CN207339088U CN201721485810.6U CN201721485810U CN207339088U CN 207339088 U CN207339088 U CN 207339088U CN 201721485810 U CN201721485810 U CN 201721485810U CN 207339088 U CN207339088 U CN 207339088U
Authority
CN
China
Prior art keywords
wire
ring
frame
overhead ground
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721485810.6U
Other languages
Chinese (zh)
Inventor
杜海
罗翰林
吴东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suining Power Supply Co of State Grid Sichuan Electric Power Co Ltd
Original Assignee
Suining Power Supply Co of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suining Power Supply Co of State Grid Sichuan Electric Power Co Ltd filed Critical Suining Power Supply Co of State Grid Sichuan Electric Power Co Ltd
Priority to CN201721485810.6U priority Critical patent/CN207339088U/en
Application granted granted Critical
Publication of CN207339088U publication Critical patent/CN207339088U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型公开了一种输电线路直线杆架空地线检修支架,包括吊架,所述吊架侧壁安装有用于与电杆连接的抱箍,吊架顶部安装有滑轮组、过线环和锚线环,过线环和锚线环设置在滑轮组的滑轮之间,滑轮组位于抱箍上方,在吊架侧壁安装有挂线环。该支架可任意调整架空地线悬挂高度,并可躲开操作位置,省时省力,提高工作效率2倍以上;同时能防止吊线钢丝绳脱落的安全风险。

The utility model discloses a maintenance bracket for overhead ground wires of straight rods of transmission lines, which includes a hanger, the side wall of the hanger is installed with a hoop for connecting with the pole, and the top of the hanger is equipped with a pulley block, a wire passing ring and an anchor. The wire ring, the wire passing ring and the anchor wire ring are arranged between the pulleys of the pulley block, the pulley block is located above the hoop, and the hanging wire ring is installed on the side wall of the hanger. The bracket can adjust the suspension height of the overhead ground wire arbitrarily, and can avoid the operating position, saving time and effort, and improving the work efficiency by more than 2 times; at the same time, it can prevent the safety risk of the suspension wire rope falling off.

Description

输电线路直线杆架空地线检修支架Transmission line straight pole overhead ground wire maintenance support

技术领域technical field

本实用新型涉及一种电力检修工具,具体涉及一种输电线路直线杆架空地线检修支架。The utility model relates to an electric power maintenance tool, in particular to a transmission line linear rod overhead ground wire maintenance bracket.

背景技术Background technique

目前,输电线路直线杆架空地线检修中,更换架空地线悬垂线夹,以及在更换架空地线时,主要用钢丝绳和紧线器将直线朝天滑轮固定在电杆顶部,由于地线距电杆顶部30厘米,距眼圈螺栓(挂线点15厘米),可调可操作空间有限,检修操作和挂线作业,费时费力,一般两人两个小时才能挂上线。同时由于电杆顶部没有挂点,紧线器钢丝绳背在电杆顶部紧线容易脱落,危及操作人员。At present, in the maintenance of the overhead ground wire of the straight pole of the transmission line, the suspension clamp of the overhead ground wire is replaced, and when the overhead ground wire is replaced, the straight-line upward pulley is mainly fixed on the top of the pole with a wire rope and a wire tensioner. The top of the rod is 30 cm away from the eye socket bolt (the hanging point is 15 cm), and the adjustable and operable space is limited. The maintenance operation and the hanging operation are time-consuming and laborious. Generally, it takes two hours for two people to hang the line. Simultaneously because there is no hanging point at the top of the electric pole, the wire rope of the wire tensioner is easy to fall off when the wire rope of the wire tensioner is on the top of the electric pole, which endangers the operator.

实用新型内容Utility model content

本实用新型所要解决的技术问题是现有用钢丝绳和紧线器更换架空地线悬垂线夹以及在更换架空地线时容易脱落,存在安全风险,同时悬挂位置紧靠电杆和眼圈螺栓,影响检修操作和挂线作业,其目的在于提供一种输电线路直线杆架空地线检修支架,该支架可任意调整架空地线悬挂高度,并可躲开操作位置,省时省力,提高工作效率2倍以上;同时能防止吊线钢丝绳脱落的安全风险。The technical problem to be solved by the utility model is that the existing wire rope and wire tensioner are used to replace the suspension clamp of the overhead ground wire and it is easy to fall off when replacing the overhead ground wire, which has safety risks. At the same time, the hanging position is close to the pole and the eye socket bolt, which affects maintenance Operation and wire-hanging operation, the purpose is to provide a maintenance support for overhead ground wires on transmission lines, which can adjust the suspension height of overhead ground wires arbitrarily, and can avoid the operating position, saving time and effort, and improving work efficiency by more than 2 times ; At the same time, it can prevent the safety risk of the suspension wire rope falling off.

本实用新型通过下述技术方案实现:The utility model is realized through the following technical solutions:

输电线路直线杆架空地线检修支架,包括吊架,所述吊架侧壁安装有用于与电杆连接的抱箍,吊架顶部安装有滑轮组、过线环和锚线环,过线环和锚线环设置在滑轮组的滑轮之间,滑轮组位于抱箍上方,在吊架侧壁安装有挂线环。针对目前输电线路的架空地线检修时由于可调可操作空间有限,检修操作和挂线作业,费时费力,一般两人两个小时才能挂上线。同时由于电杆顶部没有挂点,紧线器钢丝绳背在电杆顶部紧线容易脱落,危及操作人员的问题,本方案设计的支架,与电杆固定后,通过吊架将悬挂位置加长加高,同时可调整悬挂左右位置,躲开眼圈螺栓和悬挂点,并利用滑轮组与其对应的防滑装置限止起吊钢丝绳的位置,防止钢丝绳滑脱,利用牵引器带动钢丝绳,经过滑轮组和主吊钩,调整朝天钩滑轮,从而任意调整架空地线悬挂位置。通过吊架实现将钢丝绳绕开操作位置,省时省力,提高工作效率2倍以上,检修时能任意调整悬挂高度和防止地线滑脱,保护了设备和人员的安全。The overhead ground wire inspection support for straight poles of transmission lines includes a hanger. The side wall of the hanger is equipped with a hoop for connecting with the pole. The top of the hanger is equipped with a pulley block, a wire loop and an anchor wire ring. The wire loop and The anchor line ring is arranged between the pulleys of the block of pulleys, the block of pulleys is located above the hoop, and the line hanging ring is installed on the side wall of the hanger. Due to the limited adjustable and operable space during the maintenance of the overhead ground wire of the current transmission line, the maintenance operation and the line hanging operation are time-consuming and laborious. Generally, two people can hang up the line in two hours. At the same time, because there is no hanging point on the top of the pole, the steel wire rope of the wire tensioner is easy to fall off on the top of the pole, which endangers the operator. After the bracket designed in this scheme is fixed to the pole, the hanging position is lengthened and heightened by the hanger At the same time, the left and right positions of the suspension can be adjusted to avoid eye bolts and suspension points, and the pulley block and its corresponding anti-skid device can be used to limit the position of the lifting wire rope to prevent the wire rope from slipping. The pulley can adjust the suspension position of the overhead ground wire arbitrarily. Through the hanger, the steel wire rope can be bypassed from the operating position, saving time and effort, and improving the work efficiency by more than 2 times. During maintenance, the suspension height can be adjusted arbitrarily and the ground wire can be prevented from slipping, which protects the safety of equipment and personnel.

进一步地,吊架包括水平架和竖向架,且水平架与竖向架的侧壁垂直固定,过线环和锚线环安装在水平架的顶面上,抱箍和挂线环安装在竖向架相互对称的侧壁上,且抱箍和挂线环位于水平架下方。通过这种结构设计,能够实现与电杆侧壁的固定,并且沿着电杆顶部绕开到电杆的另一侧,使得钢丝绳调节位置和架空地线的安装位置不会干涉,方便进行调节和检修。Further, the hanger includes a horizontal frame and a vertical frame, and the horizontal frame is vertically fixed to the side wall of the vertical frame, the wire passing ring and the anchor wire ring are installed on the top surface of the horizontal frame, and the hoop and the hanging wire ring are installed on the top surface of the horizontal frame. The side walls of the vertical frame are symmetrical to each other, and the hoop and the wire hanging ring are located below the horizontal frame. Through this structural design, it can be fixed to the side wall of the pole and bypassed along the top of the pole to the other side of the pole, so that the adjustment position of the steel wire rope and the installation position of the overhead ground wire will not interfere, which is convenient for adjustment and overhaul.

而滑轮组包括转动滑轮一和转动滑轮二,转动滑轮一安装在竖向架上,转动滑轮二安装在水平架上,转动滑轮一位于水平架上方,过线环和锚线环设置在转动滑轮一和转动滑轮二之间,过线环设置在锚线环和转动滑轮二之间,水平架远离竖向架的一端设置有安装架,转动滑轮二设置在安装架中,在安装架中设置有防滑螺栓,且转动滑轮二设置在防滑螺栓和水平架之间。通过两个转动滑轮实现了对钢丝绳的调节,从而对架空地线的高度进行了调节,而且调节方便,提高了检修效率,同时防滑螺栓也避免出现打滑现象,保证了检修的安全性。And the pulley block comprises rotating pulley one and rotating pulley two, rotating pulley one is installed on the vertical frame, rotating pulley two is installed on the horizontal frame, rotating pulley one is positioned at the top of the horizontal frame, and wire loop and anchor wire ring are arranged on rotating pulley one Between the second rotating pulley and the second rotating pulley, the wire passing ring is arranged between the anchor wire ring and the second rotating pulley, the end of the horizontal frame away from the vertical frame is provided with a mounting frame, the second rotating pulley is arranged in the mounting frame, and the mounting frame is provided with Anti-slip bolts, and the second rotating pulley is arranged between the anti-slip bolts and the horizontal frame. The adjustment of the steel wire rope is realized through two rotating pulleys, thereby adjusting the height of the overhead ground wire, and the adjustment is convenient, which improves the maintenance efficiency.

为了实现稳定地安装在电杆上,抱箍的数量优选为两个,且抱箍为U型,这样与电杆外壁接触面积更大,两个抱箍设置在同一铅垂线上,两个抱箍均设置在水平架和竖向架形成的内侧区域中,挂线环设置在两个抱箍之间,这样在使用时支架能够保持稳定,不会晃动。U型抱箍和M垫铁为可拆件,可根据电杆直径更换。In order to achieve stable installation on the pole, the number of hoops is preferably two, and the hoops are U-shaped, so that the contact area with the outer wall of the pole is larger. The two hoops are set on the same vertical line, and the two hoops The hoops are all arranged in the inner area formed by the horizontal frame and the vertical frame, and the wire hanging ring is arranged between the two hoops, so that the support can be kept stable and will not shake when in use. The U-shaped hoop and M shim are detachable parts and can be replaced according to the diameter of the pole.

本实用新型与现有技术相比,具有如下的优点和有益效果:该支架可任意调整架空地线悬挂高度,并可躲开操作位置,省时省力,提高工作效率2倍以上;同时能防止吊线钢丝绳脱落的安全风险。Compared with the prior art, the utility model has the following advantages and beneficial effects: the bracket can adjust the suspension height of the overhead ground wire arbitrarily, and can avoid the operating position, saves time and effort, and improves the work efficiency by more than 2 times; at the same time, it can prevent The safety risk of wire rope falling off.

附图说明Description of drawings

此处所说明的附图用来提供对本实用新型实施例的进一步理解,构成本申请的一部分,并不构成对本实用新型实施例的限定。在附图中:The drawings described here are used to provide a further understanding of the embodiments of the utility model, constitute a part of the application, and do not constitute a limitation to the embodiments of the utility model. In the attached picture:

图1为本实用新型结构示意图。Fig. 1 is the structural representation of the utility model.

附图中标记及对应的零部件名称:Marks and corresponding parts names in the attached drawings:

1-吊架,2-挂线环,3-转动滑轮一,4-转动滑轮二,5-防滑螺栓,6-过线环,7-锚线环,8-垫铁,9-抱箍,10-牵引器,11-钢丝绳,12-主吊钩,13-锚钩,14-朝天钩滑轮,15-架空地线,16-电杆。1-hanger, 2-hanging wire ring, 3-rotating pulley 1, 4-rotating pulley 2, 5-anti-skid bolt, 6-passing wire ring, 7-anchor wire ring, 8-horn, 9-holding hoop, 10-tractor, 11-steel wire rope, 12-main hook, 13-anchor hook, 14-upward hook pulley, 15-overhead ground wire, 16-electric pole.

具体实施方式Detailed ways

为使本实用新型的目的、技术方案和优点更加清楚明白,下面结合实施例和附图,对本实用新型作进一步的详细说明,本实用新型的示意性实施方式及其说明仅用于解释本实用新型,并不作为对本实用新型的限定。In order to make the purpose, technical solutions and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the examples and accompanying drawings. The schematic implementation of the utility model and its description are only used to explain the utility model Novelty, not as a limitation to the utility model.

实施例:Example:

如图1所示,输电线路直线杆架空地线检修支架,将吊架1设计为类似“7”字型,结构强度大,吊装能力不小于2吨,吊架1细化后包括水平架和竖向架,且水平架与竖向架的侧壁垂直固定,这样能够即与电杆壁面垂直,又能够覆盖电杆顶部并沿着电杆16伸到另一侧,固定在竖向架的侧壁上安装有两个用于与电杆16固定的抱箍9,两个抱箍9均设置在水平架和竖向架形成的内侧区域中,抱箍9中还设置有呈M型的垫铁8来增大与电杆16的接触面积,一般电杆都是比较规则的圆柱体,所以两个抱箍9设置在同一铅垂线上,滑轮组的滑轮一般是两个,分别命名为转动滑轮一3和转动滑轮二4,转动滑轮一3安装在竖向架上,转动滑轮二4安装在水平架上,转动滑轮一3位于水平架上方,在水平架顶部安装过线环6和锚线环7,过线环6和锚线环7设置在转动滑轮一3和转动滑轮二4之间,过线环6设置在锚线环7和转动滑轮二4之间。竖向架的侧壁安装有挂线环2,抱箍9和挂线环2安装在竖向架相互对称的侧壁上,且抱箍9和挂线环2位于水平架下方,为了防止出现打滑,还在水平架远离竖向架的一端设置有安装架,转动滑轮二4设置在安装架中,在安装架中设置有防滑螺栓5,且转动滑轮二4设置在防滑螺栓5和水平架之间,通过安装架使得转动滑轮二4与水平架呈45°夹角,增加了结构强度。As shown in Figure 1, the maintenance support for the overhead ground wire of the transmission line straight rod, the hanger 1 is designed to be similar to the "7" shape, the structural strength is high, the lifting capacity is not less than 2 tons, and the hanger 1 is refined to include the horizontal frame and vertical frame, and the side wall of the horizontal frame and the vertical frame is vertically fixed, so that it can be perpendicular to the wall surface of the electric pole, and can cover the top of the electric pole and extend to the other side along the electric pole 16, and is fixed on the side wall of the vertical frame. Two hoops 9 for fixing the pole 16 are installed on the side wall, and the two hoops 9 are all arranged in the inner area formed by the horizontal frame and the vertical frame, and the hoop 9 is also provided with an M-shaped The pad iron 8 is used to increase the contact area with the pole 16. Generally, the poles are relatively regular cylinders, so the two hoops 9 are arranged on the same vertical line. The pulleys of the pulley block are generally two, named respectively Rotating pulley one 3 and rotating pulley two 4, rotating pulley one 3 are installed on the vertical frame, rotating pulley two 4 are installed on the horizontal frame, rotating pulley one 3 is positioned at the top of the horizontal frame, and wire ring 6 and Anchor line ring 7, crossing line ring 6 and anchor line ring 7 are arranged between rotating pulley one 3 and rotating pulley two 4, and passing line ring 6 is arranged between anchor line ring 7 and rotating pulley two 4. The side wall of the vertical frame is equipped with a wire hanging ring 2, and the hoop 9 and the wire hanging ring 2 are installed on the mutually symmetrical side walls of the vertical frame, and the hoop 9 and the wire hanging ring 2 are located below the horizontal frame. Skid, and the horizontal frame is also provided with a mounting frame at one end away from the vertical frame, the rotating pulley 2 4 is arranged in the mounting frame, the anti-skid bolt 5 is arranged in the mounting frame, and the rotating pulley 2 4 is arranged on the anti-skid bolt 5 and the horizontal frame Between, make rotating pulley 2 4 and horizontal frame be 45 ° of included angles by mounting frame, have increased structural strength.

其具体使用方法如下:Its specific use method is as follows:

第一步:固定支架。图1中的吊架1、挂线环2、转动滑轮一3、转动滑轮二4、防滑螺栓5、过线环6和锚线环7为本实用新型的主支架部分,挂线环2、过线环6和锚线环7为焊接件,转动滑轮一3和转动滑轮二4为防松螺栓固定滑轮。使用时,用两套垫铁8和U形的抱箍9将主支架部分固定在电杆16顶部。呈7字型的吊架1躲过架空地线的眼圈螺栓及悬挂点,同时7字型的吊架1中的水平杆紧靠电杆16顶部。The first step: fix the bracket. Hanger 1 among Fig. 1, hanging wire ring 2, rotating pulley one 3, rotating pulley two 4, anti-skid bolt 5, wire passing ring 6 and anchor wire ring 7 are the main support part of the present utility model, and hanging wire ring 2, Crossing wire ring 6 and anchor wire ring 7 are weldments, and rotating pulley one 3 and rotating pulley two 4 are locking bolts fixing the pulley. During use, the main bracket part is fixed on the pole 16 top with two sets of pad irons 8 and U-shaped hoop 9 . The 7-shaped hanger 1 avoids the eye socket bolt and the suspension point of the overhead ground wire, and the horizontal bar in the 7-shaped hanger 1 is close to the pole 16 top.

第二步:穿绳挂线。图中牵引器10、钢丝绳11、主吊钩12、锚钩13为主吊系统,为成品件;朝天钩滑轮14是更换架空地线15的过线轮,也是更换架空地线悬垂线夹时的挂线轮。使用时将牵引器10挂在挂线环2上。将钢丝绳11、主吊钩12、锚钩13依次穿过转动滑轮一3、转动滑轮二4,并保证防滑螺栓5锁牢。再将钢丝绳11穿过过线环6,将锚钩13挂在锚线环7上,将朝天钩滑轮14挂在主吊钩12上。将架空地线15挂在朝天钩滑轮14槽内,关好朝天钩滑轮,防止脱落。The second step: thread the rope and hang the line. In the figure, tractor 10, wire rope 11, main hook 12, and anchor hook 13 are the main hoisting system, which are finished parts; the sky hook pulley 14 is the wire passing wheel for replacing the overhead ground wire 15, and it is also used when replacing the overhead ground wire suspension clamp. hanging reel. The tractor 10 is hung on the wire ring 2 during use. Wire rope 11, main suspension hook 12, anchor hook 13 are passed through rotating pulley one 3, rotating pulley two 4 successively, and guarantee that anti-slip bolt 5 is locked. Wire rope 11 is passed through wire ring 6 again, anchor hook 13 is hung on the anchor wire ring 7, and skyward hook pulley 14 is hung on the main suspension hook 12. Hang the overhead ground wire 15 in the sky hook pulley 14 grooves, close the sky hook pulley to prevent coming off.

第三步:调整悬挂高度。收紧牵引器10,使主12吊钩(自带滑轮)随钢丝绳11收紧而提高,并带动朝天钩滑轮14上升,从而调整架空地线15悬挂高度。当达到合适位置便可以进行更换架空地线和其它检修作业。Step 3: Adjust the suspension height. Tighten the tractor 10, make the main 12 suspension hooks (with pulley) tighten up with the wire rope 11 and improve, and drive the skyward hook pulley 14 to rise, thereby adjusting the suspension height of the overhead ground wire 15. When the proper position is reached, the overhead ground wire can be replaced and other maintenance operations can be carried out.

第四步:松线拆除。当检修作业完成,松开牵引器10、钢丝绳11,将朝天钩滑轮14内架空地线载荷转由架空地线悬挂点的眼圈螺栓承担后,取下朝天钩滑轮14。再将牵引器和主吊支架等拆除,拆除操作顺序与前二步相反。Step 4: Remove the loose wire. When the overhaul operation is finished, unclamp tractor 10, steel wire rope 11, after the overhead ground wire load in the skyward hook pulley 14 is transferred to bear by the eye socket bolt of overhead ground wire suspension point, take off the skyward hook pulley 14. Then remove the tractor and the main hanger bracket, etc., and the removal operation sequence is opposite to the first two steps.

本实用新型克服了现有用钢丝绳和紧线器更换架空地线悬垂线夹以及在更换架空地线时容易脱落的安全风险,同时克服悬挂位置紧靠电杆和眼圈螺栓,影响检修操作和挂线作业的不足。其可任意调整架空地线悬挂高度,并可躲开操作位置,省时省力,提高工作效率2倍以上;同时能防止吊线钢丝绳脱落的安全风险。The utility model overcomes the safety risk of replacing the suspension clamp of the overhead ground wire with a steel wire rope and a wire tensioner and the safety risk that it is easy to fall off when replacing the overhead ground wire. Insufficient homework. It can adjust the suspension height of the overhead ground wire arbitrarily, and can avoid the operating position, saving time and effort, and improving the work efficiency by more than 2 times; at the same time, it can prevent the safety risk of the suspension wire rope falling off.

以上所述的具体实施方式,对本实用新型的目的、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本实用新型的具体实施方式而已,并不用于限定本实用新型的保护范围,凡在本实用新型的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The specific embodiments described above have further described the purpose, technical solutions and beneficial effects of the present utility model in detail. Within the protection scope of the utility model, any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the utility model shall be included in the protection scope of the utility model.

Claims (6)

1.输电线路直线杆架空地线检修支架,其特征在于,包括吊架(1),所述吊架(1)侧壁安装有用于与电杆(16)连接的抱箍(9),吊架(1)顶部安装有滑轮组、过线环(6)和锚线环(7),过线环(6)和锚线环(7)设置在滑轮组的滑轮之间,滑轮组位于抱箍(9)上方,在吊架(1)侧壁安装有挂线环(2)。1. The overhaul support for the straight rod overhead ground wire of the transmission line is characterized in that it includes a hanger (1), and the side wall of the hanger (1) is equipped with a hoop (9) for connecting with the pole (16). The top of the frame (1) is equipped with block pulleys, wire passing rings (6) and anchor wire rings (7). ) above, a hanging wire ring (2) is installed on the hanger (1) side wall. 2.根据权利要求1所述的输电线路直线杆架空地线检修支架,其特征在于,所述吊架(1)包括水平架和竖向架,且水平架与竖向架的侧壁垂直固定,过线环(6)和锚线环(7)安装在水平架的顶面上,抱箍(9)和挂线环(2)安装在竖向架相互对称的侧壁上,且抱箍(9)和挂线环(2)位于水平架下方。2. The overhaul support for transmission line straight rod overhead ground wire according to claim 1, characterized in that, the hanger (1) comprises a horizontal frame and a vertical frame, and the side walls of the horizontal frame and the vertical frame are vertically fixed , the wire passing ring (6) and the anchor wire ring (7) are installed on the top surface of the horizontal frame, the hoop (9) and the wire hanging ring (2) are installed on the symmetrical side walls of the vertical frame, and the hoop (9) and hanging wire ring (2) are positioned at the horizontal shelf below. 3.根据权利要求2所述的输电线路直线杆架空地线检修支架,其特征在于,所述滑轮组包括转动滑轮一(3)和转动滑轮二(4),转动滑轮一(3)安装在竖向架上,转动滑轮二(4)安装在水平架上,转动滑轮一(3)位于水平架上方,过线环(6)和锚线环(7)设置在转动滑轮一(3)和转动滑轮二(4)之间,过线环(6)设置在锚线环(7)和转动滑轮二(4)之间。3. The overhaul support for transmission line linear rod overhead ground wire according to claim 2, characterized in that, the pulley block includes a rotating pulley one (3) and a rotating pulley two (4), and the rotating pulley one (3) is installed on the vertical On the frame, rotating pulley two (4) is installed on the horizontal frame, rotating pulley one (3) is positioned at the top of the horizontal frame, and wire loop (6) and anchor wire ring (7) are arranged on rotating pulley one (3) and rotating pulley one (3). Between the two moving pulleys (4), the thread passing ring (6) is arranged between the anchor line ring (7) and the two rotating pulleys (4). 4.根据权利要求3所述的输电线路直线杆架空地线检修支架,其特征在于,所述水平架远离竖向架的一端设置有安装架,转动滑轮二(4)设置在安装架中,在安装架中设置有防滑螺栓(5),且转动滑轮二(4)设置在防滑螺栓(5)和水平架之间。4. The overhaul support for transmission line linear rod overhead ground wire according to claim 3, characterized in that, the horizontal frame is provided with a mounting frame away from the end of the vertical frame, and two rotating pulleys (4) are arranged in the mounting frame, Anti-slip bolts (5) are arranged in the installation frame, and two rotating pulleys (4) are arranged between the anti-slip bolts (5) and the horizontal frame. 5.根据权利要求2至4中任意一项所述的输电线路直线杆架空地线检修支架,其特征在于,所述抱箍(9)的数量为两个,且两个抱箍(9)设置在同一铅垂线上,两个抱箍(9)均设置在水平架和竖向架形成的内侧区域中。5. The overhaul support for transmission line straight pole overhead ground wire according to any one of claims 2 to 4, characterized in that, the number of the hoops (9) is two, and the two hoops (9) Set on the same vertical line, the two hoops (9) are all set in the inner area formed by the horizontal frame and the vertical frame. 6.根据权利要求5所述的输电线路直线杆架空地线检修支架,其特征在于,所述挂线环(2)设置在两个抱箍(9)之间。6. The overhaul support for overhead ground wires of transmission line straight poles according to claim 5, characterized in that the wire hanging ring (2) is arranged between two hoops (9).
CN201721485810.6U 2017-11-09 2017-11-09 Transmission line of electricity straight line pole aerial earth wire overhauls stent Active CN207339088U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721485810.6U CN207339088U (en) 2017-11-09 2017-11-09 Transmission line of electricity straight line pole aerial earth wire overhauls stent

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721485810.6U CN207339088U (en) 2017-11-09 2017-11-09 Transmission line of electricity straight line pole aerial earth wire overhauls stent

Publications (1)

Publication Number Publication Date
CN207339088U true CN207339088U (en) 2018-05-08

Family

ID=62427426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721485810.6U Active CN207339088U (en) 2017-11-09 2017-11-09 Transmission line of electricity straight line pole aerial earth wire overhauls stent

Country Status (1)

Country Link
CN (1) CN207339088U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109245004A (en) * 2018-09-26 2019-01-18 国网山东省电力公司海阳市供电公司 A kind of fixed device of insulating ceramics part for electric power and its installation method
CN109787141A (en) * 2018-12-29 2019-05-21 国网浙江杭州市富阳区供电有限公司 Isolating device is used in a kind of construction of power overhead network
CN111355185A (en) * 2020-03-06 2020-06-30 广东电网有限责任公司 Transmission line straight pole overhead earth wire overhauls support
CN112350210A (en) * 2020-10-09 2021-02-09 国网山东省电力公司博兴县供电公司 High tension transmission line overhauls appurtenance transmission coaster
CN115189287A (en) * 2022-09-13 2022-10-14 合肥优尔电子科技有限公司 Overhead circuit cable laying and mounting equipment and mounting method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109245004A (en) * 2018-09-26 2019-01-18 国网山东省电力公司海阳市供电公司 A kind of fixed device of insulating ceramics part for electric power and its installation method
CN109245004B (en) * 2018-09-26 2020-05-05 泉州旗信专利技术咨询有限公司 Insulating ceramic part fixing device for electric power
CN109787141A (en) * 2018-12-29 2019-05-21 国网浙江杭州市富阳区供电有限公司 Isolating device is used in a kind of construction of power overhead network
CN111355185A (en) * 2020-03-06 2020-06-30 广东电网有限责任公司 Transmission line straight pole overhead earth wire overhauls support
CN112350210A (en) * 2020-10-09 2021-02-09 国网山东省电力公司博兴县供电公司 High tension transmission line overhauls appurtenance transmission coaster
CN115189287A (en) * 2022-09-13 2022-10-14 合肥优尔电子科技有限公司 Overhead circuit cable laying and mounting equipment and mounting method thereof
CN115189287B (en) * 2022-09-13 2022-11-15 合肥优尔电子科技有限公司 Overhead circuit cable laying and mounting equipment and mounting method thereof

Similar Documents

Publication Publication Date Title
CN207339088U (en) Transmission line of electricity straight line pole aerial earth wire overhauls stent
CN204281108U (en) A kind of transfer crane
CN106758860B (en) Across the cable walking cord clip handling mounting device of one kind and method
CN106099747B (en) Livewire work conduction wire riser
CN109236012A (en) A kind of dry font Guywire tower hanging method of transmission line of electricity
CN205653069U (en) Steady gantry crane rises
CN203850726U (en) Wire lifter on 10 kV power distribution telegraph pole
CN213537032U (en) Special clamp crown block for carbon pre-roasting anode workshop
CN208321687U (en) A kind of wind-power tower flange ovality apparatus for correcting
CN207106242U (en) One kind hangs outstanding pulley suspension arrangement
CN106384964A (en) V-type insulator-chain electrified replacing operation method
CN204897140U (en) Guide -car's wheel is changed and is used hoisting accessory
CN203475318U (en) Cable-clamp-free hanging appliance used for anchoring stay cable at tower end in cable bent tower steel anchor beam area
CN103138204B (en) Strain cross arm is changed and is used multi-functional installing rack
CN203813317U (en) New type large tonnage self-elevating wire lifter
CN205811418U (en) Livewire work conduction wire riser
CN110526126A (en) Adjustable spacing electrical cabinet lifting frame and its handling method
CN206288881U (en) A kind of tower crane counter-jib dumping device
CN205616428U (en) A hoist device for scraper engine
CN204927955U (en) Support of using when overhead transmission line let -down ground wire, optical cable
CN203699783U (en) Hanging bracket fixed with wire pole
CN210065018U (en) Rotatory davit device of synthetic insulator chain hangs in pair L type
CN203553744U (en) An ultra extra high voltage AC-DC overhead transmission line ground wire optical cable armour clamp replacing apparatus
CN208883427U (en) A kind of killer switch inspection trolley
CN203707659U (en) Rapid installation suspender for distribution grid cross arms

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant