CN106545008A - A kind of cast-in-situ bored pile pile making method - Google Patents
A kind of cast-in-situ bored pile pile making method Download PDFInfo
- Publication number
- CN106545008A CN106545008A CN201510611036.8A CN201510611036A CN106545008A CN 106545008 A CN106545008 A CN 106545008A CN 201510611036 A CN201510611036 A CN 201510611036A CN 106545008 A CN106545008 A CN 106545008A
- Authority
- CN
- China
- Prior art keywords
- pile
- steel pipe
- steel
- rubble
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a kind of cast-in-situ bored pile pile making method, replaces existing steel reinforcement cage by steel pipe, commerical ready-mixed concrete is replaced by rubble and cement mortar.First, punched by rig, empty after reaching designed elevation, then transfer hollow steel pipe (steel tube surface has made aperture), steel pipe is laid and be outwardly and inwardly covered with graded broken stone and while transferring Grouting Pipe in steel duct in steel pipe after terminating, start high-pressure injected water mud when rubble is covered with whole stake, the i.e. pile after slurry is filled.It is possible that steel reinforcement cage is separated and deviateed in avoiding work progress, and the phenomenon of concrete disintegration.In addition, the inventive method is simple, sound construction, construction cost be not high, it is adapted to promote the use of in correlative technology field.
Description
Technical field:Patent of the present invention is related to building engineering field, more particularly to cast-in-situ bored pile pile making method.
Technical background:
Existing reinforced concrete bored pile, such pile foundation pile by way of transferring steel reinforcement cage and then casting concrete.There are shortcomings in reinforced concrete bored pile, steel reinforcement cage first belongs to colligation splicing, it is possible that steel reinforcement cage separation and the problem for deviateing in work progress.If pile foundation is deeper, vibrate in addition uneven, easily segregation phenomenon is produced in concreting process, have a strong impact on pile foundation quality.
The content of the invention:
The purpose of patent of the present invention be for the deficiencies in the prior art in place of, there is provided a kind of cast-in-situ bored pile pile making method.
Patent of the present invention uses steel pipe instead as the framing structure of foundation pile, reduces the problem that steel structure framework is separated with aggregate and deviateed, effectively improves the globality of foundation pile internal structure.
Patent of the present invention is during concreting, it will usually the phenomenon of concrete disintegration occur, and our invention is used, then Reperfu- sion cement mortar with the construction technology vibrated, and effectively solves this problem.
The inside of patent stake of the present invention is no longer steel reinforcement cage, but high tensile steel tube, and steel pipe side for convenience slip casting and beaten aperture in advance.
Description of the drawings:
Fig. 1:1, steel pipe;2, cement mortar and macadam-aggregate mix;3, Grouting Pipe.
Fig. 2:The top view of Fig. 1
Specific embodiment:
1:Rig pore-forming is first passed through, borehole cleaning after designed elevation is reached.
2:Make the hollow steel pipe of aperture in decentralization side.
3:Outwardly and inwardly be covered with graded broken stone in steel pipe, while Grouting Pipe is transferred in the middle of steel duct, treat that rubble is covered with whole stake.
4:Start high-pressure injected water mud, the i.e. pile after slurry is filled.
Claims (3)
1. a kind of cast-in-situ bored pile pile making method, including steel pipe with holes, rubble, cement mortar.Wherein steel pipe is vertically put in drilling, and rubble is equal
It is even to be covered with inside and outside steel pipe, by steel duct slip casting, form pile foundation.
2. the steel pipe according to claims 1, is hollow steel pipe, and side is covered with hole.It is characterized in being easy to cement mortar to overflow.
3. the rubble according to claims 1, is advantageous for overflowing the abundant mating surface of cement mortar, has reached internal combustion and stablized, overall pile foundation
Uniform force.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510611036.8A CN106545008A (en) | 2015-09-17 | 2015-09-17 | A kind of cast-in-situ bored pile pile making method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510611036.8A CN106545008A (en) | 2015-09-17 | 2015-09-17 | A kind of cast-in-situ bored pile pile making method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106545008A true CN106545008A (en) | 2017-03-29 |
Family
ID=58365125
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510611036.8A Pending CN106545008A (en) | 2015-09-17 | 2015-09-17 | A kind of cast-in-situ bored pile pile making method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106545008A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109797753A (en) * | 2019-03-11 | 2019-05-24 | 深圳宏业基岩土科技股份有限公司 | Suitable for the stand column pile of high scar place foundation pit and the construction method of lattice column |
CN111395318A (en) * | 2020-02-24 | 2020-07-10 | 中铁七局集团郑州工程有限公司 | Supporting pile construction process |
CN111636417A (en) * | 2020-05-14 | 2020-09-08 | 湖北中南岩土工程有限公司 | Grouting type steel pipe pile and construction method thereof |
CN112227356A (en) * | 2019-07-15 | 2021-01-15 | 河北建设勘察研究院有限公司 | Gravel grouting steel pipe pile and preparation method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0649840A (en) * | 1991-07-05 | 1994-02-22 | Nippon Steel Corp | Construction method of steel pipe foundation pile for preventing liquefaction |
CN1118399A (en) * | 1995-05-17 | 1996-03-13 | 广州市鲁班建筑防水补强专业公司 | Miniature steel pipe grouting pile and the practice |
CN101892665A (en) * | 2010-07-27 | 2010-11-24 | 中冶沈勘工程技术有限公司 | Construction method for grouting and vibro-replacement stone pile composite foundation |
CN102505684A (en) * | 2011-11-02 | 2012-06-20 | 河海大学 | Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof |
CN202969370U (en) * | 2012-11-14 | 2013-06-05 | 福建工程学院 | Novel steel pipe pile |
-
2015
- 2015-09-17 CN CN201510611036.8A patent/CN106545008A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0649840A (en) * | 1991-07-05 | 1994-02-22 | Nippon Steel Corp | Construction method of steel pipe foundation pile for preventing liquefaction |
CN1118399A (en) * | 1995-05-17 | 1996-03-13 | 广州市鲁班建筑防水补强专业公司 | Miniature steel pipe grouting pile and the practice |
CN101892665A (en) * | 2010-07-27 | 2010-11-24 | 中冶沈勘工程技术有限公司 | Construction method for grouting and vibro-replacement stone pile composite foundation |
CN102505684A (en) * | 2011-11-02 | 2012-06-20 | 河海大学 | Hollow stiffness-core slurry-solidified discrete material pile and construction method thereof |
CN202969370U (en) * | 2012-11-14 | 2013-06-05 | 福建工程学院 | Novel steel pipe pile |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109797753A (en) * | 2019-03-11 | 2019-05-24 | 深圳宏业基岩土科技股份有限公司 | Suitable for the stand column pile of high scar place foundation pit and the construction method of lattice column |
CN112227356A (en) * | 2019-07-15 | 2021-01-15 | 河北建设勘察研究院有限公司 | Gravel grouting steel pipe pile and preparation method thereof |
CN111395318A (en) * | 2020-02-24 | 2020-07-10 | 中铁七局集团郑州工程有限公司 | Supporting pile construction process |
CN111636417A (en) * | 2020-05-14 | 2020-09-08 | 湖北中南岩土工程有限公司 | Grouting type steel pipe pile and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100572683C (en) | The large-diameter ultra-deep rock borehole bottom-expanding filling pile job practices | |
CN103510510B (en) | A kind of enhancement mode long auger cast-with-pressure concrete pile and construction method | |
CN103993598B (en) | One is drawn hole and is implanted cloth bag crushed stone grouting pile and construction method | |
CN106545008A (en) | A kind of cast-in-situ bored pile pile making method | |
CN106351218B (en) | A kind of means to save the situation of pile pile broken pile | |
CN106812219A (en) | Filling wall top stuff up a crack construction method | |
CN111395300A (en) | Method for reinforcing soft soil foundation structure by using original bamboo grouting piles | |
CN105369826A (en) | Basement bearing platform side mold construction method | |
CN103758362A (en) | Earthquake resistant reinforcing method of subsequently added ring beams, constructive columns and steel pulling rods in existing building | |
CN107740427A (en) | A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure | |
CN107326898A (en) | A kind of cement soil wall interpolation rigidity can adjust drum prefabricated pile supporting construction and its construction method | |
CN105507336A (en) | Method for forming composite foundation by using dewatering well | |
CN206752454U (en) | One kind perfusion embedded pile | |
CN105064352A (en) | Building expanding head anchor rod pile construction technology and anchor rod pile adopting technology | |
KR100699359B1 (en) | Underground diaphragm wall with post-tensioning equipment and construction method the same | |
CN210117716U (en) | Trapezoidal foundation ditch lateral wall concrete typical forms of elevartor shaft | |
CN107460873B (en) | Manual digging pile construction method | |
CN103243913B (en) | The method for blocking of fabricated shear wall architectural lower floor junction grout blanket | |
CN204081064U (en) | A kind of basement sandwich | |
CN102535462A (en) | Method for constructing anchor cable on sand layer | |
CN105755979A (en) | Process for constructing cement concrete guardrails | |
CN205188933U (en) | Utilize composite foundation of precipitation well formation | |
CN105781103A (en) | Capital inverted-triangular formwork erecting and pouring method | |
CN205875714U (en) | A consolidate fixture for retainer plate beam mold board | |
CN213952209U (en) | PSB finish rolling screw-thread steel pipe pile prestressing force anti-floating pile structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170329 |