Prior art keywords
upper chord
chord member
wall
steel
web member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200232004U
Other languages
Chinese (zh)
Inventor
韩亚伦
刘尧
宁永奇
董非
才晓梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqi Jiaojian Group Corp Ltd
Original Assignee
QINGDAO JIAOZHOU CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO JIAOZHOU CONSTRUCTION GROUP CO Ltd filed Critical QINGDAO JIAOZHOU CONSTRUCTION GROUP CO Ltd
Priority to CNU2007200232004U priority Critical patent/CN201053199Y/en
Application granted granted Critical
Publication of CN201053199Y publication Critical patent/CN201053199Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses equipment for building construction, in particular a big template outer hanging rack which comprises an upper chord member and a lower chord member which are arranged horizontally and up and down and a wall-attached channel steel which is connected with the upper chord member and the lower chord member and vertically arranged; the utility model has the following special aspects: an inclined strut steel tube is connected between the upper chord member and the wall-attached channel steel in an inclined way; the cross sections of the upper chord member, the wall-attached channel steel and the inclined strut steel tube form a right triangle; a pothook bolt which can be anchored with the outer wall is movably arranged on the wall-attached channel steel; the upper surface of the upper chord member is provided with an operating platform; the upper surface of the operating platform is fixed with a ground bolt. The utility model saves a mass of steel tubes, reduces the cost of the engineering project, and is characterized in simple framework, rapid lifting, convenient assembly and disassembly, safety, reliability, economy, practicability, etc.

Description

Large mould plate pylon
(1) technical field
The utility model relates to a kind of building operations equipment, particularly a kind of large mould plate pylon.
(2) background technology
In the work progress of shear wall structure highrise building, need building external be arranged to down and on external scaffolding, some units in charge of construction bring into use pylon now, pylon is the wall-attached external scaffolding, it can give safer reliable working environment of constructor, but wasteful dimension pipe, transportation is inconvenient, workman's amount of labour is big.
(3) summary of the invention
The utility model provides a kind of large mould plate pylon in order to remedy the deficiencies in the prior art
The utility model is achieved by the following technical solution:
A kind of large mould plate pylon, comprise upper chord, the lower chord that level is placed up and down and connect the two vertical attached wall channel-section steel of placing, its special character is: the oblique diagonal brace steel pipe that is connected with between described upper chord, the attached wall channel-section steel, upper chord, attached wall channel-section steel, diagonal brace steel pipe three section constitution one right angle triangle; Be movably installed with the hook bolt that can be connected anchoring on the attached wall channel-section steel with exterior wall; The upper surface of upper chord is erected with operating platform, and the upper surface of operating platform is fixed with stone bolt.
Large mould plate pylon of the present utility model is fixed with vertical web member A and oblique web member B between described upper chord, the lower chord.The junction of described upper chord, attached wall channel-section steel, web member B three's junction and lower chord, web member A, web member B, diagonal brace steel pipe is welded to connect with steel plate respectively.
Large mould plate pylon of the present utility model, described support body arranged outside has safety barrier.Be fixed with cross bar between the vertical rod of described diagonal brace steel pipe, safety barrier.
The utility model had both satisfied the construction process requirement of large form, met the safety requirements of outer protective scaffold again, and had saved a large amount of steel pipes, had reduced the project pre-control cost of former climbing type scaffold, thereby reduced the cost of object of construction production.Former traditional this product of pylon of comparing have framework simple, promote quick, take characteristics such as tear open conveniently, safe and reliable, economical and practical.
(4) description of drawings
Below in conjunction with accompanying drawing the utility model is further described.
Accompanying drawing is a structural representation of the present utility model.
Among the figure, 1 upper chord, 2 lower chords, 3 attached wall channel-section steels, 4 diagonal brace steel pipes, 5 exterior walls, 6 hook bolts, 7 operating platforms, 8 stone bolt, 9 web member A, 10 web member B, 11 steel plates, 12 vertical rods, 13 cross bars, 14 large forms, 15 stulls, 16 triangular support brackets.
(5) specific embodiment
Accompanying drawing is a kind of specific embodiment of the present utility model.This embodiment comprises upper chord 1, the lower chord 2 that level is placed up and down and connects the two vertical attached wall channel-section steel 3 of placing, the oblique diagonal brace steel pipe 4 that is connected with between upper chord 1, the attached wall channel-section steel 3, upper chord 1, attached wall channel-section steel 3, diagonal brace steel pipe 4 three's section constitutions one right angle triangle; Be movably installed with the hook bolt 6 that can be connected anchoring on the attached wall channel-section steel 3 with exterior wall 5; Be fixed with vertical web member A9 and oblique web member B10 between upper chord 1, the lower chord 2; The junction of upper chord 1, attached wall channel-section steel 3, web member B10 three's junction and lower chord 2, web member A9, web member B10, diagonal brace steel pipe 4 four is fixed with steel plate 11 respectively; The upper surface of upper chord 1 is erected with operating platform 7, and the upper surface of operating platform 7 is fixed with stone bolt 8.The support body arranged outside has safety barrier, is fixed with cross bar 13 between the vertical rod 12 of diagonal brace steel pipe 4, safety barrier.In use, by the hook bolt on the attached wall channel-section steel 36 pylon is connected anchoring with exterior wall 5, promote large form 14 with tower crane then, stull 15 and triangular support bracket 16 are arranged on the large form 14, triangular support bracket 16 connects stone bolt 8, adjust the verticality that stone bolt 8 is regulated large form 14, can irritate concrete and build.
This product basic structural unit is the triangle projective planum truss, and attached wall channel-section steel 3 adopts the 10# channel-section steel to make, and upper chord 1, lower chord 2 and web member adopt φ 48 * 3.5 to make, and each rod member is by being welded to connect into the plane triangle truss.The element of construction tripod must not be less than 2 Pin unit tripods along the long unidirectional combination of wall in every section Combined shelf body.The whole connection of support body adopts φ 48 * 3.5 fastener type steel pipes to connect.Several Pin unit tripod can be set up plank in the above and form operating platform after being combined into whole support body, for strengthening the support body globality, support body segmentation place adds short steel pipes and connects.Pylon is connected anchoring and adopts φ 28T type hook bolt 6 to connect with exterior wall, wall-through hole utilizes large form to go up row's split bolt wall-through hole most.The totally-enclosed layout of operation layer, maximum configured spacing 1800mm.The support body hoisting way adopts the whole lifting of segmentation, is that whole unit promotes to make up back single hop support body, guardrail and support body operating platform, and elevating mechanism adopts tower crane, and the lifting cycle is one deck one lifting.Pylon support body arranged outside safety barrier, guardrail height is 6.0m, adopts φ 48 * 3.5 fastener type steel pipes to set up.Guardrail vertical rod 12 highly is 6.0m, vertical rod 12 advances are with unit tripod spacing, operating platform highly is 4.0m more than 7,7 times outstanding 2.0m of operating platform, vertical rod 12 is linked to be integral body by cruciform fastening for falsework and rotary buckle and support body, expand hurdle cross bar step pitch and be not more than 1.5m, safety barrier can be set up net, and the operating platform downside can be hung plain net.This product is constructed to the short-shear wall structure high residential building can save a large amount of steel pipes, framework is simple, it is quick to promote, take tear open conveniently, safe and reliable, economical and practical.

Claims (5)

1. large mould plate pylon, comprise upper chord (1), the lower chord (2) that level is placed up and down and connect the two vertical attached wall channel-section steel (3) of placing, it is characterized in that: the oblique diagonal brace steel pipe (4) that is connected with between described upper chord (1), the attached wall channel-section steel (3), upper chord (1), attached wall channel-section steel (3), diagonal brace steel pipe (4) three's section constitution one right angle triangle; Be movably installed with the hook bolt (6) that can be connected anchoring on the attached wall channel-section steel (3) with exterior wall (5); The upper surface of upper chord (1) is erected with operating platform (7), and the upper surface of operating platform (7) is fixed with stone bolt (8).
2. large mould plate pylon according to claim 1 is characterized in that: be fixed with vertical web member A (9) and oblique web member B (10) between described upper chord (1), the lower chord (2).
3. large mould plate pylon according to claim 1 and 2 is characterized in that: the junction of described upper chord (1), attached wall channel-section steel (3), web member B (10) three's junction and lower chord (2), web member A (9), web member B (10), diagonal brace steel pipe (4) four is fixed with steel plate (11) respectively.
4. large mould plate pylon according to claim 3 is characterized in that: described support body arranged outside has safety barrier.
5. large mould plate pylon according to claim 4 is characterized in that: be fixed with cross bar (13) between the vertical rod (12) of described diagonal brace steel pipe (4), safety barrier.
CNU2007200232004U 2007-06-19 2007-06-19 Large template pylon Expired - Fee Related CN201053199Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200232004U CN201053199Y (en) 2007-06-19 2007-06-19 Large template pylon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200232004U CN201053199Y (en) 2007-06-19 2007-06-19 Large template pylon

Publications (1)

Publication Number Publication Date
CN201053199Y true CN201053199Y (en) 2008-04-30

Family

ID=39392864

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200232004U Expired - Fee Related CN201053199Y (en) 2007-06-19 2007-06-19 Large template pylon

Country Status (1)

Country Link
CN (1) CN201053199Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074358A (en) * 2014-07-02 2014-10-01 中铁二局股份有限公司 Construction method of prefabricated assembled building
CN115929003A (en) * 2023-01-10 2023-04-07 中国十七冶集团有限公司 Construction elevator and outer wall passageway gap reinforcing device and using method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074358A (en) * 2014-07-02 2014-10-01 中铁二局股份有限公司 Construction method of prefabricated assembled building
CN115929003A (en) * 2023-01-10 2023-04-07 中国十七冶集团有限公司 Construction elevator and outer wall passageway gap reinforcing device and using method

Similar Documents

Publication Publication Date Title
CN201826525U (en) Climbing shuttering system device for buildings
CN101397844B (en) Construction method of special section steel concrete composite structure inclined wall mould base engineering
CN201598820U (en) Single-point suspension external hanging rack
CN110725597A (en) Construction platform erection structure and method for ring beam at top of concrete silo
CN113550578A (en) High-altitude overhanging structure formwork support and upper protection system construction method
CN212507296U (en) High formwork system
CN105908960A (en) Construction rack for construction of high and large space
CN115030046A (en) Hydraulic creeping formwork for hollow thin-wall pier and construction method thereof
CN212053673U (en) Tower construction operation platform of dome
CN213204915U (en) Overweight overhanging suspended component supporting system of super high-rise residential conversion layer
CN201053199Y (en) Large template pylon
CN102312563A (en) Method for connecting external scaffold with wall for large-span and ultra-story-height structures
CN101250942A (en) Large mould plate pylon
CN217203655U (en) Collapsible operation platform of prefabricated box girder diaphragm construction
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN104164889A (en) Demountable tower crane foundation
CN202831628U (en) Combined type bailey frame load-bearing shelving for pouring large span concrete beam
CN213204913U (en) Modular prefabricated staircase operation platform
CN114775979A (en) Assembly operation frame device for safety production training
CN111764623A (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method
CN202081639U (en) Steel truss tool type supporting structure for concrete framework industrial building templates
CN206581578U (en) Double-layer basket constructing device for overhanging scaffold
CN112922322B (en) Construction method of two-way cosine three-dimensional corrugated steel plate arch-shaped supporting system
CN111593874A (en) Supporting system for overweight overhung suspended member of super high-rise residential conversion layer and construction method
CN201381638Y (en) Fastener type steel pipe scaffold template bracket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ZHONGQI JIAOJIAN GROUP CO., LTD.

Free format text: FORMER NAME: QINGDAO JIAOZHOU CONSTRUCTION GROUP CO., LTD.

CP03 Change of name, title or address

Address after: 266310 No. 92 South Fuzhou Road, Shandong, Jiaozhou

Patentee after: Zhongqi Jiaojian Group Co., Ltd.

Address before: 266510 Shandong city of Qingdao Province Economic and Technological Development Zone, Xin An Xin Ming Yuan District No. 879

Patentee before: Qingdao Jiaozhou Construction Group Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080430