CN209128888U - Anchor head traction device after a kind of suspension bridge dorsal funciculus - Google Patents
Anchor head traction device after a kind of suspension bridge dorsal funciculus Download PDFInfo
- Publication number
- CN209128888U CN209128888U CN201821562943.3U CN201821562943U CN209128888U CN 209128888 U CN209128888 U CN 209128888U CN 201821562943 U CN201821562943 U CN 201821562943U CN 209128888 U CN209128888 U CN 209128888U
- Authority
- CN
- China
- Prior art keywords
- connector
- dorsal funciculus
- anchor head
- rope
- suspension bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses anchor head traction devices after a kind of suspension bridge dorsal funciculus, include at least triangle frame body and rope-grippers;Triangle frame body includes the first connector, the second connector and third connector;First connector is arranged along the direction parallel with hauling rope, and the both ends of the first connector are provided with rope-grippers, the clamping part that rope-grippers includes fixed part and connect with fixed part and extend along the circumferential direction of hauling rope;Fixed part is connect with the first connector, and clamping part is connected on hauling rope to clamp hauling rope.Anchor head traction device after the suspension bridge dorsal funciculus of the utility model can make anchor head after dorsal funciculus smoothly pass over the guide wheel group of each door frame, and be avoided that the uncontrolled ski-running pendant fast on cat road idler pulley of dorsal funciculus.
Description
Technical field
The utility model relates to anchor head traction dresses after suspension bridge construction technical field more particularly to a kind of suspension bridge dorsal funciculus
It sets.
Background technique
Suspension bridge also known as suspension bridge, refer to main push-towing rope two sides (or bridge both ends) are hung and be anchored in by Sarasota as
The bridge of the main supporting member of superstructure.Its cable geometry is determined by the equilibrium condition of power, normally close to parabola.From
Cable hangs down many sunpenders, and bridge floor is hung, and sets up between bridge floor and sunpender and sets stiff girder, forms combined system with cable,
To reduce deflection deformation caused by load.
The sequence of construction of suspension bridge totality can be divided into following steps: installation saddle, dragline cross river, installation hauling rope, installation
Cat road rope, installation main push-towing rope trailer system, sets up main push-towing rope, installation lock and hoist cable, sets up stiff girder installation cat road.It is setting up at present
When main push-towing rope, main cable erection is generally carried out using PPWS method, i.e., erection construction is drawn using Prefabricated parallel stranded metallic cable.It is general next
Say, every main push-towing rope by it is tens of it is up to a hundred formed with strand, main cable erection, be by strand one by one erection complete.
For there was only the suspension bridge of single span, main cable strand is all made of elongated strand, i.e. the rear anchor head of strand is fixed on
On the anchorage of side, preceding anchor head is drawn and is fixed on by traction mechanism on the anchorage of second side.For multispan suspension bridge, such as twin spans
For suspension bridge or three across suspension bridge, dorsal funciculus can be also arranged other than using elongated strand to carry out to end bay main push-towing rope in main push-towing rope
Reinforce, i.e. the equal length of dorsal funciculus length and end bay main push-towing rope, and be in general divided into two kinds of situations when carrying out dorsal funciculus erection,
The first is that the rear anchor head of dorsal funciculus is fixed on the anchorage of the first side, the preceding anchor head of dorsal funciculus drawn by traction mechanism and be fixed on from
On the nearest saddle of first side anchor heavy stone used as an anchor;It is for second that the preceding anchor head of dorsal funciculus needs to be fixed in the anchoring of second side, rear anchor head needs
It is fixed on the saddle nearest from second side anchorage.In the dorsal funciculus erection process of second situation, the preceding anchor head meeting of dorsal funciculus
First being drawn, current anchor head crosses the saddle nearest from the first side anchor heavy stone used as an anchor, and the rear anchor head of dorsal funciculus will leave the anchorage of the first side,
And anchor head moves together before following, until preceding anchor head moves to the anchorage of second side, rear anchor head is moved to from second side anchorage most
Close saddle, traction mechanism just stop the traction to preceding anchor head.In this process, the rear anchor head of dorsal funciculus will at least cross one
Sarasota and at least through an anchorage door frame, cat road door frame and tower top portal, and current rear anchor head suspension arrangement, are passing through
It will receive obstruction when crossing the guide wheel group of each door frame, dorsal funciculus caused to set up inefficiency.By three across suspension bridge for, in across portion
Point main push-towing rope be a vertex parabola directed downwardly, then dorsal funciculus in process across when, just have one section and be completely in lower ramp shaped
The distance of state, so due to its own gravity of dorsal funciculus, in the distance by this descending, dorsal funciculus is easy uncontrolled
The pendant of the fast ski-running on cat road idler pulley, influence suspension bridge building security.
Utility model content
For overcome the deficiencies in the prior art, the purpose of this utility model is to provide anchor heads after a kind of suspension bridge dorsal funciculus to lead
Leading-in device can make anchor head after dorsal funciculus smoothly pass over the guide wheel group of each door frame, and be avoided that dorsal funciculus it is uncontrolled
Fast ski-running pendant on cat road idler pulley.
The purpose of this utility model adopts the following technical scheme that realization:
Anchor head traction device after a kind of suspension bridge dorsal funciculus, comprising: triangle frame body and rope-grippers;The triangle frame body packet
Include the first connector, the second connector and third connector;First connector is set along the direction parallel with hauling rope
Set, and the both ends of first connector are provided with the rope-grippers, the rope-grippers include fixed part and with the fixation
Clamping part portion connection and extended along the circumferential direction of hauling rope;The fixed part is connect with first connector, the folder
The portion of holding is connected on hauling rope to clamp hauling rope.
Further, anchor head traction device further includes balancing pole after the suspension bridge dorsal funciculus, balancing pole one end setting
In the junction of second connector and the third connector, anchor head is connected after dorsal funciculus is provided in the middle part of the balancing pole
The second end of plate, the balancing pole is provided with clump weight.
Further, the clamping part includes the first holding claw and the second holding claw;First holding claw and second armful
Pawl is retractable structure.
Further, the clamping part is provided with guide part, the guide part first along the both ends of hauling rope axial direction
End is fixedly connected with the clamping part, and the guide part second end is tip, and tip is arranged towards hauling rope axial direction.
Further, first connector is channel steel, and the both ends of first connector offer through-hole, described logical
Sleeve is connected in hole, the fixed part secure fit of the rope-grippers is in the sleeve, and the clamping part is from the sleeve
It stretches out.
Further, the first connecting hole is offered in second connecting rod, begins with second in the third connecting rod
Connecting hole, the balancing pole passes through the first connecting hole and the second connecting hole is connect with connecting second connecting rod with third
Bar.
Compared with prior art, the utility model has the beneficial effects that: by anchor head connecting plate after setting dorsal funciculus, dorsal funciculus
Anchor head can be connect with anchor head connecting plate after dorsal funciculus afterwards, so not only the preceding anchor head of dorsal funciculus and the hauling rope of traction mechanism
Connection, and the rear anchor head of dorsal funciculus is also connect with the hauling rope of traction mechanism, then dorsal funciculus in process across when, even if dorsal funciculus is complete
The full state for being in descending, dorsal funciculus can also be drawn well by hauling rope, and it is uncontrolled in cat road idler pulley to avoid dorsal funciculus
Upper fast ski-running pendant, ensure that the building security of suspension bridge, also, such mode compared with the prior art in directly use tower top
Door frame hoist engine is easily more to dorsal funciculus progress reverse drawing, also more cost-effective.And the first connector, the second connector and
Third connector connects into triangle frame body, is because triangle frame body itself just has good stability, this is also ensured that
Reliability when being drawn to anchor head after dorsal funciculus.It is connect with fixed part and in addition, stating rope-grippers and having along the circumferential direction of hauling rope
The clamping part of extension, clamping part are connected on hauling rope to clamp hauling rope, i.e., the utility model is particular by clamping part
Clamping action makes after anchor head traction device draws dorsal funciculus after suspension bridge dorsal funciculus anchor head as the hauling rope of traction mechanism is synchronous
Movement, and clamping part is extended to form along the circumferential direction of hauling rope, so clamping part is consistent with the shape of hauling rope,
So clamping part would not generate obstruction when with the guide wheel group of excessively each door frame of hauling rope, can be as hauling rope smoothly
Pass through.
Detailed description of the invention
Fig. 1 is the schematic diagram of hauling rope and guide wheel group cooperation;
Fig. 2 is the perspective view of anchor head traction device and hauling rope cooperation after the utility model suspension bridge dorsal funciculus;
Fig. 3 is the bottom view of Fig. 2.
In figure: 1, triangle frame body;11, the first connector;111, sleeve;12, the second connector;13, third connector;2,
Rope-grippers;21, clamping part;211, guide part;3, balancing pole;31, anchor head connecting plate after dorsal funciculus;32, clump weight;4, hauling rope;
5, guide wheel group.
Specific embodiment
In the following, being described further in conjunction with attached drawing and specific embodiment to the utility model, it should be noted that
Under the premise of not colliding, it can be formed in any combination between various embodiments described below or between each technical characteristic new
Embodiment.
As shown in Figure 1-3, anchor head traction device after suspension bridge dorsal funciculus provided by the embodiment of the utility model is shown, until
It less include triangle frame body 1 and rope-grippers 2.Triangle frame body 1 includes that the first connector 11, the second connector 12 and third connect
Fitting 13.First connector 11 is arranged along the direction parallel with hauling rope 4, and the both ends of the first connector 11 are provided with rope-grippers
2, rope-grippers 2 include fixed part and connect with fixed part and along the circumferential direction of hauling rope 4 extension clamping part 21;It is fixed
Portion is connect with the first connector 11, and clamping part 21 is connected on hauling rope 4 to clamp hauling rope 4.Wherein, the first connector 11 is
Channel steel, and the both ends of the first connector 11 offer through-hole, and sleeve 111 is connected in through-hole, the fixed part fixation of rope-grippers 2 is matched
It closes in sleeve 111, clamping part 21 is stretched out from sleeve 111.Particular by sleeve 111 to rope-grippers i.e. in the utility model
2 fix.
By anchor head connecting plate 31 after setting dorsal funciculus, the rear anchor head of dorsal funciculus can connect with anchor head connecting plate 31 after dorsal funciculus
Connect, so not only the hauling rope 4 of the preceding anchor head of dorsal funciculus and traction mechanism connect, but also the rear anchor head of dorsal funciculus also with dragger
The hauling rope 4 of structure connects, then dorsal funciculus in process across when, even if dorsal funciculus is completely in the state of descending, dorsal funciculus can also be led
Straw line 4 is drawn well, is avoided the uncontrolled ski-running pendant fast on cat road idler pulley of dorsal funciculus, be ensure that the construction of suspension bridge
Safety, also, such mode compared with the prior art in directly using tower top portal hoist engine to dorsal funciculus carry out reverse drawing will side
Just more, it is also more cost-effective.And the first connector 11, the second connector 12 and third connector 13 connect into tripod
Body 1 is because triangle frame body 1 itself just has good stability, this is also ensured that when anchor head after to dorsal funciculus is drawn
Reliability.It is connect with fixed part and in addition, stating rope-grippers 2 and having along the clamping part 21 that the circumferential direction of hauling rope 4 extends, clamping
Portion 21 is connected on hauling rope 4 to clamp hauling rope 4, i.e. the utility model makes particular by the clamping action of clamping part 21
Anchor head traction device draws what anchor head after dorsal funciculus was moved synchronously with the hauling rope 4 of traction mechanism after suspension bridge dorsal funciculus, and
Clamping part 21 is extended to form along the circumferential direction of hauling rope 4, so clamping part 21 is consistent with the shape of hauling rope 4, then
Clamping part 21 would not generate obstruction when with the guide wheel group 5 of the excessively each door frame of hauling rope 4, can be as hauling rope 4 smoothly
Pass through.As shown in figure 3, the schematic diagram cooperated for hauling rope 4 and guide wheel group 5.
Preferably, anchor head traction device further includes balancing pole 3 after suspension bridge dorsal funciculus, and the setting of 3 one end of balancing pole connects second
The junction of fitting 12 and third connector 13, the middle part of balancing pole 3 are provided with anchor head connecting plate 31 after dorsal funciculus, balancing pole 3
Second end is provided with clump weight 32.Specifically, the first connecting hole is offered in the second connecting rod, and is begun in third connecting rod
Two connecting holes, balancing pole 3 pass through the first connecting hole and the second connecting hole to connect the second connecting rod and third connecting rod.It is logical
Above-mentioned set-up mode is crossed, when triangle frame body 1 is unbalanced, clump weight 32 can be adjusted in 3 second end of balancing pole
Weight is come so that triangle frame body 1 reaches balance, so that dorsal funciculus be avoided to wind when setting up, causes the damage of dorsal funciculus,
It ensure that the reliability that suspension bridge is set up.
Preferably, clamping part 21 includes the first holding claw and the second holding claw;First holding claw and the second holding claw are that can open
Close structure.Clamping part 21 directly can be clamped in hauling rope 4 in the case where not cutting off hauling rope 4 by retractable structure
On, it so ensures that the integrality of hauling rope 4, avoids because cutting hauling rope 4 causes its applicability limited.
Preferably, clamping part 21 is provided with guide part 211,211 first end of guide part along the both ends of 4 axial direction of hauling rope
It is fixedly connected with clamping part 21,211 second end of guide part is tip, and tip is arranged towards 4 axial direction of hauling rope.By setting
Guide part 211 is set, and 211 second end of guide part is tip, clamping part 21 can be made more to move smoothly through guide wheel in this way
Group 5.
Above embodiment is only preferred embodiments of the present invention, cannot be protected with this to limit the utility model
Range, the variation of any unsubstantiality that those skilled in the art is done on the basis of the utility model and replacement belong to
In the utility model range claimed.
Claims (6)
1. anchor head traction device after a kind of suspension bridge dorsal funciculus characterized by comprising triangle frame body and rope-grippers;Described three
Corner bracket body includes the first connector, the second connector and third connector;First connector is along parallel with hauling rope
Direction setting, and the both ends of first connector are provided with the rope-grippers, the rope-grippers include fixed part and with institute
The clamping part stating fixed part connection and extending along the circumferential direction of hauling rope;The fixed part is connect with first connector,
The clamping part is connected on hauling rope to clamp hauling rope.
2. anchor head traction device after suspension bridge dorsal funciculus as described in claim 1, which is characterized in that anchor after the suspension bridge dorsal funciculus
Head traction device further includes balancing pole, and the company of second connector Yu the third connector is arranged in described balancing pole one end
Place is met, anchor head connecting plate after dorsal funciculus is provided in the middle part of the balancing pole, the second end of the balancing pole is provided with clump weight.
3. anchor head traction device after suspension bridge dorsal funciculus as described in claim 1, which is characterized in that the clamping part includes first
Holding claw and the second holding claw;First holding claw and the second holding claw are retractable structure.
4. anchor head traction device after suspension bridge dorsal funciculus as described in claim 1, which is characterized in that the clamping part is along hauling rope
The both ends of axial direction are provided with guide part, and the guide part first end is fixedly connected with the clamping part, the guide part
Two ends are tip, and tip is arranged towards hauling rope axial direction.
5. anchor head traction device after suspension bridge dorsal funciculus as described in claim 1, which is characterized in that first connector is slot
Steel, and the both ends of first connector offer through-hole, and sleeve is connected in the through-hole, the fixed part of the rope-grippers is solid
In the sleeve, the clamping part is stretched out from the sleeve for fixed cooperation.
6. anchor head traction device after suspension bridge dorsal funciculus as claimed in claim 2, which is characterized in that opened in second connecting rod
Equipped with the first connecting hole, begin with the second connecting hole in the third connecting rod, the balancing pole pass through the first connecting hole and
Second connecting hole is to connect second connecting rod and third connecting rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821562943.3U CN209128888U (en) | 2018-09-21 | 2018-09-21 | Anchor head traction device after a kind of suspension bridge dorsal funciculus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821562943.3U CN209128888U (en) | 2018-09-21 | 2018-09-21 | Anchor head traction device after a kind of suspension bridge dorsal funciculus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209128888U true CN209128888U (en) | 2019-07-19 |
Family
ID=67228935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821562943.3U Active CN209128888U (en) | 2018-09-21 | 2018-09-21 | Anchor head traction device after a kind of suspension bridge dorsal funciculus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209128888U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109112968A (en) * | 2018-09-21 | 2019-01-01 | 广东省长大公路工程有限公司 | Anchor head traction device after a kind of suspension bridge dorsal funciculus |
CN112127284A (en) * | 2020-09-27 | 2020-12-25 | 重庆市交通工程监理咨询有限责任公司 | Cable strand traction device |
-
2018
- 2018-09-21 CN CN201821562943.3U patent/CN209128888U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109112968A (en) * | 2018-09-21 | 2019-01-01 | 广东省长大公路工程有限公司 | Anchor head traction device after a kind of suspension bridge dorsal funciculus |
CN112127284A (en) * | 2020-09-27 | 2020-12-25 | 重庆市交通工程监理咨询有限责任公司 | Cable strand traction device |
CN112127284B (en) * | 2020-09-27 | 2022-04-01 | 重庆市交通工程监理咨询有限责任公司 | Cable strand traction device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106758767B (en) | A kind of suspension bridge segmented cat road and its construction method | |
CN103088750A (en) | Especial-big span suspension bridge of uniparted hyperboloid space rope net main cable and construction method thereof | |
CN104805770B (en) | A kind of it is applicable to the mountain area occasional passage erection method across valley | |
CN106013812B (en) | A kind of two-way monolayer cable net structure without support high-altitude overhead cable construction method | |
CN209128888U (en) | Anchor head traction device after a kind of suspension bridge dorsal funciculus | |
CN109610922B (en) | Typical topography iron tower assemblage construction equipment | |
CN106099757A (en) | A kind of transmission line insulator crosses over crane span structure and construction technology thereof | |
WO2022042614A1 (en) | Wind-resistant suspension bridge | |
CN208917704U (en) | Curve lightweight I-beam beam bridge hauling construction cantilever end control device | |
CN205421022U (en) | Suspension bridge stiffening beam handing equipment that slides | |
CN206287856U (en) | A kind of new OCS Messenger Wire suspended structure | |
CN112176870B (en) | Method for installing main cable of suspension bridge with tunnel type anchorage at two banks | |
CN212670303U (en) | Stay cable beam end mounting structure | |
CN205347899U (en) | Monorail train pillar construction | |
CN208995921U (en) | Anchor head suspension arrangement after a kind of strand | |
CN109853393A (en) | A kind of the hanging cable construction system and its construction method of king-tower vertical transfer cable-stayed bridge | |
CN111924720A (en) | Wind cable anchoring system of cable crane tower and construction method | |
CN109112968A (en) | Anchor head traction device after a kind of suspension bridge dorsal funciculus | |
CN106968178B (en) | Construction method for main beam of cable-stayed suspension bridge | |
CN216235734U (en) | Vertical transportation hoisting structure for curtain wall unit plate | |
CN205591115U (en) | Suspension type catwalk veil installing the system | |
CN109083395A (en) | A kind of Excitations for Long Span Suspension operating platform and its erection method | |
CN212318045U (en) | Tunnel anchor narrow space prestress steel beam gliding installation device | |
CN209833419U (en) | Carrier cable suspension pulley and carrier cable suspension pulley windproof suspension structure | |
CN207597851U (en) | Wall-attached supporting seat drawknot device |