CN206287856U - A kind of new OCS Messenger Wire suspended structure - Google Patents

A kind of new OCS Messenger Wire suspended structure Download PDF

Info

Publication number
CN206287856U
CN206287856U CN201621440880.5U CN201621440880U CN206287856U CN 206287856 U CN206287856 U CN 206287856U CN 201621440880 U CN201621440880 U CN 201621440880U CN 206287856 U CN206287856 U CN 206287856U
Authority
CN
China
Prior art keywords
suspension
pulley
firm banking
suspended structure
messenger wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621440880.5U
Other languages
Chinese (zh)
Inventor
丁敏
彭龙虎
赵枝宗
刘涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Original Assignee
South Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd filed Critical South Engineering Co Ltd of China Railway Construction Electrification Bureau Group Co Ltd
Priority to CN201621440880.5U priority Critical patent/CN206287856U/en
Application granted granted Critical
Publication of CN206287856U publication Critical patent/CN206287856U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of new OCS Messenger Wire suspended structure, including suspension firm banking, Double-ear connector, suspended compound insulator, parallel hanging plate and suspension pulley, the suspension firm banking is provided with bolt hole, it is bolted and Double-ear connector is hung vertically in suspension firm banking lower section, suspended compound insulator is connected with below Double-ear connector, the upper end of parallel hanging plate is fixedly connected by bolt with the lower end of suspended compound insulator, the lower end of parallel hanging plate is fixedly connected by suspension ring with suspension pulley, and carrier cable is placed on suspension pulley.Between the utility model is arranged on the anchor point of contact net system two, the structure height of contact net system is improved to reach by improving the height of two anchor point carrier cables.The utility model can be very good improvement and grows up contact net system coefficient of elasticity under overbridge, steel Hang arch structures using the carrier cable suspended structure, it is ensured that train is passed through with normal speed, increased the reliability and security of electric railway.

Description

A kind of new OCS Messenger Wire suspended structure
Technical field
The utility model belongs to electric railway apparatus field, specifically a kind of new OCS Messenger Wire suspended structure.
Background technology
At present, large span, the overbridge of low clearance and steel Hang arch structure sections in contact nets in electrified railways system, contact Net suspended structure is highly relatively low, most drop shot string≤300mm, insulation distance cannot ensure and contact net system coefficient of elasticity is relatively low. Locomotive speed-limiting is typically carried out to case above to pass through.
In addition the soft suspension pulley used in contact nets in electrified railways system, its suspension connection is by top Breach connects to realize hanging carrier cable with breach on locating ring wire clamp on portion's suspension hook.But MTU depot maintenance storehouse in contact line and The suspension of the extended line of the hard crossbeam section transition in station, because its steel construction cannot install locating ring wire clamp, it is impossible to using it is soft across On suspension pulley carry out vertically suspended installation, and often occur carrier cable catching phenomenon.
The content of the invention
In order to overhead contact line structure height is relatively low under overcoming above-mentioned overbridge of growing up, steel Hang arch structures, most drop shot string≤ 300mm, insulation distance cannot ensure and the relatively low situation of contact net system coefficient of elasticity, the deficiency of carrier cable catching phenomenon, this Utility model provides a kind of new OCS Messenger Wire suspended structure, can safely, it is quick to Line for Passenger Transportation overbridge and steel Overhead contact line is adjusted under Hang arch structures, and it is required artificial few to be in course of adjustment, and time saving and energy saving, construction quality can be fully It is guaranteed.
The technical scheme that the utility model is provided:A kind of new OCS Messenger Wire suspended structure, including the fixed bottom of suspension Seat, Double-ear connector, suspended compound insulator, parallel hanging plate and suspension pulley, the suspension firm banking are provided with bolt hole, It is bolted and Double-ear connector is hung vertically in suspension firm banking lower section, suspension type is connected with below Double-ear connector Composite insulator, the upper end of parallel hanging plate is fixedly connected by bolt with the lower end of suspended compound insulator, under parallel hanging plate End is fixedly connected with the suspension ring at the top of suspension pulley, and carrier cable is hung using suspension pulley.
Further, when the suspension firm banking is arranged on OCS under bridge, fixed using anchorage style, the suspension is solid Floor installation is determined at steel Hang arches, is bolted and is fixed on steel Hang arch structures.
Further, the suspended compound insulator two ends use monaural structure, by monaural respectively with the ears of top Connector is fixedly connected with the parallel hanging plate of lower section.
Further, the suspension pulley includes frame body and pulley, and suspension pulley top is provided with suspension ring, the suspension ring Welded with suspension pulley frame body, a horizontal fixed wheel shaft on suspension pulley frame body, the pulley is fixed on wheel On axle, suspension ring (to wheel shaft wear to vertical by wearing for upper circular hole.
Further, a diameter of 140mm of the pulley, improves gearratio when carrier cable is moved freely, and reduces load The abrasion of rope.
Further, pin is horizontally arranged with the chassis body above pulley, carrier cable is limited to pin and pulley Between.
The utility model carrier cable suspended structure is generally located on large span, the overbridge of low clearance and steel Hang arch structures On, hung at most drop shot string in overhead contact line system or close at most drop shot string.
The purpose of the utility model carrier cable suspended structure is achieved in the following ways:In overbridge or the steel Hang of growing up Overhead contact line structure minimum point is found under arch structure, and nearby situation finds suitable carrier cable suspension according to live minimum point Structural mounting points, between two beams, the mount point of steel Hang arch structures is on the steel construction of top vertical line road for the mount point of general overbridge. According to the height of the minimum point carrier cable for calculating, the setting height(from bottom) of the carrier cable suspended structure is determined, and then it is outstanding to improve contact net Structure height in extension system between two anchor points improves the purpose of contact net system coefficient of elasticity, and ensures that most drop shot string is more than 300mm and electrical body insulation against ground distance.The new carrier cable suspended structure inherits soft across upper carrier cable hang And MTU depot overhauls the advantage of the hang of contact line in storehouse, carrier cable is because of environment between ensureing two anchor points by suspension pulley Moved freely during temperature change.
The beneficial effects of the utility model:(1) the utility model carrier cable suspended structure is arranged on two in contact net system Between anchor point, carrier cable suspended structure only in vertical stress and smaller, will not produce shearing resistance, to original bridge structure or Steel Hang arch structures cause secondary destruction.(2) the utility model carrier cable suspended structure combines soft across upper carrier cable suspension side The advantage of maintenance storehouse wire hang, solves overhead contact line under overbridge of growing up, steel Hang arch structures in formula and MTU depot Structure height is relatively low, most drop shot string≤300mm, insulation distance cannot ensure and the relatively low situation of contact net system coefficient of elasticity, Grow up overbridge and steel Hang arch structure Train normal operations are ensure that, the reliability and security of contact net system is increased. (3) the utility model carrier cable suspended structure employs suspension pulley suspension carrier cable, when by variation of ambient temperature, carrier cable Can be moved freely on suspension pulley, reduce the abrasion of carrier cable, increased the reliability and security of electric railway.(4) Traditional suspension hook is changed to suspension ring by the suspension pulley that the utility model is used, and it is changed to fixed guide pulley, it is to avoid to hold There is catching phenomenon in power rope.
Brief description of the drawings
Fig. 1 is the utility model carrier cable suspended structure figure;
Fig. 2 is the utility model carrier cable suspended structure side view;
Fig. 3 is suspension pulley front view in the utility model carrier cable suspended structure;
Fig. 4 is suspension pulley side view in the utility model carrier cable suspended structure.
In figure:1-suspension firm banking, 2-Double-ear connector, 3-suspended compound insulator, 4-parallel hanging plate, 5- Suspension pulley, 6-suspension ring, 7-pin, 8-frame body, 9-pulley, 10-wheel shaft.
Specific embodiment
The utility model is described further below in conjunction with the accompanying drawings.
New OCS Messenger Wire suspended structure as shown in Figure 1, 2, including suspension firm banking 1, Double-ear connector 2, Suspended compound insulator 3, parallel hanging plate 4 and suspension pulley 5, the suspension firm banking 1 are provided with bolt hole, are connected by bolt Connect and Double-ear connector 2 is hung vertically in the lower section of suspension firm banking 1, the lower section of Double-ear connector 2 is connected with suspension type and is combined absolutely Edge 3, the upper end of parallel hanging plate 4 is fixedly connected by bolt with the lower end of suspended compound insulator 3, the lower end of parallel hanging plate 4 It is fixedly connected with suspension pulley 5 by suspension ring 6, carrier cable is hung using suspension pulley 5.
As Figure 1-4, when suspension firm banking 1 is arranged on OCS under bridge, fixed using anchorage style, the suspension is solid When determining base 1 at steel Hang arches, it is bolted and is fixed on steel Hang arch structures.Adopt at the two ends of suspended compound insulator 3 Monaural structure is used, is fixedly connected with the Double-ear connector 2 of top and the parallel hanging plate 4 of lower section respectively by monaural.Suspension pulley 5 Including frame body 8 and pulley 9, a diameter of 140mm of pulley 9, the top of suspension pulley 5 is provided with suspension ring 6, the suspension ring 6 and frame Frame body 8 is welded, and a horizontal fixed wheel shaft 10 on frame body 8, the pulley 9 is fixed on wheel shaft 10, circle on suspension ring 6 Wearing for hole is worn to vertical to wheel shaft 10;Pin 7 is horizontally arranged with the chassis body 8 of the top of pulley 9, carrier cable is limited Between pin 7 and pulley 9, it is ensured that carrier cable does not occur big movement in vertical plane, play a part of to limit.
When the utility model is used, overhead contact line structure minimum point is found under grow up overbridge or steel Hang arch structures, And according to live minimum point, nearby situation finds suitable carrier cable suspended structure mount point, hangs firm banking and wire center Line is vertical, and will hang firm banking by anchoring or bolt connection is fixed on mount point, and is sequentially connected Double-ear connector, hangs Formula composite insulator, parallel hanging plate and suspension pulley, then carrier cable is suspended on suspension pulley, from suspension firm banking to outstanding The position height of carrier cable is about 1100mm on Hanging roller, and the installation site of live carrier cable suspended structure can be selected according to the height Take.After installing, it is necessary to which whether electrical body insulation against ground distance meets acceptance requirement in checking carrier cable suspended structure.
The detailed description of specific embodiment of the present utility model is the foregoing is only, it is new not limit this practicality with this Type, all any modification, equivalent and improvement made in mentality of designing of the present utility model etc., should be included in this practicality Within new protection domain.

Claims (6)

1. a kind of new OCS Messenger Wire suspended structure, it is characterised in that including suspension firm banking (1), Double-ear connector (2), suspended compound insulator (3), parallel hanging plate (4) and suspension pulley (5), suspension firm banking (1) are provided with bolt Hole, is bolted and for Double-ear connector (2) to be hung vertically in suspension firm banking (1) lower section, under Double-ear connector (2) Side is connected with suspended compound insulator (3), and the upper end of parallel hanging plate (4) is by bolt and the lower end of suspended compound insulator (3) It is fixedly connected, the lower end of parallel hanging plate (4) is fixedly connected by suspension ring (6) with suspension pulley (5), it is outstanding using suspension pulley (5) Hang carrier cable.
2. new OCS Messenger Wire suspended structure according to claim 1, it is characterised in that:The suspension firm banking (1) when installed in OCS under bridge, fixed using anchorage style, when suspension firm banking (1) is at steel Hang arches, passed through Bolt connection is fixed on steel Hang arch structures.
3. new OCS Messenger Wire suspended structure according to claim 1, it is characterised in that:The suspension composite Sub (3) two ends use monaural structure, solid with the Double-ear connector (2) of top and the parallel hanging plate (4) of lower section respectively by monaural Fixed connection.
4. new OCS Messenger Wire suspended structure according to claim 1, it is characterised in that:The suspension pulley (5) Including frame body (8) and pulley (9), suspension pulley (5) top is provided with suspension ring (6), the suspension ring (6) and frame body (8) Welding, a horizontal fixed wheel shaft (10) on frame body (8), the pulley (9) is fixed on wheel shaft (10), suspension ring (6) Wearing for upper circular hole is worn to vertical to wheel shaft (10).
5. new OCS Messenger Wire suspended structure according to claim 4, it is characterised in that:The pulley (9) it is straight Footpath is 140mm.
6. the new OCS Messenger Wire suspended structure according to claim 4 or 5, it is characterised in that:Above pulley (9) Pin (7) is horizontally arranged with chassis body (8), carrier cable is limited between pin (7) and pulley (9).
CN201621440880.5U 2016-12-27 2016-12-27 A kind of new OCS Messenger Wire suspended structure Expired - Fee Related CN206287856U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621440880.5U CN206287856U (en) 2016-12-27 2016-12-27 A kind of new OCS Messenger Wire suspended structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621440880.5U CN206287856U (en) 2016-12-27 2016-12-27 A kind of new OCS Messenger Wire suspended structure

Publications (1)

Publication Number Publication Date
CN206287856U true CN206287856U (en) 2017-06-30

Family

ID=59154132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621440880.5U Expired - Fee Related CN206287856U (en) 2016-12-27 2016-12-27 A kind of new OCS Messenger Wire suspended structure

Country Status (1)

Country Link
CN (1) CN206287856U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107745656A (en) * 2017-08-29 2018-03-02 中国建筑第八工程局有限公司 Portal frame factory building contact net suspension apparatus and its construction method
CN109720239A (en) * 2019-03-13 2019-05-07 中铁高铁电气装备股份有限公司 A kind of low clearance single-track tunnel overhead contact line structure
CN115455551A (en) * 2022-10-18 2022-12-09 中铁二十一局集团电务电化工程有限公司 Railway contact network soft crossing data processing method, equipment and storage medium

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107745656A (en) * 2017-08-29 2018-03-02 中国建筑第八工程局有限公司 Portal frame factory building contact net suspension apparatus and its construction method
CN107745656B (en) * 2017-08-29 2019-07-30 中国建筑第八工程局有限公司 Portal frame workshop contact net suspension apparatus and its construction method
CN109720239A (en) * 2019-03-13 2019-05-07 中铁高铁电气装备股份有限公司 A kind of low clearance single-track tunnel overhead contact line structure
CN115455551A (en) * 2022-10-18 2022-12-09 中铁二十一局集团电务电化工程有限公司 Railway contact network soft crossing data processing method, equipment and storage medium
CN115455551B (en) * 2022-10-18 2023-04-21 中铁二十一局集团电务电化工程有限公司 Railway contact net soft crossing data processing method, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN206287856U (en) A kind of new OCS Messenger Wire suspended structure
CN205871785U (en) Subway rigid suspension contact net bearing structure
CN204316006U (en) A kind of electric transmission line hot-line crosses over block device
CN109610922B (en) Typical topography iron tower assemblage construction equipment
CN207339088U (en) Transmission line of electricity straight line pole aerial earth wire overhauls stent
CN202268671U (en) Displaceable suspension string for overhead power transmission line
CN203850795U (en) Windage yaw prevention flexible control device used for power transmission lines
CN106099757A (en) A kind of transmission line insulator crosses over crane span structure and construction technology thereof
CN103915807B (en) A kind of wind-deviation flexible control device for transmission line of electricity
CN105337236B (en) The windproof anchoring of ultra-high-tension power transmission line
CN104577875A (en) Construction method of block crossover frame cable of power circuit
CN112176870B (en) Method for installing main cable of suspension bridge with tunnel type anchorage at two banks
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN209128888U (en) Anchor head traction device after a kind of suspension bridge dorsal funciculus
CN206128808U (en) Novel single loop cable dead end tower
CN206471750U (en) A kind of across obstacle Poling Construction protection structure
CN209313336U (en) A kind of suspension type monorail traffic box beam side light cable-laying gear
CN207579631U (en) Low headroom tunnel modified overhead contact line mechanical structure
CN205873627U (en) Permanent magnet synchronous traction machine's fixing device
CN205029285U (en) Stride highway, river high -low pressure aerial [insulated] cable buckle
CN106585428B (en) Counterweight device for contact line of electrified railway
KR100988580B1 (en) Installation method of safety net hang in midair for wiring using established pylons
CN207466411U (en) Three rail body formula rigid suspension catenary under high headroom tunnel
CN204012462U (en) A kind of for setting up the suspender of wire
CN202678841U (en) Fast rush repair tower of high-voltage transmission lines

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170630