CN1548972A - Apparatus for testing electric power system - Google Patents

Apparatus for testing electric power system Download PDF

Info

Publication number
CN1548972A
CN1548972A CNA031592643A CN03159264A CN1548972A CN 1548972 A CN1548972 A CN 1548972A CN A031592643 A CNA031592643 A CN A031592643A CN 03159264 A CN03159264 A CN 03159264A CN 1548972 A CN1548972 A CN 1548972A
Authority
CN
China
Prior art keywords
module
programmable
variable load
power
control module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA031592643A
Other languages
Chinese (zh)
Other versions
CN100406899C (en
Inventor
蔡晓恺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN031592643A priority Critical patent/CN100406899C/en
Publication of CN1548972A publication Critical patent/CN1548972A/en
Application granted granted Critical
Publication of CN100406899C publication Critical patent/CN100406899C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The device for measuring power supply system includes abnormal analog control modules, and main control module to control the abnormal analog control modules and provide various combinations of various abnormal analog control modules. After the primary power source is fed to the corresponding abnormal analog control modules, the abnormal analog control modules will process the input primary power source and outputs the secondary power source to the tested system under the control of the main control module. The measurement device of the present invention has several output power sources, can simulate power source abnormality and perform combined control to abnormality of the several output power sources, and is used in the test of stability and error tolerance limit of hardware system to verify the tolerance of the system circuit to power supply discretion and the stability and safety of hardware system in power source abnormality.

Description

A kind of device that power-supply system is tested
Technical field
The present invention relates to the electric power system measuring technology, refer to a kind of device that power-supply system is tested especially.
Background technology
In communication system, because various chips are different to the specification requirement of power supply, so on same veneer, can use multiple different power supply to satisfy the requirement of various chips.Can move with security and stability for guaranteeing communication system, it is very important that described various power supplys are tested, but since various power supplys between partial failure, local anomaly, the startup order variation of closing, pressure reduction variation etc., can both produce very large influence to the stability and the security of communication system, so the difficulty that power supply is tested is bigger.
In existing measuring technology, can only carry out unusual simulation test to single power supply, as the slow degree of the electricity that powers on/descend is simulated, under-voltage/overvoltage is simulated etc.
Obviously, there are many shortcomings in above-mentioned prior art, mainly comprises:
Though 1 can carry out simulation test to a road independent power supply, can't accomplish simultaneously multiple power supplies to be tested;
2,, thereby can't realize that the local power down of system under test (SUT), local overvoltage/undervoltage is unusual, electrifying timing sequence is unusual etc. is related to the project that needs a plurality of power supplys to act on simultaneously or ANOMALOUS VARIATIONS takes place simultaneously to be tested owing to only one road power supply is carried out fault simulation;
3, there are not function of testing and the function of simulating the system under test (SUT) load changing at secondary power supply real-time voltage/electric current;
4, only realize the unusual simulation of single power supply, thereby in the test at multi-power system, testing efficiency is very low.
Technology contents
The invention provides a kind of device that power-supply system is tested, to overcome the shortcoming that existing measuring technology can not be tested multiple power supplies simultaneously.
For addressing the above problem, the invention provides following technical scheme:
A kind of device that power-supply system is tested, include: a plurality of unusual simulation control modules, main control module, wherein, described main control module is used for described unusual simulation control module is controlled and provided the variation combination of various unusual simulation control modules; Primary power source inputs to corresponding unusual simulation control module, and under the control of main control module, this is simulated control module unusually the primary power source of input is handled, and exports secondary power supply to system under test (SUT).
This device also further comprises: the Programmable and Variable load blocks is used to provide variable load.
Import this Programmable and Variable load blocks from the control signal of described main control module, the required variable load of this Programmable and Variable load blocks output is connected to system under test (SUT), and it is made up of the Programmable and Variable load board that several are applicable to different electrical power.
Described main control module links to each other with the backstage control computer, to receive pre-set test procedure.
Described unusual simulation control module is used to provide the unusual analog controlling unit plate of different common voltage values to form by several, and different norm is intended the control module plate and further comprised:
The programmable power supply module is used to provide the output voltage of different size;
The prestrain circuit module is used to make described programmable power supply module still can keep normal voltage output when the system under test (SUT) underload;
Digital-to-analog conversion and adjusting module are used for the output voltage of described programmable power supply module is carried out gradual control, the control of stack ripple, overvoltage/undervoltage control;
The hit control module is used for that out-put supply to described programmable power supply module carries out instantaneous interruption or moment is fallen control;
Micro controller module is used to control above-mentioned each module.
Described unusual simulation control module can also comprise EMI (the Electromagnetic Interference: electromagnetic interference (EMI)) filtration module and the voltage and current measurement module that is used for real-time measuring voltage current value that is used for primary power source is carried out filtering.
Described Programmable and Variable load board further includes the microcontroller that is used to control and is used to realize capacitance-resistance matrix and program-controlled relay or the field effect transistor or the electronic switch matrix of variable load, this microcontroller is controlled described relay or field effect transistor or electronic switch matrix under the effect of described main control module, under the different switching combining control of this relay or field effect transistor or electronic switch matrix, described capacitance-resistance matrix produces corresponding combination and exports the variable load that can link to each other with system under test (SUT).
Described Programmable and Variable load board is meant the Programmable and Variable load board that is applicable to primary power source and is applicable in two kinds of the Programmable and Variable load board of secondary power supply one or both.
This device also includes the primary power source on-off controller that is used to realize primary power source hit function.
A kind of device that power-supply system is tested provided by the invention, it satisfies the tested system of many power supplys to power supply adaptability and characteristic examination fault-tolerant, tolerance limit by controlling a plurality of power control unit modules with unusual analog functuion; The unusual analog controlling unit plate of various magnitudes of voltage is by the cooperation control of certain way, can finish the simulation that the local power down of system under test (SUT) or local voltage are departed from, power-on and power-off order, the slow degree of power-on and power-off, the simulation of power-on and power-off transient state sequential between each power supply, the moment of locally supplied power source is fallen function, and different norm plan control module plate has real-time voltage, current sense function and ripple analog functuion; This device also has the load simulation function at primary power source and each secondary power supply.
The present invention has following advantage in short:
1, can realize the combination in any of many power supplys, and function such as the local power down between the program-controlled adjusting different electrical power, timing variations;
2, can realize the analog functuion that momentary load changes;
3, make the test of the abnormity of power supply of the complete electric power system of simulation become perfect, flexible and efficient.
4, the phase mutual interference in the test, big current switching, load simulation, big current detecting problem have been solved.
Introduce the present invention in detail below in conjunction with description of drawings and embodiment.
Description of drawings
Fig. 1 is a The general frame of the present invention;
Fig. 2 is the system architecture block diagram of the embodiment of the invention;
Fig. 3 is the structured flowchart of unusual analog controlling unit plate in the embodiment of the invention;
Fig. 4 is the structured flowchart of program control variable load plate in the embodiment of the invention.
Embodiment
Be illustrated in figure 1 as the device that the present invention tests power-supply system, its mainly by the main control module, unusually simulate control module, Programmable and Variable load blocks ,-48V on/off controller and auxiliary circuit module commonly used form.
As shown in Figure 2, be used in the present embodiment to provide unusual simulation control module that various abnormity of power supply change combination by seven provide respectively 5V, 3.3V, 2.5V, 1.8V, 1.5V ,-5V ,+-the unusual analog controlling unit plate of 15V voltage forms.
As shown in Figure 3, provide the unusual analog controlling unit plate of each magnitude of voltage to include respectively: the programmable power supply module of micro controller module, corresponding specification, prestrain circuit module, digital-to-analog conversion and adjusting module, moment control module, voltage and current measurement module and EMI filtration module.Enter the programmable power supply module to convert the voltage of corresponding specification to after the Filtering Processing of primary power source through the EMI filtration module, this voltage enters the hit control module so that power supply has the function that instantaneous interruption or moment fall, and voltage after treatment exports system under test (SUT) to as secondary power supply; The control signal of main control module inputs to micro controller module, controls programmable power supply module, prestrain circuit module, voltage and current measurement module, digital-to-analog conversion and adjusting module, hit control module respectively by micro controller module again; Digital-to-analog conversion and adjusting module output to gradual control, stack ripple control, the overvoltage/undervoltage output control function of programmable power supply module to realize voltage; The output terminal that the prestrain circuit module is connected to the programmable power supply module still can be kept the function of normal voltage output when the system under test (SUT) underload to realize the programmable power supply module; The voltage and current measurement module is connected to the output terminal of programmable power supply module with real-time measuring voltage electric current.
As shown in Figure 2, be used to provide the Programmable and Variable load blocks of variable load to form in the present embodiment by the suitable-Programmable and Variable load board of 48V primary power source and the Programmable and Variable load board of suitable secondary power supply.
As shown in Figure 4, each Programmable and Variable load board all comprises microcontroller, high-current relay matrix and capacitance resistance load matrix.Its microcontroller is controlled the high-current relay matrix under the effect of main control module, under the different switching combining control of high-current relay matrix, the capacitance-resistance matrix produces corresponding combination and exports the variable load that is applicable to different electrical power that can link to each other with system under test (SUT).
As shown in Figure 2, can realize in the present embodiment-48V primary power source hit function-48V on/off controller, its-the 48V primary power source inputs to this-48V on/off controller, under the effect of main control module, exports result to system under test (SUT).
Primary power source employing-48V the power supply of required input in the present embodiment.
When needs are tested hardware system, many power supplys of the simulation anomaly association that present embodiment provides and the proving installation of tolerance limit substitute each power supply of using on the side circuit, according to the required power supply situation of system under test (SUT) and test request with in the present embodiment-48V on/off controller, the unusual analog controlling unit plate of each magnitude of voltage and all or part of access system under test (SUT) of output terminal of each Programmable and Variable load board, so that required power supply of test and load to be provided.
Test process comprises following steps:
The first, main control module links to each other with the backstage control computer with a pair of serial ports by a pair of network interface, to receive pre-set test procedure.
The second, the microcontroller in the main control module is as the main frame of communication channel, microcontroller in different norm plan control module plate and each Programmable and Variable load board is as slave, main frame is distinguished each abnormity of power supply analog controlling unit plate and Programmable and Variable load board according to the address of each plate, with move instruction and data, realize different norm is intended the control real-time, combination of control module plate and Programmable and Variable load board;
Microcontroller in each abnormity of power supply analog controlling unit plate is controlled its plate interior programmable power supply module, prestrain module, digital-to-analog conversion and adjusting module, hit control module, voltage and current measurement module respectively according to the instruction and data that receives, make all or part of module wherein carry out work, so that this plate output voltage has one or more following real-time statuss:
Output 5V, 3.3V, 2.5V, 1.8V, 1.5V ,-5V ,+-a kind of voltage among the 15V;
That output voltage is realized is gradual, stack ripple, overvoltage/undervoltage change;
Output voltage instantaneous interruption or moment are fallen;
Output voltage is still kept normal voltage output when the system under test (SUT) underload.
The main control module makes up the unusual analog controlling unit plate output voltage state of each magnitude of voltage, stability and security test when realizing many abnormity of power supply that system under test (SUT) carries out combination in any are changed.
In addition, when need connecting load, system under test (SUT) can start the Programmable and Variable load blocks.Microprocessor in each Programmable and Variable load board in the Programmable and Variable load blocks receives the instruction of main control module, this plate high-current relay matrix is controlled, make it produce required switching combining, under the switching combining control of high-current relay matrix, the capacitance-resistance matrix produces corresponding combination and exports the variable load that can link to each other with system under test (SUT).
Once more, when system under test (SUT) needs access-48V primary power source, can start-48V on/off controller.It switches on or off after receiving the instruction of main control, with adapt to system under test (SUT) right-needs of 48V primary power source.
EMI filtration module and voltage and current measurement module are optional module in the unusual simulation control module of present embodiment, and the high-current relay matrix in the Programmable and Variable load blocks also can adopt big electric current field effect transistor matrix or heavy-current electronic switch matrix.
The proving installation of many power supplys of simulation anomaly association that present embodiment provides can substitute each power supply of using on the side circuit when hardware system is tested, according to the syntagmatic and the program of certain unusual simulation, examine the stability and the security of hardware system.

Claims (10)

1, a kind of device that power-supply system is tested, this device includes unusual simulation control module, it is characterized in that, this device also includes the main control module, and described main control module is used for described unusual simulation control module is controlled and provided the variation combination of various unusual simulation control modules; Primary power source inputs to corresponding unusual simulation control module, and under the control of main control module, this is simulated control module unusually the primary power source of input is handled, and exports secondary power supply to system under test (SUT).
2, a kind of device that power-supply system is tested as claimed in claim 1 is characterized in that this device also further includes:
The Programmable and Variable load blocks is used to provide variable load; Import this Programmable and Variable load blocks from the control signal of described main control module, the required variable load of this Programmable and Variable load blocks output is connected to system under test (SUT).
3, a kind of device that power-supply system is tested as claimed in claim 2 is characterized in that, described Programmable and Variable load blocks is made up of the Programmable and Variable load board that several are applicable to different electrical power.
4, a kind of device that power-supply system is tested as claimed in claim 1 or 2 is characterized in that, described main control module links to each other with the backstage control computer, to receive pre-set test procedure.
5, a kind of device that power-supply system is tested as claimed in claim 1 or 2 is characterized in that, described unusual simulation control module provides the unusual analog controlling unit plate of different common voltage values to form by several.
6, a kind of device that power-supply system is tested as claimed in claim 5 is characterized in that, described unusual analog controlling unit plate further comprises:
The programmable power supply module, it has program control adjustable, and output different size voltage;
The prestrain circuit module is used to make described programmable power supply module still can keep normal voltage output when the system under test (SUT) underload;
Digital-to-analog conversion and adjusting module are used for the output voltage of described programmable power supply module is carried out gradual control, the control of stack ripple, overvoltage/undervoltage control;
The hit control module is used for that out-put supply to described programmable power supply module carries out instantaneous interruption or moment is fallen control;
Micro controller module is used to control above-mentioned each module.
7, a kind of device that power-supply system is tested as claimed in claim 6, it is characterized in that described unusual simulation control module can also comprise the EMI filtration module and the voltage and current measurement module that is used for real-time measuring voltage current value that is used for primary power source is carried out filtering.
8, a kind of device that power-supply system is tested as claimed in claim 3, it is characterized in that, described Programmable and Variable load board further includes the microcontroller that is used to control and is used to realize capacitance-resistance matrix and program-controlled relay or the field effect transistor or the electronic switch matrix of variable load, this microcontroller is controlled described relay or field effect transistor or electronic switch matrix under the effect of described main control module, under the different switching combining control of this relay or field effect transistor or electronic switch matrix, described capacitance-resistance matrix produces corresponding combination and exports the variable load that can link to each other with system under test (SUT).
9, a kind of device that power-supply system is tested as claimed in claim 3, it is characterized in that described Programmable and Variable load board is meant the Programmable and Variable load board that is applicable to primary power source and is applicable in two kinds of the Programmable and Variable load board of secondary power supply one or both.
10, a kind of device that power-supply system is tested as claimed in claim 1 is characterized in that, this device also includes the primary power source on-off controller that is used to realize primary power source hit function.
CN031592643A 2003-05-10 2003-09-12 Apparatus for testing electric power system Expired - Fee Related CN100406899C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN031592643A CN100406899C (en) 2003-05-10 2003-09-12 Apparatus for testing electric power system

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN03128777 2003-05-10
CN03128777.8 2003-05-10
CN031592643A CN100406899C (en) 2003-05-10 2003-09-12 Apparatus for testing electric power system

Publications (2)

Publication Number Publication Date
CN1548972A true CN1548972A (en) 2004-11-24
CN100406899C CN100406899C (en) 2008-07-30

Family

ID=34378714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN031592643A Expired - Fee Related CN100406899C (en) 2003-05-10 2003-09-12 Apparatus for testing electric power system

Country Status (1)

Country Link
CN (1) CN100406899C (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100369409C (en) * 2005-07-14 2008-02-13 杭州华三通信技术有限公司 Network equipment, supply unit of network equipment and method of power supply
CN100439930C (en) * 2005-05-11 2008-12-03 华为技术有限公司 Method for testing product fault-tolerant performance and fault inserting device thereof
CN101042412B (en) * 2006-03-20 2010-05-26 佛山市顺德区顺达电脑厂有限公司 Electric loading switching equipment
CN102759648A (en) * 2011-04-28 2012-10-31 上海博泰悦臻电子设备制造有限公司 Method and system for testing power panel
CN103187802A (en) * 2012-07-12 2013-07-03 深圳市康必达中创科技有限公司 Fault tolerance testing method for simulation system of digital transformer substation
CN103223948A (en) * 2013-04-26 2013-07-31 株洲南车时代电气股份有限公司 Locomotive voltage collecting and recording system
CN104635093A (en) * 2015-02-27 2015-05-20 北京精密机电控制设备研究所 Test device for power consumption feature of electromechanical servo system
CN105572604A (en) * 2016-01-27 2016-05-11 深圳创维数字技术有限公司 Power supply testing method and power supply testing system
CN106646275A (en) * 2017-03-03 2017-05-10 京东方科技集团股份有限公司 DC/DC testing system and method
CN106909479A (en) * 2015-12-23 2017-06-30 研祥智能科技股份有限公司 A kind of test device for computer opening/closing
CN107291613A (en) * 2016-04-13 2017-10-24 阿里巴巴集团控股有限公司 A kind of abnormal analogy method of functional node and device
CN107480040A (en) * 2016-06-08 2017-12-15 阿里巴巴集团控股有限公司 Workflow stability test method and apparatus
CN109765500A (en) * 2017-11-08 2019-05-17 中兴通讯股份有限公司 A kind of power supply analog machine and power supply analogy method
CN111337847A (en) * 2020-02-20 2020-06-26 深圳市航顺芯片技术研发有限公司 Power supply transient drop recovery test platform and method for micro control chip
CN111371308A (en) * 2018-12-25 2020-07-03 华为技术有限公司 Power supply design and device
CN110994775B (en) * 2019-11-26 2021-05-11 中国航天时代电子有限公司 Intelligent power supply switching method considering load characteristics

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105823990B (en) * 2015-01-04 2018-11-09 成都锐成芯微科技有限责任公司 A kind of fictitious load for testing SOC power supplys

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9512146D0 (en) * 1995-06-15 1995-08-16 At & T Global Inf Solution An actuation apparatus
CN1132993A (en) * 1995-10-16 1996-10-09 朱建平 Fault detecting and diagnosing system for user circuit board of programmed digital telephone switchboard
US5917331A (en) * 1995-10-23 1999-06-29 Megatest Corporation Integrated circuit test method and structure
CN2405383Y (en) * 1999-09-30 2000-11-08 深圳市中兴通讯股份有限公司 Bell flow electric power supply module testing device
CN1260898C (en) * 2001-05-10 2006-06-21 中兴通讯股份有限公司 Power source single-board universal tester

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100439930C (en) * 2005-05-11 2008-12-03 华为技术有限公司 Method for testing product fault-tolerant performance and fault inserting device thereof
CN100369409C (en) * 2005-07-14 2008-02-13 杭州华三通信技术有限公司 Network equipment, supply unit of network equipment and method of power supply
CN101042412B (en) * 2006-03-20 2010-05-26 佛山市顺德区顺达电脑厂有限公司 Electric loading switching equipment
CN102759648A (en) * 2011-04-28 2012-10-31 上海博泰悦臻电子设备制造有限公司 Method and system for testing power panel
CN103187802B (en) * 2012-07-12 2015-10-07 深圳市康必达中创科技有限公司 Simulation system of digital transformer substation tolerating measure method
CN103187802A (en) * 2012-07-12 2013-07-03 深圳市康必达中创科技有限公司 Fault tolerance testing method for simulation system of digital transformer substation
CN103223948B (en) * 2013-04-26 2016-01-20 株洲南车时代电气股份有限公司 A kind of locomotive voltage acquisition register system
CN103223948A (en) * 2013-04-26 2013-07-31 株洲南车时代电气股份有限公司 Locomotive voltage collecting and recording system
CN104635093A (en) * 2015-02-27 2015-05-20 北京精密机电控制设备研究所 Test device for power consumption feature of electromechanical servo system
CN104635093B (en) * 2015-02-27 2017-07-28 北京精密机电控制设备研究所 A kind of test device of electromechanical servo system electrical characteristics
CN106909479A (en) * 2015-12-23 2017-06-30 研祥智能科技股份有限公司 A kind of test device for computer opening/closing
CN106909479B (en) * 2015-12-23 2020-11-17 研祥智能科技股份有限公司 Startup and shutdown test fixture
CN105572604A (en) * 2016-01-27 2016-05-11 深圳创维数字技术有限公司 Power supply testing method and power supply testing system
CN107291613B (en) * 2016-04-13 2020-06-05 阿里巴巴集团控股有限公司 Functional node abnormity simulation method and device
CN107291613A (en) * 2016-04-13 2017-10-24 阿里巴巴集团控股有限公司 A kind of abnormal analogy method of functional node and device
CN107480040A (en) * 2016-06-08 2017-12-15 阿里巴巴集团控股有限公司 Workflow stability test method and apparatus
CN106646275A (en) * 2017-03-03 2017-05-10 京东方科技集团股份有限公司 DC/DC testing system and method
CN109765500A (en) * 2017-11-08 2019-05-17 中兴通讯股份有限公司 A kind of power supply analog machine and power supply analogy method
CN111371308A (en) * 2018-12-25 2020-07-03 华为技术有限公司 Power supply design and device
CN110994775B (en) * 2019-11-26 2021-05-11 中国航天时代电子有限公司 Intelligent power supply switching method considering load characteristics
CN111337847A (en) * 2020-02-20 2020-06-26 深圳市航顺芯片技术研发有限公司 Power supply transient drop recovery test platform and method for micro control chip
CN111337847B (en) * 2020-02-20 2021-11-09 深圳市航顺芯片技术研发有限公司 Power supply transient drop recovery test platform and method for micro control chip

Also Published As

Publication number Publication date
CN100406899C (en) 2008-07-30

Similar Documents

Publication Publication Date Title
CN1548972A (en) Apparatus for testing electric power system
CN2919266Y (en) Direct current electronic loading device
CN103149528B (en) System and method for testing transducer PCBA (printed circuit board assembly)
CN2655309Y (en) Power supply time sequence controlling circuit
CN1812219A (en) Apparatus for effectively compensating three-phase unbalance load and reactive power
CN1544955A (en) Comprehensive test instrument of electric system primary cut out
CN1260898C (en) Power source single-board universal tester
CN108663592B (en) Opposite-dragging type SVG module debugging platform and method
CN101968503A (en) Load circuit and load testing device with same
CN105223441A (en) A kind of mobile type electric charger for automobile detection system
CN1192525C (en) Multi-function fault implanting machine
CN1308830C (en) Computer controled easy extension intelligent main board environment test system
CN207318663U (en) Portable electric actuator veneer detection device
CN100351804C (en) Multi-computer detest switch-over device
CN2648681Y (en) Auxiliary power supply device for large power uninterruption power source equipment
CN2519288Y (en) Test instrument of power supply apparatus
CN204008900U (en) Energy efficiency testing device
CN1786728A (en) Method and apparatus for testing UPS control unit
CN209821665U (en) Device for testing functions of power manager
CN103149391B (en) A kind of testing jig
CN1229722C (en) System for realizing envivonment test of mainboard
CN1235141C (en) Emulation test equipment for computer hot-plug control board
CN2378737Y (en) Electric circuit board automatic testing and signal waveform contrast equipment
CN2849832Y (en) Screened door centre interface disk circuit
CN2807261Y (en) Power on/off device used for testing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Foshan Keyuan Electric Co., Ltd.

Assignor: Huawei Technologies Co., Ltd.

Contract fulfillment period: 2008.8.26 to 2013.8.26 contract change

Contract record no.: 2009440001693

Denomination of invention: Apparatus for testing electric power system

Granted publication date: 20080730

License type: Exclusive license

Record date: 20091022

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2008.8.26 TO 2013.8.26; CHANGE OF CONTRACT

Name of requester: FOSHAN CITY KEYUAN ELECTRIC APPLICANCE CO., LTD.

Effective date: 20091022

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080730

Termination date: 20160912

CF01 Termination of patent right due to non-payment of annual fee