CN205348206U - Caisson cutting edge props up and establishes structure - Google Patents

Caisson cutting edge props up and establishes structure Download PDF

Info

Publication number
CN205348206U
CN205348206U CN201521143736.0U CN201521143736U CN205348206U CN 205348206 U CN205348206 U CN 205348206U CN 201521143736 U CN201521143736 U CN 201521143736U CN 205348206 U CN205348206 U CN 205348206U
Authority
CN
China
Prior art keywords
poppet
sleeper
template
caisson
cutting edge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521143736.0U
Other languages
Chinese (zh)
Inventor
陈春来
王春华
程莉莎
梁旭
阮俊安
方适明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU MUNICIPAL AFFAIR SUPERVISION AND MANAGEMENT CENTER
Hangzhou Xihu District Chengjian Construction Center
Zhejiang University City College ZUCC
Original Assignee
HANGZHOU MUNICIPAL AFFAIR SUPERVISION AND MANAGEMENT CENTER
Hangzhou Xihu District Chengjian Construction Center
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU MUNICIPAL AFFAIR SUPERVISION AND MANAGEMENT CENTER, Hangzhou Xihu District Chengjian Construction Center, Zhejiang University City College ZUCC filed Critical HANGZHOU MUNICIPAL AFFAIR SUPERVISION AND MANAGEMENT CENTER
Priority to CN201521143736.0U priority Critical patent/CN205348206U/en
Application granted granted Critical
Publication of CN205348206U publication Critical patent/CN205348206U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a caisson cutting edge props up and establishes structure includes ground, sword foot, template, poppet, sleeper and sand bedding course at least, the bottom of structure is established whole to the ground setting to the side is provided with the sand bedding course above that, the sleeper is laid in the sand bedding course upper end, the template bottom is connected with the sleeper, the sword foot sets up in the template, the poppet is for put the structure, its bottom and sleeper contact, top and template contact to one side, this caisson cutting edge props up and establishes structure, the use of poppet makes the ground evenly bear open caisson weight, can not sink to producing sword foot crack suddenly because of the open caisson and destroy in concreting process, secondly, it can keep the open caisson position, avoids the slope, the adjustment of being convenient for, be convenient for support and the form removal, overall structure is simple, and the practicality is strong, easily uses widely.

Description

A kind of caisson cutting edge installs structure
Technical field
This utility model relates to installing structure applied technical field, and especially a kind of caisson cutting edge installs structure.
Background technology
Open caisson is one of main construction method building the deep structures of deep foundation and underground.It is on the ground or in melt pit, first make armored concrete well bore, after reaching some strength, in pit shaft, layering is cut the earth, along with in well, soil face is gradually lowered, stack shell is made to borrow its deadweight to overcome the frictional resistance between itself and soil wall, constantly sink a kind of underground structure in place or underground engineering construction technique.Owing to its sectional dimension and rigidity are big. bearing capacity is high, and impervious and good endurance, inner space can provide utilization, therefore can be used for the construction of very deep underground engineering;Open caisson construction simultaneously does not need complicated plant equipment, in draining with not under drainage situation, all can construct thus can be used for construction when various complicated landform, geology and narrow space, and open caisson is less on close to buildings impact, can be big at the infiltration coefficient that subsoil water is very abundant, native, it is difficult to drain subsoil water, there is drift sand underground or has construction in other disadvantageous soil layer situation, compared with heavy excavation construction method, can greatly reduce and dig, transport, backfill earth volume, accelerating construction progress, reduces operating expenses.But open caisson construction method there is also following problem: working procedure is more, and construction technology is complex, and technology requires height, and quality control requirement is tight.
In open caisson processing procedure, the cutting shoe of open caisson installs structure and uses comparatively general, and prior art can not realize installing the simple and easy to do of structure.
Utility model content
Prior art is difficult to the problem solving presently, there are, and for making up prior art deficiency, this utility model aims to provide a kind of caisson cutting edge and installs structure.
For achieving the above object, this utility model is by the following technical solutions: a kind of caisson cutting edge installs structure, at least includes ground, cutting shoe, template, poppet, sleeper and sand bedding course;Described ground is arranged on the whole structure lowermost end that installs, and is provided with sand bedding course above it;Described sleeper is laid on sand bedding course upper end;Described template bottom is connected with sleeper;Described cutting shoe is arranged in template;Described poppet is inclined structure, and its bottom contacts with sleeper, top and template contacts.
As further technical scheme of the present utility model: described poppet is whole poppet or half poppet structure.
The beneficial effects of the utility model are: this caisson cutting edge installs structure, and the use of poppet makes ground uniformly bear open caisson weight, will not sink to producing suddenly because of open caisson cutting shoe Crack failure in concreting process;Secondly it can keep open caisson position, it is to avoid tilts, it is simple to adjusts;It is easy to support and form removal;Overall structure is simple, practical, it is easy to promote the use of.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model;
Fig. 2 is caisson structure schematic diagram of the present utility model;
Wherein: 1, ground, 2, cutting shoe, 3, template, 4, poppet, 5, sleeper, 6, sand bedding course.
A, top cover;B, internal partition wall;C, the borehole wall;D, well head;E, cutting shoe;F, base plate.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole embodiments.Based on the embodiment in this utility model, all other embodiments that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of this utility model protection.
Referring to Fig. 1, in this utility model embodiment, a kind of caisson cutting edge installs structure, at least includes ground 1, cutting shoe 2, template 3, poppet 4, sleeper 5 and sand bedding course 6;Described ground 1 is arranged on the whole structure lowermost end that installs, and is provided with sand bedding course 6 above it;Described sleeper 5 is laid on sand bedding course 6 upper end;Described template 3 bottom is connected with sleeper 5;Described cutting shoe 2 is arranged in template 3;Described poppet 4 is inclined structure, and its bottom contacts with sleeper 5, and top contacts with template 3.
As further technical scheme of the present utility model: described poppet 4 is whole poppet or half poppet structure.
This utility model is in use: adopts and should calculate one-time-concreting height during pad frame method construction so that it is less than the bearing capacity of ground.Diameter or the length of side light open caisson within 8m, when soil property is better, can adopt brick base.Brick cutting shoe base builds the cutting shoe tread width that should ensure that cutting shoe designing requirement by laying bricks or stones, and brick cutting shoe intensity and bottom width should be able to be resisted the horizontal thrust effect of cutting shoe slope concrete and be remained stable for: stock mould inwall application 1: 3 cement mortar is floating.The small-sized open caisson of lighter in weight, can adopt when soil property is good sand bedding course, cushion lime or in ground grooving be made clay model, its inwall is floating by 1: 3 cement mortar.
When adopting poppet or half poppet method, need first to lay at cutting shoe place sand bedding course, then spread rim wood and poppet thereon.Chock commonly uses 160 × 220mm sleeper, poppet quantity heavy according to first segment and weight and the allowable bearing of ground (or sand bedding course) calculate and determine, spacing is generally 0.5~1.0m.Poppet is laid should be symmetrical, generally first sets 8 groups of location poppets, and often group is made up of 2~3 poppets, the standing 4 groups of location poppets of rectangular open caisson, its position, long limit two ends 0.15L (L is length of long sides), installs general poppet therebetween, and poppet should vertically be laid by the borehole wall.Circular open caisson is directed at the center of circle along caisson cutting edge circular arc portion and lays, and installs cutting shoe, borehole wall template on chock.Laying chock should make end face be maintained at the same horizontal plane, levelling with level gauge, makes the discrepancy in elevation within 10mm, and tamps with sand between chock, and chock centrage should overlap with cutting shoe centrage;Chock buried depth is the half of its thickness, peripheral hardware gutter in poppet.When foundation bearing capacity is relatively low, it is computed poppet expense more, when laying overstocked, sand cushion strengthening should be divided at chock, with by heavy and weight be diffused into more in large area, with uneven sedimentation in avoiding making, poppet quantity can be reduced simultaneously, make to be prone to levelling. it is easy to chock and lays and extract.
It is obvious to a person skilled in the art that this utility model is not limited to the details of above-mentioned one exemplary embodiment, and when without departing substantially from spirit of the present utility model or basic feature, it is possible to realize this utility model in other specific forms.Therefore, no matter from which point, embodiment all should be regarded as exemplary, and be nonrestrictive, scope of the present utility model is limited by claims rather than described above, it is intended that all changes in the implication of the equivalency dropping on claim and scope included in this utility model.Any accompanying drawing labelling in claim should be considered as the claim that restriction is involved.
The above; it is only preferred embodiment of the present utility model; not in order to limit this utility model, every any trickle amendment, equivalent replacement and improvement above example made according to technical spirit of the present utility model, should be included within the protection domain of technical solutions of the utility model.

Claims (2)

1. caisson cutting edge installs a structure, at least includes ground (1), cutting shoe (2), template (3), poppet (4), sleeper (5) and sand bedding course (6);It is characterized in that: described ground (1) is arranged on the whole structure lowermost end that installs, and is provided with sand bedding course (6) above it;Described sleeper (5) is laid on sand bedding course (6) upper end;Described template (3) bottom is connected with sleeper (5);Described cutting shoe (2) is arranged in template (3);Described poppet (4) is inclined structure, and its bottom contacts with sleeper (5), and top contacts with template (3).
2. a kind of caisson cutting edge according to claim 1 installs structure, it is characterised in that: described poppet (4) is whole poppet or half poppet structure.
CN201521143736.0U 2015-12-29 2015-12-29 Caisson cutting edge props up and establishes structure Expired - Fee Related CN205348206U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521143736.0U CN205348206U (en) 2015-12-29 2015-12-29 Caisson cutting edge props up and establishes structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521143736.0U CN205348206U (en) 2015-12-29 2015-12-29 Caisson cutting edge props up and establishes structure

Publications (1)

Publication Number Publication Date
CN205348206U true CN205348206U (en) 2016-06-29

Family

ID=56173512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521143736.0U Expired - Fee Related CN205348206U (en) 2015-12-29 2015-12-29 Caisson cutting edge props up and establishes structure

Country Status (1)

Country Link
CN (1) CN205348206U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111749258A (en) * 2020-06-30 2020-10-09 中国二十二冶集团有限公司 Construction method of tire mold of edge foot of cyclone well
CN111926842A (en) * 2020-06-29 2020-11-13 中国二十冶集团有限公司 Construction method of open caisson cutting edge template support
CN111926843A (en) * 2020-06-29 2020-11-13 中国二十冶集团有限公司 Open caisson cutting edge template and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926842A (en) * 2020-06-29 2020-11-13 中国二十冶集团有限公司 Construction method of open caisson cutting edge template support
CN111926843A (en) * 2020-06-29 2020-11-13 中国二十冶集团有限公司 Open caisson cutting edge template and construction method thereof
CN111749258A (en) * 2020-06-30 2020-10-09 中国二十二冶集团有限公司 Construction method of tire mold of edge foot of cyclone well

Similar Documents

Publication Publication Date Title
CN102677695B (en) Mutually-embedded ecological building block retaining wall and construction method thereof
CN105696427B (en) The construction method and its road structure of a kind of consolidation process newly built railway karst foundation
CN204401385U (en) A kind of road structure processing Deep Thick Soft Ground karst foundation
CN202298648U (en) Soil-retaining anti-scouring system for self-embedded type flower drop wall
CN205348206U (en) Caisson cutting edge props up and establishes structure
AU2016228704B2 (en) Hard road construction method for natural groundwater recharge
CN103147614A (en) Pool with multi-layer structure and building method thereof
CN203066104U (en) H-shaped plain concrete brick and small ecological soil-blocking wall bricked by same
CN106759133A (en) The mixing structure of dam type and construction method of a kind of homogeneous earth and rockfill dam and rock
CN102561721B (en) Building jacking deviation rectifying method
CN107841908A (en) For eliminating the road structure of the high embankment lateral variation sedimentation in high-speed railway abrupt slope
CN1804239A (en) Construction method for deformation resistant building foundation in subsidence area
CN104532714A (en) Roadbed structure for treating deep soft soil karst foundation
CN202100263U (en) High-backfill open cut tunnel lining structure of high-intensity swelled ground region
CN109594575A (en) A kind of open caisson periphery grouting and reinforcing soil body construction method
CN202830673U (en) Existing embankment heightening structure for limited using land area
CN207211176U (en) A kind of big open caisson of superelevation
CN208649807U (en) For eliminating the road structure of the high embankment lateral variation sedimentation in high-speed railway abrupt slope
CN103866779B (en) A kind of construction method of sealing space enclosing structure of soft foundation building foundation pit
CN104131578B (en) Stream is moulded basement cushion cap base plate under shape soil property and is inverted construction technology and structure
CN102787608A (en) Gravity type foundation pit supporting system under vacuum effect and construction method
CN102926403B (en) Roof construction method by cover-excavation method
CN202298630U (en) System adopting root piles and pile-side compacting grouting
CN205135659U (en) A foot supporting construction encircles for controlling tunnel subsides
CN208072454U (en) A kind of immersion retaining wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160629

Termination date: 20161229