CN213115038U - Wall structure for plugging outer wall screw hole and matching device - Google Patents

Wall structure for plugging outer wall screw hole and matching device Download PDF

Info

Publication number
CN213115038U
CN213115038U CN202021098403.1U CN202021098403U CN213115038U CN 213115038 U CN213115038 U CN 213115038U CN 202021098403 U CN202021098403 U CN 202021098403U CN 213115038 U CN213115038 U CN 213115038U
Authority
CN
China
Prior art keywords
screw hole
wall
groove body
precast block
plugging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021098403.1U
Other languages
Chinese (zh)
Inventor
李志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Guangdong Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
China Railway Construction Engineering Group Guangdong Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd, China Railway Construction Engineering Group Guangdong Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN202021098403.1U priority Critical patent/CN213115038U/en
Application granted granted Critical
Publication of CN213115038U publication Critical patent/CN213115038U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a wall structure for plugging an outer wall screw hole and a matched device, wherein the wall structure comprises an outer wall body and a screw hole which runs through the cross section of the outer wall body, a round platform-shaped groove body is arranged outside the screw hole, a precast block is arranged in the groove body, the precast block is precast by pure concrete materials, the shape of the precast block is the same as that of the groove body, and bonding mortar is laid on the outer side surface of the precast block; the screw hole is filled with foaming agent. By adopting the technical scheme, the prefabricated block can be conveniently compressed by a worker through a rubber hammer, so that the seepage-proofing capacity of the outer wall body is improved; meanwhile, the plug depth and compactness are controllable.

Description

Wall structure for plugging outer wall screw hole and matching device
Technical Field
The utility model relates to a belong to the field of building engineering wall construction, concretely relates to wall structure and supporting device in shutoff outer wall screw hole.
Background
At present, most of the leakage cases of the outer wall of the building in the building engineering are caused by the fact that the screw hole of the outer wall is not tightly blocked. The traditional outer wall hole plugging mainly adopts the following modes: one method is to adopt cement mortar to plug, firstly, the sleeve in the wall is punched out, then, foaming agent is arranged in the sleeve, and finally, cement mortar is used for plugging, the operation controllability of the method is not strong, the plugging depth of the cement mortar can not reach the specified requirement, the plug is not compact, and the plugging depth of the mortar completely depends on the operation of workers; the other is to adopt a cork or a rubber plug to plug the screw hole, although the problem of compactness can be solved, the cork or the rubber plug is easy to age, and the aged plugging material generates a leakage channel, thereby causing leakage.
In order to overcome the defects of the traditional method, the wall structure for plugging the screw hole and the matched drill bit are invented through practical application and innovative research, the risk of leakage of the outer wall is avoided, and the later maintenance cost is reduced.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a wall structure and supporting device in shutoff outer wall screw hole has the advantage that improves the prevention of seepage ability of the outer wall body, and reduces the cost of maintenance in later stage.
In order to achieve the above purpose, the utility model provides a following technical scheme:
a wall structure for plugging a screw hole of an outer wall comprises an outer wall body and a screw hole penetrating through the cross section of the outer wall body, wherein a circular truncated cone-shaped groove body is formed in the outer side of the screw hole, a precast block is installed on the groove body and is prefabricated by pure concrete materials, the shape of the precast block is the same as that of the groove body, and bonding mortar is paved on the outer side surface of each precast block; and the screw hole is filled with foaming agent.
By adopting the technical scheme, the circular truncated cone-shaped groove body is formed on the outer side of the screw hole, so that the prefabricated block can be conveniently filled into the screw hole, and the large surface area of the back surface of the prefabricated block is beneficial for workers to tightly press the prefabricated block by using a rubber hammer, so that the prefabricated block and the side wall of the groove body generate pretightening force, the prefabricated block and the side wall of the groove body are combined more closely and firmly, and the seepage-proofing capacity of the outer wall body is improved; meanwhile, compared with the traditional method for plugging the screw hole by using cement mortar, the precast block can be subjected to compactness inspection before being plugged, so that the plugging depth and the compactness can be controlled. For pure concrete material prefabrication through setting up the prefabricated section, reduced because the infiltration situation that the rubber buffer is ageing to lead to takes place, reduced the cost of maintenance in later stage.
The utility model discloses further set up to: the axial direction of the groove body is the same as the axial direction of the screw hole.
Through adopting above-mentioned technical scheme, the axial direction that is the same with the axial direction in screw hole when the axial direction of cell body for the axial direction of prefabricated section is the same with the axial direction in screw hole, and then makes more inseparable of prefabricated section and screw hole butt, thereby improves the prevention of seepage ability of outer wall body.
The utility model discloses further set up to: the back of the precast block far away from the screw hole is aligned with the side face of the outer wall body.
Through adopting above-mentioned technical scheme, set up the back that the screw hole was kept away from to the prefabricated section and align with the side of outer wall for outer wall keeps leveling, reduces bellied edge to staff's fish tail, improves the security at scene.
The utility model discloses further set up to: the diameter of the back face, far away from the screw hole, of the precast block is larger than the aperture of the screw hole.
By adopting the technical scheme, the diameter of the back surface of the precast block, which is far away from the screw hole, is larger than the aperture of the screw hole, so that the precast block can be conveniently filled into the groove body, and the workload of workers is reduced; meanwhile, the prefabricated block is pressed tightly by a rubber hammer by workers, so that pretightening force is generated between the prefabricated block and the side wall of the groove body.
The utility model provides a supporting device in shutoff outer wall screw hole, includes cylindric connecting rod, the one end of connecting rod is connected with and is used for seting up the round platform drill bit of cell body.
By adopting the technical scheme, the sleeve and the concrete of the hole are ground to be smooth in a round table shape at one time through the round table type drill bit, the punching process is omitted, the working procedure is simple, and the operation and the construction are simple and convenient.
To sum up, the utility model discloses following beneficial effect has:
1. the circular truncated cone-shaped groove body is formed in the outer side of the screw hole, so that the prefabricated block can be conveniently filled into the screw hole, and the rear surface area of the prefabricated block is large, so that a worker can press the prefabricated block tightly by using a rubber hammer, the prefabricated block and the side wall of the groove body generate pretightening force, the prefabricated block and the side wall of the groove body are combined more closely and firmly, and the seepage-proofing capacity of the outer wall body is improved; meanwhile, compared with the traditional method for plugging the screw hole by using cement mortar, the precast block can be subjected to compactness inspection before being plugged, so that the plugging depth and compactness can be controlled;
2. the sleeve and the concrete of the hole are ground to be smooth in a round table shape at one time through the round table type drill, the punching process is omitted, the working procedure is simple, and the operation and the construction are simple and convenient.
Drawings
FIG. 1 is an overall structural view of the present embodiment;
fig. 2 is a schematic structural diagram of the supporting device of this embodiment.
Reference numerals: 1. an outer wall body; 2. a screw hole; 21. a foaming agent; 3. prefabricating blocks; 31. bonding mortar; 4. a round table drill bit.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
As shown in fig. 1 and 2, the utility model discloses a wall structure for plugging screw hole of external wall, which comprises an external wall 1 and a screw hole 2 penetrating the cross section of the external wall 1, wherein a truncated cone-shaped groove body is opened at the outer side of the screw hole 2, a precast block 3 is installed on the groove body, the precast block 3 is precast by pure concrete material, the precast block 3 is arranged in the same shape as the groove body, bonding mortar 31 is laid on the outer side surface of the precast block 3, and the bonding mortar 31 is pure water slurry; the screw hole 2 is filled with a foaming agent 21.
The axial direction of cell body and the same setting of the axial direction in screw rod hole 2, the back that the precast block 3 kept away from screw rod hole 2 aligns the setting with the side of outer wall 1. The diameter of the back face of the precast block 3 far away from the screw hole 2 is larger than the aperture of the screw hole 2, the height of the precast block is 5 centimeters, and the diameter of the back face of the precast block is 5 centimeters.
A matching device for plugging a screw hole in an outer wall comprises a circular truncated cone drill bit 4 for forming a groove body.
The working conditions and principles of the embodiment are as follows:
the outer side of the screw hole 2 is ground by the circular truncated cone drill 4, so that the sleeve, the laitance and the like at the periphery of the hole can be ground into a circular truncated cone-shaped groove body at one time, and the periphery of the groove body is a dense surface. Producing the prefabricated block 3 in a circular truncated cone shape with the inclination consistent with that of the side surface of the groove body, and carrying out compactness inspection on the prefabricated block 3.
Then wrapping cement slurry on the outer side surface of the prefabricated block 3, inserting the prefabricated block 3 into the groove body, and knocking the prefabricated block 3 by a rubber hammer to generate pretightening force between the prefabricated block 3 and the side surface of the groove body; meanwhile, the foaming agent 21 is filled in the screw hole 2, so that the construction period is more controllable compared with the traditional method without waiting for the hardening of the bonding mortar 31.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (5)

1. The utility model provides a wall structure in shutoff outer wall screw hole, includes outer wall body (1) and runs through screw hole (2) in outer wall body (1) cross-section, characterized by: a circular truncated cone-shaped groove body is formed in the outer side of the screw hole (2), a precast block (3) is installed on the groove body, the precast block (3) is precast by pure concrete materials, the shape of the precast block (3) is the same as that of the groove body, and bonding mortar (31) is paved on the outer side face of the precast block (3); the screw hole (2) is filled with a foaming agent (21).
2. The wall structure for plugging the screw hole of the external wall according to claim 1, which is characterized in that: the axial direction of the groove body is the same as the axial direction of the screw hole (2).
3. The wall structure for plugging the screw hole of the external wall according to claim 1, which is characterized in that: the back surface of the precast block (3) far away from the screw hole (2) is aligned with the side surface of the outer wall body.
4. The wall structure for plugging the screw hole of the external wall according to claim 3, wherein: the diameter of the back surface of the precast block (3) far away from the screw hole (2) is larger than the aperture of the screw hole (2).
5. A matching device for plugging screw holes in an external wall, which is applied to the wall structure for plugging screw holes in an external wall according to claim 1, and is characterized in that: comprises a circular truncated cone drill bit (4) for opening the groove body.
CN202021098403.1U 2020-06-15 2020-06-15 Wall structure for plugging outer wall screw hole and matching device Active CN213115038U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021098403.1U CN213115038U (en) 2020-06-15 2020-06-15 Wall structure for plugging outer wall screw hole and matching device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021098403.1U CN213115038U (en) 2020-06-15 2020-06-15 Wall structure for plugging outer wall screw hole and matching device

Publications (1)

Publication Number Publication Date
CN213115038U true CN213115038U (en) 2021-05-04

Family

ID=75671767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021098403.1U Active CN213115038U (en) 2020-06-15 2020-06-15 Wall structure for plugging outer wall screw hole and matching device

Country Status (1)

Country Link
CN (1) CN213115038U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113802698A (en) * 2021-08-20 2021-12-17 上海宝冶集团有限公司 Construction method for plugging split bolt holes of shear wall
CN115199079A (en) * 2022-08-01 2022-10-18 中国建筑第二工程局有限公司 Novel outer wall screw hole plugging assembly and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113802698A (en) * 2021-08-20 2021-12-17 上海宝冶集团有限公司 Construction method for plugging split bolt holes of shear wall
CN115199079A (en) * 2022-08-01 2022-10-18 中国建筑第二工程局有限公司 Novel outer wall screw hole plugging assembly and construction method

Similar Documents

Publication Publication Date Title
CN213115038U (en) Wall structure for plugging outer wall screw hole and matching device
CN110258538B (en) Soil nail reinforced buffer type manual hole digging pile and construction method thereof
CN111764940B (en) Double-layer primary supporting structure of weak surrounding rock tunnel and construction method thereof
CN210216427U (en) Construction solution cavity plugging device for cast-in-place pile of building project
CN105507336A (en) Method for forming composite foundation by using dewatering well
CN106545008A (en) A kind of cast-in-situ bored pile pile making method
CN1050421A (en) The piling method of casting prefabricated composite pile
CN204343166U (en) A kind of combined type gravity anchorage
CN203113332U (en) Anchor rod construction structure device after construction
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN110792077A (en) Supporting disc pile device suitable for muddy soft soil and construction process thereof
CN214832742U (en) Dig deeply and stir major diameter strength nature composite pile structure soon
CN103243913B (en) The method for blocking of fabricated shear wall architectural lower floor junction grout blanket
CN215482925U (en) Recoverable back slip casting device of concrete pipe pile
CN206386140U (en) One kind construction ground tension anchor rod
CN205188933U (en) Utilize composite foundation of precipitation well formation
CN208328970U (en) A kind of environmentally friendly connection structure of precast concrete foundation and steel-pipe pile
CN113737804A (en) Static breaking pore-forming and pouring integrated device for pile head of cast-in-place pile and using method
CN206667239U (en) One kind expansion uplift pile
CN103967135A (en) Device for blocking grout outlet for grouting of prefabricated concrete wall
CN2338380Y (en) Improved vibrating type machine for placing pipesor piles
CN212200403U (en) Prestressed pipe pile structure
CN108677935A (en) A kind of construction method of the compound construction stake of building
CN103967279A (en) Auxiliary device for grouting of prefabricated concrete wall
CN214883625U (en) Anchor rod construction device for constructional engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant