CN101042412B - Electric loading switching equipment - Google Patents
Electric loading switching equipment Download PDFInfo
- Publication number
- CN101042412B CN101042412B CN 200610034420 CN200610034420A CN101042412B CN 101042412 B CN101042412 B CN 101042412B CN 200610034420 CN200610034420 CN 200610034420 CN 200610034420 A CN200610034420 A CN 200610034420A CN 101042412 B CN101042412 B CN 101042412B
- Authority
- CN
- China
- Prior art keywords
- load
- switching equipment
- electric loading
- loading switching
- current
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Stand-By Power Supply Arrangements (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
This invention provides one electron load switch device to load the system onto power, which comprises one power input end to connect power and electron load switch device; input current to test power input end and to output one current measurement signal test module to receive the test module signals and to display the display module; load consumption terminal to load each independent power load by plug type to receive the input current.
Description
[technical field]
The present invention more in detail, loads on power supply with inserting mode with system load and external load relevant for a kind of relevant for a kind of electric loading switching equipment, and the electric loading switching equipment of the electric current situation of change of synchronous monitoring power supply full load.
[background technology]
The power supply full load, output end voltage can produce tangible drift, and power source loads test (Load PowerSupply Test) is under the state that system power supply is fully loaded with, can testing power supply and this system stablize running.In the practical operation; the electronic load that power supply consumed except system; not enough will supplying by the external load supply; the method of supplying load at present is that each is partly removed the outer layer insulation of power transmission line, directly each power source loads is sandwiched in the current-carrying part of each transmission line, so can be because of the composition surface loose contact; influence the accuracy of test result; and the current-carrying part of this transmission line is exposed to the outside, lacks insulation protection, has potential potential safety hazard.In addition, this power source loads test needs to load a current measuring device between this electronic system and this power supply, with the variation of real-time monitored current value, increases the complicacy of this system.
Therefore, being necessary to provide a kind of loads on power supply with inserting mode with system load and external load in fact, and the electric loading switching equipment of the electric current situation of change of synchronous monitoring power supply full load.
[summary of the invention]
Purpose of the present invention promptly provides a kind of electric loading switching equipment, is used for system load and external load being loaded on power supply with inserting mode, and the electric current situation of change of synchronous monitoring power supply full load.
For reaching above-mentioned purpose, the invention provides a kind of electric loading switching equipment, comprise the power input that connects power supply and this electric loading switching equipment with inserting mode, in order to measure the input current of this power input, and export the measurement module of a current measurement signal, in order to current measurement signal that receives this measurement module and the display module that is shown, and in order to receiving the electric current of this power input, and load on the load consumption end of each independent current source load with inserting mode.
Compared to prior art, electric loading switching equipment of the present invention loads on power supply with inserting mode with system load and external load, reaches relative stability and security in test process.In addition, but the electric current situation of change of this electric loading switching equipment synchronous monitoring power supply full load is analyzed the stability of this electronic system whereby, improves the ageing of test.
[description of drawings]
Fig. 1 is the block diagram of electric loading switching equipment of the present invention.
[embodiment]
As shown in Figure 1, block scheme for electric loading switching equipment of the present invention, this electric loading switching equipment 11 is mainly used in the power source loads test macro 1, this electric loading switching equipment 11 mainly comprises a power input 111, measurement module 112, display module 113, load consumption end 114, below will be elaborated to electric loading switching equipment 11 of the present invention.
Compared with prior art, electric loading switching equipment of the present invention loads on power supply with inserting mode with system load and external load, in test process, reach relative stability and security, and avoid the artificial error that causes, improve accuracy and the reliability of test. In addition, but the curent change situation of this electric loading switching equipment Simultaneous Monitoring power supply full load is analyzed the stability of this electronic system whereby, improves the ageing of test, simplied system structure.
Claims (7)
1. electric loading switching equipment, in order to system load and external load are loaded on power supply, it comprises:
Power input is mounted on the electric loading switching equipment, and connects power supply and this electric loading switching equipment in the mode of pegging graft;
Measurement module is measured the input current of this power input;
Display module shows the current value of this measurement module;
The load consumption end receives this power input electric current transmitted, and loads on each independent current source load with inserting mode.
2. electric loading switching equipment as claimed in claim 1 is characterized in that: this measurement module is measured the input current of this power input, that is the electric current situation of change of this power supply full load, and exports a current measurement signal.
3. electric loading switching equipment as claimed in claim 2, it is characterized in that: this display module receives the current measurement signal of this measurement module output, and be shown on this display module, so that the situation of change of the load current amount of the power supply unit of synchronous monitoring whole test period, analyze the stability of this system whereby.
4. electric loading switching equipment as claimed in claim 1 is characterized in that: this display module is wherein one of pointer display panel or a LED display.
5. electric loading switching equipment as claimed in claim 1 is characterized in that: this load consumption end is also integrated the total load consumption of each independent current source load.
6. electric loading switching equipment as claimed in claim 1 is characterized in that: this power input is a jack, and the probe of power supply inserts in this jack, loads on this electric loading switching equipment to make this power supply.
7. electric loading switching equipment as claimed in claim 1, it is characterized in that: this load consumption end is designed to jack, and the probe of external load supply and system load end inserts in this jack, the deficiency of this system load end load when carrying out the power source loads test to make this external load supply replenish.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610034420 CN101042412B (en) | 2006-03-20 | 2006-03-20 | Electric loading switching equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610034420 CN101042412B (en) | 2006-03-20 | 2006-03-20 | Electric loading switching equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101042412A CN101042412A (en) | 2007-09-26 |
CN101042412B true CN101042412B (en) | 2010-05-26 |
Family
ID=38808078
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200610034420 Expired - Fee Related CN101042412B (en) | 2006-03-20 | 2006-03-20 | Electric loading switching equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101042412B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109471047B (en) * | 2018-12-21 | 2021-04-02 | 北京无线电计量测试研究所 | Portable automatic measuring device for AC/DC power supply calibration |
CN111707959B (en) * | 2020-05-29 | 2022-12-27 | 苏州浪潮智能科技有限公司 | System and method for testing integrity of server board card power supply |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4333049A (en) * | 1979-05-21 | 1982-06-01 | Takamisawa Cybernetics Co., Ltd. | Inrush current measuring apparatus with instantaneous power interruption device |
CN2362137Y (en) * | 1998-11-24 | 2000-02-02 | 郭宁 | Power supply load ability tester |
CN2444271Y (en) * | 2000-07-17 | 2001-08-22 | 刘英彰 | Electric source monitor |
CN1368643A (en) * | 2001-02-05 | 2002-09-11 | 计测技术研究所 | Switching device between electronic load device and tested power supply apparatus |
US6476729B1 (en) * | 2000-08-22 | 2002-11-05 | Daniel Liu | Power monitoring module with display unit for electrical power source device |
CN1548972A (en) * | 2003-05-10 | 2004-11-24 | 华为技术有限公司 | Apparatus for testing electric power system |
CN1677359A (en) * | 2004-04-02 | 2005-10-05 | 纬创资通股份有限公司 | Power-supply load simulation device and detest method |
CN1740803A (en) * | 2004-08-24 | 2006-03-01 | 鸿富锦精密工业(深圳)有限公司 | The ohmic load system |
-
2006
- 2006-03-20 CN CN 200610034420 patent/CN101042412B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4333049A (en) * | 1979-05-21 | 1982-06-01 | Takamisawa Cybernetics Co., Ltd. | Inrush current measuring apparatus with instantaneous power interruption device |
CN2362137Y (en) * | 1998-11-24 | 2000-02-02 | 郭宁 | Power supply load ability tester |
CN2444271Y (en) * | 2000-07-17 | 2001-08-22 | 刘英彰 | Electric source monitor |
US6476729B1 (en) * | 2000-08-22 | 2002-11-05 | Daniel Liu | Power monitoring module with display unit for electrical power source device |
CN1368643A (en) * | 2001-02-05 | 2002-09-11 | 计测技术研究所 | Switching device between electronic load device and tested power supply apparatus |
CN1548972A (en) * | 2003-05-10 | 2004-11-24 | 华为技术有限公司 | Apparatus for testing electric power system |
CN1677359A (en) * | 2004-04-02 | 2005-10-05 | 纬创资通股份有限公司 | Power-supply load simulation device and detest method |
CN1740803A (en) * | 2004-08-24 | 2006-03-01 | 鸿富锦精密工业(深圳)有限公司 | The ohmic load system |
Also Published As
Publication number | Publication date |
---|---|
CN101042412A (en) | 2007-09-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204361912U (en) | Motor drive | |
KR101670785B1 (en) | Inspection Device for Angular Velocity Sensor | |
CN102064597B (en) | Energy storage device | |
RU2009139478A (en) | METHOD FOR ELECTRICAL LOAD CONTROL AND DEVICE FOR ITS IMPLEMENTATION | |
WO2011066554A3 (en) | I-v measurement system for photovoltaic modules | |
SG149782A1 (en) | Open circuit delay devices, systems, and methods for analyte measurement | |
CN101354407B (en) | Power supply apparatus | |
CN111699105B (en) | Charging station and method for charging an electric vehicle using distributed energy measurement | |
CN104350388A (en) | System and method for detecting branch circuit current | |
CN104931830B (en) | A kind of electronic cigarette host test jig | |
CN101122620B (en) | Power supply line | |
CN101042412B (en) | Electric loading switching equipment | |
CN101285864A (en) | Testing method of semiconductor integrated circuit and integrated circuit tester | |
CN108562860A (en) | Electric energy meter two-way accessory power supply power consumption Auto-Test System and test method | |
CN103618897A (en) | A testing device of a machine core main board of a TV integrated machine | |
JP2012149914A (en) | Apparatus and method for inspecting degradation of printed wiring board | |
CN207965122U (en) | High-voltage electric energy meter metering plate remote online check system | |
KR101048074B1 (en) | System for testing accelerated lifetime of electric device | |
CN207215868U (en) | A kind of circuit board testing device | |
CN204177928U (en) | The pick-up unit of temperature switch | |
CN103376421A (en) | Power supply efficiency measuring apparatus | |
JP2014089998A (en) | Monitor system for photovoltaic power generation equipment | |
KR100765344B1 (en) | Apparatus for detecting power and current used electricity and electronic type | |
CN101738534B (en) | Voltage test device and voltage test method | |
CN203037844U (en) | Intelligent testing device for electric energy meter built-in load switch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |