On described upper horizontal plate and lower horizontal board, coaxial line has the pin joint hole vertically arranged,Described pin joint hole is for connecting cord clip otic placode on pulling seat and main push-towing rope pulling seat will be acted on main push-towing rope.
The beneficial effects of the utility model: tool structure is simple, need to use pin to be connected with cord clip otic placode, then install stretch-draw material and equipment for easy for installation.By this utility model patent, it is achieved that multiple spot applies laterally drawing active force, makes main push-towing rope generation lateral shift, reach the effect expected with multi-section-line replacement circular arc.Main cable alignment is linear close to bridge completion state, improves follow-up cord clip lateral deflection angle adjustment and hoist cable, stiff girder lifting construction progress, it is ensured that construction quality, reduce construction cost, decrease construction management difficulty, provides guarantee for standardized construction.
Accompanying drawing explanation
Fig. 1 is the horizontal perspective view to drawing device of Spatial Cable face of the present utility model structural cables system;
Fig. 2 is that the main push-towing rope in the device shown in Fig. 1 is to pulling seat schematic diagram.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, this utility model is described in detail.
Spatial Cable face of the present utility model as shown in drawings structural cables system is laterally to drawing device, the multipair main push-towing rope that it includes being separately fixed on twice main push-towing rope is to pulling seat 2, two main push-towing ropes that pulling seat 2 is included being separately mounted on twice main push-towing rope along direction across bridge by every a pair main push-towing rope are to pulling seat 2, pulling seat 2 is included pedestal by each main push-towing rope respectively, intermediate symmetry in the upper and lower of described pedestal have along horizontally disposed rope hole 2-1, every a pair main push-towing rope rope hole 2-1 to pulling seat 2 is equipped with steel wire bundle 1, at every a branch of steel wire bundle 1 two ends, the outer wall place of pulling seat 2 is connected to ground tackle 3 by main push-towing rope, steel wire bundle 1 is fixed on main push-towing rope on pulling seat 2 by ground tackle 3.Protrude respectively laterally in the middle of the outer wall of described pedestal and be provided with horizontal plate and lower horizontal board, on described upper horizontal plate and lower horizontal board, coaxial line has the pin joint hole 2-2 vertically arranged, described pin joint hole 2-2 is for connecting pulling seat 2 and cord clip otic placode on main push-towing rope, it is achieved will pulling seat be acted on main push-towing rope.
The installation and application of this device is as follows:
Pulling seat 2 is separately positioned on by main push-towing rope the 1/4 of main span, 1/2,3/4 place, and be provided with on the main push-towing rope to pulling seat place installation cord clip, utilizing cord clip as main push-towing rope, pulling force to be born a little.With the otic placode on main push-towing rope cord clip, main push-towing rope being carried out pin joint to pulling seat 2, is tentatively installed by cord clip and prevent being pulled through journey main cable strand appearance jumping silk situation, cat road is counter to be hung to main push-towing rope.Laterally adopt multiple tracks steel wire rope (steel wire rope number of share of stock is determined by biasing force) to form steel wire bundle 1 drawing device, use jack tension steel wire bundle 1 to make jack tension power transmit into main push-towing rope laterally to drawing active force, and fix steel wire bundle 1 with ground tackle 3.

Claims (1)

  1. null1. structural cables system in Spatial Cable face is laterally to drawing device,It is characterized in that: the multipair main push-towing rope that it includes being separately fixed on twice main push-towing rope is to pulling seat,Two main push-towing ropes that pulling seat is included being separately mounted on twice main push-towing rope along direction across bridge by every a pair main push-towing rope are to pulling seat,Pulling seat is included pedestal by each main push-towing rope respectively,Having along horizontally disposed rope hole of intermediate symmetry in the upper and lower of described pedestal,Every a pair main push-towing rope rope hole to pulling seat is equipped with steel wire bundle,At every a branch of steel wire bundle two ends, the outer wall place of pulling seat is connected to ground tackle by main push-towing rope,Steel wire bundle is fixed on main push-towing rope on pulling seat by ground tackle,Protrude respectively laterally in the middle of the outer wall of described pedestal and be provided with horizontal plate and lower horizontal board,On described upper horizontal plate and lower horizontal board, coaxial line has the pin joint hole vertically arranged,Described pin joint hole is for connecting cord clip otic placode on pulling seat and main push-towing rope pulling seat will be acted on main push-towing rope.
CN201620188402.3U 2016-03-11 2016-03-11 Space cable face structure funicular system is transversely to drawing device Expired - Fee Related CN205399213U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620188402.3U CN205399213U (en) 2016-03-11 2016-03-11 Space cable face structure funicular system is transversely to drawing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620188402.3U CN205399213U (en) 2016-03-11 2016-03-11 Space cable face structure funicular system is transversely to drawing device

Publications (1)

Publication Number Publication Date
CN205399213U true CN205399213U (en) 2016-07-27

Family

ID=56439315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620188402.3U Expired - Fee Related CN205399213U (en) 2016-03-11 2016-03-11 Space cable face structure funicular system is transversely to drawing device

Country Status (1)

Country Link
CN (1) CN205399213U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565535A (en) * 2019-09-29 2019-12-13 中铁大桥局集团有限公司 Suspension bridge space main cable linear adjusting device and adjusting method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565535A (en) * 2019-09-29 2019-12-13 中铁大桥局集团有限公司 Suspension bridge space main cable linear adjusting device and adjusting method
CN110565535B (en) * 2019-09-29 2021-01-26 中铁大桥局集团有限公司 Suspension bridge space main cable linear adjusting device and adjusting method

Similar Documents

Publication Publication Date Title
CN204316006U (en) A kind of electric transmission line hot-line crosses over block device
CN105780658B (en) A kind of Spatial Cable face structural cables system is laterally to pulling method
CN105186378A (en) Power transmission line channel crossing protection mechanism
CN102290742B (en) Tension stringing construction technology
CN103526699B (en) Method for replacing pipe bridge hanging steel ropes
CN109610922B (en) Typical topography iron tower assemblage construction equipment
CN102354926A (en) Large-section conductor tension stringing construction method
CN108512115B (en) Screen sealing system crossing power line by auxiliary cross arm and mounting and dismounting method thereof
CN102324712A (en) Method for electrified spanning construction of high-voltage power transmission and transformation line
CN202012047U (en) Steel strand inclined pulling and buckling system of tower
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN212025936U (en) Equipment for mounting continuous steel strand stay cable at tower end of cable-stayed bridge
CN106099757A (en) A kind of transmission line insulator crosses over crane span structure and construction technology thereof
CN103603536A (en) Multi-loop crisscross-spanning steel pipe pole
CN103526688A (en) Pipe bridge hanging system
CN102593759B (en) One-pulling-two expansion and construction process of large-section lead
CN205399213U (en) Space cable face structure funicular system is transversely to drawing device
CN104362544A (en) Pulley type tower head clamp
CN112176870B (en) Method for installing main cable of suspension bridge with tunnel type anchorage at two banks
CN201118145Y (en) Powerline aerial spanning device
CN206287856U (en) A kind of new OCS Messenger Wire suspended structure
CN205329550U (en) Suspension bridge catwalk system
CN201252365Y (en) Construction charged crossover device of ultra-high and special-high voltage transmission line
CN105480873B (en) Support bar amplitude variation rotating mechanism of non-shutdown high-speed rail spanning device
CN205591115U (en) Suspension type catwalk veil installing the system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160727

CF01 Termination of patent right due to non-payment of annual fee