CN201172665Y - 一种高炉炉顶打水冷却装置 - Google Patents
一种高炉炉顶打水冷却装置 Download PDFInfo
- Publication number
- CN201172665Y CN201172665Y CNU2008200665429U CN200820066542U CN201172665Y CN 201172665 Y CN201172665 Y CN 201172665Y CN U2008200665429 U CNU2008200665429 U CN U2008200665429U CN 200820066542 U CN200820066542 U CN 200820066542U CN 201172665 Y CN201172665 Y CN 201172665Y
- Authority
- CN
- China
- Prior art keywords
- blast furnace
- furnace
- control valve
- nozzle
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
Abstract
一种高炉炉顶打水冷却装置,属于高炉冶炼的冷却设备。在主管(6)上布置有加压水泵(8)和主管控制阀(7),主管控制阀(7)的出水端与沿高炉周向布置的支管(9)连接,支管(9)上依次布置设有支管控制阀(1)、逆止阀(2)、手动控制阀(4)和喷嘴(5),所述喷嘴(5)设置在高于高炉煤气上升管(10)入口的炉顶锥台(3)内部。喷嘴(5)喷出的水雾可以直达高炉纵轴线的高温区,先对齿轮箱底部及布料溜槽进行有效地冷却降温,变成蒸汽后才随煤气一起从高炉煤气上升管(10)流出高炉,用水量小,冷却水的利用效率高,吸收炉料热量少,对炉顶设备及煤气除尘装置的冷却降温及保护效果明显提高。
Description
技术领域
本实用新型涉及一种冶炼生铁的高炉冷却装置,尤其是一种高炉炉顶的打水冷却装置。
背景技术
在高炉冶炼中,高炉炉顶设有炉顶打水装置,其主要目的是当高炉顶温度较高时向炉内打水,用于降低炉顶温度。目前有两种方式,一种是向炉内喷水柱,无任何附加处理,该方式的优点是设备简单,水柱可打到料面中心,缺点是用水量大,效率低,效果差。一部分水会进入炉料中并吸收炉料的物理热,对高炉冶炼造成影响。另一种方式是将水雾化后喷入炉顶,这种方式的喷水口安装在低于高炉煤气上升管入口的炉顶锥台上,具有效率较高的优点,不足之处是水雾行程短,喷雾口处于高炉煤气上升管入口的下方,水雾在未到达高炉纵轴线时就被向上的高炉煤气流带走。而一般情况下高炉纵轴线的温度最高,最需要冷却,该两种方法仅能对引出高炉的煤气进行冷却,而无法有效地对高炉炉顶设备进行冷却,使昂贵的炉顶设备仍长期工作在高温下,造成炉顶设备故障增加,使用寿命大大缩短。
发明内容
本实用新型的目的是克服现有技术对炉顶设备冷却效果差的缺陷和不足,提供一种高炉炉顶的打水冷却装置。它对高炉炉顶设备的冷却效果好,可以减少炉顶设备的故障,并延长炉顶设备的使用寿命。
本实用新型的目的是这样实现的,一种高炉炉顶打水冷却装置,在主管上布置有加压水泵和主管控制阀,主管控制阀的出水端与沿高炉周向布置的支管连接,支管上依次布置设有支管控制阀、逆止阀、手动控制阀和喷嘴,所述喷嘴设置在高于高炉煤气上升管入口的炉顶锥台内部。
本实用新型所述高于高炉煤气上升管入口的炉顶锥台上周向开有喷管插入孔,所述的喷嘴和支管经喷管插入孔插入炉顶锥台内部。
本实用新型所述的喷嘴为压力回流式或双流体式雾化喷嘴。
本实用新型与现有高炉打水装置相比较,显示出了实质性的优点,由于喷嘴的安装位置高于煤气上升管的入口,靠近最需要冷却的齿轮箱底部和旋转布料溜槽,喷嘴喷出的水雾可以直达高炉纵轴线的高温区,先对齿轮箱底部及布料溜槽进行有效地冷却降温,变成蒸汽后才随煤气一起从高炉煤气上升管流出高炉,用水量小,冷却水的利用效率高,吸收炉料热量少,对炉顶设备及煤气除尘装置的冷却降温及保护效果明显提高。
附图说明
图1为本实用新型高炉炉顶结构示意图。
图中,支管控制阀1,逆止阀2,炉顶锥台3,手动控制阀4,雾化喷嘴5,主管6,主管控制阀7,加压水泵8,支管9,高炉煤气上升管入口10,高炉煤气上升管10,轴线与炉顶锥台3交点的标高H。
具体实施方式
参见图1,本实用新型的一种高炉炉顶打水冷却装置,在主管6上布置有加压水泵8和主管控制阀7,主管控制阀7的出水端与沿高炉周向布置的支管9连接,支管9上依次布置设有支管控制阀1、逆止阀2、手动控制阀4和喷嘴5,所述喷嘴5设置在高于高炉煤气上升管10入口的炉顶锥台3内部。可以直接在炉顶锥台3的炉壁上打孔固定喷嘴5,使喷嘴5的喷口指向高炉的中心轴线,并使其进水口与炉顶锥台3外部的支管9连通。最好是所述高于高炉煤气上升管10入口的炉顶锥台3上周向开有喷嘴插入孔,所述的喷嘴5和支管9经喷管插入孔插入炉顶锥台3内部。图1中,布置在高炉炉身周围的支管9固定在炉顶锥台3上。在高于高炉煤气上升管10轴线与炉顶锥台3交点的标高H上方周向设有喷管插入孔,喷嘴5经喷管插入孔插入炉顶锥台3内部,喷嘴5安装在支管9的未端。
所述的喷嘴5可以采用喷水的喷嘴,由喷出的水柱对炉顶的高温区进行降温。但喷嘴5最好为压力回流式或双流体式雾化喷嘴,它们的雾化效果好,用水量较少,换热效率较高,对炉顶设备的冷却降温效果更好。
经试验,当炉顶温度达到200℃以上时,支管9上的支管控制阀1和主管气动控制阀7由关闭状态变为开启状态,水泵8启动,压力水经由压力回流式喷嘴喷入高炉,对炉顶设备进行降温,炉顶设备的降温幅度约为80-150℃左右。其降温效果远高于现有的高炉打水冷却装置。
Claims (3)
1.一种高炉炉顶打水冷却装置,在主管(6)上布置有加压水泵(8)和主管控制阀(7),主管控制阀(7)的出水端与沿高炉周向布置的支管(9)连接,支管(9)上依次布置设有支管控制阀(1)、逆止阀(2)、手动控制阀(4)和喷嘴(5),其特征在于:所述喷嘴(5)设置在高于高炉煤气上升管(10)入口的炉顶锥台(3)内部。
2.根据权利要求1所述的一种高炉炉顶打水冷却装置,其特征在于:所述高于高炉煤气上升管(10)入口的炉顶锥台(3)上周向开有喷管插入孔,所述的喷嘴(5)和支管(9)经喷管插入孔插入炉顶锥台(3)内部。
3.根据权利要求1所述的一种高炉炉顶打水冷却装置,其特征在于:所述的喷嘴(5)为压力回流式或双流体式雾化喷嘴。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200665429U CN201172665Y (zh) | 2008-04-18 | 2008-04-18 | 一种高炉炉顶打水冷却装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2008200665429U CN201172665Y (zh) | 2008-04-18 | 2008-04-18 | 一种高炉炉顶打水冷却装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201172665Y true CN201172665Y (zh) | 2008-12-31 |
Family
ID=40199777
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2008200665429U Expired - Fee Related CN201172665Y (zh) | 2008-04-18 | 2008-04-18 | 一种高炉炉顶打水冷却装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201172665Y (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102286649A (zh) * | 2011-08-15 | 2011-12-21 | 山西太钢不锈钢股份有限公司 | 高炉降料线打水枪 |
CN103088171A (zh) * | 2011-10-31 | 2013-05-08 | 上海宝冶集团有限公司 | 用于高温残铁切割的冷却装置 |
CN103789473A (zh) * | 2014-01-16 | 2014-05-14 | 宝钢集团新疆八一钢铁有限公司 | 高炉停炉打水装置 |
CN111020087A (zh) * | 2019-12-19 | 2020-04-17 | 北京首钢股份有限公司 | 一种高炉打水降温方法及装置 |
-
2008
- 2008-04-18 CN CNU2008200665429U patent/CN201172665Y/zh not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102286649A (zh) * | 2011-08-15 | 2011-12-21 | 山西太钢不锈钢股份有限公司 | 高炉降料线打水枪 |
CN103088171A (zh) * | 2011-10-31 | 2013-05-08 | 上海宝冶集团有限公司 | 用于高温残铁切割的冷却装置 |
CN103088171B (zh) * | 2011-10-31 | 2015-09-02 | 上海宝冶集团有限公司 | 用于高温残铁切割的冷却装置 |
CN103789473A (zh) * | 2014-01-16 | 2014-05-14 | 宝钢集团新疆八一钢铁有限公司 | 高炉停炉打水装置 |
CN103789473B (zh) * | 2014-01-16 | 2018-11-02 | 新疆八一钢铁股份有限公司 | 高炉停炉打水装置 |
CN111020087A (zh) * | 2019-12-19 | 2020-04-17 | 北京首钢股份有限公司 | 一种高炉打水降温方法及装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102534073B (zh) | 用于造粒装置的蒸汽冷凝塔 | |
CN201172665Y (zh) | 一种高炉炉顶打水冷却装置 | |
CN107899772A (zh) | 一种用于荒煤气冷却的雾化喷嘴 | |
CN104727843A (zh) | 一种煤矿采煤工作面气液双介质冷却装置 | |
CN207894277U (zh) | 高效传热换热器 | |
CN102478364A (zh) | 冷却凉水塔 | |
CN207146744U (zh) | 蒸发式冷凝温度调节设备 | |
CN106197063B (zh) | 离心式鼓风横流密闭式冷却塔 | |
CN210768659U (zh) | 高寒地区凿岩钻孔施工的除尘水箱防结冰系统 | |
CN102031989A (zh) | 一种无电力驱动生命保障装置 | |
CN205157478U (zh) | 一种采用空化效应强化蒸汽冷凝的实验装置 | |
CN101619903A (zh) | 一种排气引射降温装置 | |
CN201488598U (zh) | 蒸发密闭式冷却水塔 | |
CN201031231Y (zh) | 一种高炉炉顶打水冷却装置 | |
CN206207789U (zh) | 高炉冲渣水余热制冷装置 | |
CN205208777U (zh) | 基于文丘里效应的雾化空调冷凝水冷却换热器装置 | |
CN108194122A (zh) | 矿用风动式降温系统 | |
CN204327160U (zh) | 一种煤矿井下水冷却设备 | |
CN207483595U (zh) | 一种污泥干化焚烧用蒸发冷凝装置 | |
CN209178415U (zh) | 泥炮回转支承管式冷却保护装置 | |
CN209181552U (zh) | 一种汽轮机冷凝器喷淋装置 | |
CN101251341A (zh) | 水能自冷却凉水塔 | |
CN201488379U (zh) | 一种排气引射降温装置 | |
CN203702226U (zh) | 矿井作业面局部冷却器 | |
CN103307675B (zh) | 压入式节能闭式蒸发冷却冷水机组 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20081231 Termination date: 20100418 |