CN106285029B CN201610599501.5A CN201610599501A CN106285029B CN 106285029 B CN106285029 B CN 106285029B CN 201610599501 A CN201610599501 A CN 201610599501A CN 106285029 B CN106285029 B CN 106285029B
Authority
CN
China
Prior art keywords
component
cross
heightening device
plate
arm body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610599501.5A
Other languages
Chinese (zh)
Other versions
CN106285029A (en
Inventor
李琛
夏滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yucheng Power Supply Co of State Grid Shandong Electric Power Co Ltd
Qihe Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Qihe Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qihe Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Qihe Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201610599501.5A priority Critical patent/CN106285029B/en
Publication of CN106285029A publication Critical patent/CN106285029A/en
Application granted granted Critical
Publication of CN106285029B publication Critical patent/CN106285029B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/20Side-supporting means therefor, e.g. using guy ropes or struts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms

Abstract

The present invention relates to a kind of electric pole heightening device and methods, including the heightening device with electric pole Matching installation, the hoop component of heightening device bottom and the cross biling assembly being arranged at the top of heightening device are set, the heightening device generally tubular structure, heightening device inner wall is equipped with limit plate, the hoop component includes two matched anchor ear plates, fixation is bolted in the fixed plate of the same side end of two anchor ear plates, it is rotatablely connected between two anchor ear plate end sides by hinge and the anchor ear plate side end also passes through respective pin shaft and heightening device bottom end is rotatablely connected, the cross biling assembly includes cross-arm body and support rod, it is connected and fixed in the middle part of cross-arm body bottom side with heightening device top, cross-arm body two sides are connected and fixed by the side wall of support rod and heightening device;Structure of the invention design rationally, makes existing power circuit obtain secondary application, reduces the construction cost of new electric power cable, avoid opening up line corridor again.

Description

Electric pole heightening device and method
Technical field
The present invention relates to electrical equipment technical field more particularly to a kind of electric pole heightening device and methods.
Background technique
Currently, the laying needs of electric power cable, which synchronize, to be increased, but passes through new upright bar with the increase of power supply scale It sets up new line and needs high construction cost, while needing to occupy a large amount of land area, so that power operation cost Increase.
Summary of the invention
In view of the foregoing deficiencies of prior art, the purpose of the present invention is to provide a kind of electric pole heightening device and sides Method, by increasing the height in existing electric pole for providing laying space for new electric power cable.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of electric pole heightening device, it is characterised in that: including with electric pole Matching installation increase component, setting adding The hoop component of high component bottom and the cross biling assembly increased at the top of component is set, described increases component generally tubulose knot Structure increases component inner wall equipped with limit plate, and limit plate top is equipped with stiffening plate connected to it, limit plate and stiffening plate outside With increase component inner wall and be connected and fixed, the hoop component includes two matched anchor ear plates, two anchor ear plates it is same Fixation is bolted in the fixed plate of side end, passes through hinge rotation connection and anchor ear between two anchor ear plate end sides The plate side end also pass through respective pin shaft and increase component bottom end rotation connection, the cross biling assembly include cross-arm body and Support rod, in the middle part of cross-arm body bottom side with increase component top and be connected and fixed, cross-arm body two sides are by support rod and increase group The side wall of part is connected and fixed.
It is described increase to be equipped at the top of component pick up the ears for what is connect with cross-arm body, pick up the ears to be equipped with symmetrical two It is a.
The component of increasing includes the end plate positioned at its both ends and the tubular bracket between two end plates, tubulose Bracket is to be cross-linked the reticular structure constituted by several longitudinal plates and several transverse plates.
The support rod both side ends are equipped with installation panel respectively, support boom end by installation panel respectively with cross-arm Ontology and increases component and be connected and fixed.
A kind of installation method of electric pole heightening device, which is characterized in that comprise the steps that
A, it component will be increased will hang and rise to right above electric pole and slowly move down, and be embedded in electric pole top and increase group It offsets in the opening of part bottom and with the limit plate for increasing component;
B, group will be increased by being laid with direction according to electric power cable and adjusting to increase the direction of component and pass through its bottom hoop component Part bottom end is held tightly with electric pole, is made to increase component and is connected and fixed with electric pole;
C, cross-arm body is hung to rise to and increases at the top of component, by bolt by cross-arm body with increase component and pick up the ears to carry out It is connected and fixed;
D, support rod is hung to rise to and increases component two sides, by bolt by the installation panel at its both ends respectively with cross-arm body It is connected and fixed with component is increased;
E, corresponding electric power accessory is installed on cross-arm and carries out electric power cable laying.
In conclusion the electric pole being increased component and is mounted on the invention has the following advantages: reasonable in design Existing electric pole top, achievees the purpose that increase existing electric pole height, is laid with space to provide for new electric power cable, leads to The laying of new electric power cable can be carried out by crossing electric pole and increasing the cross biling assembly of component, and existing power circuit is made to have obtained two Secondary application reduces the construction cost of new electric power cable, avoids opening up line corridor again.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is broken section structural schematic diagram of the invention.
Fig. 3 is the structural schematic diagram of hoop component.
In figure, component, 3 cross-arm bodies, 4 support rods, 5 bottom plates, 6 transverse plates, 7 longitudinal plates, 8 are increased in 1 hoop component, 2 Upper head plate 9 picks up the ears, is 10 installation panels, 11 anchor ear plates, 12 electric poles, 13 level-one cross-arms, 14 limit plates, 15 stiffening plates, 16 fixed Plate, 17 pin shafts, 18 hinges.
Specific embodiment
Embodiments of the present invention are illustrated by particular specific embodiment below, those skilled in the art can be by this explanation Content disclosed by book is understood other advantages and efficacy of the present invention easily.
With reference to the accompanying drawings shown in 1,2,3: the present invention provides a kind of electric pole heightening devices, including match peace with electric pole 12 Dress increases component 2, the hoop component 1 for increasing 2 bottom of component is arranged in and the cross biling assembly for increasing 2 top of component is arranged in, Wherein:
Described increases the generally tubular structure of component 2, and increasing component 2 includes the upper head plate 8 for being located at its both ends, lower end Plate 5 and the tubular bracket between upper head plate 8, bottom plate 5 are constituted, and tubular bracket is by several longitudinal plates 7 and several transverse directions Plate 6 is cross-linked the reticular structure of composition, so that it is small and at low cost with structural strength height, light weight, resistance to increase component 2 Advantage has greater advantage for sealed tube body, increases 2 inner wall of component equipped with limit plate 14, limit plate 14 is close Bottom plate 5 is arranged, and is equipped with stiffening plate 15 connected to it at the top of limit plate 14, limit plate 14 and 15 outside of stiffening plate with increase 2 inner wall of component is connected and fixed, and when the top of electric pole 12, which is embedded in, increases 2 bottom opening of component, is limited by limit plate 14 The insert depth of electric pole 12, while limit plate 14 is also used to support and increases component 2, therefore the stress of limit plate 14 is larger, needs The connective stability that guarantee it by stiffening plate 15 and increase 2 inner wall of component;
The hoop component 1 includes two matched anchor ear plates 11, the fixation of the same side end of two anchor ear plates 11 Fixation is bolted in plate 16, is rotatablely connected between two 11 end sides of anchor ear plate by hinge 18 and anchor ear plate 11 should Side end also passes through respective pin shaft 17 and increases the rotation connection of 2 bottom end of component, allows two anchor ear plates 11 by pin shaft 17 Rotated in 5 bottom of bottom plate, at the same may also rely on hinge 18 realize be connected with each other, the hoop component 1 be mainly used for by Increase 2 bottom of component to be fixed with electric power bar, completes the integral installation for increasing component 2;
The cross biling assembly includes cross-arm body 3 and support rod 4, in the middle part of 3 bottom side of cross-arm body with increase 2 top of component Be connected and fixed, it is described increase to be equipped at the top of component 2 pick up the ears 9 for what is connect with cross-arm body 3, pick up the ears 9 equipped with symmetrical Two, cross-arm body 3 with pick up the ears 9 to be attached by bolt, 3 two sides of cross-arm body are by support rod 4 and increase component 2 Side wall is connected and fixed, and 4 both side ends of support rod are equipped with installation panel 10 respectively, and 4 end of support rod is distinguished by installation panel 10 With cross-arm body 3 and increase component 2 and be connected and fixed, realize the integral installation of cross biling assembly with this configuration.
A kind of installation method of electric pole heightening device, comprises the steps that
A, it component will be increased will hang and rise to right above electric pole and slowly move down, and be embedded in electric pole top and increase group It offsets in the opening of part bottom and with the limit plate for increasing component;
B, group will be increased by being laid with direction according to electric power cable and adjusting to increase the direction of component and pass through its bottom hoop component Part bottom end is held tightly with electric pole, is made to increase component and is connected and fixed with electric pole;
C, cross-arm body is hung to rise to and increases at the top of component, by bolt by cross-arm body with increase component and pick up the ears to carry out It is connected and fixed;
D, support rod is hung to rise to and increases component two sides, by bolt by the installation panel at its both ends respectively with cross-arm body It is connected and fixed with component is increased;
E, corresponding electric power accessory is installed on cross-arm and carries out electric power cable laying.
The electric pole heightening device install on existing electric pole 12, and electric pole 12 is made to pass through its level-one cross-arm 13 carry out the erection of original electric power cable, and the erection of new electric power cable is carried out by cross-arm body 3, obtains original power circuit Secondary application has been arrived, the construction cost of new electric power cable is reduced, has avoided opening up line corridor again.
The above description is only a preferred embodiment of the present invention, as long as achieving the object of the present invention skill with essentially identical means Art scheme, belongs within protection scope of the present invention.

Claims (2)

1. a kind of electric pole heightening device, it is characterised in that: including with electric pole Matching installation increase component, setting increasing The hoop component of component bottom and the cross biling assembly increased at the top of component is set, described increases component generally tubulose knot Structure increases component inner wall equipped with limit plate, and limit plate top is equipped with stiffening plate connected to it, limit plate and stiffening plate outside With increase component inner wall and be connected and fixed, the hoop component includes two matched anchor ear plates, two anchor ear plates it is same Fixation is bolted in the fixed plate of side end, passes through hinge rotation connection and anchor ear between two anchor ear plate end sides The plate side end also pass through respective pin shaft and increase component bottom end rotation connection, the cross biling assembly include cross-arm body and Support rod, in the middle part of cross-arm body bottom side with increase component top and be connected and fixed, cross-arm body two sides are by support rod and increase group The side wall of part is connected and fixed;It is described increase to be equipped at the top of component pick up the ears for what is connect with cross-arm body, pick up the ears to be equipped with symmetrical Two of distribution;The support rod both side ends are equipped with installation panel respectively, support boom end by installation panel respectively with Cross-arm body and increases component and be connected and fixed.
2. electric pole heightening device according to claim 1, it is characterised in that: the component of increasing includes being located at it The end plate at both ends and the tubular bracket between two end plates, tubular bracket are to be interlocked by several longitudinal plates and several transverse plates The reticular structure connected and composed.
CN201610599501.5A 2016-07-22 2016-07-22 Electric pole heightening device and method Expired - Fee Related CN106285029B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610599501.5A CN106285029B (en) 2016-07-22 2016-07-22 Electric pole heightening device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610599501.5A CN106285029B (en) 2016-07-22 2016-07-22 Electric pole heightening device and method

Publications (2)

Publication Number Publication Date
CN106285029A CN106285029A (en) 2017-01-04
CN106285029B true CN106285029B (en) 2019-05-31

Family

ID=57652598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610599501.5A Expired - Fee Related CN106285029B (en) 2016-07-22 2016-07-22 Electric pole heightening device and method

Country Status (1)

Country Link
CN (1) CN106285029B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882738A (en) * 2021-10-27 2022-01-04 河北鹏博通信设备有限公司 Split assembly type line pole heightening frame
CN114033237B (en) * 2021-11-29 2023-05-09 河北鸿宇通信器材有限公司 Self-propelled wire pole heightening device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0913743A (en) * 1995-07-03 1997-01-14 Nippon Steel Corp Joint and joint type steel pipe post
CN201158957Y (en) * 2007-12-24 2008-12-03 临沂供电公司 Pole cap of electric network cement pole
KR101117187B1 (en) * 2010-09-08 2012-03-07 이수인 Telegraph pole birds nest prevention system
CN102425327A (en) * 2011-12-08 2012-04-25 河南省电力公司洛阳供电公司 Cement power pole heightening rod
CN203559619U (en) * 2013-09-24 2014-04-23 国家电网公司 Taper type electric pole lifting frame
CN203684767U (en) * 2013-11-15 2014-07-02 天津邦尼鑫龙玻璃钢设备有限公司 Emergency wire pole
CN104652910A (en) * 2014-12-26 2015-05-27 国家电网公司 Cement telegraph pole height adjusting device
CN204691374U (en) * 2015-06-02 2015-10-07 国家电网公司 Electric pole extension fixture
CN205857791U (en) * 2016-07-22 2017-01-04 国网山东省电力公司齐河县供电公司 Electric pole heightening device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0913743A (en) * 1995-07-03 1997-01-14 Nippon Steel Corp Joint and joint type steel pipe post
CN201158957Y (en) * 2007-12-24 2008-12-03 临沂供电公司 Pole cap of electric network cement pole
KR101117187B1 (en) * 2010-09-08 2012-03-07 이수인 Telegraph pole birds nest prevention system
CN102425327A (en) * 2011-12-08 2012-04-25 河南省电力公司洛阳供电公司 Cement power pole heightening rod
CN203559619U (en) * 2013-09-24 2014-04-23 国家电网公司 Taper type electric pole lifting frame
CN203684767U (en) * 2013-11-15 2014-07-02 天津邦尼鑫龙玻璃钢设备有限公司 Emergency wire pole
CN104652910A (en) * 2014-12-26 2015-05-27 国家电网公司 Cement telegraph pole height adjusting device
CN204691374U (en) * 2015-06-02 2015-10-07 国家电网公司 Electric pole extension fixture
CN205857791U (en) * 2016-07-22 2017-01-04 国网山东省电力公司齐河县供电公司 Electric pole heightening device

Also Published As

Publication number Publication date
CN106285029A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN104481178B (en) Composite material substation structure
BR112017010873B1 (en) DEVICE TO REINFORCE A MONOPOLE
CN106285029B (en) Electric pole heightening device and method
CN205857791U (en) Electric pole heightening device
CN207988628U (en) A kind of Great span landform is convenient for the 10kV broad-base tower equipment of cable or more tower
CN210105440U (en) Pole heightening device
CN204668762U (en) A kind of mounting bracket of distribution box
CN204992482U (en) Can set up ground wire link plate of angle wantonly
CN107237535A (en) A kind of unilateral cross-arm anchor support used for transmission line
CN202405691U (en) Wire insulation support
CN209167607U (en) Cable disk storage device more than a kind of combined type suitable for ADSS optical cable
CN203961417U (en) A kind of electric pole cross-arm and thread-laying device thereof
CN108123410B (en) Ground wire safe backup suspension hardware string
CN208401508U (en) Overhead line turns the dedicated bird proof device of underground line
CN203589645U (en) Vertical bus supporting device
CN206942282U (en) A kind of reinforcement type electric force pole tower
CN106558842A (en) A kind of 630KVA power transformation boxes and installation foundation
CN111864546A (en) Power transformation framework
CN205777822U (en) Portable combined cable quadrant
CN105449612A (en) A conductive wire insulation support plate apparatus
CN205876882U (en) Novel double tops cover staple bolt
CN111864543A (en) Power transformation framework
CN105977860A (en) Composite cross-arm insulator device and method for replacing overhead transmission line
CN209250199U (en) The lightning-arrest line bracket of electric pole and the lightning-arrest line bracket of double rod electric pole
CN109914895A (en) A kind of not contour cross-arm brill crossing pole tower of overhead transmission line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190805

Address after: 253000 Shandong city of Dezhou province Qihe County District Yingbin Road No. 46

Co-patentee after: YUCHENG POWER SUPPLY COMPANY, STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee after: State Grid Shandong Electric Power Company Qihe County Power Supply Co.

Address before: 253000 Shandong city of Dezhou province Qihe County District Yingbin Road No. 46

Patentee before: State Grid Shandong Electric Power Company Qihe County Power Supply Co.

TR01 Transfer of patent right