CN1811068A - New cofferdam construction process for building pier in deep water river - Google Patents

New cofferdam construction process for building pier in deep water river Download PDF

Info

Publication number
CN1811068A
CN1811068A CN 200510048420 CN200510048420A CN1811068A CN 1811068 A CN1811068 A CN 1811068A CN 200510048420 CN200510048420 CN 200510048420 CN 200510048420 A CN200510048420 A CN 200510048420A CN 1811068 A CN1811068 A CN 1811068A
Authority
CN
China
Prior art keywords
cofferdam
building
construction process
pier
deep water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200510048420
Other languages
Chinese (zh)
Inventor
张雪松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200510048420 priority Critical patent/CN1811068A/en
Publication of CN1811068A publication Critical patent/CN1811068A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to new cofferdam construction process for building pier in deep water river. The construction process includes the following steps: building outer frame near the site to building pier, setting outer formworks outside the outer frame, building inner frame, setting inner formworks, filling soil between the outer formworks and the inner formworks to form cofferdam, pumping out water from inside the cofferdam, and constructing pier inside the cofferdam. The formwork construction process has effectively reduced soil filling amount, can facilitate the river water flow and flood release, and has the advantages of simple construction, low cost and other advantages.

Description

A kind of new cofferdam construction process for building pier in deep water river
Technical field: the present invention relates to a kind of new cofferdam construction process for building pier in deep water river suitable in a kind of bridge erection.
Background technology: at present, along with the high speed development of Chinese national economy, highway and railway construction also develop rapidly, and bridge erection then becomes the key project in the communications and transportation construction.Especially in medium and small river course bridge pier construction works, many now uses ponding water blockoff in the river course is gone into the korneforos with a large amount of earthwork heaps, carries out cofferdam construction then after the compacting.Because the amount of banketing is big, the one, hindered the proper flow of streamflow, the 2nd, after engineering construction is finished, banket that it is unclean not remove or remove, cause river course flowing water or flood discharge not smooth, caused unnecessary disaster.Part unit in charge of construction is also arranged, adopt the metal bucket cofferdam, but this way is to the medium and small project incompatibility, technical requirements of underwater operation is high, and investment is big, is not easy to transportation and construction, is unfavorable for recycling, and therefore is not easy to popularization.
Summary of the invention: the invention provides a kind of construction volume that reduced, save a kind of new cofferdam construction process for building pier in deep water river of cost.Described elder generation in the river course, design the bridge pier place build outside framed bent 2, framed bent 2 is placed outer template 1 near the steel pipe face outside, framed bent 5 in building, place internal layer template 4 at interior framed bent 5 near the steel pipe face, between outer template 1 and internal layer template 4, fill soil 3 then, ponding in the cofferdam 6 is extracted out, can in cofferdam 6, be carried out Bridge Pier Construction.Owing to used template fill construction new method in the bridge erection of the present invention, the thin-walled cofferdam is done in the piecemeal assembly, the amount of banketing be can reduce effectively, river course flowing water and flood discharge made things convenient for greatly, and construction and simple in structure, reduced construction volume, saved cost, and invested for a short time, the duration is short, it is easy to remove cleaning, thereby has good social benefit and economic benefit.
Description of drawings; Fig. 1 is a front view of the present invention
Fig. 2 is the lateral view of Fig. 1
The specific embodiment: shown in Figure 2 as Fig. 1, this job practices is framed bent 2 outside build at design bridge pier place in the river course earlier, and framed bent 2 is placed outer template 1 near the steel pipe face outside; Framed bent 5 in building is placed internal layer template 4 at interior framed bent 5 near the steel pipe face; Between outer template 1 and internal layer template 4, place Polypropylence Sheet then, fill soil 3 and place in the Polypropylence Sheet; Ponding in the cofferdam 6 is extracted out, can in cofferdam 6, be carried out Bridge Pier Construction.
The present invention is applicable to medium and small deep water river bridge construction engineering, can establish the single or multiple lift use according to discharge and flow velocity.

Claims (2)

1, a kind of new cofferdam construction process for building pier in deep water river, it is characterized in that framed bent (2) outside earlier build at design bridge pier place in the river course, framed bent (2) is placed outer template (1) near the steel pipe face outside, build interior framed bent (5), place internal layer template (4) at interior framed bent (5) near the steel pipe face, between outer template (1) and internal layer template (4), fill soil (3) then, cofferdam (6) interior ponding is extracted out, can in cofferdam (6), carry out Bridge Pier Construction.
2, a kind of deep water river bridge pier cofferdam construction method according to claim 1 is characterized in that placing Polypropylence Sheet in the middle of outer template (1) and internal layer template (4), fills soil (3) and places in the Polypropylence Sheet.
CN 200510048420 2005-10-14 2005-10-14 New cofferdam construction process for building pier in deep water river Pending CN1811068A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510048420 CN1811068A (en) 2005-10-14 2005-10-14 New cofferdam construction process for building pier in deep water river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510048420 CN1811068A (en) 2005-10-14 2005-10-14 New cofferdam construction process for building pier in deep water river

Publications (1)

Publication Number Publication Date
CN1811068A true CN1811068A (en) 2006-08-02

Family

ID=36844171

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510048420 Pending CN1811068A (en) 2005-10-14 2005-10-14 New cofferdam construction process for building pier in deep water river

Country Status (1)

Country Link
CN (1) CN1811068A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485356A (en) * 2013-09-29 2014-01-01 中铁港航局集团有限公司 Overwater laying frame and method for filling sand pockets with same
CN105040714A (en) * 2015-07-08 2015-11-11 成都绿迪科技有限公司 Seepage-preventing cofferdam

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485356A (en) * 2013-09-29 2014-01-01 中铁港航局集团有限公司 Overwater laying frame and method for filling sand pockets with same
CN103485356B (en) * 2013-09-29 2015-06-17 中铁港航局集团有限公司 Overwater laying frame and method for filling sand pockets with same
CN105040714A (en) * 2015-07-08 2015-11-11 成都绿迪科技有限公司 Seepage-preventing cofferdam

Similar Documents

Publication Publication Date Title
CN103526766B (en) Method for plugging relief well of deep foundation pit
CN101845889A (en) Concrete casting and tamping method of steel tube concrete structure column
CN102561402A (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN104790381B (en) Lining wall concrete pouring inversing method based on UEA micro-expanding agent
CN113622464A (en) Anti-cracking waterproof construction process for basement outer wall post-cast strip
CN203684210U (en) Secondary hole cleaning device for bottom of bored pile
CN1811068A (en) New cofferdam construction process for building pier in deep water river
CN201883609U (en) Recycled concrete core post for metal bellows
CN1904226A (en) Construction method of recoverable brad wall base pit enclosure
CN201686965U (en) Cast-in-situ reinforced concrete strobe for diversion tunnel
CN215052265U (en) Reinforced concrete thin wall body reinforced structure
CN201873991U (en) Device for forming cast-in-place pile through high frequency vibrating and compacting dry soil displacement
CN202139604U (en) Cast-in-situ abnormal reinforced concrete pile core cement soil underground continuous wall for retaining and protection for foundation excavation
CN104652426B (en) A kind of saline soil area waterglass anticorrosion pile foundation construction method
CN202108039U (en) Cylindrical compound concrete macadam placepile
CN211250563U (en) Pouring die for bearing wall board
CN110616714B (en) Novel enclosure construction method for existing underground structure deepening
CN204447424U (en) A kind of architectural engineering groundwater treatment and reclamation set
CN109555130B (en) Middle plate of subway main body structure and temporary supporting structure and construction method
CN204080857U (en) Subway station Y type cast steel is in conjunction with steel pipe column interior concrete lift-up device
CN206220560U (en) A kind of Static crushing structure for dismantling concrete
CN205712147U (en) Compound impervious wall for water conservancy project coffering
CN105672498A (en) Device and method for performing construction by taking marine sand as concrete fine aggregates
CN105297857B (en) Chamber pot flushing water method for supplementing water
CN102011398A (en) Device and method for forming high-frequency vibratory pressing displacement bored concrete pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication