CN1458435A - Mounting and construction equipment for large span large bore river crossing bridge pipe and its construction method - Google Patents

Mounting and construction equipment for large span large bore river crossing bridge pipe and its construction method Download PDF

Info

Publication number
CN1458435A
CN1458435A CN 02111664 CN02111664A CN1458435A CN 1458435 A CN1458435 A CN 1458435A CN 02111664 CN02111664 CN 02111664 CN 02111664 A CN02111664 A CN 02111664A CN 1458435 A CN1458435 A CN 1458435A
Authority
CN
China
Prior art keywords
pipe
dolly
steel pipe
bridge
spanning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 02111664
Other languages
Chinese (zh)
Other versions
CN1205431C (en
Inventor
郑小明
杨文灿
陶伟元
魏思平
冯益
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI RUNNING WATER SUPPLY EQUIPMENT ENGINEERING Co
Original Assignee
SHANGHAI RUNNING WATER SUPPLY EQUIPMENT ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI RUNNING WATER SUPPLY EQUIPMENT ENGINEERING Co filed Critical SHANGHAI RUNNING WATER SUPPLY EQUIPMENT ENGINEERING Co
Priority to CN 02111664 priority Critical patent/CN1205431C/en
Publication of CN1458435A publication Critical patent/CN1458435A/en
Application granted granted Critical
Publication of CN1205431C publication Critical patent/CN1205431C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The mounting and constructing equipment includes one vertical pipe elevating platform, at least two pipe conveying bogies and one installing and maintaining bogie. During operation, the vertical pipe elevating platform is set on one side of the main bridge span, the two pipe conveying bogies are set on the rails below the side bridge span and the main bridge span, and the installing and maintaining bogie is suspended inside the chute below the main bridge span. The construction process includes hoisting the steel pipe with crane to the platform site, jacking the steel pipe with hydraulic pump to installation height, dragging the steel pipe onto the pipe conveying bogies, pushing the side bridge span pipe conveying bogie to the cross of the side bridge span and the main bridge span, pushing the steel pipe to installation position, fixing the steel pipe with suspending part, welding, regulating the lower screw nut of the suspension rod to regulate the slope and other steps.

Description

Mounting and construction equipment for large span large bore river crossing bridge pipe and method of construction thereof
Technical field
The present invention relates to a kind of mounting and construction equipment for large span large bore river crossing bridge pipe and method of construction thereof.
Background technique
The bridge tube engineering is a component part of pipework.The laying of water supply line generally all in the land construction, is got over through the river in company with bridge when pipeline, then constitutes the bridge tube engineering, and its difficulty of laying is more much bigger than the land certainly.And each engineering look its job site actual conditions difference and have nothing in common with each other.For this reason, be at the actual conditions of each concrete engineering and carry out construction technology research.
To the bridge tube engineering that can't lift and transport with crane gears such as cranes, for example the bridge span surpasses more than 30 meters, according to traditional arrangement and method for construction, build the pipeline bridge that some bridge piers be arranged in a side of bridge, and the pipeline frame is crossed the river on the pipeline bridge.Building the pipeline bridge then needs through a whole set of programs such as prospecting, piling, structural design and construction construction.Therefore, according to accounting: length is that 790 meters pipeline bridge need cost about 6,000,000 yuan.
Summary of the invention
The objective of the invention is defective in order to overcome existing river crossing bridge pipe construction cost of idleness, lost labor, to lose time, and a kind of novel mounting and construction equipment for large span large bore river crossing bridge pipe and the method for construction thereof that provide.Adopt this construction equipment and this method of construction, can save and build time, cost and the manpower of pipeline bridge, thereby improve the economic and social benefits.
In order to realize purpose of the present invention, the technical measures that the present invention takes are:
Mounting and construction equipment for large span large bore river crossing bridge pipe is characterized in: comprising: a pipeline vertical-lift platform, at least two fortune pipe dollies, an installation and maintenance dolly;
Described pipeline vertical-lift platform constitutes the platform body by angle steel and channel-section steel welding; Platform body center is provided with the steel pipe set-point, and the hydraulic rod that set-point comes directly towards and is located under the hydraulic pressure top by two hydraulic pressure constitutes, and utilizes the hydraulic pump drive top, and steel pipe is pushed up to setting height(from bottom);
Described each fortune pipe dolly comprises the car body, and its bottom is provided with four runners; Settle a cover lifting cucurbit by vertical rod on the car body, in order to the traction steel pipe; Also comprise the track that a pair of runner that allows fortune manage dolly rolls thereon;
Described installation and maintenance dolly comprises the car body, and car body both sides are provided with four arms, and there is roller on the arm top; There is a side also to be provided with a lifting cucurbit in these both sides; Also comprise a pair of chute that is located at main spanning bridge bottom surface, described roller is suspended in the notch of this chute.
Above-mentioned mounting and construction equipment for large span large bore river crossing bridge pipe, wherein: described installation and maintenance dolly is provided with the insurance limit stoper, to prevent in the derailed degeneration of the roller river; This insurance limit stoper is made of the block in the chute arranged outside.
Above-mentioned mounting and construction equipment for large span large bore river crossing bridge pipe, wherein: on the described installation and maintenance dolly braking device is housed, this braking device is controlled this brake block action by the brake block that is provided with on roller hand lever constitutes.
Above-mentioned mounting and construction equipment for large span large bore river crossing bridge pipe, wherein: also comprise a plurality of sprung partses, each sprung parts is made of the carriage that suspension rod is connected with this with one a pair of suspension rod.
Above-mentioned mounting and construction equipment for large span large bore river crossing bridge pipe, wherein: the two ends of described each suspension rod are provided with screw thread, and described carriage two ends are provided with the hole that can pass through suspension rod.
Above-mentioned mounting and construction equipment for large span large bore river crossing bridge pipe, wherein: comprise that also one regulates the fixedly controlling mechanism of the gradient of pipeline, this controlling mechanism is made of the nut that is separately positioned on the suspension rod top and bottom.
A kind of method that adopts above-mentioned mounting and construction equipment for large span large bore river crossing bridge pipe to construct is characterized in, may further comprise the steps:
A, at first pipeline vertical-lift platform is positioned over limit spanning one side;
B, be positioned under the bridge tripe tubing position below use the steel plate passage that the bridge main body structure is laid a belt track, place two fortune pipe dollies under the spanning of limit respectively and on the track of main spanning lower steel plate passage;
C, be positioned in main spanning under the bridge floor of tubing position and lay a pair of chute, the installation and maintenance dolly is hung in the chute under the main spanning;
D, steel pipe is hung on the pipeline vertical-lift platform, and the axis of controlling plumbing fixtures design centre must aim at the steel pipe set-point at lifting platform center, utilize oil hydraulic pump the setting height(from bottom) of steel pipe jacking to the bridge base plate with crane;
E, by the pulley on the fortune pipe dolly and cucurbit with on the lifting platform on the fortune pipe dolly of jacking under to the steel pipe traction of setting height(from bottom) to the limit spanning;
F, promotion limit spanning fortune are managed the intersection of dolly to limit spanning and main spanning;
G, the steel pipe traction of spanning fortune in limit being managed on the dolly by the lifting cucurbit on the main spanning fortune pipe dolly are pushed into the mounting point to main spanning fortune pipe dolly and with steel pipe;
H, stand on the installation and maintenance dolly, withdraw from fortune pipe dolly then with sling steel pipe on the fortune pipe dolly of lifting cucurbit;
I, stand on the installation and maintenance dolly, steel pipe is fixed with sprung parts, and the steel pipe of welding, assembly unit butt joint;
J, stand on the installation and maintenance dolly, regulate the following nut of suspension rod, steel pipe is adjusted to the required gradient;
K, like this installs until all river crossing bridge pipes gap bridges.
The method that above-mentioned mounting and construction equipment for large span large bore river crossing bridge pipe is constructed, wherein, step I is smeared external anticorrosive material after also being included in welding, assembly unit steel pipe outside steel pipe.
The method that above-mentioned mounting and construction equipment for large span large bore river crossing bridge pipe is constructed, wherein, step I is described to refer to the combination of suspension rod and carriage with sprung parts, its method that steel pipe is fixing is:
I-1, at first the corresponding position that the river pipeline was set is provided with many to mounting hole in advance at interval on the bridge floor of bridge;
I-2, mounting hole to bridge deck top is passed in the upper end of described suspension rod fix with nut again;
I-3, the hole at carriage two ends is passed in the lower end of described suspension rod, fix with nut again;
I-4, pipeline is lifted on this carriage gets final product.
Because the present invention has adopted above technological scheme, can guarantee the required precision of engineering, can avoid the danger of high-lift operation again.Simultaneously, because piping erection under the bridge tripe, is overlooked at all and be cannot see, thereby can improve the city look and feel in city, to meet the requirement of current city construction.
Present device has following effect when using:
1, because the objective condition of construction does not possess lifting head-room clearance (only 250mm), therefore can not use hanging device to construct, so adopt pipeline vertical-lift platform to carry out vertical-lift.Require the axis that the center of lifting platform must the align with tube design centre, utilize oil hydraulic pump that steel pipe is promoted to setting height(from bottom) under the bridge base plate then.
2, because lifting platform can only be fixed on the point, therefore also can only solve steel pipe height problem in transit, and the skyborne level transportation of steel pipe waits to solve.For this reason, supporting fortune pipe dolly and installation and maintenance dolly have been designed.Fortune pipe dolly has 2, and stride with end bay at main bridge center respectively 1.Because main bridge center is striden with the end bay structure entirely different, so the fortune pipe dolly of end bay can only be transported to steel pipe the intersection that stride at end bay and center, thereby main bridge center is striden a fortune pipe dolly also need be installed, on this dolly pulley is housed, available traction method is drawn to main span fortune pipe dolly to the steel pipe on the end bay fortune pipe dolly and gets on, and then is transported to the mounting points of main span.2 fortune pipe dollies are installed on the light rail, promote with manpower.And main span has 1 suspension type maintenance dolly in addition, is suspended on its roller in the notch of 2 channel-section steels, and channel-section steel then is laid in below the suspension rod, and the insurance limit stoper is housed, and guaranteeing the reliable and secure of dolly, also can not degenerate in the river even trolley idler wheels is overstepped the limit.Its purposes is maintained also device effect except the external pipeline maintenance from now on of pipe laying.
3, because bridge tube is consistent with the gradient of bridge, ascents and descents is also arranged, so must be controlled to the gradient of pipeline.Utilize the screw thread of the suspension rod lower end of sprung parts to regulate, can make the design grade of pipeline obtain guaranteeing comparatively accurately.
Description of drawings
Specific structural features of the present invention is further described by following embodiment and accompanying drawing thereof.
Fig. 1 is the structural representation of pipeline vertical-lift platform of the present invention.
Fig. 2 is the structural representation that the present invention transports the pipe dolly.
Fig. 3 is the structural representation of installation and maintenance dolly of the present invention.
Principle schematic when Fig. 4 is the present invention's two fortune pipe dolly fortune pipe linking work.
Fig. 5 is the principle schematic of the present invention when transporting pipe dolly fortune pipe and being connected work with the installation and maintenance dolly.
Fig. 6 is the schematic representation that bridge floor of the present invention is provided with mounting hole.
Fig. 7 is the structural representation that sprung parts of the present invention hangs pipeline.
Fig. 8 is a whole construction effect schematic representation of the present invention.
Embodiment
See also Fig. 1, Fig. 2, Fig. 3.Mounting and construction equipment for large span large bore river crossing bridge pipe of the present invention comprises: a pipeline vertical-lift platform 1, at least two fortune pipe dollies 2, an installation and maintenance dolly 3; Wherein:
Pipeline vertical-lift platform 1 constitutes platform body 11 by angle steel and channel-section steel welding, the center of platform body is provided with steel pipe 8 set-points, set-point is by two hydraulic pressure top 12 and be located at hydraulic pressure top hydraulic rod 13 down and constitute, utilize oil hydraulic pump 14 to drive and come directly towards, with the steel pipe jacking to setting height(from bottom).The platform body is installed four wheels 15 11 times, is convenient to transportation.
Fortune pipe dolly 2 has two, and limit spanning and main spanning respectively have one, and its structure is identical.Every fortune pipe dolly comprises car body 21, and the car body is installed four wheels 22 21 times, settles a cover lifting cucurbit 24 by vertical rod 23 on the car body, in order on the traction platform or limit spanning fortune manage steel pipe on the dolly.The four wheels 22 of fortune pipe dolly rolls in two tracks 25, promotes with manpower.For reducing the resistance of traction steel pipe, pair of guide rails 26, two guide rail interbody spacers are installed on car body 21 are provided with roller 27.
Installation and maintenance dolly 3 comprises car body 31, and there are four arms 32 its both sides, and there is roller 33 on the arm top, and roller is suspended in the notch 34 of two chutes.One gusset hurdle of installation and maintenance dolly 3 is provided with strut 35, and its top is provided with hanging device cucurbit 36.Be provided with the installation and maintenance dolly and place below the main spanning, its move then by the operator by steel pipe grab to push away and realize.On this installation and maintenance dolly the insurance limit stoper is housed, to prevent in the derailed degeneration of the roller river; This insurance limit stoper is made of the block (not shown) in the chute arranged outside.Braking device also is housed on the installation and maintenance dolly, and this braking device is controlled this brake block action by the brake block that is provided with on roller hand lever (not shown) constitutes.
Mounting and construction equipment for large span large bore river crossing bridge pipe of the present invention also comprises a plurality of sprung partses 5, please cooperate referring to Fig. 7, and each sprung parts is made of the carriage 52 that suspension rod is connected with this with one a pair of suspension rod 51.The two ends of described each suspension rod are provided with screw thread, and described carriage two ends are provided with the hole that can pass through suspension rod.
Comprise that also one regulates the fixedly controlling mechanism of the gradient of pipeline, this controlling mechanism is made of the nut 54,55 that is separately positioned on the suspension rod top and bottom.
See also Fig. 4~Fig. 7.The method that a kind of above-mentioned mounting and construction equipment for large span large bore river crossing bridge pipe of the present invention is constructed may further comprise the steps:
A, at first pipeline vertical-lift platform is positioned over limit spanning one side;
B, be positioned under the bridge tripe tubing position below use the steel plate passage that the bridge main body structure is laid a belt track, place two fortune pipe dollies under the spanning of limit respectively and on the track of main spanning lower steel plate passage;
C, be positioned in main spanning under the bridge floor of tubing position and lay a pair of chute, the installation and maintenance dolly is hung in the chute under the main spanning;
D, steel pipe is hung on the pipeline vertical-lift platform, and the axis of controlling plumbing fixtures design centre must aim at the steel pipe set-point at lifting platform center, utilize oil hydraulic pump the setting height(from bottom) of steel pipe jacking to the bridge base plate with crane;
E, by the pulley on the fortune pipe dolly and cucurbit with on the lifting platform on the fortune pipe dolly of jacking under to the steel pipe traction of setting height(from bottom) to the limit spanning;
F, promotion limit spanning fortune are managed the intersection of dolly to limit spanning and main spanning;
G, the steel pipe traction of spanning fortune in limit being managed on the dolly by the lifting cucurbit on the main spanning fortune pipe dolly are pushed into the mounting point to main spanning fortune pipe dolly and with steel pipe;
H, stand on the installation and maintenance dolly, withdraw from fortune pipe dolly then with sling steel pipe on the fortune pipe dolly of lifting cucurbit;
I, stand on the installation and maintenance dolly, steel pipe is fixed with sprung parts, and the steel pipe of welding, assembly unit butt joint;
J, stand on the installation and maintenance dolly, regulate the following nut of suspension rod, steel pipe is adjusted to the required gradient;
K, like this installs until all river crossing bridge pipes gap bridges.
The method that mounting and construction equipment for large span large bore river crossing bridge pipe of the present invention is constructed, wherein, step I is smeared external anticorrosive material after also being included in welding, assembly unit steel pipe outside steel pipe.
Describe method of construction of the present invention in detail for an embodiment below.
The river crossing bridge pipe of 790 meters of one total lengths for example is installed, and wherein main bridge center is striden 230 meters, each 280 meters of two end bays.Main bridge center is striden and is passed through certain waters main stem, dried up about 15 meters.Diameter is that the tap water cross under of 900mm (DN900) is this bridge conveyance system.According to the pipeline absolute altitude that designing institute provides, the only surplus 250mm of spacing of back pipeline end face and bridge base plate is installed, therefore do not possess the lifting head-room clearance.Wide because of the waters, wind-force is big, and hanging operation is greatly dangerous.The objective condition of construction is quite abominable.
According to method of the present invention, main bridge center is striden 230 meters in the centre, and the employing locking hood type soars under the bridge tripe that is suspended on highway bridge; Other two end bays are to pass bridge pier for each 280 meters, are installed in the culvert hole of the original box structure of highway bridge, then adopt the suspension type fixed installation.
At first carry out pipeline and carry out the assembly unit welding: earlier pipeline vertical-lift platform is positioned over limit spanning one side; Be positioned under the bridge tripe tubing position below use the steel plate passage that the bridge main body structure is laid a belt track, place two fortune pipe dollies under the spanning of limit respectively and on the track of main spanning lower steel plate passage; Be positioned in main spanning and lay a pair of chute under the bridge floor of tubing position, the installation and maintenance dolly is hung in the chute under the main spanning; With crane steel pipe is hung on the pipeline vertical-lift platform, and the axis of controlling plumbing fixtures design centre must aim at the steel pipe set-point at lifting platform center, utilize oil hydraulic pump the setting height(from bottom) of steel pipe jacking to the bridge base plate; By the pulley on the fortune pipe dolly and cucurbit with on the lifting platform on the fortune pipe dolly of jacking under to the steel pipe traction of setting height(from bottom) to the limit spanning; With fortune pipe dolly pipeline is transported to assembly unit soldering point (cooperating referring to Fig. 4), utilize the chain hois on the maintenance dolly again, pipeline on the fortune pipe dolly is sling (cooperating referring to Fig. 5), withdraw from fortune pipe dolly, adjust the pipe height to designed elevation, match with the port in last pipe joint road, promptly carry out the assembly unit welding.For guaranteeing welding quality, require the method for inspection that adopts dye penetrant inspection and radiographic inspection to combine.
Adopt suspension rod to hang (cooperation) with carriage in involutory pipeline 8, make the conduit bracket of main spanning become locking hood type referring to Fig. 7.Because main spanning is different fully with the crossstructure of limit spanning, the limit spanning is installed in the culvert hole of box structure, and main spanning does not have the culvert hole of box structure, so adopt anchor ear to fix.But both have a common ground, all are to utilize giving on the bridge deck 7 to box out for 71 (cooperating referring to Fig. 6).For example stride per 2 meters one grade is provided with giving of 2 φ 30mm and boxes out at main bridge center.Utilization is given and being boxed out, and penetrates the suspension rod of φ 23 * 1560, and there is the M22 screw thread at suspension rod two.Suspension rod needs through preservative treatment, before bridge floor is not built, insert to give by bridge floor and box out, with the metal mat of the contacting point cushioning 100 * 100 * 10 of bridge deck.The screw via hole that the carriage two ends are held by conduit bracket in the bottom surface of steel pipe is connected with suspension rod.
Again steel pipe is carried out preservative treatment.The internal and external anti-corrosive of every joint steel pipe is all handled on the ground in advance, lifting splicing then, and just interface internal and external anti-corrosive partly needs to carry out after the assembly unit welding.Anticorrosion because caliber very big (DN900) in wherein, can be directly by the workmen pierce in the pipe gunite with in the complete driving fit of interior anticorrosive coat of processing, must not leave the slit; Outer anticorrosion construction personnel can stand on the maintenance dolly and finish, and brushing epoxy chlorine tincture rubberbase paint is to prolong the life-span of steel pipe.
Technical order
1. strength test: Strengh testing pressure is 10kg/cm 2,, fall pump and be no more than 0.2kg/cm through 3 minutes 2
2. waterproof test:, fall pump and be no more than 0.5kg/cm through 15 minutes 2
3. flaw detection: dye penetrant inspection and radiographic inspection combine.
4. steel pipe is outer anticorrosion: (1) rust cleaning should reach SA 1/ 2Level.
(2) the infantees coating thickness reaches more than the 0.5mm.
(3) spark test: voltage 〉=2500V, every m 2Allow place's pin hole to puncture the withstand voltage 500V of strip off area on the area.
Fig. 8 is the schematic representation after the construction.
The present invention can be applied to the long-span bridge plumber journey of urban construction, can solve higher and need than long-distance transportation and don't possess the pipeline construction of lifting condition apart from the river surface height.Certainly, this construction process is not limited to water supply pipeline, also can be applicable to sewage conduct and carries the bridge tube of the pipeline of media such as other liquid, gas to lay.

Claims (9)

1, mounting and construction equipment for large span large bore river crossing bridge pipe is characterized in that: comprising: a pipeline vertical-lift platform, at least two fortune pipe dollies, an installation and maintenance dolly;
Described pipeline vertical-lift platform constitutes the platform body by angle steel and channel-section steel welding; Platform body center is provided with the steel pipe set-point, and the hydraulic rod that set-point comes directly towards and is located under the hydraulic pressure top by two hydraulic pressure constitutes, and utilizes the hydraulic pump drive top, and steel pipe is pushed up to setting height(from bottom);
Described each fortune pipe dolly comprises the car body, and its bottom is provided with four runners; Settle a cover lifting cucurbit by vertical rod on the car body, in order to the traction steel pipe; Also comprise the track that a pair of runner that allows fortune manage dolly rolls thereon;
Described installation and maintenance dolly comprises the car body, and car body both sides are provided with four arms, and there is roller on the arm top; There is a side also to be provided with a lifting cucurbit in these both sides; Also comprise a pair of chute that is located at main spanning bridge bottom surface, described roller is suspended in the notch of this chute.
2, mounting and construction equipment for large span large bore river crossing bridge pipe according to claim 1 is characterized in that: described installation and maintenance dolly is provided with the insurance limit stoper, to prevent in the derailed degeneration of the roller river; This insurance limit stoper is made of the block in the chute arranged outside.
3, mounting and construction equipment for large span large bore river crossing bridge pipe according to claim 1, it is characterized in that: on the described installation and maintenance dolly braking device is housed, this braking device is controlled this brake block action by the brake block that is provided with on roller hand lever constitutes.
4, mounting and construction equipment for large span large bore river crossing bridge pipe according to claim 1 is characterized in that: also comprise a plurality of sprung partses, each sprung parts is made of the carriage that suspension rod is connected with this with one a pair of suspension rod.
5, mounting and construction equipment for large span large bore river crossing bridge pipe according to claim 4 is characterized in that: the two ends of described each suspension rod are provided with screw thread, and described carriage two ends are provided with the hole that can pass through suspension rod.
6, mounting and construction equipment for large span large bore river crossing bridge pipe according to claim 1 is characterized in that: comprise that also one regulates the fixedly controlling mechanism of the gradient of pipeline, this controlling mechanism is made of the nut that is separately positioned on the suspension rod top and bottom.
7, a kind of method that adopts the described mounting and construction equipment for large span large bore river crossing bridge pipe of claim 1 to construct is characterized in that, may further comprise the steps:
A, at first pipeline vertical-lift platform is positioned over limit spanning one side;
B, be positioned under the bridge tripe tubing position below use the steel plate passage that the bridge main body structure is laid a belt track, place two fortune pipe dollies under the spanning of limit respectively and on the track of main spanning lower steel plate passage;
C, be positioned in main spanning under the bridge floor of tubing position and lay a pair of chute, the installation and maintenance dolly is hung in the chute under the main spanning;
D, steel pipe is hung on the pipeline vertical-lift platform, and the axis of controlling plumbing fixtures design centre must aim at the steel pipe set-point at lifting platform center, utilize oil hydraulic pump the setting height(from bottom) of steel pipe jacking to the bridge base plate with crane;
E, by the pulley on the fortune pipe dolly and cucurbit with on the lifting platform on the fortune pipe dolly of jacking under to the steel pipe traction of setting height(from bottom) to the limit spanning;
F, promotion limit spanning fortune are managed the intersection of dolly to limit spanning and main spanning;
G, the steel pipe traction of spanning fortune in limit being managed on the dolly by the lifting cucurbit on the main spanning fortune pipe dolly are pushed into the mounting point to main spanning fortune pipe dolly and with steel pipe;
H, stand on the installation and maintenance dolly, withdraw from fortune pipe dolly then with sling steel pipe on the fortune pipe dolly of lifting cucurbit;
I, stand on the installation and maintenance dolly, steel pipe is fixed with sprung parts, and the steel pipe of welding, assembly unit butt joint;
J, stand on the installation and maintenance dolly, regulate the following nut of suspension rod, steel pipe is adjusted to the required gradient;
K, like this installs until all river crossing bridge pipes gap bridges.
8, a kind of method that adopts the described mounting and construction equipment for large span large bore river crossing bridge pipe of claim 1 to construct is characterized in that, step I is smeared external anticorrosive material after also being included in welding, assembly unit steel pipe outside steel pipe.
9, a kind of method that adopts the described mounting and construction equipment for large span large bore river crossing bridge pipe of claim 1 to construct is characterized in that, step I is described to refer to the combination of suspension rod and carriage with sprung parts, and its method that steel pipe is fixing is:
I-1, at first the corresponding position that the river pipeline was set is provided with many to mounting hole in advance at interval on the bridge floor of bridge;
I-2, mounting hole to bridge deck top is passed in the upper end of described suspension rod fix with nut again;
I-3, the hole at carriage two ends is passed in the lower end of described suspension rod, fix with nut again;
I-4, pipeline is lifted on this carriage gets final product.
CN 02111664 2002-05-15 2002-05-15 Mounting and construction equipment for large span large bore river crossing bridge pipe and its construction method Expired - Lifetime CN1205431C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02111664 CN1205431C (en) 2002-05-15 2002-05-15 Mounting and construction equipment for large span large bore river crossing bridge pipe and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02111664 CN1205431C (en) 2002-05-15 2002-05-15 Mounting and construction equipment for large span large bore river crossing bridge pipe and its construction method

Publications (2)

Publication Number Publication Date
CN1458435A true CN1458435A (en) 2003-11-26
CN1205431C CN1205431C (en) 2005-06-08

Family

ID=29426336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02111664 Expired - Lifetime CN1205431C (en) 2002-05-15 2002-05-15 Mounting and construction equipment for large span large bore river crossing bridge pipe and its construction method

Country Status (1)

Country Link
CN (1) CN1205431C (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101660630B (en) * 2008-08-26 2010-12-15 宝山钢铁股份有限公司 Method for mounting large-diameter pipeline in confined space
CN102635732A (en) * 2012-04-13 2012-08-15 中国海洋石油总公司 Process for mounting relatively long pipeline
CN103123016A (en) * 2013-02-28 2013-05-29 浙江国联设备工程有限公司 Construction method for laying gas pipelines along bridge
CN104180658A (en) * 2014-08-08 2014-12-03 天津二十冶建设有限公司 Mounting method for dedusting system of sintering machine
CN105460385A (en) * 2014-09-12 2016-04-06 任丘市永基建筑安装工程有限公司 Steel bridge stand column transportation technology
CN106567565A (en) * 2016-10-19 2017-04-19 中建三局安装工程有限公司 Method for installing super-long warehouse plates
CN107458445A (en) * 2017-08-28 2017-12-12 中海油能源发展股份有限公司 A kind of dolly that material is had bad luck for offshore platform
CN107697849A (en) * 2017-10-31 2018-02-16 上海宝冶集团有限公司 Pipeline lift car and its application method in restricted clearance
CN107794840A (en) * 2017-11-08 2018-03-13 中铁上海工程局集团有限公司 A kind of bridge Large Diameter Steel Drainage Pipe erecting device and its construction method
CN109973717A (en) * 2019-05-20 2019-07-05 李联辉 A kind of tap water conveyance conduit laying apparatus
CN110778786A (en) * 2019-10-22 2020-02-11 铜陵有色金属集团铜冠矿山建设股份有限公司 Narrow-space large pipe fitting installation method
CN114704688A (en) * 2021-08-13 2022-07-05 中铁三局集团有限公司 Construction method of large-span inverted siphon pressure steel pipe at slope section

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101660630B (en) * 2008-08-26 2010-12-15 宝山钢铁股份有限公司 Method for mounting large-diameter pipeline in confined space
CN102635732A (en) * 2012-04-13 2012-08-15 中国海洋石油总公司 Process for mounting relatively long pipeline
CN103123016A (en) * 2013-02-28 2013-05-29 浙江国联设备工程有限公司 Construction method for laying gas pipelines along bridge
CN103123016B (en) * 2013-02-28 2014-11-12 浙江国联设备工程有限公司 Construction method for laying gas pipelines along bridge
CN104180658A (en) * 2014-08-08 2014-12-03 天津二十冶建设有限公司 Mounting method for dedusting system of sintering machine
CN104180658B (en) * 2014-08-08 2015-12-30 天津二十冶建设有限公司 A kind of installation method of sintering machine dust pelletizing system
CN105460385A (en) * 2014-09-12 2016-04-06 任丘市永基建筑安装工程有限公司 Steel bridge stand column transportation technology
CN106567565A (en) * 2016-10-19 2017-04-19 中建三局安装工程有限公司 Method for installing super-long warehouse plates
CN107458445A (en) * 2017-08-28 2017-12-12 中海油能源发展股份有限公司 A kind of dolly that material is had bad luck for offshore platform
CN107697849A (en) * 2017-10-31 2018-02-16 上海宝冶集团有限公司 Pipeline lift car and its application method in restricted clearance
CN107794840A (en) * 2017-11-08 2018-03-13 中铁上海工程局集团有限公司 A kind of bridge Large Diameter Steel Drainage Pipe erecting device and its construction method
CN107794840B (en) * 2017-11-08 2024-02-09 中铁上海工程局集团有限公司 Bridge large-diameter drainage steel pipe installation device and construction method thereof
CN109973717A (en) * 2019-05-20 2019-07-05 李联辉 A kind of tap water conveyance conduit laying apparatus
CN110778786A (en) * 2019-10-22 2020-02-11 铜陵有色金属集团铜冠矿山建设股份有限公司 Narrow-space large pipe fitting installation method
CN114704688A (en) * 2021-08-13 2022-07-05 中铁三局集团有限公司 Construction method of large-span inverted siphon pressure steel pipe at slope section

Also Published As

Publication number Publication date
CN1205431C (en) 2005-06-08

Similar Documents

Publication Publication Date Title
CN1205431C (en) Mounting and construction equipment for large span large bore river crossing bridge pipe and its construction method
CN103726421B (en) Height and span adjustable track paver for metro construction
CN107013038A (en) A kind of steel structure slipping of building roof lighting Zhongting changes column construction method
CN106794889A (en) Seabed drilling operation ship
CN102720432A (en) Self-propelled underground boring jumbo
CN113818478B (en) Overweight prefabricated pipe gallery installation system and construction method thereof
CN104670418B (en) Assembly process of helideck of offshore platform
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN104973517A (en) Electric gantry platform for installing sintering machine head equipment and application method thereof
CN108396749B (en) Installation system and installation method of steel support in foundation pit
CN106638323A (en) Assembling construction method for arch ribs of tied arch bridge
CN103848333B (en) Door frame Lift-on/Lift-off System and using method thereof
CN210766417U (en) Pier-spanning lifting beam support device at side position of bridge
CN203684019U (en) Height and span adjustable track laying machine for subway construction
CN210366808U (en) Lifting and dismantling device for rail walking
CN102225580B (en) Method for longitudinally moving box girder internal mold
CN106320181A (en) Construction method for installing precast beam slabs by adopting bridge girder erection machine
CN100366832C (en) Construction technique for hoisting steel made coal hopper on-site
JP2021021252A (en) Viaduct replacing method
CN2839224Y (en) Lifting large gantry cane
CN205976546U (en) Rail transport device for inclined working face
CN211496656U (en) Purlin hangs equipment
CN208345621U (en) High pressure abrupt slope diversion steel pipe lifting operation system
CN107288585A (en) Base system for deep water exploration and use method thereof
CN106012854A (en) Transportation equipment for prefabricated viaduct plates

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20050608

CX01 Expiry of patent term