CN201132806Y - Work platform around valley type red mud storage yard - Google Patents

Work platform around valley type red mud storage yard Download PDF

Info

Publication number
CN201132806Y
CN201132806Y CNU2007202014428U CN200720201442U CN201132806Y CN 201132806 Y CN201132806 Y CN 201132806Y CN U2007202014428 U CNU2007202014428 U CN U2007202014428U CN 200720201442 U CN200720201442 U CN 200720201442U CN 201132806 Y CN201132806 Y CN 201132806Y
Authority
CN
China
Prior art keywords
red mud
platform
cover plate
hillside
workplatform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007202014428U
Other languages
Chinese (zh)
Inventor
李明阳
王波
胡禹志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CNU2007202014428U priority Critical patent/CN201132806Y/en
Application granted granted Critical
Publication of CN201132806Y publication Critical patent/CN201132806Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a cycling pool working platform of a valley-typed red mud dump. The working platform (1) is arranged along the hillside of the cycling pool and is connected with an initial dam (3). A flood intercepting drain (4) is arranged at one side of the platform near the hillside. The intercepting drain (4) is covered with a cover board (5) which is provided with leakage holes (6). An anchored channel (8) is arranged on one side of the platform near a reservoir region (7). An impermeable membrane (9) is laid in the anchored channel (8). Compacted clay (11) is filled on the impermeable membrane (9). One side of the impermeable membrane extends out of one side of the anchored channel and covers a side slope (10) of the reservoir region. A pavement (12) is paved over the anchored channel and a dead wall (13) is arranged on the edge of the side of the pavement near the reservoir region. The cycling pool working platform adopts a structure-compact design and arranges the flood intercepting drain and the anchored channel below the working platform so that the work amount of mountain-cutting and stone-breaking is reduced significantly, thereby reducing the project cost and the unstable factors of the hillside caused by cutting mountains and breaking stones.

Description

A kind of ring storehouse workplatform of mountain valley-type red mud dump
Technical field
The utility model belongs to the red mud dump field, the ring storehouse workplatform of mountain valley-type red mud dump in particularly a kind of alumina producing.
Background technology
Red mud is the waste residue that produces in the alumina producing, and except that can fully utilizing on a small quantity, each alumina producer all need be built special red mud dump and stack red mud.The site of red mud dump, natural condition and land resources situation according to alumina producer periphery landform can roughly be divided into mountain valley-type, sloping field type, flat type, basin type four classes.For concrete alumina producer, be limited to plant area's periphery physical environment and land resources situation, have to select the site of the suitable mountain valley-type place of area sometimes as red mud dump, the initial dam of constructing certain altitude at the mouth of a valley forms certain storage capacity.
The mountain valley-type stockyard is compared with the other types stockyard, the characteristics of mountain valley-type stockyard on floor plan are, with the initial dam dam crest absolute altitude massif around the stockyard about the same on, need build following facility: Great Gulch is cut in the ring storehouse, be used to tackle massif side slope rainwater, reduce the amount of rainfall that enters the stockyard; Anti seepage membrane anchoring ditch is used for the anti seepage membrane that storage yard slope is laid is fixed on the top anti-sliding stop; The dam crest perimeter path is used for managerial personnel tour is overhauled in the stockyard; Ring storehouse cloth tube is used for laying the red mud material in the stockyard.At present these facilities generally are provided with respectively, and this just need be halfway up the hill and build the workplatform of a circle broad, and the quantities that makes a sudden snatch of cutting into a mountain is very great, and bring hidden danger to the stability of slope of massif easily.How under the situation that satisfies the workplatform width, reducing the quantities of cutting into a mountain and making a sudden snatch as much as possible, is the problem that we need solve.
The utility model content
The purpose of this utility model is to provide a kind of ring storehouse workplatform of mountain valley-type red mud dump.This workplatform compact construction practicality can reduce the quantities of cutting into a mountain and making a sudden snatch greatly in the construction of platform, save construction costs, has also reduced the hillside labile factor that makes a sudden snatch and cause because of cutting into a mountain.The deficiencies in the prior art have been overcome.
The utility model is achieved in that hillside 2 settings of the ring storehouse workplatform 1 of mountain valley-type red mud dump along the ring storehouse, and is connected with the initial dam 3 that is located at the mountain valley mouth; Platform 1 is provided with a section Great Gulch 4 near a side on hillside 2, cuts the top of Great Gulch 4 and is stamped cover plate 5, and cover plate 5 is provided with two or more leaking holes 6; Platform 1 is provided with anchoring ditch 8 near a side of reservoir area 7, is equipped with anti seepage membrane 9 in the anchoring ditch 8, is filled with the clay 11 of compacting on the anti seepage membrane 9, and stretch out from a side of anchoring ditch 8 on one side of anti seepage membrane 9, rides on the side slope 10, with interior side slope 10 coverings the reservoir area in; Anchoring ditch 8 tops are equipped with road surface 12, and road surface 12 width extend to cover plate 5, and concordant with the upper surface of cover plate 5, are provided with barricade 13 at 12 edges, road surface near reservoir area 7 one sides.
In the ring storehouse workplatform of above-mentioned mountain valley-type red mud dump, described section Great Gulch 4 two ends are connected with the open drain 14 at initial dam 3 two ends; Cut Great Gulch 4 and have the gradient, its vertex is positioned at the solstics on initial dam 3 opposites, and lower-most point is positioned at the junction in initial dam 3 two ends and open drain 14.
In the ring storehouse workplatform of aforementioned mountain valley-type red mud dump, the sectional area of described section Great Gulch 4 calculates gained according to the rainfall runoff amount in the water catchment area of cutting Great Gulch 4 gradients and interception.
In the ring storehouse workplatform of aforementioned mountain valley-type red mud dump, the diameter of the leaking hole 6 on the described cover plate 5 or width are less than the width of maintenance vehicle wheel.
Compared with prior art, because workplatform needed facility in stockyard is provided with respectively in the prior art, therefore the required quantities that makes a sudden snatch of cutting into a mountain is very big in the construction, the utility model adopts the design of compact construction, and will cut Great Gulch and the anchoring ditch is located at below the workplatform, but do not reducing under the operation element planar width like this, total working face width has reduced a lot, therefore in the construction of platform, can reduce the quantities of cutting into a mountain and making a sudden snatch greatly, save construction costs, also reduced the hillside labile factor that makes a sudden snatch and cause because of cutting into a mountain.The deficiencies in the prior art have been overcome.
Description of drawings
Accompanying drawing 1 is a synoptic diagram of the present utility model;
Accompanying drawing 2 is vertical views of accompanying drawing 1;
Accompanying drawing 3 is that the utility model is always schemed in the distribution of reservoir area.
Being labeled as in the accompanying drawing: the 1-platform, the 2-hillside, the 3-initial dam, 4-cuts Great Gulch, 5-cover plate, 6-leaking hole, 7-reservoir area, 8-anchoring ditch, 9-anti seepage membrane, side slope in the 10-reservoir area, the clay of 11-compacting, 12-road surface, 13-barricade, 14-open drain, 15-cloth tube.
Embodiment
Embodiment.The ring storehouse workplatform of mountain valley-type red mud dump is as Fig. 1, Fig. 2 and shown in Figure 3.The ring storehouse workplatform 1 of mountain valley-type red mud dump is provided with along the hillside 2 in ring storehouse, and is connected with the initial dam 3 that is located at the mountain valley mouth; Platform 1 is provided with a section Great Gulch 4 near a side on hillside 2, cuts Great Gulch 4 two ends and is connected with the open drain 14 at initial dam 3 two ends; Cut Great Gulch 4 and have the gradient, its vertex is positioned at the solstics on initial dam 3 opposites, and lower-most point is positioned at the junction in initial dam 3 two ends and open drain 14.The sectional area that cuts Great Gulch 4 calculates gained according to the rainfall runoff amount in the water catchment area of cutting Great Gulch 4 gradients and interception.Cut the top of Great Gulch 4 and be stamped cover plate 5, cover plate 5 is provided with two or more leaking holes 6; The diameter of leaking hole 6 or width are less than the width of maintenance vehicle wheel.Platform 1 is provided with anchoring ditch 8 near a side of reservoir area 7, is equipped with anti seepage membrane 9 in the anchoring ditch 8, is filled with the clay 11 of compacting on the anti seepage membrane 9, and stretch out from a side of anchoring ditch 8 on one side of anti seepage membrane 9, rides on the side slope 10, with interior side slope 10 coverings the reservoir area in; Anchoring ditch 8 tops are equipped with road surface 12, and road surface 12 width extend to cover plate 5, and concordant with the upper surface of cover plate 5, are provided with barricade 13 at 12 edges, road surface near reservoir area 7 one sides.
During concrete enforcement, at first, on the Huan Ku hillside 2 suitable with initial dam 3 dam crest absolute altitudes, excavation one circle ring storehouse platform 1, its width is than the required big 1m of minimum width of maintenance vehicle pass-through.A side on close hillside 2 on platform 1, rectangle is set cuts Great Gulch 4, being starting point from initial dam 3 solstics, section Great Gulch 4 bottoms of trench of this point are vertex, aspect initial dam 3 is step-down gradually, and 3 two ends, dam and junction, hillside are established the rainwater that will cut in the Great Gulch 3 in open drain 14 and guided to the dam body downstream drain in the early stage.Cutting the cross dimensions and the gradient of Great Gulch 3 can calculate according to the rainfall runoff amount in the water catchment area of being tackled.
The ditch top of cutting Great Gulch 3 is provided with reinforced concrete cover plate 5, reserves some long strip shape leaking holes 6 every a determining deviation on the cover plate 5, and these leaking holes 6 enter the inlet that cuts Great Gulch 4 as the hillside rainwater, and the width of leaking hole 6 is less than the width of the wheel of maintenance vehicle.Load when cover plate 5 will be considered to overhaul vehicle pass-through.That is to say, cut the cover plate 5 of Great Gulch 4 and both can drain rainwater, is again the travel part of passage of maintenance vehicle.
In platform 1 a side near reservoir area 7, orthogonal ring storehouse anchoring ditch 8 is set, the anti seepage membrane 9 of laying on the side slope 10 extends to the inwall of anchoring ditch 8 the reservoir area in, lays proper after, in anchoring ditch 8, insert clay and also tamp.Lay concrete road surface 12 at the rest part except that cover plate 5 on the platform 1 then, (the ditch top that comprises the anchoring ditch), and on the 12 close borders of reservoir area 7, road surface, the ring storehouse concrete barricade 13 that 0.4m is wide, 1m is high is set, will encircle the storehouse cloth tube again and be erected on the concrete barricade 13.
So just finished the ring storehouse workplatform of the mountain valley-type red mud dump that the utility model proposed.During rainfall, absolute altitude is higher than the rainwater on the hillside 2 of platform 1, flow to platform 1 after, under the obstruction of barricade 13, the leaking hole 6 from the cover plate 5 enters and cuts a Great Gulch 4, discharges outside the storehouse then.When the maintenance vehicle entered platform 1, cutting the cover plate 5 of Great Gulch 4 and the ditch top of anchoring ditch 8 all was the part on road surface, and the clear span of whole platform 1 can satisfy the vehicle pass-through needs.

Claims (4)

1. the ring storehouse workplatform of a mountain valley-type red mud dump, this platform (1) is provided with along the hillside (2) in ring storehouse, and is connected with the initial dam that is located at the mountain valley mouth (3); It is characterized in that: platform (1) is provided with a section Great Gulch (4) near a side on hillside (2), cuts the top of Great Gulch (4) and is stamped cover plate (5), and cover plate (5) is provided with two or more leaking holes (6); Platform (1) is provided with anchoring ditch (8) near a side of reservoir area (7), be equipped with anti seepage membrane (9) in the anchoring ditch (8), be filled with the clay (11) of compacting on the anti seepage membrane (9), stretch out from a side of anchoring ditch (8) on one side of anti seepage membrane (9), ride on the side slope in the reservoir area (10), interior side slope (10) is covered; Anchoring ditch (8) top is equipped with road surface (12), and road surface (12) width extends to cover plate (5), and concordant with the upper surface of cover plate (5), is provided with barricade (13) at the edge, road surface (12) near reservoir area (7) one sides.
2. the ring storehouse workplatform of mountain valley-type red mud dump according to claim 1 is characterized in that: described section Great Gulch (4) two ends are connected with the open drain (14) at initial dam (3) two ends; Cut Great Gulch (4) and have the gradient, its vertex is positioned at the solstics on initial dam (3) opposite, and lower-most point is positioned at the junction of initial dam (3) two ends and open drain (14).
3. the ring storehouse workplatform of mountain valley-type red mud dump according to claim 2 is characterized in that: the sectional area of described section Great Gulch (4) calculates gained according to the rainfall runoff amount in the water catchment area of cutting Great Gulch (4) gradient and interception.
4. the ring storehouse workplatform of mountain valley-type red mud dump according to claim 3 is characterized in that: the diameter of the leaking hole on the described cover plate (5) or width are less than the width of maintenance vehicle wheel.
CNU2007202014428U 2007-11-27 2007-11-27 Work platform around valley type red mud storage yard Expired - Fee Related CN201132806Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007202014428U CN201132806Y (en) 2007-11-27 2007-11-27 Work platform around valley type red mud storage yard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007202014428U CN201132806Y (en) 2007-11-27 2007-11-27 Work platform around valley type red mud storage yard

Publications (1)

Publication Number Publication Date
CN201132806Y true CN201132806Y (en) 2008-10-15

Family

ID=40061081

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007202014428U Expired - Fee Related CN201132806Y (en) 2007-11-27 2007-11-27 Work platform around valley type red mud storage yard

Country Status (1)

Country Link
CN (1) CN201132806Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101838992A (en) * 2010-06-23 2010-09-22 贵阳铝镁设计研究院 Method for dry-method compatibilization of valley-type wet-method red dump site
CN105672443A (en) * 2016-01-20 2016-06-15 中国电建集团贵阳勘测设计研究院有限公司 Structure integrating anti-seepage film anchoring, flood interception and passage
CN109403356A (en) * 2018-11-09 2019-03-01 中国电建集团贵阳勘测设计研究院有限公司 A kind of slope retaining structure
CN109577378A (en) * 2018-11-20 2019-04-05 大连德联科技有限公司 A kind of transverse-plug type quick-assembling stockyard protective device
CN109594570A (en) * 2018-12-06 2019-04-09 贵阳铝镁设计研究院有限公司 Filter cake dry method red mud storage yard slope drainage structure and construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101838992A (en) * 2010-06-23 2010-09-22 贵阳铝镁设计研究院 Method for dry-method compatibilization of valley-type wet-method red dump site
CN101838992B (en) * 2010-06-23 2014-03-12 贵阳铝镁设计研究院有限公司 Method for dry-method compatibilization of valley-type wet-method red dump site
CN105672443A (en) * 2016-01-20 2016-06-15 中国电建集团贵阳勘测设计研究院有限公司 Structure integrating anti-seepage film anchoring, flood interception and passage
CN109403356A (en) * 2018-11-09 2019-03-01 中国电建集团贵阳勘测设计研究院有限公司 A kind of slope retaining structure
CN109403356B (en) * 2018-11-09 2024-03-19 中国电建集团贵阳勘测设计研究院有限公司 Side slope supporting structure
CN109577378A (en) * 2018-11-20 2019-04-05 大连德联科技有限公司 A kind of transverse-plug type quick-assembling stockyard protective device
CN109594570A (en) * 2018-12-06 2019-04-09 贵阳铝镁设计研究院有限公司 Filter cake dry method red mud storage yard slope drainage structure and construction method

Similar Documents

Publication Publication Date Title
CN106759825B (en) Construction method of sponge urban green land water storage system
CN206752614U (en) A kind of sponge-type road sinks formula afforests dividing strip Rainwater collection system
CN201835198U (en) Drainage roadbed for high underground water level
CN106351103A (en) Permeable pavement structure with high strength and high permeability and paving method thereof
CN201132806Y (en) Work platform around valley type red mud storage yard
CN206219935U (en) A kind of permeable pavement structure of high intensity, high osmosis
CN201459905U (en) Urban rainwater drainage system
CN109267445B (en) Sponge urban ecological road rainwater regulation and storage system
CN100510287C (en) Combined member specially for discharging and storaging water
CN205530580U (en) System for collection is prevented osmosis membrane anchor, is cut flood and current as an organic whole
CN110904979A (en) Highway cutting side slope ecological protection system
CN112982072B (en) Green belt water storage and drainage curbstone system and water storage and drainage method
CN109826065A (en) A kind of high-fill roadbed guard system and its construction method
CN103556672A (en) Rainwater harvesting and water storage system for field road and construction method thereof
CN210002537U (en) lateral slope type grass planting ditch for sponge city
CN111648383A (en) Internal drainage method for loess high-fill side slope
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN207727719U (en) Ooze storage row's rainwater piping lane
CN201080614Y (en) Slope type dry method red mud storage yard water drainage structure
CN215329163U (en) Structure of combined sponge city system for sidewalk and green belt
CN113073706B (en) Submerged flow intercepting water intake structure and construction method
CN215122670U (en) Semiarid refuse dump side slope vegetation restoration structure of high-efficient rainfall of utilizing
CN107558587A (en) One kind omits water system in printing slowly after first catchmenting
CN211210711U (en) Green belt for assembled landscape design
CN203334157U (en) Composite rainwater blind drain capable of planting green plants on top

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110721

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110721

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081015

Termination date: 20131127