CN1844581A - Urban stereo road - Google Patents

Urban stereo road Download PDF

Info

Publication number
CN1844581A
CN1844581A CN 200610020300 CN200610020300A CN1844581A CN 1844581 A CN1844581 A CN 1844581A CN 200610020300 CN200610020300 CN 200610020300 CN 200610020300 A CN200610020300 A CN 200610020300A CN 1844581 A CN1844581 A CN 1844581A
Authority
CN
China
Prior art keywords
road
highway section
layers
way
deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610020300
Other languages
Chinese (zh)
Other versions
CN100516364C (en
Inventor
陈清伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006100203001A priority Critical patent/CN100516364C/en
Publication of CN1844581A publication Critical patent/CN1844581A/en
Application granted granted Critical
Publication of CN100516364C publication Critical patent/CN100516364C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a three-dimensional road, which comprises: bottom road (2), first road (3), and the overhead road (1) of second road (4); wherein, the first and second roads have one-way roads (9, 10) and the patio (20) for separating the one-way roads (9, 10); said one-way roads have connecting road (11); one-way roads have the interlayer guide road for connecting the bottom road and the first and second roads; the patio (20) that along the axes of main road (22) which can directly be through at the cross road separates the first and second roads of main road (322) to the one-way roads (9, 10), to block the one-way roads (9, 10) of the first and second roads of sub-road (23) which can not be directly through; the one-way road (9, 10) of first road (3) of sub-road are connected via the guide bridge that spanning the patio. The invention is characterized in that: some one-way roads (9, 10) of second road (4) at sub-road and cross are connected to cover some patio (20) of first road (3); the middle part of connected road is protruded to connect the second road that spanning the main road (22) and the arc bridge (21) of patio (20) of the axes of second road; the flat parts at two sides are connected to the second road of main road (22), while its inner side has a descending guide road (13) connected to the first road.

Description

City overpass
Technical field:
The present invention is relevant with urban elevated road, especially with to intersect elevated road relevant.
Background technology:
Existing elevated road such as name are called " city overpass ", the patent No. is the technical scheme of ZL99114942.4, be based on late nineteen nineties China's motor vehicle and increase fast, urban traffic infrastructure but seriously lags behind, and caused urban traffic is serious to be stopped up and stops difficulty and the invention made.This invention " city overpass " has solved in the past, and urban elevated road is difficult to problem up and down, make it forming combination under the prerequisite of not destroying the various functions of original ground level road and between original ground level road, because of one deck road can stop, and solved the problem of parking difficulty simultaneously." city overpass " is though have about the inner solution of road self system vehicle and the two big advantages of parking, but cause the node of traffic jam, be the traffic diverging difficult problem at crossing, also not basic the solution is so it still belongs to the road system that connects pattern basically.Such as, no matter the magnitude of traffic flow in the intersection on the relative both direction in main highway section is big, still little, it is all equally lived together peacefully with the craspedodrome road, because the original function that this " city overpass " kept ground level road is constant, promptly the original traffic capacity of ground level road is constant, if but two such " city overpass " are crossing, when the magnitude of traffic flow of four direction was all quite big again, change had just taken place in situation.Because there is the through vehicles on the both direction when keeping straight on, need pass through communication channel 11, needs doubling just can finish craspedodrome for twice and pass through; Left-hand bend vehicle on the four direction also need be before or after by communication channel 11 once doubling travel.So when less important road section traffic volume flow is less, the degree that vehicle on the direction of main highway section is disturbed also can be not clearly, the timesharing if all relatively very big dereliction of four direction vehicle flowrate takes second place, obviously just can not satisfy the demand, travel and near communication channel 11, formation to be detained and to stop up because of continuous vehicle doubling, finally be affected completely.
The content of invention:
The purpose of this invention is to provide a kind of under all big situation of the vehicle flowrate of intersection four direction, all directions to pass through performance good, the city overpass that throughput is big.
The present invention is achieved in that
City overpass of the present invention, comprise bottom road 2, one deck road 3, the viaduct 1 in two layers of road 4, one deck road, there is one-way street 9 in two layers of road, 10 and with one- way street 9,10 courtyards that separate 20, the one-way street that is separated by courtyard 20 has communication channel 11, one-way street has the bottom road of connection and one deck road, the interlayer in one deck road and two layers of road leads the way 13, in the intersection along the courtyard 20 of the axis in the main highway section 22 that can lead directly to one deck road with main highway section 22, two layers of road are separated into the one-way street 9 that is separated from each other, 10, and the blocking-up less important highway section 23 that can not lead directly to one, the one-way street 9 in two layers of road, 10, the one-way street that is disconnected 9 in one deck road 3 in less important highway section, 10 access bridges 11 by leap courtyard 20 are connected, in the intersection, part one-way street 9 on two layers of road 4 in less important highway section, 10 link to each other and covered portion courtyard 20, the middle part, road that links to each other raises up and is connected to form across the two layers of road in main highway section 22 and the arch bridge 24 of the courtyard 20 on the axis thereof, the both sides flat is connected with two layers of road in main highway section 22, and its inboard has descending leading the way 13 to be connected with one deck road.
One-way street 9 on two layers of road 4 in less important highway section 23,10 13 are connected with one deck road 3 by descending leading the way in the intersection, the communication channel 11 of crossing over courtyard 20 on 22 axis of main highway section is arranged on one deck road 3, have on main one deck road, highway section 3 along the up access bridge 13 of main highway section axis and connect two layers of road 4, main highway section, the one-way street 9 in two layers of road 4 in main highway section, 10 respectively have descending access bridge 21 to cross over the one-way street 10 in courtyard 20 and one deck road 3 on opposite on the axis of main highway section, 9 connect, and one deck road, less important highway section is along the one-way street 10 in the up 13 and two layers of road of leading the way of its axis, 9 connect.
Access bridge 21 is acute angle or right angle with main highway section 22 axis angles.
Two layers of road in main highway section 22 and up access bridge 13 extend and are connected to courtyard 20.
Late nineteen nineties, China's automobile annual production has only more than 100 ten thousand, and automobile annual production in 2005 has reached more than 560 ten thousand, the following several years also will increase this trend fast like not changing, concerning having felt the very severe big and medium-sized cities, various places of traffic environment pressure now, must not face " limitting little ", encourage the finiteness of automotive industrial policy and urban traffic resource, and country forbids city, the various places policy of " wide road, Grand Place " of building for the saving soil and constitutes all challenges all for the traffic environment in city for setting up saving property society.For this reason, the present invention is at the bilayer of existing " city overpass ", two-way separation intercommunication adds on the built-in basis of leading the way up and down, when mainly having solved two such city overpass and having intersected, all have under the traffic behavior of big flow again on all directions, how to make vehicle capable orderly, non-interfering problem by the crossing.The invention solves the crossing traffic flow when all directions are all big relatively, just must cause the phase mutual interference this to ordering weakness, will make this system of city overpass more become perfect, also have more science, practicality.
Description of drawings:
Fig. 1 is a structure chart of the present invention.
Fig. 2 is one of structure chart that does not contain arch bridge of the present invention.
Fig. 3 is two of the structure chart that does not contain arch bridge of the present invention.
Fig. 4 is three of the structure chart that does not contain arch bridge of the present invention.
The specific embodiment:
The shunting through vehicles: (we are claiming main highway section 22 with the highway section of the relative both direction that the crossing through vehicles can directly be kept straight in the less important highway section 23 of " city overpass " intersection in the present invention, need claim less important highway section 23 by the highway section that communication channel 11 just can be finished the relative both direction of craspedodrome process when through vehicles is kept straight on) near the crossing suitable apart from the time, two one-way streets that are separated from each other 9 on two layers of road 4 of overpass, 10 is continuous to the inner space extension respectively, upwards strides across two one-way streets 9 on the main highway section then, 10 with less important highway section, opposite on two one- way streets 9,10 link to each other.This in fact just forms 1 and connects two sections that less important highway section is separated by courtyard 20, crosses over the bridge crossing 24 in main highway section.So just solved the situation that original main highway section is divided into two less important highway section at the crossing, this has also just solved the mutual interference problem of straightgoing vehicle on all directions.
Shunting guiding left-hand bend vehicle: less important highway section is after shunting to through vehicles has been finished in the appropriate location, crossing, and the part road width of cloth of two one- way streets 9,10 on the two floor road directly forms one downwards and leads the way and 13 arrive one deck roads 3.Two ends, less important like this highway section respectively two to lead the way 13, one be that less important highway section turns left to arrive the descending of one deck road 3 downwards by two layers of road 4 and lead the way 13; Article one, be directly to lead the way 13 by 3 arrival the up of two layers of road 4 of one deck road for meeting main highway section to turn left.
Left-hand bend vehicle operation order on less important highway section 23 and the main highway section 22 is respectively: one, turn left to main highway section 22 in less important highway section 23: after the through vehicles shunting is finished in less important highway section, the two floor road one- way streets 9 or 10 the part road width of cloth directly sink to forming descending leading the way and 13 arrive one deck roads, a clinodiagonal communication channel 11 is built to one deck road 3 of main highway section another side in piggybacking one deck road 3, upwards building one by one deck road 3 in main highway section again leads the way 13 to two layers of road 4, main highway section up (this up leading the way can be to separating two one-way streets 9, extend 10 inner space, also can not extend and direct making progress), at this moment just to have finished of the left-hand rotation of less important highway section 23 to main highway section 22.Two, turn left to less important highway section in main highway section: the vehicle that turns left on the main highway section (has a plurality of positions selective in the appropriate location at crossing, turn left again after equally also can selecting to extend internally or do not extend direct left-hand rotation, here Fig. 2-4 table three kind of form) respectively build one deck roads 3 that a downward access bridge 21 directly connects the opposite roads by two one- way streets 9,10 in two layers of road, main highway section, one deck road 3 that relends less important highway section is upwards built one and is arrived the up of two layers of road 4, less important highway section and lead the way 13.Finished main highway section so again to travelling of turning left in less important road.

Claims (4)

1, city overpass, comprise bottom road (2), one deck road (3), the viaduct (1) in two layers of road (4), one deck road, there is one-way street (9) in two layers of road, (10) with one-way street (9), (10) courtyard that separates (20), the one-way street that is separated by courtyard (20) has communication channel (11), one-way street has the bottom road of connection and one deck road, the interlayer in one deck road and two layers of road lead the way (13), in the intersection along the courtyard (20) of the axis in the main highway section (22) that can lead directly to one deck road with main highway section (22), two layers of road are separated into the one-way street (9) that is separated from each other, (10), and the blocking-up less important highway section (23) that can not lead directly to one, the one-way street in two layers of road (9), (10), the one-way street that is disconnected (9) in one deck road (3) in less important highway section, (10) be connected by the access bridge (11) of crossing over courtyard (20), it is characterized in that in the intersection, part one-way street (9) on two layers of road (4) in less important highway section, (10) continuous and covered portion courtyard (20), the middle part, road that links to each other raises up and is connected to form across the two layers of road in main highway section (22) and the arch bridge (24) of the courtyard (20) on the axis thereof, the both sides flat is connected with two layers of road in main highway section (22), and the inboard has descending leading the way (13) to be connected with one deck road.
2, city overpass according to claim 1, it is characterized in that the one-way street (9) on two layers of road (4) in less important highway section (23), (10) be connected with one deck road (3) by descending leading the way (13) in the intersection, the communication channel (11) of crossing over courtyard (20) on the axis of main highway section (22) is arranged on one deck road (3), have along the up access bridge (13) of main highway section axis on main one deck road, highway section (3) and connect two layers of road, main highway section (4), the one-way street (9) in two layers of road (4) in main highway section, (10) respectively there is descending access bridge (21) to cross over the one-way street (10) in courtyard (20) and one deck road (3) on opposite on the axis of main highway section, (9) connect, one deck road, less important highway section is along up the leading the way (13) of its axis and the one-way street (10) in two layers of road, (9) connect.
3, city overpass according to claim 1 is characterized in that access bridge (21) and main highway section (22) axis angle are acute angle or right angle.
4, city overpass according to claim 1, the two layers of road that it is characterized in that main highway section (22) and up access bridge (13) extend and are connected to courtyard (20).
CNB2006100203001A 2006-02-17 2006-02-17 Urban stereo road Expired - Fee Related CN100516364C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100203001A CN100516364C (en) 2006-02-17 2006-02-17 Urban stereo road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100203001A CN100516364C (en) 2006-02-17 2006-02-17 Urban stereo road

Publications (2)

Publication Number Publication Date
CN1844581A true CN1844581A (en) 2006-10-11
CN100516364C CN100516364C (en) 2009-07-22

Family

ID=37063543

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100203001A Expired - Fee Related CN100516364C (en) 2006-02-17 2006-02-17 Urban stereo road

Country Status (1)

Country Link
CN (1) CN100516364C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425090A (en) * 2011-12-28 2012-04-25 陈清伟 Urban three-dimensional road for aggregating and utilizing land and avoiding traffic jam
CN103306176A (en) * 2013-05-25 2013-09-18 王建友 Dual-layer cross road and bridge
CN104195910A (en) * 2014-08-23 2014-12-10 王建友 Crossroad

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425090A (en) * 2011-12-28 2012-04-25 陈清伟 Urban three-dimensional road for aggregating and utilizing land and avoiding traffic jam
WO2013097646A1 (en) * 2011-12-28 2013-07-04 Chen Qingwei Stacked city road
CN103306176A (en) * 2013-05-25 2013-09-18 王建友 Dual-layer cross road and bridge
CN104195910A (en) * 2014-08-23 2014-12-10 王建友 Crossroad

Also Published As

Publication number Publication date
CN100516364C (en) 2009-07-22

Similar Documents

Publication Publication Date Title
CN1249302C (en) Full spatial urban road system and traffic method using same
CN2797426Y (en) Ring stacked 3-D steel structure interchange overpass
CN102277806B (en) Shift-type interchange for all-time omnidirectional traffic at intersection of roads
CN1804219A (en) Single-layer completely intercommunicating flyover
CN100516364C (en) Urban stereo road
CN100351468C (en) Full stereoscopic city road system and traffic method using said system
CN100482889C (en) Urban stereo road
CN1776094A (en) Semi-submersible full-interpass man-vehicle separate flyover
CN1141446C (en) Traffic arrangement in plane intersection
CN1085976A (en) Road of grade-separated junction with three diverging interconnections
CN201031333Y (en) Overpass in town
CN1149318C (en) Interchange road
CN101126218A (en) Gyration expedite viaduct
CN1069091A (en) The X-shaped orientation type grade separation bridge
CN2863864Y (en) Crossroad of overground two-layer square pavement and underground well type furcated way
CN2751060Y (en) Flyover bridge with parking space function
CN1222664C (en) Two-layer intercommunication footway and vehicular travelway separated overpass
CN108867217A (en) Four crossway fast passing viaduct
CN102277807B (en) The full unblocked cross composite bridge in crossroad of two kinds of right-hand rotation bridges
CN2743407Y (en) Two-road stereo crossing overpass
CN201459557U (en) Completely interchanging flyover
CN2890146Y (en) Urban interchanged intersection using ramp
CN200974950Y (en) Urban traffic combined overpass
CN1244611A (en) Combined double-horn overpass
CN1587522A (en) Direct overrun flat tura city interchange cross road

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090722

Termination date: 20120217