CN1626734A - 桥面结构顶推施工的立柱体系受力自平衡及纠偏装置 - Google Patents

桥面结构顶推施工的立柱体系受力自平衡及纠偏装置 Download PDF

Info

Publication number
CN1626734A
CN1626734A CN 200310109223 CN200310109223A CN1626734A CN 1626734 A CN1626734 A CN 1626734A CN 200310109223 CN200310109223 CN 200310109223 CN 200310109223 A CN200310109223 A CN 200310109223A CN 1626734 A CN1626734 A CN 1626734A
Authority
CN
China
Prior art keywords
column
head end
steel strand
displacable jack
bridge deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200310109223
Other languages
English (en)
Other versions
CN100519944C (zh
Inventor
潘令誉
吴欣之
吴昊
吴金山
张�杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Co Ltd filed Critical Shanghai Mechanized Construction Co Ltd
Priority to CNB2003101092233A priority Critical patent/CN100519944C/zh
Publication of CN1626734A publication Critical patent/CN1626734A/zh
Application granted granted Critical
Publication of CN100519944C publication Critical patent/CN100519944C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种桥面结构顶推施工中立柱体系受力自平衡及纠偏装置,其特征在于:在首端及中间立柱顶端固定安装有穿心式千斤顶;钢绞线穿过各穿心式千斤顶,其末端固定在末端立柱顶部,首端由首端立柱的穿心式千斤顶的锚具夹持,首端立柱顶部有串接有螺旋扣的缆风绳锚固于地面。调整首端立柱上的穿心式千斤顶柱塞的伸出长度调整钢绞线的预紧力,调整首端立柱上的缆风绳的螺旋扣,使首端立柱的顶端位移为零,中间立柱的穿心式千斤顶锚具锚紧已施加预紧力的钢绞线;顶推胎架上桥面结构过立柱时,调整立柱顶端的穿心式千斤顶的柱塞伸缩,使立柱的顶端位移为零。本发明的优点是改变了每根立柱单独受力的状况,使桥梁下部结构形成了一个受力自平衡体系。

Description

桥面结构顶推施工的立柱体系受力自平衡及纠偏装置
技术领域
本发明涉及一种桥面结构顶推施工中的立柱体系受力自平衡及纠偏装置。
背景技术
目前在桥梁施工中常采用顶推施工技术,即先在桥面结构的设计安装位置边侧的胎架上拼装桥面结构,然后再将拼装好的桥面结构沿一个一个立柱顶端顶推滑移到设计位置安装就位。当桥面结构顶推过程中接触到立柱顶端时,会因摩擦而对立柱产生水平方向的推力,造成立柱顶端位移,水平推力若超过立柱的设计标准时就会损坏立柱,对桥梁和施工的安全构成危险。现有的施工技术措施中常采用架设钢性撑杆或拉设缆风绳来纠正或减少水平推力对立柱的影响和控制立柱的垂直度。然而,这些施工装置有一定的局限性:这些装置会阻断交通,无法在繁忙的交通区域进行施工;钢性撑杆受到长度限制,而且还需考虑稳定问题,最主要的是桥面结构顶推过程中对各立柱产生的水平推力是不断变化着的,用这些施工装置来随时调控各立柱承受的水平推力和顶端位移不仅操作繁复,调控精度也难以保证。
发明内容
本发明的目的是解决现有技术中存在的桥面结构顶推施工时立柱顶端因水平推力造成位移的检测和调控问题,提供一种思路新颖、装置简单、监控操作方便、施工区域交通仍能保持的立柱体系受力自平衡及纠偏装置。本发明设计桥面结构顶推施工的立柱体系受力自平衡及纠偏装置,其特征在于:在首端及中间立柱顶端固定安装有穿心式千斤顶;有一钢绞线穿过各穿心式千斤顶,钢绞线的末端固定连接在与胎架固定连接的末端立柱上,钢绞线的首端由首端立柱的穿心式千斤顶的锚具夹持,首端立柱顶部有串接有螺旋扣的缆风绳锚固于地面。利用所述的立柱纠偏装置实施纠偏的方法,其特征在于:松开中间穿心式千斤顶的锚具,首端立柱上固定安装的穿心式千斤顶的锚具锚紧钢绞线,再调整首端立柱上固定安装的穿心式千斤顶柱塞的伸出长度调整钢绞线的预紧力,再调整连接在首端立柱上的串接有缆风绳的螺旋扣,使首端立柱的顶端位移为零,将中间立柱顶端固定安装的穿心式千斤顶的锚具锚紧已施加预紧力的钢绞线;在顶推胎架上桥面结构过立柱时,调整立柱顶端固定安装的穿心式千斤顶的柱塞伸缩,使立柱的顶端位移为零。本发明的优点是改变了每根立柱单独受力的状况,使桥梁下部结构形成了一个受力自平衡体系,因而在桥面结构顶推施工中单根立柱的受力影响被弱化;施工中每根立柱顶端发生位移时的监控和调整的操作得到简化、精度得到提高;装置结构简单、安装调试方便、施工安全可靠;而且采用这套装置不会阻断施工区域的交通。
附图说明
附图是本发明的施工示意图
下面结合实施例对本发明作详细说明,
具体实施方式
在桥面结构的设计安装位置边侧的胎架4上拼装桥面结构,同时在需要纠偏的首端立柱1和各中间立柱2顶部固定安装穿心式千斤顶5,令各穿心式千斤顶5均在同一直线上并松开各穿心式千斤顶5的锚具,把钢绞线6穿过各穿心式千斤顶5,钢绞线6的一端固定在与胎架4固定连接的末端立柱3顶部,钢绞线6整理成一直线后,另一端由首端立柱1顶部的穿心式千斤顶5的锚具夹紧,再在首端立柱1顶部固定连接缆风绳8,缆风绳8的另一端串接螺旋扣7后锚固于地面;检查并确定各中间立柱2上穿心式千斤顶5的锚具处于松开状态后,调整首端立柱1上穿心式千斤顶5的柱塞伸出长度以对钢绞线6施加预紧力,施加的预紧力控制在该立柱设计允许承受的水平推力的百分之五十,再调整缆风绳8中串接的螺旋扣7的长度以纠正该立柱顶端的位移,令位移归零,然后令各中间立柱2上穿心式千斤顶5的锚具夹紧已被施加预紧力的钢绞线6,从而使胎架4、各立柱1-3、各穿心式千斤顶5、钢绞线6、缆风绳8、螺旋扣7及大地形成一个受力自平衡体系。
当桥面结构顶推通过某立柱顶端时,监测该立柱顶端发生的位移程度和发展趋势,并可随时调整该立柱上穿心式千斤顶5的柱塞伸出长度,使该立柱顶端发生的位移归零;依此操作程序对在桥面结构顶推中逐一经过的各立柱顶端的位移进行监控和调整,直至顶推施工结束。
本发明突破了现有的施工技术措施仅加固单根立柱的思路,使桥梁下部结构形成了一个受力自平衡体系,改变了每根立柱单独受力的状况,在桥面结构顶推施工中单根立柱的受力影响被弱化,因而不必对立柱另外采取加固稳定措施,并且施工中每根立柱顶端发生位移时的监控和调整的操作得到简化、精度得到提高;本发明装置结构简单、安装调试方便、施工安全可靠;而且采用这套装置不会阻断施工区域的交通,特别适用于交通枢纽或立柱跨度较大的桥梁的施工。

Claims (2)

1、桥面结构顶推施工的立柱体系受力自平衡及纠偏装置,其特征在于:在首端及中间立柱顶端固定安装有穿心式千斤顶;有一钢绞线穿过各穿心式千斤顶,钢绞线的末端固定连接在与胎架固定连接的末端立柱上,钢绞线的首端由首端立柱的穿心式千斤顶的锚具夹持,首端立柱顶部有串接有螺旋扣的缆风绳锚固于地面。
2、利用权利要求1所述的立柱纠偏装置实施纠偏的方法,其特征在于:松开中间穿心式千斤顶的锚具,首端立柱上固定安装的穿心式千斤顶的锚具锚紧钢绞线,再调整首端立柱上固定安装的穿心式千斤顶柱塞的伸出长度调整钢绞线的预紧力,再调整连接在首端立柱上的串接有缆风绳的螺旋扣,使首端立柱的顶端位移为零,将中间立柱顶端固定安装的穿心式千斤顶的锚具锚紧已施加预紧力的钢绞线;在顶推胎架上桥面结构过立柱时,调整立柱顶端固定安装的穿心式千斤顶的柱塞伸缩,使立柱的顶端位移为零。
CNB2003101092233A 2003-12-10 2003-12-10 桥面结构顶推施工中立柱的受力自平衡装置和纠偏方法 Expired - Fee Related CN100519944C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2003101092233A CN100519944C (zh) 2003-12-10 2003-12-10 桥面结构顶推施工中立柱的受力自平衡装置和纠偏方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2003101092233A CN100519944C (zh) 2003-12-10 2003-12-10 桥面结构顶推施工中立柱的受力自平衡装置和纠偏方法

Publications (2)

Publication Number Publication Date
CN1626734A true CN1626734A (zh) 2005-06-15
CN100519944C CN100519944C (zh) 2009-07-29

Family

ID=34758887

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2003101092233A Expired - Fee Related CN100519944C (zh) 2003-12-10 2003-12-10 桥面结构顶推施工中立柱的受力自平衡装置和纠偏方法

Country Status (1)

Country Link
CN (1) CN100519944C (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101492967B (zh) * 2008-01-22 2011-01-19 上海宝冶建设有限公司 钢柱纠偏方法
CN102102343A (zh) * 2010-12-17 2011-06-22 杭州市市政工程集团有限公司 一种对连续箱梁弯桥纠扭的方法
CN101259940B (zh) * 2007-03-07 2011-11-09 柳州欧维姆机械股份有限公司 大吨位桅杆多根缆风绳同时预紧或放松系统及其方法
CN102619174A (zh) * 2012-03-20 2012-08-01 中铁四局集团钢结构有限公司 大跨度连续钢桁梁带拱顶推装置
CN102733316A (zh) * 2012-07-13 2012-10-17 中铁大桥局股份有限公司 一种小半径平曲线桥整体同步旋转顶升施工方法
CN102778893A (zh) * 2012-08-07 2012-11-14 中铁二十三局集团有限公司 一种桁架梁精确就位检测方法
CN111608212A (zh) * 2019-02-24 2020-09-01 广州市市政工程试验检测有限公司 一种液压自平衡式单桩竖向抗拔静载试验方法及装置
CN112177039A (zh) * 2019-07-03 2021-01-05 中天建设集团有限公司 一种逆作法一桩一柱高精度辅助调垂施工方法
CN113526365A (zh) * 2021-07-27 2021-10-22 湖南省中南桥梁安装工程有限公司 一种缆索吊机起重索及牵引索塔顶自平衡系统

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3501075A1 (de) * 1985-01-15 1986-07-17 Polensky & Zöllner GmbH & Co, 6000 Frankfurt Verfahren und vorrichtung zum laengsverschieben eines langgestreckten bauwerkes
CN86201711U (zh) * 1986-03-22 1987-06-10 湖南省公路管理局 水平千斤顶自动调位活动支座
FR2750146B1 (fr) * 1996-06-21 1998-12-18 Royer Jacques Procede de mise en place ou d'enlevement par poussage d'un tablier de pont

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101259940B (zh) * 2007-03-07 2011-11-09 柳州欧维姆机械股份有限公司 大吨位桅杆多根缆风绳同时预紧或放松系统及其方法
CN101492967B (zh) * 2008-01-22 2011-01-19 上海宝冶建设有限公司 钢柱纠偏方法
CN102102343A (zh) * 2010-12-17 2011-06-22 杭州市市政工程集团有限公司 一种对连续箱梁弯桥纠扭的方法
CN102619174A (zh) * 2012-03-20 2012-08-01 中铁四局集团钢结构有限公司 大跨度连续钢桁梁带拱顶推装置
CN102619174B (zh) * 2012-03-20 2014-05-28 中铁四局集团钢结构有限公司 大跨度连续钢桁梁带拱顶推装置
CN102733316A (zh) * 2012-07-13 2012-10-17 中铁大桥局股份有限公司 一种小半径平曲线桥整体同步旋转顶升施工方法
CN102778893A (zh) * 2012-08-07 2012-11-14 中铁二十三局集团有限公司 一种桁架梁精确就位检测方法
CN102778893B (zh) * 2012-08-07 2014-10-08 中铁二十三局集团有限公司 一种桁架梁精确就位检测方法
CN111608212A (zh) * 2019-02-24 2020-09-01 广州市市政工程试验检测有限公司 一种液压自平衡式单桩竖向抗拔静载试验方法及装置
CN112177039A (zh) * 2019-07-03 2021-01-05 中天建设集团有限公司 一种逆作法一桩一柱高精度辅助调垂施工方法
CN113526365A (zh) * 2021-07-27 2021-10-22 湖南省中南桥梁安装工程有限公司 一种缆索吊机起重索及牵引索塔顶自平衡系统
CN113526365B (zh) * 2021-07-27 2024-02-27 湖南省中南桥梁安装工程有限公司 一种缆索吊机起重索及牵引索塔顶自平衡系统

Also Published As

Publication number Publication date
CN100519944C (zh) 2009-07-29

Similar Documents

Publication Publication Date Title
CN100519944C (zh) 桥面结构顶推施工中立柱的受力自平衡装置和纠偏方法
CN102444086B (zh) 一种桥梁斜拉索挂索系统及桥梁斜拉索挂索方法
CN109489882B (zh) 大尺寸模型试验用斜拉桥拉索锚固及索力测试装置及方法
CN106592441A (zh) 斜拉桥斜拉索的安装方法
AU782827B2 (en) Adjustable anchor bearing a civil engineering structure
CN102021887A (zh) 双塔单跨大横向倾角空间主缆自锚式悬索桥吊索张拉方法
CN106245527A (zh) 一种双环式吊具及大跨径猫道承重索的架设方法
CN108221694B (zh) 安装大跨度拱桥系杆的方法
CN105544871A (zh) 低回缩量精轧螺纹钢筋预应力锚固体系及其施工方法
CN107227686A (zh) 一种隧道式锚碇预应力系统定位支架施工方法
CN112195784A (zh) 采用空中纺线法架设主缆的猫道垂度调整系统及调整方法
CN109489883B (zh) 大尺寸模型试验用矮塔斜拉桥拉索锚固及索力测试装置
CN205743048U (zh) 一种幕墙较大尺寸立柱安装校正定位装置
CN106351246A (zh) T型螺栓直径≤48mm的整体式套筒安装方法
CN103328046A (zh) 安全绳锚固件
CN115979309B (zh) 一种角度式水平位移传感器
CN217924999U (zh) 一种钢结构施工装配式安装装置及防护装置
KR101385512B1 (ko) 임시 케이블 장력 조절 장치
CN105421230B (zh) 一种多向调节式扣锚梁装置
CN210458943U (zh) 一种装配式主索索力调整及锚固装置
CN219653521U (zh) 一种平拉索桥主索空缆失度调整结构
CN219513748U (zh) 一种单边长臂电缆平台
CN113062231B (zh) 悬臂浇筑拱圈施工装置及施工方法
CN210797275U (zh) 一种后张法预应力张拉千斤顶定位装置
CN216947886U (zh) 一种大型锚碇散索鞍偏角安装定位装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI MECHANIZED CONSTRUCTION CO., LTD.

Free format text: FORMER NAME: SHANGHAI CITY MACHINERY CONSTRUCTION CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 200072, Shanghai, 200 old Shanghai Road

Patentee after: Shanghai Mechanized Construction Group Co., Ltd.

Address before: 200072, Shanghai, 200 old Shanghai Road

Patentee before: Shanghai Mechanized Construction Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090729

Termination date: 20181210