CN101042412B - Electric loading switching equipment - Google Patents

Electric loading switching equipment Download PDF

Info

Publication number
CN101042412B
CN101042412B CN 200610034420 CN200610034420A CN101042412B CN 101042412 B CN101042412 B CN 101042412B CN 200610034420 CN200610034420 CN 200610034420 CN 200610034420 A CN200610034420 A CN 200610034420A CN 101042412 B CN101042412 B CN 101042412B
Authority
CN
China
Prior art keywords
load
switching equipment
electric loading
loading switching
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200610034420
Other languages
Chinese (zh)
Other versions
CN101042412A (en
Inventor
蔡明霓
黄建程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitac Computer Shunde Ltd
Shunda Computer Factory Co Ltd
Mitac International Corp
Original Assignee
Mitac Computer Shunde Ltd
Mitac International Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitac Computer Shunde Ltd, Mitac International Corp filed Critical Mitac Computer Shunde Ltd
Priority to CN 200610034420 priority Critical patent/CN101042412B/en
Publication of CN101042412A publication Critical patent/CN101042412A/en
Application granted granted Critical
Publication of CN101042412B publication Critical patent/CN101042412B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Stand-By Power Supply Arrangements (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

This invention provides one electron load switch device to load the system onto power, which comprises one power input end to connect power and electron load switch device; input current to test power input end and to output one current measurement signal test module to receive the test module signals and to display the display module; load consumption terminal to load each independent power load by plug type to receive the input current.

Description

Electric loading switching equipment
[technical field]
The present invention more in detail, loads on power supply with inserting mode with system load and external load relevant for a kind of relevant for a kind of electric loading switching equipment, and the electric loading switching equipment of the electric current situation of change of synchronous monitoring power supply full load.
[background technology]
The power supply full load, output end voltage can produce tangible drift, and power source loads test (Load PowerSupply Test) is under the state that system power supply is fully loaded with, can testing power supply and this system stablize running.In the practical operation; the electronic load that power supply consumed except system; not enough will supplying by the external load supply; the method of supplying load at present is that each is partly removed the outer layer insulation of power transmission line, directly each power source loads is sandwiched in the current-carrying part of each transmission line, so can be because of the composition surface loose contact; influence the accuracy of test result; and the current-carrying part of this transmission line is exposed to the outside, lacks insulation protection, has potential potential safety hazard.In addition, this power source loads test needs to load a current measuring device between this electronic system and this power supply, with the variation of real-time monitored current value, increases the complicacy of this system.
Therefore, being necessary to provide a kind of loads on power supply with inserting mode with system load and external load in fact, and the electric loading switching equipment of the electric current situation of change of synchronous monitoring power supply full load.
[summary of the invention]
Purpose of the present invention promptly provides a kind of electric loading switching equipment, is used for system load and external load being loaded on power supply with inserting mode, and the electric current situation of change of synchronous monitoring power supply full load.
For reaching above-mentioned purpose, the invention provides a kind of electric loading switching equipment, comprise the power input that connects power supply and this electric loading switching equipment with inserting mode, in order to measure the input current of this power input, and export the measurement module of a current measurement signal, in order to current measurement signal that receives this measurement module and the display module that is shown, and in order to receiving the electric current of this power input, and load on the load consumption end of each independent current source load with inserting mode.
Compared to prior art, electric loading switching equipment of the present invention loads on power supply with inserting mode with system load and external load, reaches relative stability and security in test process.In addition, but the electric current situation of change of this electric loading switching equipment synchronous monitoring power supply full load is analyzed the stability of this electronic system whereby, improves the ageing of test.
[description of drawings]
Fig. 1 is the block diagram of electric loading switching equipment of the present invention.
[embodiment]
As shown in Figure 1, block scheme for electric loading switching equipment of the present invention, this electric loading switching equipment 11 is mainly used in the power source loads test macro 1, this electric loading switching equipment 11 mainly comprises a power input 111, measurement module 112, display module 113, load consumption end 114, below will be elaborated to electric loading switching equipment 11 of the present invention.
Power input 111, it is mounted on the electric loading switching equipment 11, be used for connecting power supply 12 and this electric loading switching equipment 11 with inserting mode, in present embodiment, this power input 111 is a jack, the probe of power supply 12 inserts in this jack, power supply 12 is loaded on this electric loading switching equipment 11.
Measurement module 112, in order to measuring the input current of this power input 111, that is the electric current situation of change of these power supply 12 full loads, and export a current measurement signal and give display module 113 to carry out subsequent job.
Display module 113, in order to receive the current measurement signal of these measurement module 113 outputs, and be shown on this display module 113, so that the situation of change of the load current amount of the power supply unit 12 of synchronous monitoring whole test period, analyze the stability of this power source loads test macro 1 whereby, preferably, this display module 113 can be embodied as wherein one of pointer display panel or LED display.
Load consumption end 114, in order to receive this power input 111 electric current transmitted, and load on each independent current source load with inserting mode, for example external load supply 13 and system load end 2, and this load consumption end 114 is integrated each independent current source load, the for example total load consumption of external load supply 13 and system load end 2, in present embodiment, this load consumption end 114 is designed to jack, this external load supply 13 inserts in this jack with the probe of this system load end 2, makes this external load supply 13 replenish the deficiency of system load end 2 loads when carrying out the power source loads test.
Compared with prior art, electric loading switching equipment of the present invention loads on power supply with inserting mode with system load and external load, in test process, reach relative stability and security, and avoid the artificial error that causes, improve accuracy and the reliability of test. In addition, but the curent change situation of this electric loading switching equipment Simultaneous Monitoring power supply full load is analyzed the stability of this electronic system whereby, improves the ageing of test, simplied system structure.

Claims (7)

1. electric loading switching equipment, in order to system load and external load are loaded on power supply, it comprises:
Power input is mounted on the electric loading switching equipment, and connects power supply and this electric loading switching equipment in the mode of pegging graft;
Measurement module is measured the input current of this power input;
Display module shows the current value of this measurement module;
The load consumption end receives this power input electric current transmitted, and loads on each independent current source load with inserting mode.
2. electric loading switching equipment as claimed in claim 1 is characterized in that: this measurement module is measured the input current of this power input, that is the electric current situation of change of this power supply full load, and exports a current measurement signal.
3. electric loading switching equipment as claimed in claim 2, it is characterized in that: this display module receives the current measurement signal of this measurement module output, and be shown on this display module, so that the situation of change of the load current amount of the power supply unit of synchronous monitoring whole test period, analyze the stability of this system whereby.
4. electric loading switching equipment as claimed in claim 1 is characterized in that: this display module is wherein one of pointer display panel or a LED display.
5. electric loading switching equipment as claimed in claim 1 is characterized in that: this load consumption end is also integrated the total load consumption of each independent current source load.
6. electric loading switching equipment as claimed in claim 1 is characterized in that: this power input is a jack, and the probe of power supply inserts in this jack, loads on this electric loading switching equipment to make this power supply.
7. electric loading switching equipment as claimed in claim 1, it is characterized in that: this load consumption end is designed to jack, and the probe of external load supply and system load end inserts in this jack, the deficiency of this system load end load when carrying out the power source loads test to make this external load supply replenish.
CN 200610034420 2006-03-20 2006-03-20 Electric loading switching equipment Expired - Fee Related CN101042412B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610034420 CN101042412B (en) 2006-03-20 2006-03-20 Electric loading switching equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610034420 CN101042412B (en) 2006-03-20 2006-03-20 Electric loading switching equipment

Publications (2)

Publication Number Publication Date
CN101042412A CN101042412A (en) 2007-09-26
CN101042412B true CN101042412B (en) 2010-05-26

Family

ID=38808078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610034420 Expired - Fee Related CN101042412B (en) 2006-03-20 2006-03-20 Electric loading switching equipment

Country Status (1)

Country Link
CN (1) CN101042412B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109471047B (en) * 2018-12-21 2021-04-02 北京无线电计量测试研究所 Portable automatic measuring device for AC/DC power supply calibration
CN111707959B (en) * 2020-05-29 2022-12-27 苏州浪潮智能科技有限公司 System and method for testing integrity of server board card power supply

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4333049A (en) * 1979-05-21 1982-06-01 Takamisawa Cybernetics Co., Ltd. Inrush current measuring apparatus with instantaneous power interruption device
CN2362137Y (en) * 1998-11-24 2000-02-02 郭宁 Power supply load ability tester
CN2444271Y (en) * 2000-07-17 2001-08-22 刘英彰 Electric source monitor
CN1368643A (en) * 2001-02-05 2002-09-11 计测技术研究所 Switching device between electronic load device and tested power supply apparatus
US6476729B1 (en) * 2000-08-22 2002-11-05 Daniel Liu Power monitoring module with display unit for electrical power source device
CN1548972A (en) * 2003-05-10 2004-11-24 华为技术有限公司 Apparatus for testing electric power system
CN1677359A (en) * 2004-04-02 2005-10-05 纬创资通股份有限公司 Power-supply load simulation device and detest method
CN1740803A (en) * 2004-08-24 2006-03-01 鸿富锦精密工业(深圳)有限公司 The ohmic load system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4333049A (en) * 1979-05-21 1982-06-01 Takamisawa Cybernetics Co., Ltd. Inrush current measuring apparatus with instantaneous power interruption device
CN2362137Y (en) * 1998-11-24 2000-02-02 郭宁 Power supply load ability tester
CN2444271Y (en) * 2000-07-17 2001-08-22 刘英彰 Electric source monitor
US6476729B1 (en) * 2000-08-22 2002-11-05 Daniel Liu Power monitoring module with display unit for electrical power source device
CN1368643A (en) * 2001-02-05 2002-09-11 计测技术研究所 Switching device between electronic load device and tested power supply apparatus
CN1548972A (en) * 2003-05-10 2004-11-24 华为技术有限公司 Apparatus for testing electric power system
CN1677359A (en) * 2004-04-02 2005-10-05 纬创资通股份有限公司 Power-supply load simulation device and detest method
CN1740803A (en) * 2004-08-24 2006-03-01 鸿富锦精密工业(深圳)有限公司 The ohmic load system

Also Published As

Publication number Publication date
CN101042412A (en) 2007-09-26

Similar Documents

Publication Publication Date Title
CN204361912U (en) Motor drive
KR101670785B1 (en) Inspection Device for Angular Velocity Sensor
CN102064597B (en) Energy storage device
RU2009139478A (en) METHOD FOR ELECTRICAL LOAD CONTROL AND DEVICE FOR ITS IMPLEMENTATION
WO2011066554A3 (en) I-v measurement system for photovoltaic modules
SG149782A1 (en) Open circuit delay devices, systems, and methods for analyte measurement
CN101354407B (en) Power supply apparatus
CN111699105B (en) Charging station and method for charging an electric vehicle using distributed energy measurement
CN104350388A (en) System and method for detecting branch circuit current
CN104931830B (en) A kind of electronic cigarette host test jig
CN101122620B (en) Power supply line
CN101042412B (en) Electric loading switching equipment
CN101285864A (en) Testing method of semiconductor integrated circuit and integrated circuit tester
CN108562860A (en) Electric energy meter two-way accessory power supply power consumption Auto-Test System and test method
CN103618897A (en) A testing device of a machine core main board of a TV integrated machine
JP2012149914A (en) Apparatus and method for inspecting degradation of printed wiring board
CN207965122U (en) High-voltage electric energy meter metering plate remote online check system
KR101048074B1 (en) System for testing accelerated lifetime of electric device
CN207215868U (en) A kind of circuit board testing device
CN204177928U (en) The pick-up unit of temperature switch
CN103376421A (en) Power supply efficiency measuring apparatus
JP2014089998A (en) Monitor system for photovoltaic power generation equipment
KR100765344B1 (en) Apparatus for detecting power and current used electricity and electronic type
CN101738534B (en) Voltage test device and voltage test method
CN203037844U (en) Intelligent testing device for electric energy meter built-in load switch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100526

Termination date: 20110320