CN2486596Y - Assembled concrete beam making bench in site - Google Patents
Assembled concrete beam making bench in site Download PDFInfo
- Publication number
- CN2486596Y CN2486596Y CN 01243985 CN01243985U CN2486596Y CN 2486596 Y CN2486596 Y CN 2486596Y CN 01243985 CN01243985 CN 01243985 CN 01243985 U CN01243985 U CN 01243985U CN 2486596 Y CN2486596 Y CN 2486596Y
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- beam making
- utility
- pile foundation
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses an assembled pedestal which is used for field beam making of a concrete bridge, and consists of a pile foundation, a crossbeam and a longitudinal beam. The utility model is characterized in that the longitudinal beam which is provided with a plurality of crossbeams is fixed on the pile foundation; a bottom die is fixed on the crossbeam; the crossbeam and the longitudinal beam are made of section steel and are connected into a whole with the pile station. Compared with the technology in prior art, the utility model has the advantages of reducing environmental pollution, reducing great amount of field masonry workload, fast construction speed, short production cycle and high turnover utilization ratio, which is an assembled pedestal that can replace the common-used cast-in-place concrete beam making pedestal.
Description
Technical field
The utility model is a kind of on-the-spot beam making bench of pin-connected panel concrete that is used for post stressed concrete or ordinary reinforced concrete bridge.
Background technology
The site prefabrication of existing highway, railroad bridge is more and more general, mostly adopts the beam making bench of cast-in-situ concrete, and this pedestal leaves a large amount of discarded concretes in the back of having constructed to the scene, but also easy-clear not causes serious environmental to pollute.
The utility model content
The technical problem that the utility model solves is the on-the-spot beam making bench of pin-connected panel concrete that field fabrication concrete beam making bench can reuse, speed of application is fast, production cycle is short.
The utility model is achieved in that the on-the-spot beam making bench of pin-connected panel concrete, comprises pile foundation, crossbeam, longeron, it is characterized in that the longeron that some crossbeams are housed is fixed on the pile foundation, is fixed with bed die on the crossbeam.The pedestal of this structure, crossbeam, longeron and bed die sectional are made, and on-the-spot the installation connects into integral body, is convenient to dismounting and repeated use.
Longeron at least two rows of the present utility model are convenient to assembly unit crossbeam and bed die.Width according to pedestal can increase corresponding longeron row number.
Pile foundation of the present utility model is a steel sheet pile, is convenient to construction and dismounting.
Pile foundation of the present utility model also can adopt castinplace pile, during making on stake top pre-embedded steel slab or bolt so that be connected and fixed with longeron.
The utility model compared with prior art has, and at first is the beam making bench that has replaced cast-in-situ concrete commonly used, and environmental pollution is few, can save a large amount of on-the-spot bricklaying workloads, and speed of application is fast, production cycle is short, turnover utilization rate height is convenient to dismounting and repeated use.
Description of drawings:
Fig. 1 is the main TV structure figure of the on-the-spot beam making bench of pin-connected panel concrete
Fig. 2 is the vertical view of Fig. 1
Fig. 3 is the lateral view of Fig. 1
Specific implementation method
With reference to the accompanying drawings embodiment is further described, the on-the-spot beam making bench of pin-connected panel concrete, form by pile foundation 4, crossbeam 2, longeron 3 etc., crossbeam 2 and longeron 3 adopt shaped steel to make, be fixed on the pile foundation 4, be fixed with bed die 1 on the crossbeam 2, bed die adopts steel plate to be made to on-the-spot the installation with pile foundation 4 and connects into integral body.The concrete job practices of pedestal: 1) geological prospecting, carry out geological prospecting at the pedestal design attitude, grasp geological condition and bearing capacity of foundation soil; 2) pedestal design according to ground exploration situation and definite stake type, is carried out the design of pile foundation, longitudinal and transverse beam and bed die; 3) pedestal construction technology process is fixed the construction that can finish pedestal after the smooth place of production-measuring stake position-beat steel sheet pile or construction cast-in-place concrete pile-installations longeron-installation crossbeam and the bed die-lining.
Claims (4)
1, the on-the-spot beam making bench of a kind of pin-connected panel concrete comprises pile foundation, crossbeam, longeron, and the longeron (3) that it is characterized in that being equipped with some crossbeams (2) is fixed on the pile foundation (4), is fixed with bed die (1) on the crossbeam (2).
2, the on-the-spot beam making bench of splicing type concrete according to claim 1 is characterized in that described longeron (3) at least two rows.
3, the on-the-spot beam making bench of splicing type concrete according to claim 1 and 2 is characterized in that described pile foundation (4) is steel sheet pile.
4, the on-the-spot beam making bench of splicing type concrete according to claim 1 and 2 is characterized in that described pile foundation (4) is castinplace pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01243985 CN2486596Y (en) | 2001-07-17 | 2001-07-17 | Assembled concrete beam making bench in site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 01243985 CN2486596Y (en) | 2001-07-17 | 2001-07-17 | Assembled concrete beam making bench in site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2486596Y true CN2486596Y (en) | 2002-04-17 |
Family
ID=33655493
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 01243985 Expired - Fee Related CN2486596Y (en) | 2001-07-17 | 2001-07-17 | Assembled concrete beam making bench in site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2486596Y (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101890755A (en) * | 2010-07-07 | 2010-11-24 | 中铁四局集团第一工程有限公司 | Steel and concrete beam cast pedestal |
CN102717431A (en) * | 2012-07-06 | 2012-10-10 | 重庆亲禾预制品有限公司 | Prefabricated beam production method |
CN108340331A (en) * | 2018-01-16 | 2018-07-31 | 石家庄铁道大学 | A kind of assembled steel deposits beam pedestal |
CN108943368A (en) * | 2018-07-10 | 2018-12-07 | 中铁十局集团第二工程有限公司 | A kind of beam making bench construction method and box beam prefabricated factory construction method |
CN110666953A (en) * | 2019-10-25 | 2020-01-10 | 石家庄铁道大学 | High-speed railway beam-making pedestal suitable for unfavorable geology and construction method thereof |
CN117817832A (en) * | 2024-01-29 | 2024-04-05 | 中铁五局集团华南工程有限责任公司 | Pi beam prefabrication pedestal and construction method thereof |
-
2001
- 2001-07-17 CN CN 01243985 patent/CN2486596Y/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101890755A (en) * | 2010-07-07 | 2010-11-24 | 中铁四局集团第一工程有限公司 | Steel and concrete beam cast pedestal |
CN101890755B (en) * | 2010-07-07 | 2012-08-22 | 中铁四局集团第一工程有限公司 | Steel and concrete beam cast pedestal |
CN102717431A (en) * | 2012-07-06 | 2012-10-10 | 重庆亲禾预制品有限公司 | Prefabricated beam production method |
CN108340331A (en) * | 2018-01-16 | 2018-07-31 | 石家庄铁道大学 | A kind of assembled steel deposits beam pedestal |
CN108943368A (en) * | 2018-07-10 | 2018-12-07 | 中铁十局集团第二工程有限公司 | A kind of beam making bench construction method and box beam prefabricated factory construction method |
CN110666953A (en) * | 2019-10-25 | 2020-01-10 | 石家庄铁道大学 | High-speed railway beam-making pedestal suitable for unfavorable geology and construction method thereof |
CN117817832A (en) * | 2024-01-29 | 2024-04-05 | 中铁五局集团华南工程有限责任公司 | Pi beam prefabrication pedestal and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109868726A (en) | A kind of prefabricated assembled cylindricality bridge pier and its construction method | |
CN2486596Y (en) | Assembled concrete beam making bench in site | |
CN202227360U (en) | Wide-span prestressed concrete pile beam plate structure used for grounds of buildings, workshops, etc. | |
CN1087801C (en) | Fast-mounting highway, railway and river automotive bridge | |
CN1959034A (en) | Adjustable quick dismountable steel support of roof plate template | |
CN202989755U (en) | Integral-casting and fabricated prestressing force bridge structure | |
CN210596987U (en) | Straddle type monorail bridge with large-line-spacing T piers | |
CN1877037A (en) | Large-span large-column distance quasi-ribbed floor type prestressed steel grid roof structure | |
CN105220793B (en) | Precast concrete and shear wall module and preparation method thereof with the component | |
CN203878459U (en) | Box type prestressed concrete cap beam structure applied to gate-type pier | |
CN206570922U (en) | Assembled integral armored concrete grid type framework | |
CN215471896U (en) | Prefabricated case roof beam die block length adjustment device | |
CN203878460U (en) | Prefabricated assembly combined type portal pier | |
CN214497157U (en) | Three-column type prestressed concrete gate-type pier for rail transit | |
CN115948993A (en) | Construction method of integral cast-in-place concrete bracket | |
CN210636844U (en) | Reinforced supporting structure for constructional engineering | |
CN114232656A (en) | UHPC (ultra high performance polycarbonate) assembled soil nailing wall structure and construction method | |
CN203429528U (en) | Bridge-type precast-reinforced-concrete-trough-plate wear-resistant pavement structure system | |
CN113526322B (en) | Roof beam construction hanger and construction method for construction after bridge reconstruction and expansion engineering | |
CN201762721U (en) | W-shaped steel plate supporting continuous wall | |
CN220364865U (en) | Integral cast-in-situ concrete bracket structure | |
CN220903696U (en) | But reuse steel pedestal | |
CN201486017U (en) | Improved building material substrate | |
CN2321850Y (en) | Large prefabricated panel | |
CN1173102C (en) | In-situ deposited prestressed hollow reinforced concrete roof and its construction process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |