CN1696414A - Method for treating mattress for soil and stone in foundation combined soil with rock - Google Patents

Method for treating mattress for soil and stone in foundation combined soil with rock Download PDF

Info

Publication number
CN1696414A
CN1696414A CN 200510200367 CN200510200367A CN1696414A CN 1696414 A CN1696414 A CN 1696414A CN 200510200367 CN200510200367 CN 200510200367 CN 200510200367 A CN200510200367 A CN 200510200367A CN 1696414 A CN1696414 A CN 1696414A
Authority
CN
China
Prior art keywords
mattress
soil
rock
bed pad
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200510200367
Other languages
Chinese (zh)
Inventor
盖毕平
王绍华
杨树敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN 200510200367 priority Critical patent/CN1696414A/en
Publication of CN1696414A publication Critical patent/CN1696414A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses an earth and rock bed pad treatment method of earth rock combined ground base. It is characterized by that in the place contacted with rock under the ground base of building a bed pad is placed. Firstly, the earth layer with rock on the base rock surface is uniformly stirred, then levelled and compacted so as to form the invented bed pad whose thickness is 400mm-600mm, the ratio of earth and rock in the bed pad is 1:0.6-1, its water content is as follows: water content of simple clay is 20%-40% and water content of earth and rock bed pad is 10%-20%, and the back-fill compacted degree, namely ratio of compacted bed pad thickness and virtual laid thickness is 0.7-0.8.

Description

The soil and the stone bed pad processing method of soil rock combined foundation
Technical field:
The present invention relates to the native rock combined foundation processing method of construction work.
Background technology:
In the construction project of mountain area, the foundation soil rock that usually runs into the place is combined, promptly ground in the plane the part be soil and the part be rock.For example, clint gathers and the ground of exposure is arranged, and just belongs to native rock combined foundation.The soil base can produce sedimentation and deformation under the effect of building load, the rock ground then can not be out of shape.For avoiding building differential settlement to occur, the position that need contact with rock on the basis adopts mattress to handle.
Native horsestone commonly used in the ground is done mattress, and requiring native horsestone medium stone content is 20%~30%; This native horsestone mattress has reached and has made the building lot effect of uniform.Place, a lot of mountain area is arranged, have native horsestone natively, and the ratio that wherein contains stone substantially exceeds 20%~30%, time-consuming if also prepare according to 20%~30% ratio, can strengthen construction costs.
Summary of the invention:
The objective of the invention is to: the method for treating mattress that proposes a kind of native rock combined foundation newly, utilize the natural soil horsestone that excavates out in the levelling of the land as far as possible, take certain method to make mattress, make it under design load, the settling amount of ground satisfies code requirement, saving of work and time reduces construction costs.
The present invention is achieved in that at first the native dirt band on basement rock surface (1) is turned evenly, goes up in basement rock surface (1) then and lays mattress (2); Mattress (2) comprises lower floor's mattress (3) and upper strata mattress (4), lay and carry out in two steps, the first step is carried out the laying of lower floor's mattress (3), lays evenly smooth, wait that the empty paving that reaches lower floor's mattress (3) promptly tamps, tamp the real paving of lower floor's mattress (3); Second step was carried out the laying of upper strata mattress (4), laid evenly smoothly, waited that the empty paving that reaches upper strata mattress (4) promptly tamps, and tamped to the real paving of upper strata mattress (4).
The thickness of mattress (2) is 400mm~600mm; Soil is 1: 0.45~1 with the ratio of stone in the mattress; Water content is: the water content of simple clay is 20%~40%, and soil is 10%~20% with the water content of stone bed pad; Rammer degree of filling out is that the thickness after the mattress compacting and the ratio of virtual resurfacing thickness are 0.7~0.8.
Mattress thickness need be definite with ratio and other factor of stone according to soil in the supporting capacity requirement that designs ground, permission settling amount, the mattress.
The invention has the beneficial effects as follows: make full use of the natural soil horsestone that excavates out in the levelling of the land, can guarantee that the settling amount of ground under design load satisfies code requirement, and saving of work and time, reduce construction costs.
Description of drawings:
Fig. 1 is a schematic diagram of the present invention.
Among the figure, 1. basement rock surface, 2. mattress, 3. lower floor's mattress, 4. upper strata mattress.
The specific embodiment:
Embodiments of the invention:
The position that contacts with rock on the basis is a laying mattress 2 above the basement rock surface 1; The material of mattress 2 is soil and the stone mixture on this project site, and soil is 1: 1 with the part by weight of stone, and the thickness of mattress 2 is 500mm; For making building lot even, before the laying, it need be turned evenly; Lay lower floor's mattress 3 earlier, lay smooth to lower floor's mattress 3 empty paving such as accompanying drawing in dotted line position, promptly tamp, tamp solid line position in the real paving of lower floor's mattress 3 such as the accompanying drawing, re-lay upper strata mattress 4, wait to lay smooth to upper strata mattress 4 empty paving such as accompanying drawing in dotted line position, tamp again, tamp solid line position in the real paving of upper strata mattress 4 such as the accompanying drawing, promptly reach the regulation requirement, the compacting degree of this moment is 0.74, and soil is 19.2% with the water content of stone bed pad.
The ground of this project is handled and is simplified, and expense greatly reduces, and saves nearly 400,000 yuan of engineering cost.

Claims (5)

1. the soil of a native rock combined foundation and stone bed pad processing method is characterized in that: at first the native dirt band on basement rock surface (1) is turned evenly, go up in basement rock surface (1) then and lay mattress (2); Mattress (2) comprises lower floor's mattress (3) and upper strata mattress (4), lay and carry out in two steps, the first step is carried out the laying of lower floor's mattress (3), lays evenly smooth, wait that the empty paving that reaches lower floor's mattress (3) promptly tamps, tamp the real paving of lower floor's mattress (3); Second step was carried out the laying of upper strata mattress (4), laid evenly smoothly, waited that the empty paving that reaches upper strata mattress (4) promptly tamps, and tamped to the real paving of upper strata mattress (4).
2. the soil of native rock combined foundation according to claim 1 and stone bed pad processing method is characterized in that: the thickness of mattress (2) is 300mm~500mm; Soil is 1: 0.45~1 with the ratio of stone in the mattress; Water content is: the water content of simple clay is 20%~40%, and soil is 10%~20% with the water content of stone bed pad; Rammer degree of filling out is that the thickness after the mattress compacting and the ratio of virtual resurfacing thickness are 0.7~0.8.
3. the soil of native rock combined foundation according to claim 2 and stone bed pad processing method is characterized in that: the thickness of mattress (2) is 500mm.
4. the soil of native rock combined foundation according to claim 2 and stone bed pad processing method is characterized in that: soil is 1: 1 with the ratio of stone in the mattress.
5. the soil of native rock combined foundation according to claim 1 and stone bed pad processing method is characterized in that: the compacting degree is 0.74.
CN 200510200367 2005-07-01 2005-07-01 Method for treating mattress for soil and stone in foundation combined soil with rock Pending CN1696414A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200510200367 CN1696414A (en) 2005-07-01 2005-07-01 Method for treating mattress for soil and stone in foundation combined soil with rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200510200367 CN1696414A (en) 2005-07-01 2005-07-01 Method for treating mattress for soil and stone in foundation combined soil with rock

Publications (1)

Publication Number Publication Date
CN1696414A true CN1696414A (en) 2005-11-16

Family

ID=35349292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200510200367 Pending CN1696414A (en) 2005-07-01 2005-07-01 Method for treating mattress for soil and stone in foundation combined soil with rock

Country Status (1)

Country Link
CN (1) CN1696414A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1952921B (en) * 2006-05-22 2010-08-11 黄广军 A determination method of anticipated settlement in ground base
CN104532819A (en) * 2014-12-18 2015-04-22 重庆大学 Stress control type reinforcement enclosure structure and foundation treatment construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1952921B (en) * 2006-05-22 2010-08-11 黄广军 A determination method of anticipated settlement in ground base
CN104532819A (en) * 2014-12-18 2015-04-22 重庆大学 Stress control type reinforcement enclosure structure and foundation treatment construction method thereof
CN104532819B (en) * 2014-12-18 2016-05-25 重庆大学 A kind of Stress Control formula reinforcement inclusion texture and foundation treatment construction method thereof

Similar Documents

Publication Publication Date Title
CN102226335A (en) Foundation treatment method for controlling post-construction settlement and deformation of soft soil
CN106283944B (en) Method for reinforcing shallow soft foundation by pressing and filling rubbles and/or blocks
CN203295913U (en) Novel ecological permeable road structure
CN110512589A (en) A kind of shallow-layer ultra-soft foundation curing method of vacuum Yield rainfall relation co-oxidation magnesium carbonization
CN206256334U (en) A kind of novel environment friendly paving structure
CN202380454U (en) Combined treating collapsible loess foundation of factory building by adopting plain concrete pile and branch filling pile
CN104674842B (en) Solidified earth barricade and constructional method thereof
CN205348206U (en) Caisson cutting edge props up and establishes structure
CN101012648A (en) Method for compacting cohesive soil road embankment and ground foundation of highroad, road and railroad by using vacuum precompression
CN105421328A (en) Collapsible loess area roadbed foundation treatment structure and construction method
CN110820456A (en) Anti-settling and replacement-filling alternate airport runway and construction method thereof
CN208830325U (en) A kind of Waste Landfill Site Area mound design structure
CN208280158U (en) A kind of steel storage tank basis composite foundation structure
CN104790404B (en) A kind of dam foundation high-pressure grouting structure and grouting method
CN1696414A (en) Method for treating mattress for soil and stone in foundation combined soil with rock
CN205223770U (en) Crowded close stake of rubble adds muscle roadbed structure
CN204780981U (en) Outdoor GIS equipment foundations of shallow formula of burying
CN215906482U (en) High embankment highway structure in deep soft soil layer
CN202850013U (en) Whole composite foundation structure for lime soil and anti-seepage membrane
CN202755438U (en) Integrative structure with functions of anchoring, drainage and flood interception in refuse landfill
CN207160074U (en) A kind of non-settling structure of stable public way well body
CN216428317U (en) Water-resisting and seepage-preventing terrace structure suitable for collapsible loess area
CN107795145B (en) Cave collapse filling and soil organic reconstruction method
CN206070257U (en) A kind of roadbed for improving rail track bearing capacity
CN220580013U (en) Structure layer for treating filled soil

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication