CN1493746A - Bridge board leveling method used in bridge maintenance - Google Patents

Bridge board leveling method used in bridge maintenance Download PDF

Info

Publication number
CN1493746A
CN1493746A CNA031506852A CN03150685A CN1493746A CN 1493746 A CN1493746 A CN 1493746A CN A031506852 A CNA031506852 A CN A031506852A CN 03150685 A CN03150685 A CN 03150685A CN 1493746 A CN1493746 A CN 1493746A
Authority
CN
China
Prior art keywords
bridge
joist
maintenance
bridge board
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA031506852A
Other languages
Chinese (zh)
Other versions
CN1219132C (en
Inventor
斌 徐
徐斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 03150685 priority Critical patent/CN1219132C/en
Publication of CN1493746A publication Critical patent/CN1493746A/en
Application granted granted Critical
Publication of CN1219132C publication Critical patent/CN1219132C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A method for leveling the bridge slabs in the maintenance of bridge includes installing a bridge maintaining unit with a supporting beam at the position on bridge to be maintained, putting the easily deforming containers on said supporting beam, pouring concrete in them, pushing up the supporting beam until the concrete is closed to the lower surfaces of bridge slabs, solidifying the concrete, and further pushing up the supporting beam to hold the upper surfaces of bridge in a same level.

Description

A kind of bridge board leveling method that is used for bridge maintenance
Technical field
The present invention relates to the maintenance field of bridge, particularly a kind of bridge board leveling method that is used for bridge maintenance.
Background technology
In the bridge construction process, in order to reduce bump and the vibration that vehicular load causes bridge, simultaneously also in order to satisfy the needs of bridge board different directions displacement, generally at the bent cap of bridge and shelve between the bridge board on it and be provided with bearing, wherein mostly be the rubber material, aging easily, the particularly inflow use of bearing inferior and the appearance of jerry-built project at a low price in recent years, the replacing of bridge maintenance and bearing has market greatly.Traditional method for maintaining is, sets up support from the road under bridge face, will change, keep in repair after the bridge board jack-up, therefore, needs road closure, envelope bridge when maintenance, influence traffic, and this method can't be used for the bridge of bridge pier post at the sea, river.For this reason, it is a kind of with the maintenance unit of bridge pier post as stressed bearing post that " method for maintaining of bridge pad and the device " that No. 00108445.3, my application for a patent for invention formerly provides, it includes anchor ear brake holding and following brake holding on the bridge pier post, and on, following brake holding connects by strut, form whole fixed mount, jack is set thereon, and by embracing fixedly a plate of holder, the many also whole up connecting rod groups that are the umbrella frame shape are set on junction plate again, the upper end of connecting rod group links to each other with joist under being positioned at bridge board, thereby forms the carriage of an integral body.During maintenance, only need jack is upwards pushed up, then joist will hold up bridge board, the bearing on the promptly replaceable bent cap.This patent application initiated with the bridge pier post make stressed bearing post, with joist with the whole method for maintaining that holds up of bridge board, work efficiency is improved greatly, while can construct, be open to traffic, do not influence traffic.But also there is a problem in this design scheme, the thickness that is each bridge board might not be identical, and after bridge construction was finished, the upper surface of each bridge board was equal, and the soffit of bridge board might be to be uneven, therefore, when joist holds up bridge board integral body, because the deadweight of bridge board, the soffit of each bridge board will be equal because of being pressed on the joist, so the upper surface of each bridge board then becomes and is uneven, thereby influence is open to traffic.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of bridge board leveling method that is used for bridge maintenance at above-mentioned prior art present situation, makes each bridge board because of maintenance during by joist jack-up, and it is equal that their upper surface still keeps.
The present invention solves the problems of the technologies described above the technical scheme that is adopted: the bridge board leveling method in this bridge maintenance may further comprise the steps: 1. install the bridge maintenance device that has joist at bridge place to be keeped in repair; The quantity of 2. pressing bridge board is selected the easy deformation material container of respective numbers, in each container, behind the fluid concrete, their compartment of terrains placed on the joist, and relative with each bridge board; 3. utilize the last top function of maintenance unit self to push up on the joist, the concrete in each container all with behind the soffit pressurized of corresponding bridge board is close to, and keeps a period of time, and is dry and hard until concrete; 4. utilize the last top function of maintenance unit self that joist is up pushed up again, promptly still remained original phase level state by each bridge board upper surface of jack-up this moment.
" the bridge maintenance device that has joist " in above-mentioned can adopt as disclosed scheme in No. 00108445.3 application for a patent for invention, also can adopt other prior aries, so long as utilize joist with bridge board jack-up and keep in repair just can adopt the inventive method.
Compared with prior art, the present invention does solid method with the concrete scene dexterously between joist and bridge board, the soffit unification of original and irregular each bridge board is filled up smooth, thereby guarantee that the upper surface of each bridge board (being bridge floor) still keeps equal when joist flattens and does concrete block after consolidating in by container in advance and holds up each bridge board.
Description of drawings
Fig. 1 is the structural representation of the embodiment of the invention.
Structural representation when Fig. 2 all pastes with the soffit of corresponding bridge board mutually for the concrete in each container of back, top on the joist.
Fig. 3 is an application examples schematic diagram of the inventive method.
The specific embodiment
Embodiment describes in further detail the present invention below in conjunction with accompanying drawing.
As Fig. 1~shown in Figure 3, the bridge board leveling method in the bridge maintenance may further comprise the steps:
1. install the bridge maintenance device that has joist at bridge place to be keeped in repair, adopt Z font carriage of linking up with on the bent cap of bridge 6 and the scheme (this scheme is applied for a patent separately) that jack 5 is set in the present embodiment thereon, referring to Fig. 3;
The quantity of 2. pressing bridge board is selected the easy deformation material container 1 of respective numbers, as iron sheet container, rubber and plastic container etc., in each container 1, behind the fluid concrete 3, their compartment of terrains placed on the joist 2, and relative with each bridge board 4, referring to Fig. 1;
3. utilize the last top function (in example shown in Figure 3 promptly by jack on push up) of maintenance unit self will be on the joist 2 top, concrete 3 in each container 1 all pastes mutually with the soffit of corresponding bridge board 4, keep a period of time, dry and hard until concrete 3, referring to Fig. 2;
4. the last top function (in example shown in Figure 3 promptly by jack on push up) of utilizing maintenance unit self is with joist 2 top up again, and promptly still remained original phase level state by each bridge board 4 upper surface of jack-up this moment.

Claims (1)

1, the bridge board leveling method in a kind of bridge maintenance is characterized in that may further comprise the steps:
1. install the bridge maintenance device that has joist at bridge place to be keeped in repair;
The quantity of 2. pressing bridge board is selected the easy deformation material container of respective numbers, in each container, behind the fluid concrete, their compartment of terrains placed on the joist, and relative with each bridge board;
3. utilize the last top function of maintenance unit self to push up on the joist, the concrete in each container all pastes mutually with the soffit of corresponding bridge board, keeps a period of time, and is dry and hard until concrete;
4. utilize the last top function of maintenance unit self that joist is up pushed up again, promptly still remained original phase level state by each bridge board upper surface of jack-up this moment.
CN 03150685 2003-08-28 2003-08-28 Bridge board leveling method used in bridge maintenance Expired - Fee Related CN1219132C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03150685 CN1219132C (en) 2003-08-28 2003-08-28 Bridge board leveling method used in bridge maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03150685 CN1219132C (en) 2003-08-28 2003-08-28 Bridge board leveling method used in bridge maintenance

Publications (2)

Publication Number Publication Date
CN1493746A true CN1493746A (en) 2004-05-05
CN1219132C CN1219132C (en) 2005-09-14

Family

ID=34240597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03150685 Expired - Fee Related CN1219132C (en) 2003-08-28 2003-08-28 Bridge board leveling method used in bridge maintenance

Country Status (1)

Country Link
CN (1) CN1219132C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726438A (en) * 2013-12-20 2014-04-16 吴江市俊成精密机械有限公司 Bridge plate
CN110219255A (en) * 2019-07-16 2019-09-10 警通建设(集团)有限公司 A kind of bridge maintaining structure and its method for maintaining

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103726438A (en) * 2013-12-20 2014-04-16 吴江市俊成精密机械有限公司 Bridge plate
CN110219255A (en) * 2019-07-16 2019-09-10 警通建设(集团)有限公司 A kind of bridge maintaining structure and its method for maintaining

Also Published As

Publication number Publication date
CN1219132C (en) 2005-09-14

Similar Documents

Publication Publication Date Title
CN1219132C (en) Bridge board leveling method used in bridge maintenance
CN201502033U (en) Novel truss type bridge inspection car
CN201261871Y (en) Weight-limiting apparatus for non-motor lane
CN201520942U (en) Moving die carrier spreader for resolving problems of cast-in-site beam concrete construction
CN206385448U (en) A kind of support for jacking road and bridge
CN206800220U (en) One kind is used for across highway old bridge removal Fast Installation adjustable support
CN200964720Y (en) Separation wall for urban construction
CN210421852U (en) Vehicle-mounted cement ground leveling machine
CN201217779Y (en) U-beam temporary support for aerial track
CN2793165Y (en) Pile end displacement adjuster
CN2454416Y (en) Weel mounted on surface of road
CN2566587Y (en) Apparatus capable of timely continuous regulating ceramic tile die distributing depth
CN202359502U (en) Hydraulic through-type jacking device for lifting jack
CN2486596Y (en) Assembled concrete beam making bench in site
CN206986732U (en) A kind of bridge pier concrete casting device
CN213358189U (en) Durable rural highway pavement structure
CN217781602U (en) New and old road bed connection structure
CN2680736Y (en) Well cover stand capable of lifting and correcting tilt of well cover
CN218492260U (en) Variable cross section hangs and waters 0 # block fixed bolster of roof beam
CN219080103U (en) Hanging basket suspension system connecting suspender
CN201850483U (en) Adjustable pad frame for up-run vehicle on one side of rubber road
CN211080300U (en) Reference box
CN214939377U (en) Supporting equipment for bridge construction of bridge engineering
CN217579596U (en) Urban road prevention of seepage passes through project organization
CN210598056U (en) Frame positioning device for wall tile pasting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Ningbo Roaby Technology Industrial Group Co., Ltd.

Assignor: Xu Bin

Contract fulfillment period: 2008.8.25 to 2023.8.28 contract change

Contract record no.: 2008990000414

Denomination of invention: Bridge board leveling method used in bridge maintenance

Granted publication date: 20050914

License type: Exclusive license

Record date: 2008.9.17

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENCE; TIME LIMIT OF IMPLEMENTING CONTACT: 2008.8.25 TO 2023.8.28

Name of requester: NINGBO LUBAO SCIENCE INDUSTRY GROUP CO., LTD.

Effective date: 20080917

EC01 Cancellation of recordation of patent licensing contract

Assignee: Ningbo Roaby Technology Industrial Group Co., Ltd.

Assignor: Xu Bin

Contract record no.: 2008990000414

Date of cancellation: 20111219

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050914

Termination date: 20150828

EXPY Termination of patent right or utility model