CN201031333Y - Overpass in town - Google Patents
Overpass in town Download PDFInfo
- Publication number
- CN201031333Y CN201031333Y CNU2006201220298U CN200620122029U CN201031333Y CN 201031333 Y CN201031333 Y CN 201031333Y CN U2006201220298 U CNU2006201220298 U CN U2006201220298U CN 200620122029 U CN200620122029 U CN 200620122029U CN 201031333 Y CN201031333 Y CN 201031333Y
- Authority
- CN
- China
- Prior art keywords
- road
- city
- intersection
- vehicle
- overpass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Signs Or Road Markings (AREA)
Abstract
The utility model discloses an urban overpass, the proposal for settling the increasingly serious problem of traffic jams at road crossings in urban areas is provided. The existing solution adopts electronic signal lights to guide the vehicles at a road crossing by distributing time in accordance with vehicle flowrate. However, the existing solution is incapable to settle the problem of increasingly serious traffic jams at road crossings. The utility model is characterized in that a stilt layer is constructed based on the existing road to achieve a crossover to solve the disadvantages of the prior art.
Description
Technical field: the utility model relates to overpass bridge in the not stifled city of intersection, a kind of urban traffic road vehicle.
Background technology: the vehicle clogging that urban traffic presents when road intersects is common existence, increase day by day along with vehicle, it is serious that this problem more and more seems, existing scheme utilizes electronic signal light rationally to control its passing through by the crossing staff vehicles by the vehicle flowrate distribution time, though can play certain remission effect, but still can't be resolved to serious day by day crossing vehicle traffic congestion phenomenon, traditional overpass bridge is brought the intersection that is built in the city, its cost extra-high-speed not only, and to take up an area of big also be problem, what tearing open of original building around the crossing brought one is problem, is infeasible equally.
Summary of the invention: at present in the city traffic route intersection motor vehicles by the time be to utilize electronic signal light to come the current of distribution time control staff vehicles.
The feature of overpass bridge is in the city: the basis of intersection in former city, and stop up serious intersection at the generation traffic route and do not tear original building all around open, go up overhead one deck and build up overpass bridge in a city.
Overpass bridge is an invention on the overpass bridge architectural history in this city, has solved vehicle pass-through not smooth present situation in traffic route intersection exists in the city defective and deficiency.
Description of drawings:
Describe in further detail below in conjunction with accompanying drawing:
Accompanying drawing 1 is the overpass bridge schematic diagram behind overhead one deck.
(1) is major trunk roads among the figure, (2) high rack-layer auxiliary main road.
Figure (1) major trunk roads, for the more vehicle of straightgoing vehicle flow keep straight on and the four directions to the vehicle of direction running to the right.
Accompanying drawing 2 is that high rack-layer and four directions make progress lower channel guardrails of both sides schematic diagram.(1)
Shape is to support guardrail, and (2) are the soft rubbers of all adorning.
The specific embodiment:
Accompanying drawing 2 is that less through vehicles of vehicle and major-minor arterial highway road need the porte-cochere of direction running left for last high rack-layer, at 200-400 rice, intersection, distance road from slope, turnpike road right side by extending upwardly paramount rack-layer, in like manner high rack-layer lower channel has been designed in the left side.
Its overhead layer height is apart from 4 meters of path layers, and accompanying drawing 1 is that the more major trunk roads of original path vehicle flowrate are done to keep straight on and cubic porte-cochere to the need right travel, and upper and lower like this shunting vehicle has reached the purpose that the road traffic intersection does not block up in the city.
Claims (1)
1. overpass bridge is that overhead one deck forms on the basis of road traffic intersection in former city in the city, it is characterized in that: on the basis of original path traffic intersection, overhead one deck does not cause overpass bridge in a city on the original building around tear open the serious intersection of generation traffic route obstruction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2006201220298U CN201031333Y (en) | 2006-06-26 | 2006-06-26 | Overpass in town |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2006201220298U CN201031333Y (en) | 2006-06-26 | 2006-06-26 | Overpass in town |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201031333Y true CN201031333Y (en) | 2008-03-05 |
Family
ID=39163226
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2006201220298U Expired - Fee Related CN201031333Y (en) | 2006-06-26 | 2006-06-26 | Overpass in town |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201031333Y (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102277815A (en) * | 2011-04-28 | 2011-12-14 | 张光裕 | Suspension type urban overhead bus channel |
CN102345259A (en) * | 2010-08-03 | 2012-02-08 | 陈海水 | Overhead gain road connection method |
CN102433813A (en) * | 2011-09-28 | 2012-05-02 | 孙禄刚 | Four-plane plum type overpass |
CN102444062A (en) * | 2010-10-02 | 2012-05-09 | 郜小天 | Network overpass |
CN103334355A (en) * | 2013-08-06 | 2013-10-02 | 兰州理工大学 | Pipe network and construction method thereof of urban underground automobile pipeline traffic and traffic method |
-
2006
- 2006-06-26 CN CNU2006201220298U patent/CN201031333Y/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102345259A (en) * | 2010-08-03 | 2012-02-08 | 陈海水 | Overhead gain road connection method |
CN102444062A (en) * | 2010-10-02 | 2012-05-09 | 郜小天 | Network overpass |
CN102277815A (en) * | 2011-04-28 | 2011-12-14 | 张光裕 | Suspension type urban overhead bus channel |
CN102433813A (en) * | 2011-09-28 | 2012-05-02 | 孙禄刚 | Four-plane plum type overpass |
CN103334355A (en) * | 2013-08-06 | 2013-10-02 | 兰州理工大学 | Pipe network and construction method thereof of urban underground automobile pipeline traffic and traffic method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2005031069A1 (en) | A full interchange urban road system and the traffic method of using it | |
CN103452020A (en) | Urban crossroad | |
CN201031333Y (en) | Overpass in town | |
CN201245803Y (en) | Crossroad overhead passage for relieving traffic congestion | |
CN207073044U (en) | Bridge tunnel composite cross crossing road | |
CN101008171A (en) | Obstacle-free crossover for city road crossing | |
CN102268852A (en) | Two-phase implementation method of urban road transport system | |
CN202017171U (en) | Three-layer flyover for urban roads | |
CN102296504A (en) | Viaduct with a junction of three roads | |
CN201080585Y (en) | Unidirectional straight-through crossroad for crossroad | |
CN102912701B (en) | Multi-functional left-turn directional interchange overpass | |
CN204417943U (en) | A kind of crossroad short overpass bridge | |
CN100478519C (en) | Bridge tunel combined crossing road on different level for crossroads | |
CN101792994A (en) | Multifunctional tunnel grade separation hub bridge | |
CN102121221B (en) | Flyover with five bridges | |
CN101338541B (en) | Crossing elevated passage for relaxing traffic jam | |
CN209602887U (en) | A kind of no red light overpass at crossroads | |
CN202139520U (en) | Flyover without left turn | |
CN102900000B (en) | Comprehensive complete straight-through direct left-hand rotation right lateral viaduct | |
CN102337712A (en) | Crossed directional barrier-free overpass | |
CN1395007A (en) | Two-layer intercommunication footway and vehicular travelway separated overpass | |
CN203451962U (en) | Intersection fast-slow diverging cross road structure | |
CN101177927A (en) | Rapid passing road system | |
CN201317903Y (en) | Lane tunnel bridge at crossing | |
CN201648900U (en) | Multifunctional tunnel interchange hinge bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: Gao Xiaotian Document name: Notification of Termination of Patent Right |
|
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080305 Termination date: 20100626 |