CN1974944A - 一种成桩工艺 - Google Patents
一种成桩工艺 Download PDFInfo
- Publication number
- CN1974944A CN1974944A CN 200610134718 CN200610134718A CN1974944A CN 1974944 A CN1974944 A CN 1974944A CN 200610134718 CN200610134718 CN 200610134718 CN 200610134718 A CN200610134718 A CN 200610134718A CN 1974944 A CN1974944 A CN 1974944A
- Authority
- CN
- China
- Prior art keywords
- pile
- base
- immersed tube
- concrete
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种建筑桩基工程的施工工艺,特别是沉管扩底桩的成桩工艺。它包括将带有金属桩头的沉管压至设计标高硬土层;取出金属桩头,从沉管口扔离散物,用扩底设备进行挖土扩底施工,先垂直扩底再水平扩底,扩底挖土直至达到设计要求底座空腔型为止;取土;将在地面制作好的砼浇注到底座空腔内制成砼底座;下入预制钢砼桩身并通过其底部插筋与现浇砼底座对接锚固成一体;拔出沉管灌注水泥浆成桩。本发明采用上述技术方案与现有技术相比具有工艺方法简单先进,扩底腔几何形状规则,效率高,有效提高单桩承载力,并达设计要求,确保桩基工程质量,降低建筑成本,提高材料强度利用率,提高施工安全性。
Description
技术领域
本发明涉及一种建筑桩基工程的施工工艺,特别是沉管扩底桩的成桩工艺。
背景技术
建筑基础工程质量的好坏将直接影响建筑物的质量,因此各施工单位不仅重视地上建筑的施工质量,而且更注重基础工程的质量。并投入科研力量向桩基工程挖潜,使其在确保工程质量的前提下提高材料强度的利用率。为提高单桩承载力的扩底桩、复合基础桩等相继出现,这尽管比传统基础桩的单桩承载力有明显的提高,但是由于传统的桩基工程施工方法是用人工一点一点挖土,取土挖桩身土,并为防止塌方随之向下挖一定深度下一段沉管,待挖到设计标高时,将人吊起来,再用传统扩底设备进行扩底,而且定位在硬土层上,成型后吊出扩底设备取土后直接浇砼成桩。从而可见传统的桩基成桩工艺还存在如下缺陷:桩身部分土体是用人工挖掉,施工面太大,取土工作量明显增大,工作效率低,成本高;扩底设备由于没有沉管做依托,定位不准,底座扩展角度太小,扩底过程中的各参数不能保证,从而使桩的质量不容易控制,并难以达到设计要求,导致单桩的承载力大打折扣;存在施工人员安全隐患,施工人员稍不注意就容易发生事故;使用范围窄,不仅不适用于小直径桩身扩底,而且也不能用于预制桩身及高复杂地质情况下进行扩底和成桩。基于上述情况,为提高单桩承载力,降低基础工程成本,必须加以改进。
发明内容
本发明针对上述技术存在的问题,提供适用于各种建筑安全等级、地质情况的各类桩身,确保桩基工程质量、明显提高单桩承载力、提高材料强度及利用率、提高成桩效率,安全的成桩工艺。
为了解决上述技术问题,本发明是这样实现的:成桩工艺如下:a、将带有金属桩头的沉管穿过软土层压至设计标高硬土层;b、取出金属桩头,从沉管口扔离散物,用扩底设备进行挖土扩底施工,先垂直扩底再水平扩底,扩底挖土直至达到设计要求底座空腔型为止;c、将底座内的残土取出;d、将在地面制作好的砼由沉管口现浇注到底座空腔内制成砼底座,下入预制钢砼桩身并通过其底部插筋与现浇砼底座对接锚固成一体;e、拔出沉管,沿拔出沉管后的缝隙灌注水泥浆成桩。
本发明优点和效果如下:
本发明与现有技术相比,由于利用了具有金属桩头的沉管、扩底设备和预制桩身等一系列技术措施,并采用先进的生产工艺,经试验证明有工艺方法简单先进,扩底腔几何形状规则,不必取桩身腔土,成桩速度快,效率高,扩底端面直径与桩身截面之比值范围大,有效提高单桩承载力,并达到设计要求,确保桩基工程质量,降低建筑成本,提高材料强度利用率,使桩在最经济状态下工作;同时适用范围宽,依据建筑安全等级和不同的地质情况采用与之相匹配的桩身和相应的扩底方法、机械设备取代人工操作,不仅提高了工作效率、缩短了施工工期,而且还明显减少了挖土的土方量,提高了施工安全性,减少出现事故隐患。
具体实施方式
本发明成桩工艺:它是由下述工艺过程实现:a、将带有金属桩头的沉管穿过软土层压至设计标高硬土层;b、取出金属桩头,从沉管口扔离散物,用扩底设备进行挖土扩底施工,先垂直扩底再水平扩底,扩底挖土直至达到设计要求底座空腔型为止;c、将底座内的残土取出;d、将在地面制作好的砼由沉管口现浇注到底座空腔内制成砼底座,下入预制钢砼桩身并通过其底部插筋与现浇砼底座对接锚固成一体;e、拔出沉管,沿拔出沉管后的缝隙灌注水泥浆成桩。
本发明的方法可以根据不同安全等级建筑,地质情况而采用与之相匹配的桩身和扩底方法,适用范围宽。
所述的离散物是生石灰或滑石粉中的一种或以任意比的混合物。
Claims (1)
1、一种成桩工艺,a、将带有金属桩头的沉管穿过软土层压至设计标高硬土层;b、取出金属桩头,从沉管口扔离散物,用扩底设备进行挖土扩底施工,先垂直扩底再水平扩底,扩底挖土直至达到设计要求底座空腔型为止;c、将底座内的残土取出;d、将在地面制作好的砼由沉管口现浇注到底座空腔内制成砼底座,下入预制钢砼桩身并通过其底部插筋与现浇砼底座对接锚固成一体;e、拔出沉管,沿拔出沉管后的缝隙灌注水泥浆成桩。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610134718 CN1974944A (zh) | 2006-12-12 | 2006-12-12 | 一种成桩工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610134718 CN1974944A (zh) | 2006-12-12 | 2006-12-12 | 一种成桩工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1974944A true CN1974944A (zh) | 2007-06-06 |
Family
ID=38125275
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200610134718 Pending CN1974944A (zh) | 2006-12-12 | 2006-12-12 | 一种成桩工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1974944A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101135156B (zh) * | 2007-09-29 | 2011-12-14 | 童乐天 | 具有高承载力的二级扩底预制桩身的机械成桩方法 |
-
2006
- 2006-12-12 CN CN 200610134718 patent/CN1974944A/zh active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101135156B (zh) * | 2007-09-29 | 2011-12-14 | 童乐天 | 具有高承载力的二级扩底预制桩身的机械成桩方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102518135B (zh) | 水平旋喷土锚和灌注桩复合基坑支护施工工法 | |
CN101570970A (zh) | 一种水泥土地锚的施工方法及其锚定板组合构件 | |
CN108517877A (zh) | 杂填土超深基坑固结注浆结合双排钢管桩支护工法 | |
CN102505704A (zh) | 软弱地质竖井中大型沉井施工方法 | |
CN103321244A (zh) | 砂土地基既有建筑增设地下室的施工方法 | |
CN105442605A (zh) | 拔出phc桩再利用于深基坑支护施工方法 | |
CN111501781A (zh) | 一种杂填土超深基坑固结注浆结合双排钢管桩支护方法及结构 | |
CN104762956B (zh) | 一种基于建筑垃圾再生骨料桩的成桩方法 | |
CN200943205Y (zh) | 土体锚杆施工用锚杆组合件 | |
CN201078234Y (zh) | 立井施工过流砂层的整体液压钢板桩帷幕 | |
CN207062958U (zh) | 一种深基坑复杂多种支护组合结构 | |
CN1974939A (zh) | 一种建筑基础施工方法 | |
CN1974944A (zh) | 一种成桩工艺 | |
CN205776152U (zh) | 预应力锚杆波形板桩支挡结构 | |
CN1974940A (zh) | 一种成桩方法 | |
CN1974942A (zh) | 一种地基桩基施工方法 | |
CN100549307C (zh) | 一种建筑基础施工工艺 | |
CN102677679A (zh) | 建筑基坑用现浇异型钢筋混凝土桩芯水泥土地下连续墙 | |
CN220550544U (zh) | 一种串珠状溶洞桩基础结构 | |
CN1974937A (zh) | 建筑基础成桩方法 | |
CN1974947A (zh) | 一种桩基施工方法 | |
CN1202317C (zh) | 夯扩复合桩基施工方法 | |
CN1320215C (zh) | 高填方区地基桩的制作方法 | |
CN1974938A (zh) | 一种桩基施工工艺 | |
CN1974945A (zh) | 一种建筑成桩工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |