CN1458358A - Wall building method - Google Patents

Wall building method Download PDF

Info

Publication number
CN1458358A
CN1458358A CN 03133396 CN03133396A CN1458358A CN 1458358 A CN1458358 A CN 1458358A CN 03133396 CN03133396 CN 03133396 CN 03133396 A CN03133396 A CN 03133396A CN 1458358 A CN1458358 A CN 1458358A
Authority
CN
China
Prior art keywords
wall
building block
connecting rod
alignment pin
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 03133396
Other languages
Chinese (zh)
Inventor
曲长贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 03133396 priority Critical patent/CN1458358A/en
Publication of CN1458358A publication Critical patent/CN1458358A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The wall building method uses large block of industrial slag and few clay brick and has simple wall building process, fast construction speed and low wall building cost. Used wall materials may be reused and thus produce no building garbage. The wall consists of large blocks with high strength and in certain shape, containing parts to connect and fix the large blocks, and stuffing with low strength after being air drying and coagulating. The containing parts connect and fix large blocks to form sandwiched wall and the stuffing is filled inside. The connected sandwiched wall bears the swelling of the stuffing and has no loosening and peeling.

Description

The wall construction method
Affiliated technical field
The present invention relates to the wall construction method.
Background technology
Present known clay solid brick production consumes coal with ruining.Though saving the certain volume solid brick, the structural clay tile body of wall must use cement covering because of brick wall is thin.Body of wall is turned harm into good but wall cost is too high though industrial residue is laid bricks.More than all walls to build the many constructions of construction process slow.The discarded dismounting of body of wall becomes building waste to cause harm entirely.
Summary of the invention
For in body of wall few with or without clay solid brick, utilize industrial residue in a large number or all, simplify and build wall technology and improve speed of application, reduce wall cost, body of wall is discarded to be removed each material and can reuse and do not produce building waste, the invention provides the wall construction method.
The present invention solves the cruel substantially picture of method that above-mentioned all body of wall shortcomings are adopted, and " draw fixingly in inner two walls are connected of bay wall, (being called for short even wall wall) fills industrial residue in two walls." the concrete technical scheme that adopts of the present invention is the big building block (available vitrified bond; also available waste residue; cement make) of this wall by the high definite shape of intensity, is connected and fixed the connector (abbreviation member) of big building block definite shape, the filler of air-dry caking (generally being industrial residue) is formed.Be connected and fixed two walls that big building block becomes bay wall with member, also internally two walls connected simultaneously and hold even wall wall, filler is filled out between Liang Bi, plays height layer by layer.Member is connected and fixed two walls that big building block becomes and promptly will sustains squeezing when filling and expand, and big building block never becoming loose is come off, and the filler that two walls that the big building block that intensity is high is linked to be protect between two walls is avoided weathering weathering.Intensity of packing is not high, accounts for the big portion of body of wall volume.
Beneficial effect of the present invention be first few with or without clay solid brick, utilize industrial residue in a large number or all.Building block double wall inner space volume is exactly few amount with solid brick if big building block is fired then with clay, also is the utilization of industrial residue.Big building block is if make then body of wall loam brick useless with industrial residue and cement.All utilized industrial residue.Wall technology is built in second simplification, and speed of application is fast.Be connected and fixed big building block with member and become two walls, the waste residue that stirs is inserted double wall, body of wall is inside and outside smoothly smears the outer cover levelling without the lining, and so simple construction nature is fast.The 3rd reduces wall cost.No matter big building block is to fire or make with waste residue and cement with clay, has replaced volume clay solid brick or the high industry of intensity to lay bricks owing to inserted the waste residue of air-dry caking in the double wall.Also saved between the wet construction puzzle joint and in smear outer cover cement mortar and artificial, wall cost is low naturally.The 4th, each material of the discarded dismounting of this body of wall can be reused and not produce building waste.Because this law is to be connected and fixed building block without cement mortar with member, the cement mortar levelling also useless of the about face of body of wall, two wall inner stuffing intensity are again little, so big building block when body of wall is removed, member is harmless.Though filler is pulverized, the cement of adding some points can refill again, so each material all can be reused, does not produce building waste.The 5th other beneficial effect also has, and wants insulation and adds thick wall body and only need the wall length of connecting rod a bit and fill out a waste residue more.Wanting insulation does not also add thick wall body to put one deck benzene plate between Liang Bi also very convenient.The brickbat head also can be mixed in the waste residue and insert.If the outer tile fixing of wall can post Hou Chengqiang earlier outside building block, also can be directly at building block outside sintering one deck enamel.
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
The accompanying drawing contents
Fig. 1--Fig. 4 connects wall wall embodiment one (being called for short the mode one that connects)
Fig. 5--Figure 10 connects wall wall embodiment two
Figure 11--Figure 15 connects wall wall embodiment three
Figure 16--Figure 20 connects wall wall embodiment four
Figure 21--Figure 24 single wall wall embodiment one
Figure 25--Figure 28 single wall wall embodiment two
Fig. 1 connects mode one building block stereogram
Fig. 2 connects mode one building block three-view diagram
Fig. 3 connects mode one member stereogram
Fig. 4 connects mode one and connects wall wall construction schematic diagram
Fig. 5 connects mode two building block stereograms
Fig. 6 connects mode two building block three-view diagrams
Fig. 7 connects mode two building blocks (thin-walled soil-saving) stereogram
Fig. 8 connects mode two building blocks (thin-walled soil-saving) three-view diagram
Fig. 9 connects mode two member stereograms
Figure 10 connects mode two and connects wall wall construction schematic diagram
Figure 11 connects mode three building block stereograms
Figure 12 connects mode three building block three-view diagrams
Figure 13 connects mode three member stereograms
Figure 14 connects mode one member three-view diagram
Figure 15 connects mode three and connects wall wall construction schematic diagram
Figure 16 connects mode four building block stereograms
Figure 17 connects mode four building block three-view diagrams
Figure 18 connects mode four member stereograms
Figure 19 connects mode four member stereograms
Figure 20 connects mode four and connects wall wall construction schematic diagram
Figure 21 folk prescription formula one building block stereogram
Figure 22 folk prescription formula one building block three-view diagram
Figure 23 folk prescription formula one member stereogram
Figure 24 folk prescription formula one single wall wall construction schematic diagram
Figure 25 folk prescription formula two building block stereograms
Figure 26 folk prescription formula two building block three-view diagrams
Figure 27 folk prescription formula two member stereograms
Figure 28 folk prescription formula two single wall wall construction schematic diagrames
Figure 29 corner structural representation
Figure 30 window mouth structure schematic diagram
Title among the figure
1. alignment pin 2. the sleeve pipe alignment pin 3. the alignment pin connecting rod 4. the wall connecting rod 5. mend with cramps and follow closely 6. 7. alignment pin connecting rod hugging of dowel hole
The specific embodiment
Connecting mode one with Fig. 1-Fig. 4 is the example explanation.See Fig. 4,
1. building block 1,2 delegation, building block 3,4 delegation, two row building block opposite faces are outside, and bottom surface is pressed the sleeve pipe alignment pin; Cover upper wall connecting rod.
2. up upper bottom surface dowel hole is by last sleeve pipe set pin sleeve upper wall connecting rod.
3. the industrial residue that stirs is inserted between two walls.
4. repeat abovely, but the center line of building block 5,6 is aimed at the suture of lower floor's building block 1,2 or 3,4.
Building block in the comparable faced chamber of building block outside the faced chamber is thicker again, and intensity is big.For saving the inboard available fish-scale pit formula of building block, in dowel hole and origin of force thickening.Roughing when hole and groove are done at base, finishing behind the sintering.But stand column and beam is born a heavy burden to solve body of wall within the walls.Curium has been followed closely fixing two-layer building block effect up and down, and considering to remove can.Not, later villager Fang Keyong 80cm * 44cm * 7.5cm six floor heights are to the edge, room according to the room for the building block size.

Claims (9)

1. wall construction method, it is characterized in that of the big building block of this body of wall by the high definite shape of intensity, be connected and fixed the connector (this claims member) of big building block, filler three parts that air-dry cake strength is low are formed, be connected and fixed two walls that big building block becomes bay wall with member, also internally two walls being connected pulling (this wall claims to connect the wall wall) filler simultaneously fills out between Liang Bi, play height layer by layer, filler accounts for the big portion of body of wall volume, two walls that the tall and big building block of intensity forms protect the filler in it, be not subjected to weathering weathering, object is connected and fixed two walls that building block becomes and sustains squeezing when filling and expand and make the building block never becoming loose, come off.
2. become wall method to it is characterized in that being connected and fixed big building block with member becomes bay wall two walls also internally the binding of two walls to be fixed into Lian Biqiang simultaneously according to the described wall wall that connects of claim 1.
3. connect the specific embodiment one that the wall wall becomes wall method (see that Fig. 1-Fig. 4) is characterized in that two branches of limit end of three fourth class branches of bottom surface in the big building block have totally four of sleeve pipe alignment pins, each hole is left to the inboard and held wall connecting rod half thick hugging according to claim 2 is described.The wall connecting rod is enclosed within on the sleeve pipe alignment pin.Building block center line in upper strata is aimed at lower floor's two building blocks and is connected seam.The upper strata building block is fixing about with lower floor's two building blocks by two sleeve pipe alignment pins, and the wall connecting rod is connected and fixed two wall building blocks by the sleeve pipe alignment pin.
4. connect the specific embodiment two that the wall wall becomes wall method and (see Fig. 5-Figure 10) it is characterized in that big building block upper and lower surface respectively has totally four of dowel holes nearby apart from two ends, the left and right sides according to claim 2 is described, there is the groove that holds half long half thick alignment pin connecting rod in the hole outside to the left and right, center, wall connecting rod two ends connects two alignment pin connecting rods and becomes I shape, and alignment pin connecting rod two ends respectively are connected with an alignment pin and set up I shape.Two alignment pins and connecting rod are being connected and fixed for each one jiao with wall four building blocks up and down.The wall connecting rod is connected and fixed two wall building blocks by the alignment pin connecting rod.Connection is stitched in building block together.
5. connect the specific embodiment three that the wall wall becomes wall method (see Figure 11-Figure 15) it is characterized in that four jiaos of big building blocks respectively have a rectangle gap, there is an alignment pin gap inboard according to claim 2 is described.Member two ends upper and lower surface has the adjacent circular holes that holds alignment pin.The dowel hole on member one end two sides is connected and fixed each jiao of four building blocks up and down, and member is connected and fixed two walls simultaneously.
6. connect the specific embodiment four that the wall wall becomes wall method (see Figure 16-Figure 20) it is characterized in that connecting four jiaos of hollow cuboids that become not have up and down face of inside and outside wall two building blocks by four beams, every angle upper and lower surface has dowel hole and holds the hugging of half long half thick alignment pin connecting rod according to claim 2 is described.Two alignment pins and connecting rod are connected and fixed four building blocks up and down for four jiaos.
7. the method according to the described one-tenth single wall of claim 1 wall is characterized in that using alignment pin, the alignment pin connecting rod, and the curium nail is connected and fixed the method that the building block that adapts with it becomes the single wall wall.
8. connect the specific embodiment one that the wall wall becomes wall method and (see that Figure 21-Figure 24) is characterized in that there are totally four of location pin-and-holes at two branch places of three fourth class branch limit ends of bottom surface in the building block according to claim 7 is described, the every face of building block has totally eight curium nail holes, four two sides, upper strata building block center line is ridden lower floor's two building block opposite joints, the upper strata building block by alignment pin about fixedly lower floor's two building blocks, the fixing two layers of building block up and down of curium nail.
9. (see that two alignment pins of hugging and connecting rod that Figure 25-Figure 28) is characterized in that two ends, the building block upper and lower surface left and right sides are respectively left a dowel hole and held half long half thick alignment pin connecting rod can be connected and fixed four building blocks for each one jiao, the curium nail is fixed the levels building block to become the specific embodiment two of wall method according to the described single wall wall of claim 7.
CN 03133396 2003-05-27 2003-05-27 Wall building method Pending CN1458358A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03133396 CN1458358A (en) 2003-05-27 2003-05-27 Wall building method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03133396 CN1458358A (en) 2003-05-27 2003-05-27 Wall building method

Publications (1)

Publication Number Publication Date
CN1458358A true CN1458358A (en) 2003-11-26

Family

ID=29430610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03133396 Pending CN1458358A (en) 2003-05-27 2003-05-27 Wall building method

Country Status (1)

Country Link
CN (1) CN1458358A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193581A (en) * 2016-08-31 2016-12-07 广州市轻能建材有限公司 A kind of building template assembly
CN106193388A (en) * 2016-08-31 2016-12-07 广州市轻能建材有限公司 The building template that need not dismantle
CN106193579A (en) * 2016-08-31 2016-12-07 广州市轻能建材有限公司 Building template assembly
CN106193389A (en) * 2016-08-31 2016-12-07 广州市轻能建材有限公司 One is exempted to tear building template assembly open
CN106245828A (en) * 2016-08-31 2016-12-21 广州市轻能建材有限公司 The method of construction of heat insulation integrated body of wall
CN108301420A (en) * 2017-01-11 2018-07-20 嵘标有限公司 Building filler and building structure
CN108612221A (en) * 2018-06-07 2018-10-02 吴庆华 Construction wall structure
CN111670289A (en) * 2017-10-04 2020-09-15 快砖知识产权私人有限公司 Block for use in automated building construction

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106193581A (en) * 2016-08-31 2016-12-07 广州市轻能建材有限公司 A kind of building template assembly
CN106193388A (en) * 2016-08-31 2016-12-07 广州市轻能建材有限公司 The building template that need not dismantle
CN106193579A (en) * 2016-08-31 2016-12-07 广州市轻能建材有限公司 Building template assembly
CN106193389A (en) * 2016-08-31 2016-12-07 广州市轻能建材有限公司 One is exempted to tear building template assembly open
CN106245828A (en) * 2016-08-31 2016-12-21 广州市轻能建材有限公司 The method of construction of heat insulation integrated body of wall
CN108301420A (en) * 2017-01-11 2018-07-20 嵘标有限公司 Building filler and building structure
CN111670289A (en) * 2017-10-04 2020-09-15 快砖知识产权私人有限公司 Block for use in automated building construction
US11608633B2 (en) 2017-10-04 2023-03-21 Fastbrick Ip Pty Ltd. Block for use in automated building construction
CN108612221A (en) * 2018-06-07 2018-10-02 吴庆华 Construction wall structure
CN108612221B (en) * 2018-06-07 2019-11-05 龙元明筑科技有限责任公司 Construction wall structure

Similar Documents

Publication Publication Date Title
CN1458358A (en) Wall building method
CN101806099A (en) Vertical joint waterproofing node of exterior wall
CN1348042A (en) Hollow floor slab with hidden and dense ribs
CN211229052U (en) Hoist and mount ALC wallboard with outer wall tile structure
CN102409793A (en) Bearing structure and house structure
CN1070711A (en) Anti-seismic heat-preservation building blocks and manufacturing thereof
CN105002895B (en) More drilling rod cement mixing methods inserted with prefabricated shaped-section
CN213115038U (en) Wall structure for plugging outer wall screw hole and matching device
CN111395269B (en) Concrete construction method capable of eliminating air bubbles at bottom of spherical key groove of arch dam transverse joint
CN203174854U (en) Load-bearing shock-resistant waterproof impervious anti-freezing crack-resistant cross-bore sound-proof self-heat-insulating air brick
CN114575620A (en) Formwork-supporting-free reinforcement high-ductility concrete construction method for masonry reinforcement
CN203684497U (en) Novel chain block
CN2534270Y (en) Blind rib hollow floor
CN105297950A (en) Infilled wall and horizontal load-bearing structure gap wall surface crack-controlling construction method
CN103195192A (en) Wallboard connecting structure and process for buildings
CN87107183A (en) With the wall rib is the sandwich building block and the manufacture method thereof of neutral surface structure
CN215167131U (en) Aerated concrete slotted sand building block
CN219471330U (en) Novel mortise and tenon brick airtight structure
CN215106526U (en) Novel aerated concrete block
CN206337696U (en) A kind of interlock type insulation blocks
CN214461728U (en) Novel assembled building block for building and wall body composed of building blocks
CN216042117U (en) Stable in structure's evaporate and press aerated concrete block
CN203066109U (en) Fan-shaped pitshaft building block and pitshaft enclosed by fan-shaped pitshaft building blocks
CN218437733U (en) Explosion-proof type silicon mullite brick
CN217079254U (en) Ceramsite concrete composite brick

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication