CN209128888U - Anchor head traction device after a kind of suspension bridge dorsal funciculus - Google Patents

Anchor head traction device after a kind of suspension bridge dorsal funciculus Download PDF

Info

Publication number
CN209128888U
CN209128888U CN201821562943.3U CN201821562943U CN209128888U CN 209128888 U CN209128888 U CN 209128888U CN 201821562943 U CN201821562943 U CN 201821562943U CN 209128888 U CN209128888 U CN 209128888U
Authority
CN
China
Prior art keywords
connector
dorsal funciculus
anchor head
rope
suspension bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821562943.3U
Other languages
Chinese (zh)
Inventor
罗超云
张东曾
王晓佳
崖岗
代希华
郑波涛
童俊豪
吴育剑
廖国聪
杨博文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Changda Highway Engineering Co Ltd
Original Assignee
Guangdong Changda Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Changda Highway Engineering Co Ltd filed Critical Guangdong Changda Highway Engineering Co Ltd
Priority to CN201821562943.3U priority Critical patent/CN209128888U/en
Application granted granted Critical
Publication of CN209128888U publication Critical patent/CN209128888U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses anchor head traction devices after a kind of suspension bridge dorsal funciculus, include at least triangle frame body and rope-grippers;Triangle frame body includes the first connector, the second connector and third connector;First connector is arranged along the direction parallel with hauling rope, and the both ends of the first connector are provided with rope-grippers, the clamping part that rope-grippers includes fixed part and connect with fixed part and extend along the circumferential direction of hauling rope;Fixed part is connect with the first connector, and clamping part is connected on hauling rope to clamp hauling rope.Anchor head traction device after the suspension bridge dorsal funciculus of the utility model can make anchor head after dorsal funciculus smoothly pass over the guide wheel group of each door frame, and be avoided that the uncontrolled ski-running pendant fast on cat road idler pulley of dorsal funciculus.

Description

Anchor head traction device after a kind of suspension bridge dorsal funciculus
Technical field
The utility model relates to anchor head traction dresses after suspension bridge construction technical field more particularly to a kind of suspension bridge dorsal funciculus It sets.
Background technique
Suspension bridge also known as suspension bridge, refer to main push-towing rope two sides (or bridge both ends) are hung and be anchored in by Sarasota as The bridge of the main supporting member of superstructure.Its cable geometry is determined by the equilibrium condition of power, normally close to parabola.From Cable hangs down many sunpenders, and bridge floor is hung, and sets up between bridge floor and sunpender and sets stiff girder, forms combined system with cable, To reduce deflection deformation caused by load.
The sequence of construction of suspension bridge totality can be divided into following steps: installation saddle, dragline cross river, installation hauling rope, installation Cat road rope, installation main push-towing rope trailer system, sets up main push-towing rope, installation lock and hoist cable, sets up stiff girder installation cat road.It is setting up at present When main push-towing rope, main cable erection is generally carried out using PPWS method, i.e., erection construction is drawn using Prefabricated parallel stranded metallic cable.It is general next Say, every main push-towing rope by it is tens of it is up to a hundred formed with strand, main cable erection, be by strand one by one erection complete.
For there was only the suspension bridge of single span, main cable strand is all made of elongated strand, i.e. the rear anchor head of strand is fixed on On the anchorage of side, preceding anchor head is drawn and is fixed on by traction mechanism on the anchorage of second side.For multispan suspension bridge, such as twin spans For suspension bridge or three across suspension bridge, dorsal funciculus can be also arranged other than using elongated strand to carry out to end bay main push-towing rope in main push-towing rope Reinforce, i.e. the equal length of dorsal funciculus length and end bay main push-towing rope, and be in general divided into two kinds of situations when carrying out dorsal funciculus erection, The first is that the rear anchor head of dorsal funciculus is fixed on the anchorage of the first side, the preceding anchor head of dorsal funciculus drawn by traction mechanism and be fixed on from On the nearest saddle of first side anchor heavy stone used as an anchor;It is for second that the preceding anchor head of dorsal funciculus needs to be fixed in the anchoring of second side, rear anchor head needs It is fixed on the saddle nearest from second side anchorage.In the dorsal funciculus erection process of second situation, the preceding anchor head meeting of dorsal funciculus First being drawn, current anchor head crosses the saddle nearest from the first side anchor heavy stone used as an anchor, and the rear anchor head of dorsal funciculus will leave the anchorage of the first side, And anchor head moves together before following, until preceding anchor head moves to the anchorage of second side, rear anchor head is moved to from second side anchorage most Close saddle, traction mechanism just stop the traction to preceding anchor head.In this process, the rear anchor head of dorsal funciculus will at least cross one Sarasota and at least through an anchorage door frame, cat road door frame and tower top portal, and current rear anchor head suspension arrangement, are passing through It will receive obstruction when crossing the guide wheel group of each door frame, dorsal funciculus caused to set up inefficiency.By three across suspension bridge for, in across portion Point main push-towing rope be a vertex parabola directed downwardly, then dorsal funciculus in process across when, just have one section and be completely in lower ramp shaped The distance of state, so due to its own gravity of dorsal funciculus, in the distance by this descending, dorsal funciculus is easy uncontrolled The pendant of the fast ski-running on cat road idler pulley, influence suspension bridge building security.
Utility model content
For overcome the deficiencies in the prior art, the purpose of this utility model is to provide anchor heads after a kind of suspension bridge dorsal funciculus to lead Leading-in device can make anchor head after dorsal funciculus smoothly pass over the guide wheel group of each door frame, and be avoided that dorsal funciculus it is uncontrolled Fast ski-running pendant on cat road idler pulley.
The purpose of this utility model adopts the following technical scheme that realization:
Anchor head traction device after a kind of suspension bridge dorsal funciculus, comprising: triangle frame body and rope-grippers;The triangle frame body packet Include the first connector, the second connector and third connector;First connector is set along the direction parallel with hauling rope Set, and the both ends of first connector are provided with the rope-grippers, the rope-grippers include fixed part and with the fixation Clamping part portion connection and extended along the circumferential direction of hauling rope;The fixed part is connect with first connector, the folder The portion of holding is connected on hauling rope to clamp hauling rope.
Further, anchor head traction device further includes balancing pole after the suspension bridge dorsal funciculus, balancing pole one end setting In the junction of second connector and the third connector, anchor head is connected after dorsal funciculus is provided in the middle part of the balancing pole The second end of plate, the balancing pole is provided with clump weight.
Further, the clamping part includes the first holding claw and the second holding claw;First holding claw and second armful Pawl is retractable structure.
Further, the clamping part is provided with guide part, the guide part first along the both ends of hauling rope axial direction End is fixedly connected with the clamping part, and the guide part second end is tip, and tip is arranged towards hauling rope axial direction.
Further, first connector is channel steel, and the both ends of first connector offer through-hole, described logical Sleeve is connected in hole, the fixed part secure fit of the rope-grippers is in the sleeve, and the clamping part is from the sleeve It stretches out.
Further, the first connecting hole is offered in second connecting rod, begins with second in the third connecting rod Connecting hole, the balancing pole passes through the first connecting hole and the second connecting hole is connect with connecting second connecting rod with third Bar.
Compared with prior art, the utility model has the beneficial effects that: by anchor head connecting plate after setting dorsal funciculus, dorsal funciculus Anchor head can be connect with anchor head connecting plate after dorsal funciculus afterwards, so not only the preceding anchor head of dorsal funciculus and the hauling rope of traction mechanism Connection, and the rear anchor head of dorsal funciculus is also connect with the hauling rope of traction mechanism, then dorsal funciculus in process across when, even if dorsal funciculus is complete The full state for being in descending, dorsal funciculus can also be drawn well by hauling rope, and it is uncontrolled in cat road idler pulley to avoid dorsal funciculus Upper fast ski-running pendant, ensure that the building security of suspension bridge, also, such mode compared with the prior art in directly use tower top Door frame hoist engine is easily more to dorsal funciculus progress reverse drawing, also more cost-effective.And the first connector, the second connector and Third connector connects into triangle frame body, is because triangle frame body itself just has good stability, this is also ensured that Reliability when being drawn to anchor head after dorsal funciculus.It is connect with fixed part and in addition, stating rope-grippers and having along the circumferential direction of hauling rope The clamping part of extension, clamping part are connected on hauling rope to clamp hauling rope, i.e., the utility model is particular by clamping part Clamping action makes after anchor head traction device draws dorsal funciculus after suspension bridge dorsal funciculus anchor head as the hauling rope of traction mechanism is synchronous Movement, and clamping part is extended to form along the circumferential direction of hauling rope, so clamping part is consistent with the shape of hauling rope, So clamping part would not generate obstruction when with the guide wheel group of excessively each door frame of hauling rope, can be as hauling rope smoothly Pass through.
Detailed description of the invention
Fig. 1 is the schematic diagram of hauling rope and guide wheel group cooperation;
Fig. 2 is the perspective view of anchor head traction device and hauling rope cooperation after the utility model suspension bridge dorsal funciculus;
Fig. 3 is the bottom view of Fig. 2.
In figure: 1, triangle frame body;11, the first connector;111, sleeve;12, the second connector;13, third connector;2, Rope-grippers;21, clamping part;211, guide part;3, balancing pole;31, anchor head connecting plate after dorsal funciculus;32, clump weight;4, hauling rope; 5, guide wheel group.
Specific embodiment
In the following, being described further in conjunction with attached drawing and specific embodiment to the utility model, it should be noted that Under the premise of not colliding, it can be formed in any combination between various embodiments described below or between each technical characteristic new Embodiment.
As shown in Figure 1-3, anchor head traction device after suspension bridge dorsal funciculus provided by the embodiment of the utility model is shown, until It less include triangle frame body 1 and rope-grippers 2.Triangle frame body 1 includes that the first connector 11, the second connector 12 and third connect Fitting 13.First connector 11 is arranged along the direction parallel with hauling rope 4, and the both ends of the first connector 11 are provided with rope-grippers 2, rope-grippers 2 include fixed part and connect with fixed part and along the circumferential direction of hauling rope 4 extension clamping part 21;It is fixed Portion is connect with the first connector 11, and clamping part 21 is connected on hauling rope 4 to clamp hauling rope 4.Wherein, the first connector 11 is Channel steel, and the both ends of the first connector 11 offer through-hole, and sleeve 111 is connected in through-hole, the fixed part fixation of rope-grippers 2 is matched It closes in sleeve 111, clamping part 21 is stretched out from sleeve 111.Particular by sleeve 111 to rope-grippers i.e. in the utility model 2 fix.
By anchor head connecting plate 31 after setting dorsal funciculus, the rear anchor head of dorsal funciculus can connect with anchor head connecting plate 31 after dorsal funciculus Connect, so not only the hauling rope 4 of the preceding anchor head of dorsal funciculus and traction mechanism connect, but also the rear anchor head of dorsal funciculus also with dragger The hauling rope 4 of structure connects, then dorsal funciculus in process across when, even if dorsal funciculus is completely in the state of descending, dorsal funciculus can also be led Straw line 4 is drawn well, is avoided the uncontrolled ski-running pendant fast on cat road idler pulley of dorsal funciculus, be ensure that the construction of suspension bridge Safety, also, such mode compared with the prior art in directly using tower top portal hoist engine to dorsal funciculus carry out reverse drawing will side Just more, it is also more cost-effective.And the first connector 11, the second connector 12 and third connector 13 connect into tripod Body 1 is because triangle frame body 1 itself just has good stability, this is also ensured that when anchor head after to dorsal funciculus is drawn Reliability.It is connect with fixed part and in addition, stating rope-grippers 2 and having along the clamping part 21 that the circumferential direction of hauling rope 4 extends, clamping Portion 21 is connected on hauling rope 4 to clamp hauling rope 4, i.e. the utility model makes particular by the clamping action of clamping part 21 Anchor head traction device draws what anchor head after dorsal funciculus was moved synchronously with the hauling rope 4 of traction mechanism after suspension bridge dorsal funciculus, and Clamping part 21 is extended to form along the circumferential direction of hauling rope 4, so clamping part 21 is consistent with the shape of hauling rope 4, then Clamping part 21 would not generate obstruction when with the guide wheel group 5 of the excessively each door frame of hauling rope 4, can be as hauling rope 4 smoothly Pass through.As shown in figure 3, the schematic diagram cooperated for hauling rope 4 and guide wheel group 5.
Preferably, anchor head traction device further includes balancing pole 3 after suspension bridge dorsal funciculus, and the setting of 3 one end of balancing pole connects second The junction of fitting 12 and third connector 13, the middle part of balancing pole 3 are provided with anchor head connecting plate 31 after dorsal funciculus, balancing pole 3 Second end is provided with clump weight 32.Specifically, the first connecting hole is offered in the second connecting rod, and is begun in third connecting rod Two connecting holes, balancing pole 3 pass through the first connecting hole and the second connecting hole to connect the second connecting rod and third connecting rod.It is logical Above-mentioned set-up mode is crossed, when triangle frame body 1 is unbalanced, clump weight 32 can be adjusted in 3 second end of balancing pole Weight is come so that triangle frame body 1 reaches balance, so that dorsal funciculus be avoided to wind when setting up, causes the damage of dorsal funciculus, It ensure that the reliability that suspension bridge is set up.
Preferably, clamping part 21 includes the first holding claw and the second holding claw;First holding claw and the second holding claw are that can open Close structure.Clamping part 21 directly can be clamped in hauling rope 4 in the case where not cutting off hauling rope 4 by retractable structure On, it so ensures that the integrality of hauling rope 4, avoids because cutting hauling rope 4 causes its applicability limited.
Preferably, clamping part 21 is provided with guide part 211,211 first end of guide part along the both ends of 4 axial direction of hauling rope It is fixedly connected with clamping part 21,211 second end of guide part is tip, and tip is arranged towards 4 axial direction of hauling rope.By setting Guide part 211 is set, and 211 second end of guide part is tip, clamping part 21 can be made more to move smoothly through guide wheel in this way Group 5.
Above embodiment is only preferred embodiments of the present invention, cannot be protected with this to limit the utility model Range, the variation of any unsubstantiality that those skilled in the art is done on the basis of the utility model and replacement belong to In the utility model range claimed.

Claims (6)

1. anchor head traction device after a kind of suspension bridge dorsal funciculus characterized by comprising triangle frame body and rope-grippers;Described three Corner bracket body includes the first connector, the second connector and third connector;First connector is along parallel with hauling rope Direction setting, and the both ends of first connector are provided with the rope-grippers, the rope-grippers include fixed part and with institute The clamping part stating fixed part connection and extending along the circumferential direction of hauling rope;The fixed part is connect with first connector, The clamping part is connected on hauling rope to clamp hauling rope.
2. anchor head traction device after suspension bridge dorsal funciculus as described in claim 1, which is characterized in that anchor after the suspension bridge dorsal funciculus Head traction device further includes balancing pole, and the company of second connector Yu the third connector is arranged in described balancing pole one end Place is met, anchor head connecting plate after dorsal funciculus is provided in the middle part of the balancing pole, the second end of the balancing pole is provided with clump weight.
3. anchor head traction device after suspension bridge dorsal funciculus as described in claim 1, which is characterized in that the clamping part includes first Holding claw and the second holding claw;First holding claw and the second holding claw are retractable structure.
4. anchor head traction device after suspension bridge dorsal funciculus as described in claim 1, which is characterized in that the clamping part is along hauling rope The both ends of axial direction are provided with guide part, and the guide part first end is fixedly connected with the clamping part, the guide part Two ends are tip, and tip is arranged towards hauling rope axial direction.
5. anchor head traction device after suspension bridge dorsal funciculus as described in claim 1, which is characterized in that first connector is slot Steel, and the both ends of first connector offer through-hole, and sleeve is connected in the through-hole, the fixed part of the rope-grippers is solid In the sleeve, the clamping part is stretched out from the sleeve for fixed cooperation.
6. anchor head traction device after suspension bridge dorsal funciculus as claimed in claim 2, which is characterized in that opened in second connecting rod Equipped with the first connecting hole, begin with the second connecting hole in the third connecting rod, the balancing pole pass through the first connecting hole and Second connecting hole is to connect second connecting rod and third connecting rod.
CN201821562943.3U 2018-09-21 2018-09-21 Anchor head traction device after a kind of suspension bridge dorsal funciculus Active CN209128888U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821562943.3U CN209128888U (en) 2018-09-21 2018-09-21 Anchor head traction device after a kind of suspension bridge dorsal funciculus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821562943.3U CN209128888U (en) 2018-09-21 2018-09-21 Anchor head traction device after a kind of suspension bridge dorsal funciculus

Publications (1)

Publication Number Publication Date
CN209128888U true CN209128888U (en) 2019-07-19

Family

ID=67228935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821562943.3U Active CN209128888U (en) 2018-09-21 2018-09-21 Anchor head traction device after a kind of suspension bridge dorsal funciculus

Country Status (1)

Country Link
CN (1) CN209128888U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109112968A (en) * 2018-09-21 2019-01-01 广东省长大公路工程有限公司 Anchor head traction device after a kind of suspension bridge dorsal funciculus
CN112127284A (en) * 2020-09-27 2020-12-25 重庆市交通工程监理咨询有限责任公司 Cable strand traction device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109112968A (en) * 2018-09-21 2019-01-01 广东省长大公路工程有限公司 Anchor head traction device after a kind of suspension bridge dorsal funciculus
CN112127284A (en) * 2020-09-27 2020-12-25 重庆市交通工程监理咨询有限责任公司 Cable strand traction device
CN112127284B (en) * 2020-09-27 2022-04-01 重庆市交通工程监理咨询有限责任公司 Cable strand traction device

Similar Documents

Publication Publication Date Title
CN106758767B (en) A kind of suspension bridge segmented cat road and its construction method
CN103088750A (en) Especial-big span suspension bridge of uniparted hyperboloid space rope net main cable and construction method thereof
CN104805770B (en) A kind of it is applicable to the mountain area occasional passage erection method across valley
CN106013812B (en) A kind of two-way monolayer cable net structure without support high-altitude overhead cable construction method
CN209128888U (en) Anchor head traction device after a kind of suspension bridge dorsal funciculus
CN109610922B (en) Typical topography iron tower assemblage construction equipment
CN106099757A (en) A kind of transmission line insulator crosses over crane span structure and construction technology thereof
WO2022042614A1 (en) Wind-resistant suspension bridge
CN208917704U (en) Curve lightweight I-beam beam bridge hauling construction cantilever end control device
CN205421022U (en) Suspension bridge stiffening beam handing equipment that slides
CN206287856U (en) A kind of new OCS Messenger Wire suspended structure
CN112176870B (en) Method for installing main cable of suspension bridge with tunnel type anchorage at two banks
CN212670303U (en) Stay cable beam end mounting structure
CN205347899U (en) Monorail train pillar construction
CN208995921U (en) Anchor head suspension arrangement after a kind of strand
CN109853393A (en) A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge
CN111924720A (en) Wind cable anchoring system of cable crane tower and construction method
CN109112968A (en) Anchor head traction device after a kind of suspension bridge dorsal funciculus
CN106968178B (en) Construction method for main beam of cable-stayed suspension bridge
CN216235734U (en) Vertical transportation hoisting structure for curtain wall unit plate
CN205591115U (en) Suspension type catwalk veil installing the system
CN109083395A (en) A kind of Excitations for Long Span Suspension operating platform and its erection method
CN212318045U (en) Tunnel anchor narrow space prestress steel beam gliding installation device
CN209833419U (en) Carrier cable suspension pulley and carrier cable suspension pulley windproof suspension structure
CN207597851U (en) Wall-attached supporting seat drawknot device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant