CN1904243A - Integrated polyurethane hard foam filling decorative surface no disassembling support mould external wall heat insulation system - Google Patents

Integrated polyurethane hard foam filling decorative surface no disassembling support mould external wall heat insulation system Download PDF

Info

Publication number
CN1904243A
CN1904243A CN 200510089251 CN200510089251A CN1904243A CN 1904243 A CN1904243 A CN 1904243A CN 200510089251 CN200510089251 CN 200510089251 CN 200510089251 A CN200510089251 A CN 200510089251A CN 1904243 A CN1904243 A CN 1904243A
Authority
CN
China
Prior art keywords
template
polyurethane
wall
external member
heat insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200510089251
Other languages
Chinese (zh)
Inventor
冀广宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200510089251 priority Critical patent/CN1904243A/en
Publication of CN1904243A publication Critical patent/CN1904243A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a heat preservation system with the integrating polyurethane coating covering on the decorative nondetaching mould which is fixed on the wall. It can avoid the pollution from spraying the polyurethane and the inequality of the thickness; also it can avoid the trouble of setting and dismantling the module and plastering the ash veneer. The process includes: 1. installing the connecting external member on the bottom (7); 2. Installing the groove module (3); 3. Pressing into the medium connecting external member (5); 4. The wall built-in fitting fixes the medium connecting external member; 5. Adjusting the space between the module connect piece and the wall fixing piece; 6. Sealing the module slot (4); 7. Pouring the foaming polyurethane (6); 8. Pour the upper module continuous; 9. Level the sealing slot; 10. Fill the slot with the paint filler; 11. Check the work. So the process has the high mechanization and low cost, also the quality can be safeguarded.

Description

Integrated polyurethane hard foam perfusion band mo(u)lding face does not have dismounting formwork external wall heat insulation system
One, technical field
The invention belongs to the construction technology of energy-saving building technology China and foreign countries exterior surface of wall lagging facility.
Two, background technology
The Energy Saving Technique for Buildings in Our Country level is promoted power-saving technology far below developed country in building trade, and the development of carrying out low energy consumption, super low energy consumption and green building is a current vital task.Hard polyurethane foams of holding in Beijing is applied seminar in building energy saving field and has been affirmed polyurethane foam at the promotion prospect aspect the building heat preservation in the recent period, has also pointed out the problem that modes such as current polyurethane coating, polyurethane perfusion will solve simultaneously.The normality of polyurethane is a liquid, promptly begins foaming and intumescing and curing gradually after different component proportionings are mixed, and becomes the hard polyaminoester with heat-insulating property.The heat transmission that polyurethane is covered outer surface of wall building capable of blocking reaches energy-conservation effect.The implementation method of prior art is a kind of to be that polyurethane foam is sprayed at surface of wall, and spraying process is difficult to accurate control, the one, can not guarantee all even surfacing of thickness, and the 2nd, foam is blown away by wind and causes waste and contaminated environment.Another kind of implementation method is a predetermined fixed template on the wall, and filling polyurethane in template and body of wall gap is dismantled template then, smears cement paint brush coating outside the layer of polyurethane after curing or pastes ceramic tile, finishes the construction of exterior surface of wall.The problem that it exists is: just can carry out next step surface construction for preventing that template from by polyurethane bonding dismounting difficulty, needing to be coated with release agents such as butter on template, will polish after the template dismounting release agent that sticks to polyurethane surface.Speed of application is slow, cost of labor is high, the numerous rope of complex procedures, and the construction period prolongs greatly.
Three, summary of the invention
In order to solve the problems referred to above that polyurethane heat insulation material exists in building operations, the present invention has designed integrated polyurethane hard foam perfusion band mo(u)lding face does not have dismounting formwork external wall heat insulation system.It is the integrated process that the band mo(u)lding face die plate does not have the dismounting formwork in the polyurethane pouring construction, and its technological process is: 1, the bottom is installed connects external member (7); 2, dress groove template (3); 3, be pressed into intermediate connecting sleeve spare (5); 4, the fixing body of wall fixture of intermediate connecting sleeve spare; 5, adjust the template connecting piece and the body of wall fixture spacing of intermediate connecting sleeve spare; 6, Sealing formboard side seam (4); 7, perfusion polyurathamc (6); 8, formwork perfusion foaming continuously; 9, equating sealing seam; 10, putty jointing; 11, examination is handed over.
This construction technology adopts the connection external member and the band mo(u)lding face die plate that give manufacturing earlier directly to install on body of wall, template be connected external member and no longer dismantle, save man-hour, connect that external member is stealthy installs, filling polyurethane do not have leakage, pollution-free, construction flow process is fast, quality good.
Four, description of drawings
Fig. 1 does not have dismounting formwork external wall heat insulation system process flow diagram for integrated polyurethane hard foam perfusion band mo(u)lding face of the present invention.
Fig. 2 is a polyurethane pouring construction schematic diagram.
Five, the specific embodiment
It is after main building is finished that integrated polyurethane hard foam perfusion band mo(u)lding face does not have dismounting formwork external wall heat insulation system, installs the integrated coherent construction skill of polyurethane insulation coating and exterior wall finish plate additional as external surface at exterior wall.Construction is followed the frame process that rises of scaffold at first from the body of wall bottom, and construction progressively extends upward until the top.Construction in playing the frame process comprises preceding nine procedures among Fig. 1.1 installs the bottom in the body of wall bottom according to the hanging wire level connects external member (7).The intermediate connector (5) that the bottom here connects external member and back all is the special special connecting piece that fixes the groove template of technology for this reason, and they all are strip spares, divide two ones of body of wall fixture and template connecting pieces, and these two parts connect and adjustable distance with screw.The effect that the bottom connects external member is that template above supporting and closed bottom edge are so that pouring construction.The effect of intermediate connecting sleeve spare is to compress following template and support top template, and does not hinder the polyurethane perfusion.2 install groove template (3).The groove template is given system, and its upper and lower end has and is connected the groove that external member is joined, and has facing, and facing can be zone face brick, coloured cement face, be coated with forms such as charge level or lacquer painting.The groove of template is installed on the template connecting piece.3 install intermediate connecting sleeve spare (5).Intermediate connecting sleeve spare is installed on the template top margin was comprised for 4,5,6, three steps.The 4th, template connecting piece is pressed into the lower bolster groove.The 5th, fixing on the wall the body of wall fixture with nailing or expansible stopper.The 6th, according to the spacing of outer hanging wire adjustment template connecting piece and body of wall fixture.The purpose in this step is the thickness that guarantees the insulation layer design, guarantees on this basis that the template outside finish finally is on the plane to make wall face smooth bright and clean.The 7th, the sealing of template side seam (4).After template is installed, there is certain interval upper and lower, left and right, when pouring into, do not leak and attractive in appearance, the insulation in the back of completing for making the gap, must seal by the injection cranny filler of polyurethane foam, door and window hole is pasted with fixed thick band mo(u)lding face warming plate, hang partial-length and equal the insulation layer design thickness, do side form simultaneously and use.。The 8th, filling polyurethane (6).In template that seals and body of wall die cavity, use Filling gun (2) sprinkling irrigation hard polyurethane foam heat insulating material.In order to make connector not bear overweight template weight and to prevent that the cavity from not appearring in filling polyurethane, influx height is not too big.The height that does not surpass the layer 2-3 template.Polyurethane after the perfusion has very strong cementation, and template and body of wall are bonded to one, and the dimensional stability of hard bubbling is good, in<20 ℃, and deformation<5%.The 9th, prop up upper mould continuously.Repeat said process with template upwards install from level to level, fixing, side seam sealing, perfusion, up to building top.After this be the frame process that falls, follow the dismounting of scaffold, three process after finishing from the top down.The 10th, the equating side seam.Root out the polyurethane foam on the unnecessary template side seam.The 11st, the putty jointing.With putty with template seam collude smear neat.The 12nd, check and accept and hand over.
This construction technological process, the per pass operation closely connects, and template does not have dismounting, and the stealthy nothing of installing of connector exposes.Nonmetal parts is adopted in the spacing adjustment of template connecting piece and body of wall fixture, has blocked body of wall and exterior wall surface heat and has transmitted.Polyurethane perfusion nothing is sewed and is splashed, and has eliminated pollution and cleaning process, and it is quick that work progress is linked up, and guaranteed construction quality.

Claims (2)

1, it is the integrated process that the band mo(u)lding face die plate does not have the dismounting formwork in the polyurethane pouring construction that integrated polyurethane hard foam perfusion band mo(u)lding face does not have dismounting formwork external wall heat insulation system, it is characterized in that: the construction sequence of this process is 1, the bottom is installed connects external member (7), 2, dress groove template (3), 3, intermediate connecting sleeve spare (5) is installed, 4, the fixing body of wall fixture of intermediate connecting sleeve spare, 5, adjust the template connecting piece and the body of wall fixture spacing of intermediate connecting sleeve spare, 6, Sealing formboard side seam (4), 7, perfusion polyurathamc (6), 8, prop up upper mould continuously, 9, equating sealing seam, 10, the putty jointing, 11, examination is handed over.
2, integrated polyurethane hard foam perfusion band mo(u)lding face as claimed in claim 1 does not have dismounting formwork external wall heat insulation system, it is characterized in that: the bottom connects external member (7) and intermediate connecting sleeve spare (5) is the strip connector that level is installed, the upper and lower end band groove of ceramic tile or coating facing template (3) during construction, template connecting piece inserts the groove of template.
CN 200510089251 2005-07-27 2005-07-27 Integrated polyurethane hard foam filling decorative surface no disassembling support mould external wall heat insulation system Pending CN1904243A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510089251 CN1904243A (en) 2005-07-27 2005-07-27 Integrated polyurethane hard foam filling decorative surface no disassembling support mould external wall heat insulation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510089251 CN1904243A (en) 2005-07-27 2005-07-27 Integrated polyurethane hard foam filling decorative surface no disassembling support mould external wall heat insulation system

Publications (1)

Publication Number Publication Date
CN1904243A true CN1904243A (en) 2007-01-31

Family

ID=37673587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510089251 Pending CN1904243A (en) 2005-07-27 2005-07-27 Integrated polyurethane hard foam filling decorative surface no disassembling support mould external wall heat insulation system

Country Status (1)

Country Link
CN (1) CN1904243A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102277961A (en) * 2009-04-03 2011-12-14 广州拜尔冷链聚氨酯科技有限公司 Construction method of large-size cold store wall
WO2017156599A1 (en) * 2016-03-18 2017-09-21 Berger Francisco Wall lining acting as a cooling siding
CN107313572A (en) * 2017-07-19 2017-11-03 能诚集团有限公司 A kind of plug-in member connecting structure
CN108237636A (en) * 2016-12-23 2018-07-03 德州北辰福润达卫浴有限公司 The mating tile wall board production technology of integral bathroom
CN113529987A (en) * 2021-07-09 2021-10-22 吉林建筑大学 Hanging plate for external wall and production method thereof
CN113818653A (en) * 2021-08-30 2021-12-21 谭涵 Spraying hard bubble polyurethane heat preservation outer wall structure
CN114193633A (en) * 2020-09-18 2022-03-18 苏州有巢氏家居有限公司 Production process of ceramic tile wallboard matched with integral bathroom

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102277961A (en) * 2009-04-03 2011-12-14 广州拜尔冷链聚氨酯科技有限公司 Construction method of large-size cold store wall
CN102277961B (en) * 2009-04-03 2013-10-09 广州拜尔冷链聚氨酯科技有限公司 Construction method of large-size cold store wall
WO2017156599A1 (en) * 2016-03-18 2017-09-21 Berger Francisco Wall lining acting as a cooling siding
CN108237636A (en) * 2016-12-23 2018-07-03 德州北辰福润达卫浴有限公司 The mating tile wall board production technology of integral bathroom
CN107313572A (en) * 2017-07-19 2017-11-03 能诚集团有限公司 A kind of plug-in member connecting structure
CN114193633A (en) * 2020-09-18 2022-03-18 苏州有巢氏家居有限公司 Production process of ceramic tile wallboard matched with integral bathroom
CN113529987A (en) * 2021-07-09 2021-10-22 吉林建筑大学 Hanging plate for external wall and production method thereof
CN113818653A (en) * 2021-08-30 2021-12-21 谭涵 Spraying hard bubble polyurethane heat preservation outer wall structure

Similar Documents

Publication Publication Date Title
CN102777103B (en) Energy-saving door and window attached frame and door and window installation method
CN1904243A (en) Integrated polyurethane hard foam filling decorative surface no disassembling support mould external wall heat insulation system
CN101487335B (en) External wall heat-preserving decoration wall and its construction process
CN103572845A (en) Insulation mortar reflective insulation coating external wall insulation system and construction process thereof
CN101131002A (en) Mould-locking assembled water-proof heat-insulating slab and construction method thereof
CN101818573B (en) External heat preservation technology method of wall by means of pouring polyurethane heat preservation layer with disassembly-free mould
CN1944831A (en) Process for producing outer heat insulation wall by on-site pouring polyurethane heat insulation layer real stone paint decoration surface
CN205475825U (en) Keep warm and decorate wall body
CN105821956A (en) Construction method for special-shape eave of concrete building
CN201180323Y (en) Polyurethane support mold pouring heat preservation wall
CN1944830A (en) Process for producing pouring polyurethane paint decoration surface wall
CN217001418U (en) Door and window frame mounting system and door and window system
CN108729580B (en) Wall manufacturing method
CN216641817U (en) Door and window frame mounting system and door and window system
CN110259144A (en) A kind of novel energy-saving environment-friendly ash concrete lightweight wall plate construction method
CN205976290U (en) Compound incubation intergral template anchor is held in palm and is hung structure
CN201826403U (en) Building exterior wall insulation structure
CN204326275U (en) Polyurethane composite thermal insulation template
CN103953197A (en) Glass curtain wall construction method
CN201908415U (en) Wall decorative board layer structure
CN206722276U (en) A kind of heat insulating decorative board of alternative dry close plating curtain wall
CN110374227B (en) External net sheet type wall heat preservation and decoration system and construction method thereof
CN114033276A (en) Door and window frame mounting system and door and window system
CN108277894A (en) A kind of plate heat preserving formwork mounting process of concrete shear force wall
CN113775197A (en) Construction method for plugging and preventing leakage of concrete outer wall through-wall bolt hole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication