CN101230594B - Concrete post poured strip slurry stop building blocks and construction method thereof - Google Patents

Concrete post poured strip slurry stop building blocks and construction method thereof Download PDF

Info

Publication number
CN101230594B
CN101230594B CN2008100101666A CN200810010166A CN101230594B CN 101230594 B CN101230594 B CN 101230594B CN 2008100101666 A CN2008100101666 A CN 2008100101666A CN 200810010166 A CN200810010166 A CN 200810010166A CN 101230594 B CN101230594 B CN 101230594B
Authority
CN
China
Prior art keywords
building block
building blocks
cuboid
building
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100101666A
Other languages
Chinese (zh)
Other versions
CN101230594A (en
Inventor
吴献
回国臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN2008100101666A priority Critical patent/CN101230594B/en
Publication of CN101230594A publication Critical patent/CN101230594A/en
Application granted granted Critical
Publication of CN101230594B publication Critical patent/CN101230594B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to concrete back pouring region slurry stopping and building blocks and a construction method, wherein, the shape of each building block is cuboid or cylinder, the building blocks are solid building blocks and building blocks with holes, and the building blocks are provided with a plurality of protuberance strips and are made of rubber material; when the construction is carried out at the reserving position of the concrete back pouring region, the cross section at the end part is solidly built by the building blocks and a reinforcing steel bar gap at the bottom of the reserving position is filled by minitype cuboid building blocks or cylinder building blocks and is infilled by dry cement; the delamination is infilled by the cuboid building blocks and is caulked joint by the cylinder building blocks or the minitype cuboid building blocks, and then the gap is filled with the dry cement; the upper part and the lower part of every layer of the building blocks are both tiled with a layer of dry cement; when building to the position of the reinforcing steel bar at the upper part, the gap is filled with the cylinder building blocks or the minitype cuboid building blocks and is infilled by the dry cement; after all the cross sections are solidly built, the cross sections are solidly pressed and fixed. The invention is easy to become deformed, firm and durable as well as has the characteristic of being hard to affix other substances, and makes use of the strong hydroscopic property of the dry cement to play the role of stopping slurry.

Description

Concrete post poured strip slurry stop building blocks and job practices
Technical field
The invention belongs to technical field of civil engineering, particularly a kind of concrete post poured strip slurry stop building blocks and job practices.
Background technology
Water after construction back concrete casting band is divided into the subsiding belt, after water contraction bands and after water the temperature band, be respectively applied for and solve high-rise main building and the sedimentation of low layer podium differences, steel concrete shrinkage strain and reduce problem such as thermal stresses.But the construction of reserving the ater-casting is difficulty relatively, and cement paste is difficult to seal, and a lot of cement pastes flow to the place, ater-casting, solidify the back and are difficult to cleaning, have in addition make the ater-casting not have the effect (place, ater-casting is filled up by cement paste) of ater-casting.
Summary of the invention
Difficulty at the construction of present reservation ater-casting the invention provides a kind of concrete post poured strip slurry stop building blocks and job practices.
Late poured band of the present invention only grouts piece to be made up of the rubber building blocks of different size and shape, and blocks shape has cuboid, cylinder etc.Building block is divided into solid block and porose building block (hole is arranged in the building block).With the cuboid building block is the main body building block, cylinder building block (or small-sized cuboid building block) plays the filleting effect, building block length can be 200mm to 2000mm according to structure size, (fixed) according to structure size, cuboid building block breadth of section can be 30mm to 500mm, building block highly can be 30mm to 500mm, and cylinder building block diameter of section is 30mm to 200mm.Hole diameter is fixed according to the building block size in the building block, can be 10mm to 100mm etc.Establish the multiple tracks raised item in the building block.
Job practices:
When constructing late poured band reservation place, to build in fact with building block in ater-casting reservation place end cross-sectional, fill with small-sized cuboid building block or cylinder building block in reservation place bottom reinforcement bars slit, and tamp with dry cement; Layering is built real with the cuboid building block, with cylinder building block or small-sized cuboid building block filleting, fill dry cement in the slit, in every layer of building block one deck dry cement that all tiles up and down; Block is same during to top reinforcing bar place to be tamped with cylinder building block or small-sized cuboid building block filling and with dry cement; After building real gross section, compacting, fixing.When executing fluid concrete, cement paste makes cement paste do with fixed attention after running into dry cement immediately, and the state that can not flow plays only slurry effect.After the construction, treat concrete initial set after, take out various rubber building blocks, clean out unnecessary cement residue in ater-casting place and dry cement etc., to treat the construction of late poured band.
Simultaneously, the residue in the cleaning building block is so that reuse next time.
Block material is solid soft materials such as rubber, and is not fragile, reusable.
The effect of hole:
1. rubber building blocks is yielding in compacting process, thereby makes slit, cross section, ater-casting littler.
2. be easy to after the construction take out, can stretch into to prize in the hole with bar reinforcement and get rubber building blocks.
3. clear up the cement residue (strike building block, porose Oscillation Amplitude is big) on the rubber building blocks well.
The effect of raised item is to stop the interior cement paste of rubber building blocks to flow.
The present invention has utilized the characteristic of rubber, and is promptly yielding, durable, be difficult for the character that bonds with other materials.In addition, also utilized the dry cement water imbibition strong, run into and cement paste is done coagulate, the state that can not flow plays only slurry effect.After the construction, the place, ater-casting is easy to cleaning, saves a lot of human and material resources, and can make the ater-casting play due effect.
Description of drawings
Fig. 1 is a perforated cylinder rubber building blocks front view;
Fig. 2 is Fig. 1 perforated cylinder rubber building blocks lateral view;
Fig. 3 is porose cuboid rubber building blocks front view;
Fig. 4 is the porose cuboid rubber building blocks of a Fig. 3 lateral view;
Fig. 5 is the porose cuboid rubber building blocks of a Fig. 3 vertical view;
Fig. 6 is a non-porous cylinder rubber building blocks front view;
Fig. 7 is Fig. 6 non-porous cylinder rubber building blocks lateral view;
Fig. 8 is an atresia cuboid rubber building blocks front view;
Fig. 9 is Fig. 8 atresia cuboid rubber building blocks lateral view;
Figure 10 is Fig. 8 atresia cuboid rubber building blocks vertical view;
Among the figure: 1 cuboid building block, 2 holes, 3 raised items, 4 cylinder building blocks.
The specific embodiment
The piece that only grouts of the present invention:
Example 1: the cuboid building block is that 15mm circular hole (hole depth 160mm) constitutes in the middle of the long * wide * high 200mm * 50mm of being * 50mm rubber building blocks 1 diameter being arranged.If twice raised item height is 1mm.
Example 2: the cuboid building block is that 20mm circular hole (hole depth 260mm) constitutes in the middle of the long * wide * high 300mm * 200mm of being * 150mm rubber building blocks 4 diameters being arranged.If three road raised item height are 2mm.
Example 3: the cuboid building block is that 20mm circular hole (hole depth 360mm) constitutes in the middle of the long * wide * high 400mm * 300mm of being * 150mm rubber building blocks 6 diameters being arranged.If four road raised item height are 3mm.
Example 4: the cuboid building block is that 30mm circular hole (hole depth 460mm) constitutes in the middle of the long * wide * high 500mm * 200mm of being * 200mm rubber building blocks 4 diameters being arranged.If five road raised item height are 4mm.
Example 5: the cylinder building block is long 200mm, and diameter is that 1 diameter is arranged in the middle of the 60mm rubber building blocks is that 20mm circular hole (hole depth 160mm) constitutes.If twice raised item height is 1mm.
Example 6: the cylinder building block is long 300mm, and diameter is that 1 diameter is arranged in the middle of the 70mm rubber building blocks is that 30mm circular hole (hole depth 260mm) constitutes.If three road raised item height are 2mm.
Example 7: the cylinder building block is long 400mm, and diameter is that 1 diameter is arranged in the middle of the 80mm rubber building blocks is that 30mm circular hole (hole depth 360mm) constitutes.If four road raised item height are 3mm.
Example 8: the cylinder building block is long 500mm, and diameter is that 1 diameter is arranged in the middle of the 100mm rubber building blocks is that 40mm circular hole (hole depth 460mm) constitutes.If five road raised item height are 4mm.
Example 9: the cuboid building block is 200mm * 30mm * 30mm rubber solid block for length * wide * height.If twice raised item height is 1mm.
Example 10: the cylinder building block is long 200mm, and diameter is the solid block of 40mm rubber.If twice raised item height is 1mm.
Example 11: establishing 4 smugglings in the middle of cuboid building block 2000mm * 500mm * 500mm rubber building blocks is that 30mm circular hole (hole depth 1900mm) constitutes, and establishes 10 road raised items, highly is 5mm, and width is 10mm.
Example 12: the long 2000mm of cylinder building block, diameter are 200mm, and establishing 4 diameters in the middle of the rubber building blocks is the 30mm circular hole, and (hole depth 1900mm) constitutes, and establishes 10 road raised items, and the raised item height is 5mm, and width is 10mm.
Using the piece that only grouts of the present invention constructs, when constructing late poured band reservation place, build in fact with building block in ater-casting reservation place end cross-sectional, fill with small-sized cuboid building block 1 or cylinder building block 4 in reservation place bottom reinforcement bars slit, and tamp with dry cement; Layering is built real with cuboid building block 1, with cylinder building block 4 or small-sized cuboid building block 1 filleting, fill dry cement in the slit, in every layer of building block one deck dry cement that all tiles up and down; Block is same during to top reinforcing bar place to be tamped with cylinder building block 4 or small-sized cuboid building block 1 filling and with dry cement; After building real gross section, compacting, fixing.When executing fluid concrete, cement paste makes cement paste do with fixed attention after running into dry cement immediately, and the state that can not flow plays only slurry effect.After the construction, treat concrete initial set after, take out various rubber building blocks, clean out unnecessary cement residue in ater-casting place and dry cement etc., to treat the construction of late poured band.

Claims (4)

1. concrete post poured strip slurry stop building blocks, it is characterized in that blocks shape is cuboid or cylinder, building block is divided into solid block and porose building block, and building block length is 200mm~2000mm, cuboid building block breadth of section is 30mm~500mm, and building block highly is 30mm~500mm; Cylinder building block diameter of section is 30mm~200mm, establishes the multiple tracks raised item in the building block, and building block adopts elastomeric material to make.
2. concrete post poured strip slurry stop building blocks according to claim 1 is characterized in that described porose building block, and its hole diameter is 10mm~100mm.
3. concrete post poured strip slurry stop building blocks according to claim 1 is characterized in that the raised item width of establishing in the described building block is 0~10mm, highly is 0~10mm.
4. the job practices of concrete post poured strip slurry stop building blocks according to claim 1, it is characterized in that when constructing late poured band reservation place, build real with building block in ater-casting reservation place end cross-sectional, fill with small-sized cuboid building block or cylinder building block in reservation place bottom reinforcement bars slit, and tamp with dry cement; Layering is built real with the cuboid building block, with cylinder building block or small-sized cuboid building block filleting, fill dry cement in the slit, in every layer of building block one deck dry cement that all tiles up and down; Block is same during to top reinforcing bar place to be tamped with cylinder building block or small-sized cuboid building block filling and with dry cement; After building real gross section, compacting, fixing.
CN2008100101666A 2008-01-18 2008-01-18 Concrete post poured strip slurry stop building blocks and construction method thereof Expired - Fee Related CN101230594B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100101666A CN101230594B (en) 2008-01-18 2008-01-18 Concrete post poured strip slurry stop building blocks and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100101666A CN101230594B (en) 2008-01-18 2008-01-18 Concrete post poured strip slurry stop building blocks and construction method thereof

Publications (2)

Publication Number Publication Date
CN101230594A CN101230594A (en) 2008-07-30
CN101230594B true CN101230594B (en) 2010-07-07

Family

ID=39897375

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100101666A Expired - Fee Related CN101230594B (en) 2008-01-18 2008-01-18 Concrete post poured strip slurry stop building blocks and construction method thereof

Country Status (1)

Country Link
CN (1) CN101230594B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652621A (en) * 2013-11-19 2015-05-27 任丘市永基建筑安装工程有限公司 Assembled house wallboard gap treatment technology

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2592740Y (en) * 2002-06-26 2003-12-17 刘宇航 Ater-casting rubber waterstop
CN201152022Y (en) * 2008-01-18 2008-11-19 沈阳建筑大学 Concrete post pouring strip grout stop building block

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2592740Y (en) * 2002-06-26 2003-12-17 刘宇航 Ater-casting rubber waterstop
CN201152022Y (en) * 2008-01-18 2008-11-19 沈阳建筑大学 Concrete post pouring strip grout stop building block

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
JP特开2006-028980A 2006.02.02
JP特开平5-295806A 1993.11.09
JP特开平9-112033A 1997.04.28

Also Published As

Publication number Publication date
CN101230594A (en) 2008-07-30

Similar Documents

Publication Publication Date Title
US10273691B2 (en) Method of constructing a reinforced compound concrete beam containing demolished concrete lumps
CN105298020B (en) Semi-precast circular steel pipe regenerated mixed concrete pillar and preparation method thereof
CN207987983U (en) A kind of waterproof construction being used for underground engineering main body construction seam and post-cast strip
CN105350559B (en) A kind of construction method of diamond dust structural floor suitable for large-sized workshop
CN106437034A (en) Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CN102296546A (en) Treatment scheme of hollow slab bridge hinge joint defects and construction process thereof
CN108638324A (en) A kind of construction method of prefabricated case beam
CN104372952A (en) Unstressed permeating washing scabbling technology
CN102677901B (en) Construction method of horizontal combined member by using large-size waste concrete block
CN204266136U (en) Stone arch bridge cover arch rib shotcrete ruggedized construction
CN102116092A (en) Method for constructing reinforcing band for compensating contraction of concrete and preventing cracks
CN105463986B (en) Construction method of bridge expansion joint
CN204386018U (en) Autoclaved aerated concrete slabs steel sheet arrangement of reinforcement
CN113073680B (en) Slag disposal site retaining wall structure of plateau high-cold area and construction method thereof
CN200999409Y (en) Prefabricated thin-plate cast-in-situs super-positioned hollow core floor slab
CN110344844A (en) A kind of track engineering section of track well construction method
CN108240045A (en) A kind of compound late poured band structure of outer wall precast slab and its construction method
CN104594654A (en) Building reinforcement reconstruction scheme generation method
CN103215950A (en) Pile foundation extension construction method in backfilling area
CN109440733A (en) A kind of cemented gravel dam and its construction technology
CN101230594B (en) Concrete post poured strip slurry stop building blocks and construction method thereof
CN201152022Y (en) Concrete post pouring strip grout stop building block
CN204238264U (en) A kind of sole plate post-poured strip structure
CN108824810B (en) Laying construction process for steel skeleton composite building top plate
CN109372281A (en) A method of utilizing prefabricated TRC plate reinforcement and repair concrete component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100707

Termination date: 20140118