CN101570970A - 一种水泥土地锚的施工方法及其锚定板组合构件 - Google Patents

一种水泥土地锚的施工方法及其锚定板组合构件 Download PDF

Info

Publication number
CN101570970A
CN101570970A CNA2008100109278A CN200810010927A CN101570970A CN 101570970 A CN101570970 A CN 101570970A CN A2008100109278 A CNA2008100109278 A CN A2008100109278A CN 200810010927 A CN200810010927 A CN 200810010927A CN 101570970 A CN101570970 A CN 101570970A
Authority
CN
China
Prior art keywords
anchor
soil
cement
root
combined member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100109278A
Other languages
English (en)
Inventor
李宪奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2008100109278A priority Critical patent/CN101570970A/zh
Publication of CN101570970A publication Critical patent/CN101570970A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种水泥土地锚的施工方法及其所采用的锚定板组合件,在含水量丰富的松散软弱的砂石层、软塑流塑状态的软土层、淤泥质土地层等不良地质条件的地区,常规锚杆技术在施工中很难施工,如同豆腐块插针,无法保证锚拉力。常规的锚杆钢绞线、钢梁及锚头锚具等大量材料不能回收重复利用。作为临时性的支护锚,大量的材料埋在地下永久性建筑物旁边,形成地下障碍物严重影响后来地下结构施工,侵犯周边地界会造成法律纠纷。如在繁华的大都市上海、杭州、武汉、天津等城市旧的常规锚杆施工锚杆都会延深到红线外侵占其它的地域。本发明技术针对上述问题,通过是钻进注浆下锚筋一次性完成,在基坑支护结构失去作用后,急时回收锚筋及腰梁等材料,解决了上述难题又确保施工质量。

Description

一种水泥土地锚的施工方法及其锚定板组合构件
技术领域
本发明专利技术涉及一种岩土工程领域用的锚杆施工方法。
背景技术
在含水量丰富松散软弱的砂石层、软塑流塑状态的淤泥质土地层等不良的地质条件的地区,常规锚杆技术在施工中很难使用,如同豆腐块插针,无法保证锚拉力。常规的锚杆钢绞线,钢梁及锚头锚具等大量钢材由于不能回收从复利用。作为临时性的支护锚大量的材料埋在地下永久性建筑物旁边,不担严重的影响后来地下结构施工又会造成严重的浪费,侵犯周边地界会造成法律纠纷,如在繁华的大都市上海、杭州、武汉、天津等城市旧的常规锚杆施工锚杆都会延深到红线外侵占其它的地域。现有常规技术遇到这样的难题无法解决。
发明的内容
本发明专利技术的上述目的,在不良的地质条件的松散软弱地层中,提供一种新的钢绞线钢梁可重复利用的水泥士地锚施工方法。该锚杆施工方法不需要成孔后再往孔内下锚筋后注浆等复杂工艺,是钻进、成孔、注浆、下锚筋一次性完成。在基坑支护结构失去作用后可回收锚筋及腰梁锚具等材料的施工方法,解决了上述各种难题确保施工质量,大大降低施工造价。
本发明专利是通过下述方法实现
a)本发明专利技术的上述目的是通过下述方法,1通过钻机动力钻进、推进方法使挂在刚性钻杆前部的锚定板组合构件,钻进、推进到地层土体中的设计位置。
b)采用钻机退钻和拨出刚性钻杆的方式将锚定板组合构件与刚性钻杆分离,刚性钻杆退出,锚定板组合构件保留在原位的土体内,成为在土体内的预埋构件,从而改变地锚的受力形式。
c)利用刚性钻杆的中空孔,往孔内及土体内注入水泥浆及化学剂
7)在支护锚完成后地下主体结构做出地面时锚筋和腰梁锚具等及时回收。
该施工方法包括所采用的锚定板组合件,钻机通过钻杆把锚定板组合件挂在钻杆前部送入土体内,采用注浆泵和刚性杆与锚定板、锚筋连结一起,再通过旋转钻进带入地层的设计位置后,往管内注入水泥浆,通过旋喷法、搅拌法达到设计要求后退出刚性钻杆。锚定板、锚筋保留在土层原处,同水泥浆和地下砂砾石混合凝固成一体形成较大直径的水泥土地锚,并可根据设计需要在不同位置设计扩大头。在回收锚筋时由于挤压柱套采用特殊工艺使钢绞线在极限拉力值内,设计拉力值外,拨出力破坏挤压柱套而抽出钢绞线。
上述锚杆方法特点:在含水量丰富的流塑状的淤泥土层、粉细砂层及粗砂、园砾的土层,不但可以施工地锚又能回收大量的材料。解决常规锚杆无法回收材料的问题,避免了内支撑方法所造成的坑内不空旷、土方挖运及地下室施工不便。常规技术必须先成孔,钻孔扰动松散原土容易产生砂土液化从而造成管涌喷砂事故。本发明技术不需钻孔,钻进注浆有加固和护壁士体的功能,只进浆不出水,水泥浆可迅速凝固成止水型锚杆,高压旋喷注浆、高压灌注浆会使锚固体直径扩大,有超前加固砂土的功能,施工速度快、节能又环保,可回收材料、造价底、无污染,抗拉拨力高。
附图说明:
附图1:地锚钻进施工
附图2:刚性杆退出
附图3:地锚施工完毕
附图4:钢绞线回收完毕
附图5:锚定板组合件同注浆钻杆连接大样图
附图6:锚定板组合件大样图
附图7:锚定板组合件透视图
其中1、钻机,2、刚性杆,3、喷浆口,4、锚定板,5、水泥土地锚,6、挡盘,7、锚固套柱,8、钢绞线,9锥形锚头10锥形钻头插孔。

Claims (7)

1、一种水泥土地锚的施工方法及其所采用的锚定板组合构件
a)通过钻机动力钻进、推进方法使挂在刚性钻杆前部的锚定板组合构件,钻进、推进到地层土体中的设计位置。
b)采用钻机退钻和拨出刚性钻杆的方式将锚定板组合构件与刚性钻杆分离,锚定板组合构件自留在原位的土体内。
c)利用刚性钻杆的中空孔,往孔内及土体内注入水泥浆。
2、根椐权利要求1)、所述的水泥土锚杆施工方法其特征:在于上述步骤中所述的方法,刚性杆可以是地质钻杆、钢管、螺纹钢管等。
3、根椐权利要求c)、所述的水泥土地锚的施工方法,其特征在于,上述所述的水泥土地锚的施工方法可以是搅拌法,高压旋喷法和注浆法形成的大直径的水泥土地锚。
4、根椐权利要求1)、所述的锚定板组合结构件,该锚定板组合构件,包括钢绞线,锚定板和锚固挤压柱构成的。
5、根椐权利要求1)、所述的方法地锚,可以称之为是直径大的锚杆、土钉。
6、根椐权利要求5)、所述的锚杆、土钉的施工方法:其特征在于灌注的水泥浆液,可以是用高压旋喷法、注浆搅拌法和压力注浆法形成。
7、根椐权利要求4)、所述的钢绞线,可以是刚性的金属线和非金属线其特点是上述刚性线可以回收从复利用。
CNA2008100109278A 2008-04-07 2008-04-07 一种水泥土地锚的施工方法及其锚定板组合构件 Pending CN101570970A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100109278A CN101570970A (zh) 2008-04-07 2008-04-07 一种水泥土地锚的施工方法及其锚定板组合构件

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100109278A CN101570970A (zh) 2008-04-07 2008-04-07 一种水泥土地锚的施工方法及其锚定板组合构件

Publications (1)

Publication Number Publication Date
CN101570970A true CN101570970A (zh) 2009-11-04

Family

ID=41230434

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100109278A Pending CN101570970A (zh) 2008-04-07 2008-04-07 一种水泥土地锚的施工方法及其锚定板组合构件

Country Status (1)

Country Link
CN (1) CN101570970A (zh)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832101A (zh) * 2010-04-21 2010-09-15 邵辉 一种旋喷搅拌钻具
CN102011602B (zh) * 2010-01-13 2012-03-21 孙世国 盘式锚杆加固技术计算方法
CN102505950A (zh) * 2011-10-17 2012-06-20 李宪奎 一种自进式锚杆回收的施工方法及其锚杆结构件
CN102505687A (zh) * 2011-12-13 2012-06-20 江苏建筑职业技术学院 可预爆钻注锚一体化锚杆及施工方法
CN103343537A (zh) * 2013-07-29 2013-10-09 李宪奎 一种高压旋喷锚杆钻机及其高压旋喷锚杆的施工方法
CN103422869A (zh) * 2013-08-22 2013-12-04 山东科技大学 软岩巷道旋喷锚固综合施工方法
CN103953039A (zh) * 2014-05-15 2014-07-30 山东大学 一种提高锚杆拉拔力的方法及装置
CN104314076A (zh) * 2014-10-13 2015-01-28 安徽湖滨建设集团有限公司 一种软土地基可回收式预应力锚索结构及施工方法
CN106948790A (zh) * 2017-04-13 2017-07-14 叶晓明 钻机、盾构机旋喷护壁装置及施工方法
CN107476814A (zh) * 2017-09-28 2017-12-15 滨州学院 一种自振射流注浆锚杆一体化施工设备及方法
CN107574835A (zh) * 2016-07-05 2018-01-12 辛德刚 水泥土土钉土墙
CN107882039A (zh) * 2016-09-30 2018-04-06 上海城地建设股份有限公司 一种钢管前撑h型构件围护结构及其施工方法
CN108277808A (zh) * 2017-01-05 2018-07-13 上海城地建设股份有限公司 一种钢管前撑、锚索后拉h型构件围护结构及其应用方法
CN108360531A (zh) * 2018-03-09 2018-08-03 兰州理工大学 一种自适应预应力锚杆复合土钉墙及施工方法
CN109972613A (zh) * 2019-04-28 2019-07-05 中冶沈勘工程技术有限公司 可回收式锚固机构及施工方法
CN112878322A (zh) * 2021-03-23 2021-06-01 北京京能建设集团有限公司 一种地下水水位以下锚杆施工方法
CN114278219A (zh) * 2021-11-23 2022-04-05 中车永济电机有限公司 一种可重复利用的铁路道砟打孔预埋钢管组件

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011602B (zh) * 2010-01-13 2012-03-21 孙世国 盘式锚杆加固技术计算方法
CN101832101A (zh) * 2010-04-21 2010-09-15 邵辉 一种旋喷搅拌钻具
CN101832101B (zh) * 2010-04-21 2012-06-27 邵辉 一种旋喷搅拌钻具
CN102505950A (zh) * 2011-10-17 2012-06-20 李宪奎 一种自进式锚杆回收的施工方法及其锚杆结构件
CN102505687A (zh) * 2011-12-13 2012-06-20 江苏建筑职业技术学院 可预爆钻注锚一体化锚杆及施工方法
CN102505687B (zh) * 2011-12-13 2014-08-06 江苏建筑职业技术学院 可预爆钻注锚一体化锚杆及施工方法
CN103343537A (zh) * 2013-07-29 2013-10-09 李宪奎 一种高压旋喷锚杆钻机及其高压旋喷锚杆的施工方法
CN103422869A (zh) * 2013-08-22 2013-12-04 山东科技大学 软岩巷道旋喷锚固综合施工方法
CN103953039A (zh) * 2014-05-15 2014-07-30 山东大学 一种提高锚杆拉拔力的方法及装置
CN104314076B (zh) * 2014-10-13 2016-03-30 安徽湖滨建设集团有限公司 一种软土地基可回收式预应力锚索结构及施工方法
CN104314076A (zh) * 2014-10-13 2015-01-28 安徽湖滨建设集团有限公司 一种软土地基可回收式预应力锚索结构及施工方法
CN107574835A (zh) * 2016-07-05 2018-01-12 辛德刚 水泥土土钉土墙
CN107882039A (zh) * 2016-09-30 2018-04-06 上海城地建设股份有限公司 一种钢管前撑h型构件围护结构及其施工方法
CN108277808A (zh) * 2017-01-05 2018-07-13 上海城地建设股份有限公司 一种钢管前撑、锚索后拉h型构件围护结构及其应用方法
CN106948790A (zh) * 2017-04-13 2017-07-14 叶晓明 钻机、盾构机旋喷护壁装置及施工方法
CN107476814A (zh) * 2017-09-28 2017-12-15 滨州学院 一种自振射流注浆锚杆一体化施工设备及方法
CN107476814B (zh) * 2017-09-28 2023-08-25 滨州学院 一种自振射流注浆锚杆一体化施工设备及方法
CN108360531A (zh) * 2018-03-09 2018-08-03 兰州理工大学 一种自适应预应力锚杆复合土钉墙及施工方法
CN109972613A (zh) * 2019-04-28 2019-07-05 中冶沈勘工程技术有限公司 可回收式锚固机构及施工方法
CN109972613B (zh) * 2019-04-28 2024-02-23 中冶沈勘工程技术有限公司 可回收式锚固机构及施工方法
CN112878322A (zh) * 2021-03-23 2021-06-01 北京京能建设集团有限公司 一种地下水水位以下锚杆施工方法
CN114278219A (zh) * 2021-11-23 2022-04-05 中车永济电机有限公司 一种可重复利用的铁路道砟打孔预埋钢管组件

Similar Documents

Publication Publication Date Title
CN101570970A (zh) 一种水泥土地锚的施工方法及其锚定板组合构件
CN102518135B (zh) 水平旋喷土锚和灌注桩复合基坑支护施工工法
CN101058980B (zh) 一种自进式锚杆的施工方法
CN100580188C (zh) 四重管地层减压式双液旋喷的施工方法
CN101748728B (zh) 水泥土扩径抗拔桩
CN1193141C (zh) 一种加固地基基础的复合注浆施工方法
CN100350104C (zh) 带高压旋喷桩尖的同步组合桩的施工方法
CN203452083U (zh) 旋扩桩成桩设备及进浆装置
CN108775014A (zh) 自携伞状扩体结构的旋喷锚索或旋喷锚杆施工方法
CN105155550B (zh) 联合支护开挖大厚度强风化砂岩层深基坑的施工方法
CN104895073B (zh) 可多次拆装的锚索施工系统及其施工方法
CN101736760A (zh) 一种预应力抗浮锚杆及其施工方法
CN1657711A (zh) 旋喷锚杆桩施工工艺
CN102002956A (zh) 开挖边坡断层出露区域的多层次全封闭加固技术
CN105442605A (zh) 拔出phc桩再利用于深基坑支护施工方法
CN103603379A (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系及其施工工艺
CN104818713A (zh) 一种适应于多种地层的型钢水泥土桩施工方法
CN110144978A (zh) 一种抗浮锚杆施工方法
CN101949151A (zh) 一种可回收的锁定式锚杆及其施工方法
CN203613568U (zh) 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系
CN101338567B (zh) 旋喷沉井法配合半逆作法施工地下建筑物的施工方法
CN103343537A (zh) 一种高压旋喷锚杆钻机及其高压旋喷锚杆的施工方法
CN102286979A (zh) 钢管桩-自钻式预应力锚杆深基坑支护施工方法
CN105421446B (zh) 一种用于软基处理的混合土挤压固化预制桩的施工方法
CN205062810U (zh) 一种端承型螺纹芯组合桩的施工设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20091104