CN201031231Y - 一种高炉炉顶打水冷却装置 - Google Patents
一种高炉炉顶打水冷却装置 Download PDFInfo
- Publication number
- CN201031231Y CN201031231Y CNU200720084829XU CN200720084829U CN201031231Y CN 201031231 Y CN201031231 Y CN 201031231Y CN U200720084829X U CNU200720084829X U CN U200720084829XU CN 200720084829 U CN200720084829 U CN 200720084829U CN 201031231 Y CN201031231 Y CN 201031231Y
- Authority
- CN
- China
- Prior art keywords
- control valve
- blast furnace
- nozzle
- water
- furnace roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Blast Furnaces (AREA)
Abstract
一种高炉炉顶打水冷却装置,这种高炉炉顶打水冷却装置由加压水泵、控制阀、管道、逆止阀、手动控制阀和喷嘴组成,其中在主管上布置有加压水泵和控制阀,主管控制阀的出水端与沿高炉周向布置的支管连接,其支管上依次布置设有支管控制阀、逆止阀、手动控制阀,在支管插入炉顶内部的末端布置安装有打水喷嘴,其喷嘴为旋转式或气流式或压力式结构,并通过喷嘴旋转室或喷嘴芯的控制将冷却水滴调整在0.3mm-6mm范围。
Description
技术领域
本实用新型涉及高炉冶炼生铁的冷却装置,尤其是一种高炉炉顶的喷水冷却装置。
背景技术
在本实用新型提出之前,在高炉冶炼中,高炉炉顶设有炉顶打水装置,其主要目的是当高炉顶温度较高时向炉内打水,用于降低炉顶温度。目前有两种方式,一种是向炉内喷水柱,无任何附加处理,该方式的优点是设备简单,水柱可打到料面中心,缺点是用水量大,效率低,效果差。一部分水会进入炉料中并吸收炉料的物理热,对高炉冶炼赞成影响。另一种方式是将水雾化成小于0.5毫米的雾滴喷入炉顶,该方式的优点是效率高,效果好,不足之处是水雾行程短,在未到达高炉轴线时就被向上的高炉煤气流带走,而一般情况下高炉轴线的温度最高,最需要冷却,该方法仅能对出高炉的煤气进行冷却,无法对高炉炉顶设备进行冷却。造成昂贵的炉顶设备长期工作在高温下,故障增加,寿命大大缩短。
发明内容
本实用新型的目的是提供一种高炉炉顶的喷水冷却装置,达到冷却高炉炉顶设备,减少炉顶设备故障,并延长炉顶设备寿命的作用。
为了实现本实用新型的目的,这种高炉炉顶打水冷却装置由加压水泵、控制阀、管道、逆止阀、手动控制阀和喷嘴组成,其中在主管上布置有加压水泵和控制阀,主管控制阀的出水端与沿高炉周向布置的支管连接,其支管上依次布置设有支管控制阀、逆止阀、手动控制阀,在支管插入炉顶内部的未端布置安装有打水喷嘴。
本实用新型所述支管围高炉圆周布置。
本实用新型所述布置于支管未端的打水喷嘴,为旋转式或离心式或气流式结构,并通过喷嘴旋转室或喷嘴芯的控制将冷却水滴调整在0.3mm-6mm范围。
本实用新型与现有高炉打水装置相比较,显示出了实质性的优点,当沿高炉周向支管未端布置的喷嘴,将喷入高炉的水处理成0.3mm~6mm的水滴,在这个区间的水滴可以有较远的运动距离,可以顶着高炉煤气流到达高炉的轴线。同时水滴还具有较大的表面积,能较为迅速地蒸发,吸收煤气的热量降低炉顶煤气的温度。起到保护炉顶设备及煤气除尘装置的作用。
附图说明
附图为本实用新型高炉炉顶打水冷却装置剖视结构示意图。图中,喷嘴1,手动控制阀2,逆止阀3,支管气动或电动控制阀4,支管管道5,主管气动或电动控制阀6,加压水泵7。
具体实施方式
本实用新型在实施中,布置在高炉炉身周围的支管固定在炉顶锥台上,当加压水泵加压将管内压强达到0.6~8Mpa时,能使水打到沿高炉轴线安装在支管道末端的喷嘴1,并产生0.3mm~6mm的水滴。当炉顶温度达到200℃以上时,支管气动控制阀4,主管气动控制阀6,由关闭状态变为开启状态,水泵7启动,压力水经由喷嘴1控制调整成0.3mm~6mm的冷却水滴喷入高炉。
本实用新型的喷嘴采用旋转式或压力或气流式喷嘴,控制调整水滴的效果好。
Claims (3)
1.一种高炉炉顶打水冷却装置,它由加压水泵、控制阀、管道、逆止阀、手动控制阀和喷嘴组成,其特征是:在主管上布置有加压水泵和控制阀,主管控制阀的出水端与沿高炉周向布置的支管连接,其支管上依次布置设有支管控制阀、逆止阀、手动控制阀,在支管插入炉顶内部的未端布置安装有打水喷嘴。
2.根据权利要求1所述的一种高炉炉顶打水冷却装置,其特征是:所述支管围高炉圆周布置。
3.根据权利要求1所述的一种高炉炉顶打水冷却装置,其特征是:所述布置于支管未端的打水喷嘴,为旋转式或离心式或气流式结构,并通过喷嘴旋转室或喷嘴芯的控制将冷却水滴调整在0.3mm-6mm范围。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200720084829XU CN201031231Y (zh) | 2007-05-24 | 2007-05-24 | 一种高炉炉顶打水冷却装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU200720084829XU CN201031231Y (zh) | 2007-05-24 | 2007-05-24 | 一种高炉炉顶打水冷却装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201031231Y true CN201031231Y (zh) | 2008-03-05 |
Family
ID=39163125
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU200720084829XU Expired - Fee Related CN201031231Y (zh) | 2007-05-24 | 2007-05-24 | 一种高炉炉顶打水冷却装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201031231Y (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104236316A (zh) * | 2014-09-02 | 2014-12-24 | 南京凯盛国际工程有限公司 | 一种水泥熟料冷却机用喷水装置 |
CN110760636A (zh) * | 2019-12-12 | 2020-02-07 | 山东钢铁股份有限公司 | 高炉炉顶分段循环打水降温装置及其使用方法 |
CN111020087A (zh) * | 2019-12-19 | 2020-04-17 | 北京首钢股份有限公司 | 一种高炉打水降温方法及装置 |
-
2007
- 2007-05-24 CN CNU200720084829XU patent/CN201031231Y/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104236316A (zh) * | 2014-09-02 | 2014-12-24 | 南京凯盛国际工程有限公司 | 一种水泥熟料冷却机用喷水装置 |
CN104236316B (zh) * | 2014-09-02 | 2016-05-25 | 南京凯盛国际工程有限公司 | 一种水泥熟料冷却机用喷水装置 |
CN110760636A (zh) * | 2019-12-12 | 2020-02-07 | 山东钢铁股份有限公司 | 高炉炉顶分段循环打水降温装置及其使用方法 |
CN111020087A (zh) * | 2019-12-19 | 2020-04-17 | 北京首钢股份有限公司 | 一种高炉打水降温方法及装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201575547U (zh) | 无电源式单机空调 | |
CN201031231Y (zh) | 一种高炉炉顶打水冷却装置 | |
CN109680229A (zh) | 一种铝合金圆管用淬火装置 | |
CN103234365A (zh) | 利用冶金冲渣水并工艺低温烟气余热进行空调采暖的系统及方法 | |
CN202532776U (zh) | 压缩空气降温装置 | |
CN201172665Y (zh) | 一种高炉炉顶打水冷却装置 | |
CN202993694U (zh) | 空调系统 | |
CN203464559U (zh) | 液化气储存罐快速降温装置 | |
CN209568123U (zh) | 一种铜钢一体风口套 | |
CN101514378B (zh) | 一种高炉鼓风机机后脱湿装置 | |
CN208579327U (zh) | 一种风水冷却式滚筒冷渣机 | |
CN104196769B (zh) | 一种环保型多通道射水抽气器 | |
CN201272697Y (zh) | 发电机组用水除氧装置 | |
CN202913736U (zh) | 节能一体化基站 | |
CN201488618U (zh) | 套筒式风冷散热器 | |
CN108954905A (zh) | 一种带喷射器的复叠压缩式制冷-溶液再生复合机组 | |
CN204061355U (zh) | 一种环保型多通道射水抽气器 | |
CN209435366U (zh) | 一种通信用户外信号中转装置 | |
CN201697254U (zh) | 喷气织机车间空压机-空调节能系统 | |
CN204739706U (zh) | 射流式岗位空调装置 | |
CN207483595U (zh) | 一种污泥干化焚烧用蒸发冷凝装置 | |
CN103307675B (zh) | 压入式节能闭式蒸发冷却冷水机组 | |
CN111829204A (zh) | 一种制茶用热泵霜冻装置 | |
CN201555463U (zh) | 水泥窑头冷却装置 | |
CN103574803A (zh) | 水蒸发制冷空调 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080305 Termination date: 20140524 |