CN201152022Y - Concrete post pouring strip grout stop building block - Google Patents

Concrete post pouring strip grout stop building block Download PDF

Info

Publication number
CN201152022Y
CN201152022Y CNU2008200103489U CN200820010348U CN201152022Y CN 201152022 Y CN201152022 Y CN 201152022Y CN U2008200103489 U CNU2008200103489 U CN U2008200103489U CN 200820010348 U CN200820010348 U CN 200820010348U CN 201152022 Y CN201152022 Y CN 201152022Y
Authority
CN
China
Prior art keywords
building block
block
building
cylinder
cuboid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200103489U
Other languages
Chinese (zh)
Inventor
吴献
回国臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CNU2008200103489U priority Critical patent/CN201152022Y/en
Application granted granted Critical
Publication of CN201152022Y publication Critical patent/CN201152022Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a grout-stop block used for a concrete alter-pouring strip which belongs to the technology field of a civil engineering. The block is a rectangular solid or a cylinder. The block is divided into a solid block and a poriferous block. The block is 200mm to 2000mm in length and 30mm to 500mm in height. The cross section of the rectangular solid is 30mm to 500mm in width. The diameter of the cross section of the cylinder block is 30mm to 200mm. A plurality of convex strips are arranged on the block. The block is made of rubber materials. The grout-stop block used for the concrete alter-pouring strip has the characteristics of good deformation, durability and non-cementation. In addition, the grout-stop block used for the concrete alter-pouring strip makes use of the strong water absorption of dry cerement to stop grout.

Description

Concrete post poured strip slurry stop building blocks
Technical field
The utility model belongs to technical field of civil engineering, particularly a kind of concrete post poured strip slurry stop building blocks.
Background technology
Water after construction back concrete casting band is divided into the subsiding belt, after water contraction bands and after water the temperature band, be respectively applied for and solve high-rise main building and the sedimentation of low layer podium differences, steel concrete shrinkage strain and reduce problem such as thermal stresses.But the construction of reserving the ater-casting is difficulty relatively, and cement paste is difficult to seal, and a lot of cement pastes flow to the place, ater-casting, solidify the back and are difficult to cleaning, have in addition make the ater-casting not have the effect (place, ater-casting is filled up by cement paste) of ater-casting.
Summary of the invention
At the difficulty of present reservation ater-casting construction, the utility model provides a kind of concrete post poured strip slurry stop building blocks.
Late poured band of the present utility model only grouts piece to be made up of the rubber building blocks of different size and shape, and blocks shape has cuboid, cylinder etc.Building block is divided into solid block and porose building block (hole is arranged in the building block).With the cuboid building block is the main body building block, cylinder building block (or small-sized cuboid building block) plays the filleting effect, building block length can be 200mm to 2000mm according to structure size, (fixed) according to structure size, cuboid building block breadth of section can be 30mm to 500mm, building block highly can be 30mm to 500mm, and cylinder building block diameter of section is 30mm to 200mm.Hole diameter is fixed according to the building block size in the building block, can be 10mm to 100mm etc.Establish the multiple tracks raised item in the building block.
Job practices:
When constructing late poured band reservation place, to build in fact with building block in ater-casting reservation place end cross-sectional, fill with small-sized cuboid building block or cylinder building block in reservation place bottom reinforcement bars slit, and tamp with dry cement; Layering is built real with the cuboid building block, with cylinder building block or small-sized cuboid building block filleting, fill dry cement in the slit, in every layer of building block one deck dry cement that all tiles up and down; Block is same during to top reinforcing bar place to be tamped with cylinder building block or small-sized cuboid building block filling and with dry cement; After building real gross section, compacting, fixing.When executing fluid concrete, cement paste makes cement paste do with fixed attention after running into dry cement immediately, and the state that can not flow plays only slurry effect.After the construction, treat concrete initial set after, take out various rubber building blocks, clean out unnecessary cement residue in ater-casting place and dry cement etc., to treat the construction of late poured band.
Simultaneously, the residue in the cleaning building block is so that reuse next time.
Block material is solid soft materials such as rubber, and is not fragile, reusable.
The effect of hole:
1. rubber building blocks is yielding in compacting process, thereby makes slit, cross section, ater-casting littler.
2. be easy to after the construction take out, can stretch into to prize in the hole with bar reinforcement and get rubber building blocks.
3. clear up the cement residue (strike building block, porose Oscillation Amplitude is big) on the rubber building blocks well.
The effect of raised item is to stop the interior cement paste of rubber building blocks to flow.
The utility model has utilized the characteristic of rubber, and is promptly yielding, durable, be difficult for the character that bonds with other materials.In addition, also utilized the dry cement water imbibition strong, run into and cement paste is done coagulate, the state that can not flow plays only slurry effect.After the construction, the place, ater-casting is easy to cleaning, saves a lot of human and material resources, and can make the ater-casting play due effect.
Description of drawings
Fig. 1 is a perforated cylinder rubber building blocks front view;
Fig. 2 is Fig. 1 perforated cylinder rubber building blocks lateral view;
Fig. 3 is porose cuboid rubber building blocks front view;
Fig. 4 is the porose cuboid rubber building blocks of a Fig. 3 lateral view;
Fig. 5 is the porose cuboid rubber building blocks of a Fig. 3 vertical view;
Fig. 6 is a non-porous cylinder rubber building blocks front view;
Fig. 7 is Fig. 6 non-porous cylinder rubber building blocks lateral view;
Fig. 8 is an atresia cuboid rubber building blocks front view;
Fig. 9 is Fig. 8 atresia cuboid rubber building blocks lateral view;
Figure 10 is Fig. 8 atresia cuboid rubber building blocks vertical view;
Among the figure: 1 cuboid building block, 2 holes, 3 raised items, 4 cylinder building blocks.
The specific embodiment
As shown in drawings:
Example 1: the cuboid building block is that 15mm circular hole (hole depth 160mm) constitutes in the middle of the long * wide * high 200mm * 50mm of being * 50mm rubber building blocks 1 diameter being arranged.If twice raised item height is 1mm.
Example 2: the cuboid building block is that 20mm circular hole (hole depth 260mm) constitutes in the middle of the long * wide * high 300mm * 200mm of being * 150mm rubber building blocks 4 diameters being arranged.If three road raised item height are 2mm.
Example 3: the cuboid building block is that 20mm circular hole (hole depth 360mm) constitutes in the middle of the long * wide * high 400mm * 300mm of being * 150mm rubber building blocks 6 diameters being arranged.If four road raised item height are 3mm.
Example 4: the cuboid building block is that 30mm circular hole (hole depth 460mm) constitutes in the middle of the long * wide * high 500mm * 200mm of being * 200mm rubber building blocks 4 diameters being arranged.If five road raised item height are 4mm.
Example 5: the cylinder building block is long 200mm, and diameter is that 1 diameter is arranged in the middle of the 60mm rubber building blocks is that 20mm circular hole (hole depth 160mm) constitutes.If twice raised item height is 1mm.
Example 6: the cylinder building block is long 300mm, and diameter is that 1 diameter is arranged in the middle of the 70mm rubber building blocks is that 30mm circular hole (hole depth 260mm) constitutes.If three road raised item height are 2mm.
Example 7: the cylinder building block is long 400mm, and diameter is that 1 diameter is arranged in the middle of the 80mm rubber building blocks is that 30mm circular hole (hole depth 360mm) constitutes.If four road raised item height are 3mm.
Example 8: the cylinder building block is long 500mm, and diameter is that 1 diameter is arranged in the middle of the 100mm rubber building blocks is that 40mm circular hole (hole depth 460mm) constitutes.If five road raised item height are 4mm.
Example 9: the cuboid building block is 200mm * 30mm * 30mm rubber solid block for length * wide * height.If twice raised item height is 1mm.
Example 10: the cylinder building block is long 200mm, and diameter is the solid block of 40mm rubber.If twice raised item height is 1mm.
Example 11: establishing 4 smugglings in the middle of cuboid building block 2000mm * 500mm * 500mm rubber building blocks is that 30mm circular hole (hole depth 1900mm) constitutes, and establishes 10 road raised items, highly is 5mm, and width is 10mm.
Example 12: the long 2000mm of cylinder building block, diameter are 200mm, and establishing 4 diameters in the middle of the rubber building blocks is the 30mm circular hole, and (hole depth 1900mm) constitutes, and establishes 10 road raised items, and the raised item height is 5mm, and width is 10mm.

Claims (3)

1, a kind of concrete post poured strip slurry stop building blocks, it is characterized in that blocks shape is cuboid or cylinder, building block is divided into solid block and porose building block, and building block length is 200mm~2000mm, cuboid building block breadth of section is 30mm~500mm, and building block highly is 30mm~500mm; Cylinder building block diameter of section is 30mm~200mm, establishes the multiple tracks raised item in the building block, and building block adopts elastomeric material to make.
2, concrete post poured strip slurry stop building blocks according to claim 1 is characterized in that described porose building block, and its hole diameter is 10mm~100mm.
3, concrete post poured strip slurry stop building blocks according to claim 1 is characterized in that the raised item width of establishing in the described building block is 0~10mm, highly is 0~10mm.
CNU2008200103489U 2008-01-18 2008-01-18 Concrete post pouring strip grout stop building block Expired - Lifetime CN201152022Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200103489U CN201152022Y (en) 2008-01-18 2008-01-18 Concrete post pouring strip grout stop building block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200103489U CN201152022Y (en) 2008-01-18 2008-01-18 Concrete post pouring strip grout stop building block

Publications (1)

Publication Number Publication Date
CN201152022Y true CN201152022Y (en) 2008-11-19

Family

ID=40127702

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200103489U Expired - Lifetime CN201152022Y (en) 2008-01-18 2008-01-18 Concrete post pouring strip grout stop building block

Country Status (1)

Country Link
CN (1) CN201152022Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101230594B (en) * 2008-01-18 2010-07-07 沈阳建筑大学 Concrete post poured strip slurry stop building blocks and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101230594B (en) * 2008-01-18 2010-07-07 沈阳建筑大学 Concrete post poured strip slurry stop building blocks and construction method thereof

Similar Documents

Publication Publication Date Title
US10273691B2 (en) Method of constructing a reinforced compound concrete beam containing demolished concrete lumps
CN101041980B (en) Lightweight plaster wall and integral pouring procedure thereof
CN105298020B (en) Semi-precast circular steel pipe regenerated mixed concrete pillar and preparation method thereof
CN106437034A (en) Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN103306501B (en) Energy-saving domestic architecture with cast-in-place industrial gypsum bearing wall and manufacturing method thereof
CN105350559B (en) A kind of construction method of diamond dust structural floor suitable for large-sized workshop
CN204266136U (en) Stone arch bridge cover arch rib shotcrete ruggedized construction
CN102116092A (en) Method for constructing reinforcing band for compensating contraction of concrete and preventing cracks
CN108265587A (en) Saturating storage functional surface brick and manufacture craft based on building waste crushed material
CN101451380B (en) Processing method of prefabricating common concrete outer plate recycled concrete core shear wall
CN200999409Y (en) Prefabricated thin-plate cast-in-situs super-positioned hollow core floor slab
CN113073680B (en) Slag disposal site retaining wall structure of plateau high-cold area and construction method thereof
CN102535356B (en) Construction method used for carrying out strengthening treatment on heavy haul railway bridge
CN201722813U (en) Confined masonry structure
CN201152022Y (en) Concrete post pouring strip grout stop building block
CN104594654A (en) Building reinforcement reconstruction scheme generation method
CN101230594B (en) Concrete post poured strip slurry stop building blocks and construction method thereof
CN209907616U (en) Cast-in-place floor construction joint side keeps off structure
CN204238264U (en) A kind of sole plate post-poured strip structure
CN109372281A (en) A method of utilizing prefabricated TRC plate reinforcement and repair concrete component
CN105926652B (en) Method and structure for reinforcing inclined retaining wall
CN205954643U (en) Concrete bank protection suppression instrument
CN209429284U (en) A kind of overlength reinforced concrete water pond expansion joint processing mechanism
CN201883700U (en) Structure for reinforcing floor boards or roof boards of building structures

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20081119

Effective date of abandoning: 20080118