CN206800220U - One kind is used for across highway old bridge removal Fast Installation adjustable support - Google Patents

One kind is used for across highway old bridge removal Fast Installation adjustable support Download PDF

Info

Publication number
CN206800220U
CN206800220U CN201720324684.XU CN201720324684U CN206800220U CN 206800220 U CN206800220 U CN 206800220U CN 201720324684 U CN201720324684 U CN 201720324684U CN 206800220 U CN206800220 U CN 206800220U
Authority
CN
China
Prior art keywords
steel
support
fast installation
pipe pile
old bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720324684.XU
Other languages
Chinese (zh)
Inventor
李志成
尧建敏
刘炎
卢佩
刘宁波
李送根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201720324684.XU priority Critical patent/CN206800220U/en
Application granted granted Critical
Publication of CN206800220U publication Critical patent/CN206800220U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses one kind to be used for across highway old bridge removal Fast Installation adjustable support, including Extended chemotherapy, steel-pipe pile support and main beam;Steel-pipe pile support vertical is fixed in Extended chemotherapy upper end;Steel-pipe pile pedestal upper end is connected with main beam;The height adjustable device of jacking main beam is provided between steel-pipe pile support and main beam;Height adjustable device includes firm banking, lifting footstock, hydraulic jack;Firm banking is fixed in steel-pipe pile cantilever tip;Lifting footstock is fixed in main beam bottom;Hydraulic jack is provided between firm banking and lifting footstock.The utility model is simple in construction, easy to install, is set up using the utility model support, quick, convenient, the inexpensive complete design support installation of energy, and completes construction task with relatively low cost.

Description

One kind is used for across highway old bridge removal Fast Installation adjustable support
Technical field
A kind of old bridge removal support is the utility model is related to, belongs to bridge construction field of engineering technology, and in particular to one Kind is used for across highway old bridge removal Fast Installation adjustable support.
Background technology
As China's expressway construction achieves development at full speed, the highway that part early stage builds, friendship is showed The very nervous situation of flux saturation, transport capacity, road passage capability and service level reduce, security incident gradually increases, Socio-economic development and the demand of town and country construction can not be well adapted to, and highway extension project turns into China's traffic base An important and pressing task in Facilities Construction.Particularly removing, it is necessary in the most short time across existing highway bridge With the dismounting of bridge is completed in limited working face, mucks haulage, the content such as protect,
The content of the invention
In view of the above-mentioned drawbacks of the prior art, the purpose of this utility model seeks to solve above-mentioned background technology not Foot, there is provided one kind is used for across highway old bridge removal Fast Installation adjustable support, and it is in small section static(al) cutting construction, both Support can be provided for beams of concrete, can be quick mounting to design attitude when Large-scale Hoisting equipment can not march into the arena, pass through regulation again Frame upper tunable arrangement, rack beam is bonded closely with beam body, solves well and relate to the road engineering time and be limited this and apply Work problem.
In order to solve the above technical problems, the utility model employ it is such a be used for across highway old bridge removal it is quick Adjustable support is installed, it includes Extended chemotherapy, steel-pipe pile support and main beam;The steel-pipe pile support vertical is fixed in the expansion Big basic upper end;The steel-pipe pile pedestal upper end is connected with the main beam;Between the steel-pipe pile support and the main beam It is provided with the height adjustable device for jacking the main beam;The height adjustable device includes firm banking, lifting footstock, hydraulic pressure Jack;The firm banking is fixed in the steel-pipe pile cantilever tip;The lifting footstock is fixed in the main beam bottom; The hydraulic jack is provided between the firm banking and the lifting footstock.
In a kind of preferred embodiment of the present utility model, the firm banking and the lifting footstock are coaxially arranged; The cylinder body of the hydraulic jack and the firm banking are affixed, and the piston rod of the hydraulic jack is consolidated with the lifting footstock Connect.
In a kind of preferred embodiment of the present utility model, also set up between the firm banking and the lifting footstock It is vertically directed component.
In a kind of preferred embodiment of the present utility model, the component that is vertically directed includes activity adjustment post and regulation Post holes road;The activity adjustment post is fixed in the lower end of the lifting footstock;The adjustable column duct is arranged at the fixed bottom Seat is internal;The activity adjustment post is slidably connected in the adjustable column duct.
In a kind of preferred embodiment of the present utility model, the activity adjustment post has two;Described two activities are adjusted Segmented column is arranged symmetrically relative to the central axis of the lifting footstock.
In a kind of preferred embodiment of the present utility model, steel cushion block is provided between described two activity adjustment posts.
In a kind of preferred embodiment of the present utility model, the Extended chemotherapy is square;The Extended chemotherapy is by four The shaped steel welding fabrication of individual HM588 × 300.
In a kind of preferred embodiment of the present utility model, reinforcing plate is provided with the Extended chemotherapy.
In a kind of preferred embodiment of the present utility model, the steel-pipe pile support includes lateral, steel column and diagonal brace; The steel column is vertically fixed in the Extended chemotherapy upper end;Adjacent steel column is connected with each other by the lateral;The steel is stood The diagonal brace is connected between post and the lateral.
In a kind of preferred embodiment of the present utility model, use is provided with the firm banking or the lifting footstock In the mounting groove for installing the hydraulic jack.
The beneficial effects of the utility model are:The utility model is simple in construction, easy to install, using the utility model Support is set up, quick, convenient, the inexpensive complete design support installation of energy, and completes construction task with relatively low cost.This practicality The new height adjustable device that component is vertically directed by being provided between steel-pipe pile support and main beam, it is Large-scale Hoisting The quick dismounting of the old bridge of highway provides support under special operation condition when equipment can not march into the arena, is applied so as to highly shortened Work man-hour;The utility model is effectively improved hydraulic jack work by designing Dual Action adjustable column respective outer side edges steel cushion block When stability, add the security of construction.
Brief description of the drawings
Fig. 1 is a kind of structure for across highway old bridge removal Fast Installation adjustable support of the utility model embodiment Schematic diagram;
Fig. 2 is a kind of structure for across highway old bridge removal Fast Installation adjustable support of the utility model embodiment Schematic diagram;
Fig. 3 is a kind of A-A for across highway old bridge removal Fast Installation adjustable support of the utility model embodiment Sectional view;
Fig. 4 is a kind of B-B for across highway old bridge removal Fast Installation adjustable support of the utility model embodiment Sectional view;
Fig. 5 is a kind of height for across highway old bridge removal Fast Installation adjustable support of the utility model embodiment Tunable arrangement structural representation;
In figure:1- Extended chemotherapies, 2- laterals, 3- steel columns, 4- diagonal braces, 5- height adjustable devices, 6- hydraulic jacks, 7- Steel cushion block, 8- main beams, 9- activity adjustment posts, 10- regulation cavitys, 11- adjustable columns duct, 12- firm bankings, 13- liftings top Seat, 14- steel-pipe pile supports.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining this Utility model, it is not used to limit the utility model.
Shown as a kind of structure for across highway old bridge removal Fast Installation adjustable support shown in Figure of description It is intended to understand, the utility model includes Extended chemotherapy 1, steel-pipe pile support 14 and main beam 8;Steel-pipe pile support 14 is vertically affixed In the upper end of Extended chemotherapy 1;The upper end of steel-pipe pile support 14 is connected with main beam 8;It is provided between steel-pipe pile support 14 and main beam 8 Jack the height adjustable device 5 of main beam 8;Height adjustable device 5 includes firm banking 12, lifting footstock 13, hydraulic jack 6;Firm banking 12 is fixed in the top of steel-pipe pile support 14;Lifting footstock 13 is fixed in the bottom of main beam 8;Firm banking 12 and liter Hydraulic jack 6 is provided between drop footstock 13;Firm banking 12 and lifting footstock 13 are coaxially arranged;The cylinder of hydraulic jack 6 Body and firm banking 12 are affixed, and the piston rod and lifting footstock 13 of hydraulic jack 6 are affixed;Firm banking 12 and lifting footstock 13 Between be additionally provided with and be vertically directed component;Being vertically directed component includes activity adjustment post 9 and adjustable column duct 10;Activity adjustment post 9 are fixed in the lower end of lifting footstock 13;Adjustable column duct 10 is arranged inside firm banking 12;Activity adjustment post 9 is slidably matched It is connected in adjustable column duct 10;Activity adjustment post 9 has two;Two activity adjustment posts 9 are relative to the center for lifting footstock 13 Axisymmetrical arranges that the clearance space between two activity adjustment posts 9 forms regulation cavity 10, can be installed in the regulation cavity 10 Steel cushion block 7;Steel cushion block 7 is provided between two activity adjustment posts 9;Extended chemotherapy 1 is square;Extended chemotherapy 1 is by four The shaped steel welding fabrication of HM588 × 300;Reinforcing plate is provided with Extended chemotherapy 1;Steel-pipe pile support 14 includes lateral 2, steel column 3 With diagonal brace 4;Steel column 3 is vertically fixed in the upper end of Extended chemotherapy 1;Adjacent steel column 3 is connected with each other by lateral 2;The He of steel column 3 Diagonal brace 4 is connected between lateral 2, for ease of constructing operation, shortening relates to the road engineering time, welds and be easy on steel-pipe pile support 14 What fork truck directly pitched fortune drags mouth, it is quick mounting to design attitude;It is provided with and is used on firm banking 12 or lifting footstock 13 The mounting groove of hydraulic jack 6 is installed.
During using the utility model, hydraulic jack 6 is placed between firm banking 12 and lifting footstock 13, passes through tune The height of the work regulation main beam 8 of hydraulic jack 6 is saved, makes to be welded on main beam 8 and the bridge to be torn open lifted on footstock 13 The fitting of beam bottom it is close, after main beam 8 jacks up, activity adjustment post 9 can rise certain altitude, then be filled in cavity is adjusted Hydraulic jack 6 can be removed after steel cushion block 7, completes the regulation of main beam 8, regulation height control is within 35cm, Mei Gezhu Crossbeam 8 is adjusted using two hydraulic jacks.
This technology has larger practicality and economy.By taking across the highway old bridge removal of Zhejiang, Taiwan and Wenzhou project as an example, entirely Bridge amounts to 4 span continuous beams, wherein 2 across for across existing Zhejiang, Taiwan and Wenzhou at a high speed.Set up using the utility model support, can it is quick, convenient, Inexpensive complete design support installation.Save 2 days durations, and by applying the technology, with relatively low cost input, just remarkably Construction task is completed, achieves good economic benefit and social benefit.
It should be appreciated that the foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not Be confined to this, any those skilled in the art disclosed herein technical scope in, the change that can readily occur in Or replace, it should all be included within the scope of the present invention.

Claims (10)

1. one kind is used for across highway old bridge removal Fast Installation adjustable support, including Extended chemotherapy (1), steel-pipe pile support And main beam (8) (14);The steel-pipe pile support (14) is vertically fixed in the Extended chemotherapy (1) upper end;The steel-pipe pile branch Frame (14) upper end is connected with the main beam (8);It is characterized in that:The steel-pipe pile support (14) and the main beam (8) it Between be provided with the height adjustable device (5) for jacking the main beam (8);The height adjustable device (5) includes firm banking (12) footstock (13), hydraulic jack (6), are lifted;The firm banking (12) is fixed in steel-pipe pile support (14) top; The lifting footstock (13) is fixed in the main beam (8) bottom;The firm banking (12) and it is described lifting footstock (13) it Between be provided with the hydraulic jack (6).
2. one kind according to claim 1 is used for across highway old bridge removal Fast Installation adjustable support, its feature exists In:The firm banking (12) and the lifting footstock (13) are coaxially arranged;The cylinder body of the hydraulic jack (6) with it is described solid Determine that base (12) is affixed, the piston rod of the hydraulic jack (6) and the lifting footstock (13) are affixed.
3. one kind according to claim 1 or 2 is used for across highway old bridge removal Fast Installation adjustable support, its feature It is:It is additionally provided between the firm banking (12) and the lifting footstock (13) and is vertically directed component.
4. one kind according to claim 3 is used for across highway old bridge removal Fast Installation adjustable support, its feature exists In:The component that is vertically directed includes activity adjustment post (9) and adjustable column duct (10);The activity adjustment post (9) is fixed in The lower end of the lifting footstock (13);It is internal that the adjustable column duct (10) is arranged at the firm banking (12);The activity Adjustable column (9) is slidably connected in the adjustable column duct (10).
5. one kind according to claim 4 is used for across highway old bridge removal Fast Installation adjustable support, its feature exists In:The activity adjustment post (9) has two;Described two activity adjustment posts (9) are relative to the center for lifting footstock (13) Axisymmetrical is arranged.
6. one kind according to claim 5 is used for across highway old bridge removal Fast Installation adjustable support, its feature exists In:Steel cushion block (7) is provided between described two activity adjustment posts (9).
7. one kind according to claim 1 is used for across highway old bridge removal Fast Installation adjustable support, its feature exists In:The Extended chemotherapy (1) is square;The Extended chemotherapy (1) is by the shaped steel welding fabrication of four HM588 × 300.
8. one kind according to claim 7 is used for across highway old bridge removal Fast Installation adjustable support, its feature exists In:Reinforcing plate is provided with the Extended chemotherapy (1).
9. one kind according to claim 1 is used for across highway old bridge removal Fast Installation adjustable support, its feature exists In:The steel-pipe pile support (14) includes lateral (2), steel column (3) and diagonal brace (4);The steel column (3) is vertically fixed in institute State Extended chemotherapy (1) upper end;Adjacent steel column (3) is connected with each other by the lateral (2);The steel column (3) and described flat The diagonal brace (4) is connected between connection (2).
10. one kind according to claim 3 is used for across highway old bridge removal Fast Installation adjustable support, its feature exists In:The installation for installing the hydraulic jack (6) is provided with the firm banking (12) or the lifting footstock (13) Groove.
CN201720324684.XU 2017-03-30 2017-03-30 One kind is used for across highway old bridge removal Fast Installation adjustable support Expired - Fee Related CN206800220U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720324684.XU CN206800220U (en) 2017-03-30 2017-03-30 One kind is used for across highway old bridge removal Fast Installation adjustable support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720324684.XU CN206800220U (en) 2017-03-30 2017-03-30 One kind is used for across highway old bridge removal Fast Installation adjustable support

Publications (1)

Publication Number Publication Date
CN206800220U true CN206800220U (en) 2017-12-26

Family

ID=60731294

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720324684.XU Expired - Fee Related CN206800220U (en) 2017-03-30 2017-03-30 One kind is used for across highway old bridge removal Fast Installation adjustable support

Country Status (1)

Country Link
CN (1) CN206800220U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258294A (en) * 2019-04-30 2019-09-20 安徽省公路桥梁工程有限公司 Steel truss arch bridge installs system and its construction method
CN110952463A (en) * 2019-12-10 2020-04-03 中铁大桥(南京)桥隧诊治有限公司 Reverse jacking reinforcement method and jacking structure of concrete box girder bridge
CN114411555A (en) * 2021-12-24 2022-04-29 中海广瀛工程物流有限公司 SPMT quick frame and bridge-dismantling variable consignment support
CN114960458A (en) * 2022-07-04 2022-08-30 中铁四局集团第二工程有限公司 Temporary support for bridge superstructure construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258294A (en) * 2019-04-30 2019-09-20 安徽省公路桥梁工程有限公司 Steel truss arch bridge installs system and its construction method
CN110952463A (en) * 2019-12-10 2020-04-03 中铁大桥(南京)桥隧诊治有限公司 Reverse jacking reinforcement method and jacking structure of concrete box girder bridge
CN114411555A (en) * 2021-12-24 2022-04-29 中海广瀛工程物流有限公司 SPMT quick frame and bridge-dismantling variable consignment support
CN114960458A (en) * 2022-07-04 2022-08-30 中铁四局集团第二工程有限公司 Temporary support for bridge superstructure construction

Similar Documents

Publication Publication Date Title
CN206800220U (en) One kind is used for across highway old bridge removal Fast Installation adjustable support
CN103437291B (en) Monolithic water tank precompressed construction technology
CN206646417U (en) A kind of multispan concrete simply supported beam bridge integral jacking system
CN102864788A (en) Method for underpinning reinforced bridge pile foundation by bear-type static pressure cluster pile
CN112227232B (en) Pier upright post underpinning method of pier-beam consolidation continuous beam bridge
CN202247687U (en) Universal cast-in-situ trestle for bridge
CN104695336A (en) Double-layer cast-in-situ beam support construction method adopting sequence from upper layer to lower layer
CN204097853U (en) A kind of liftable steel bridge
CN207828792U (en) Removable support for the installation of urban steel bridges beam
CN103015330A (en) Steel hoop support system of jacking bridge
CN110240082A (en) The ultra-thin more bar hydraulic jacks of one kind and its operating method
CN215052151U (en) Temporary supporting device for bridge construction
CN203684113U (en) Automatic beam placement platform device
CN210597037U (en) Pre-compaction structure of super high beam support
CN102758405B (en) Technology for integrally jacking steel box girder and concrete beam
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN207525625U (en) Sandbox preformer
CN106677557B (en) A kind of support protection structure and construction technology rising top replacement large-scale air spring
CN108342984B (en) Soft foundation trestle for mudflat and installation and sedimentation method thereof
CN207793886U (en) A kind of height-adjustable segmental timbering
CN105297643A (en) Method for replacing support of hollow slab type bridge
CN204940283U (en) Gate base plate steel lining uphill running concrete construction platform
CN213951992U (en) Auxiliary temporary supporting device for old bridge replacement support construction
CN204753409U (en) Utilization can be heightened support and carry out only post supporting beam bridge antidumping reinforcing apparatus
CN204151670U (en) Pressure-adjusting type bridge bearing pad

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226

CF01 Termination of patent right due to non-payment of annual fee