CN107740427A - A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure - Google Patents

A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure Download PDF

Info

Publication number
CN107740427A
CN107740427A CN201711037063.4A CN201711037063A CN107740427A CN 107740427 A CN107740427 A CN 107740427A CN 201711037063 A CN201711037063 A CN 201711037063A CN 107740427 A CN107740427 A CN 107740427A
Authority
CN
China
Prior art keywords
concrete prefabricated
side wall
prefabricated square
guan liang
interpolation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711037063.4A
Other languages
Chinese (zh)
Inventor
刘国杰
胡国伟
武永珍
傅重阳
宁轲
郑保才
马健
郭云飞
侯大鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Fifth Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201711037063.4A priority Critical patent/CN107740427A/en
Publication of CN107740427A publication Critical patent/CN107740427A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to foundation pit enclosure technical field of construction, specifically a kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure, shift to an earlier date pre-buried side wall connection embedded sleeve barrel in prefabrication process and be connected embedded sleeve barrel with Guan Liang, Guan Liang embedded ribs are installed on Guan Liang connection embedded sleeve barrel in construction, overall structure is formed with Guan Liang;Before side wall construction, inner side soil cement parcel is cut, side wall embedded ribs are installed on side wall connection embedded sleeve barrel, overall structure is formed with side wall.Have the following advantages compared with prior art:Method of the present invention in later stage main body construction, has carried out secondary use to foundation pit enclosure structure, and by connecting reinforcing bar, the concrete prefabricated square pile of interpolation is combined with side wall integral, improves the secondary service efficiency of resource.Method of the present invention, is easily understood, and the instrument used is also daily visible, so being worthy to be popularized.

Description

A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure
Technical field
The present invention relates to foundation pit enclosure technical field of construction, and in particular to a kind of interpolation concrete prefabricated square pile foundation pit enclosure The construction method of structure.
Background technology
Building enclosure, which can only be used as, in traditional construction design goes along with sb. to guard him merely use, can not be sharp again after the completion of later stage main body With causing the significant wastage of resource.
Therefore, it is necessary to cheat new construction method of enclosure structure using a kind of interpolation concrete prefabricated square pile foundation so that early stage Building enclosure is combined integral in later stage main body construction with side wall, improves agent structure intensity and resource utilization.
The content of the invention
A kind of the present invention is intended to provide construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure.
The present invention is achieved by the following technical solutions:A kind of interpolation concrete prefabricated square stake foundation pit enclosure structure is applied Work method, comprises the following steps:
(i) the construction of the concrete prefabricated square pile of interpolation
1)After rotary drilling rig movement is in place, drill bit is accurately aimed at stake position center, stops drilling after piercing preexisting hole depth, and with clearly Slag drilling bucket borehole cleaning is to design requirement;
2)Drilling rod is proposed after the sediment of rotated inside unit head cleaning hole bottom in situ after the completion of drilling, with crawler crane the filling assembled Starch under pipe to bottom hole, soil cement is pumped into preexisting hole by grout pipe using pumping equipment;
3)Concrete prefabricated square pile is transferred into designed elevation using crawler crane, stake top absolute altitude is checked, is checked before lifting by crane Whether side wall connection embedded sleeve barrel is towards side wall design attitude;The concrete prefabricated square pile is the concrete with framework of steel reinforcement Precast square pile, one side outside of framework of steel reinforcement are provided with some side walls connection embedded sleeve barrels, reinforcing bar by reinforcing bar from top to bottom Top of the trellis is threaded with some Guan Liang connection embedded sleeve barrels;
(ii) concrete prefabricated square pile is connected with Guan Liang
4)After concrete prefabricated square pile to be interpolated is completed and reaches design strength, four sides of concrete prefabricated square pile periphery formed with The soil cement solidification layer that preexisting hole wall is adapted, then carry out concrete prefabricated square pile stake top Guan Liang foundation trench and excavate;
5)After the completion of concrete prefabricated square pile stake top Guan Liang foundation trench excavates, stake top is cleared up, at the same it is pre- in interpolation concrete Guan Liang embedded ribs are installed on the Guan Liang connection embedded sleeve barrel of square pile processed, the overall skeleton connection of Guan Liang embedded ribs and Guan Liang, poured The concrete of Guan Liang, form integrative-structure;
(iii) concrete prefabricated square pile is connected with side wall
6)After the completion of concrete prefabricated square pile to be interpolated, when side wall is constructed, the cement of concrete prefabricated square pile one side periphery is cut Native solidification layer, side wall embedded ribs are installed on side wall connection embedded sleeve barrel, side wall embedded ribs are connected with side wall framework of steel reinforcement, poured The concrete of side wall, form overall structure.
As the further improvement of technical solution of the present invention, the side wall connection embedded sleeve barrel passes through bar connecting to reinforcing bar The cross rail outer of skeleton.
As the further improvement of technical solution of the present invention, the Guan Liang connection embedded sleeve barrel is connected to the vertical of framework of steel reinforcement Back portion.
As the further improvement of technical solution of the present invention, center and the stake position centre deviation≤20mm of described drill bit.
As the further improvement of technical solution of the present invention, described drilling process inner side unit head pressure≤24Mpa.
As the further improvement of technical solution of the present invention, the design requirement of described borehole cleaning is scarfing cinder drilling bucket borehole cleaning to hole Bottom sediment≤50mm.
The soil cement prepared as the further improvement of technical solution of the present invention, described soil cement for following ratio, water Mud:Dry ground:Water:The mass ratio of waterglass is 2:1:1.75:2.5.
A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure of the present invention, it is pre- in advance in prefabrication process Bury side wall connection embedded sleeve barrel and embedded sleeve barrel is connected with Guan Liang, installation Guan Liang is pre-buried on Guan Liang connection embedded sleeve barrel in construction Muscle, overall structure is formed with Guan Liang;Before side wall construction, inner side soil cement parcel is cut, is installed on side wall connection embedded sleeve barrel Side wall embedded ribs, overall structure is formed with side wall.
Have the following advantages compared with prior art:
1st, method of the present invention has carried out secondary use to foundation pit enclosure structure in later stage main body construction, passes through connection It is integral that reinforcing bar makes the concrete prefabricated square pile of interpolation be combined with side wall, improves the secondary service efficiency of resource.
2nd, the concrete prefabricated square pile of interpolation used in the process can shift to an earlier date precasting yard carry out it is prefabricated, with side wall connect After connecing, agent structure intensity is effectively increased, it is safe.
3rd, method of the present invention, is easily understood, and the instrument used is also daily visible, so being worthy to be popularized.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the use state figure for the interpolation assembly concrete precast square pile that piling wall of the present invention combines.
Fig. 2 is A-A sectional views in Fig. 1.In figure, the soil cement solidification layer in side wall construction linea oblique anterior region is present, during construction Need to cut the hatched example areas.
Fig. 3 is the B-B sectional views in Fig. 1.
In figure:1- frameworks of steel reinforcement, 2- side walls connection embedded sleeve barrel, 3- side walls embedded ribs, 4- Guan Liangs connection embedded sleeve barrel, 5- Guan Liang embedded ribs, 6- pile bodies, 7- soil cements solidification layer, 8- side walls, 9- Guan Liangs.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, technical scheme will be carried out below Detailed description.Obviously, described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.Base Embodiment in the present invention, those of ordinary skill in the art are resulting on the premise of creative work is not made to be owned Other embodiment, belong to the scope that the present invention is protected.
Technical scheme is described in detail below in conjunction with the accompanying drawings.
Interpolation concrete prefabricated square stake foundation pit enclosure structure is mixed using the pore-forming slip casting interpolation C50 of Φ 1100,70cm × 70cm Coagulate native precast square pile, stake spacing 130cm.The present invention at concrete prefabricated square stake top end and with the adjacent sections of side wall 8 by being connected Embedded sleeve barrel, later stage are combined into overall structure with Guan Liang 9 and side wall 8 by installing embedded ribs on connection embedded sleeve barrel, improved While having enclosed protection structure intensity, agent structure intensity is enhanced, improves the utilization rate of resource.
The concrete prefabricated square pile of interpolation, including pile body 6, the pile body 6 are made up of stake core and stake side, the stake Core is the concrete prefabricated square pile with framework of steel reinforcement 1, and the stake side is the soil cement solidification layer 7 positioned at the side of stake core four periphery, There are some side walls to connect embedded sleeve barrel 2, the top of framework of steel reinforcement 1 by reinforcement installation on the framework of steel reinforcement 1 on wherein one side of stake core It is threaded with some Guan Liang connection embedded sleeve barrels 4.Specifically, side wall connection embedded sleeve barrel 2 connects embedded sleeve barrel 4 with Guan Liang Outermost can flush with stake core outer surface, or extended stake core outer surface.In addition before construction method of the present invention progress Prefabricated concrete prefabricated square pile need to be shifted to an earlier date.
A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure, comprises the following steps:
(i) the construction of the concrete prefabricated square pile of interpolation
1)After the movement of SWDM280 types rotary drilling rig is in place, drill bit is accurately aimed at stake position center and deviation≤20mm, in drilling process Side unit head pressure≤24Mpa, pierce and stop drilling after preexisting hole depth, and use scarfing cinder drilling bucket borehole cleaning to design requirement, i.e., clearly Slag drilling bucket borehole cleaning is to bottom hole sediment≤50mm;
2)Drilling rod is proposed after the sediment of rotated inside unit head cleaning hole bottom in situ after the completion of drilling, with crawler crane the filling assembled Starch under pipe to bottom hole, soil cement is pumped into preexisting hole by grout pipe using pumping equipment, cement in the soil cement:Dry ground: Water:The mass ratio of waterglass is 2:1:1.75:2.5;
3)Concrete prefabricated square pile is transferred into designed elevation using XGC150 types crawler crane, stake top absolute altitude checked, partially Difference control checks side wall connection embedded sleeve barrel 2 between 0 ~ 2cm before lifting by crane(Model M24)Whether towards the design attitude of side wall 8; The concrete prefabricated square pile is the concrete prefabricated square pile with framework of steel reinforcement 1, passes through reinforcing bar on the outside of one side of framework of steel reinforcement 1 Some side wall connection embedded sleeve barrels 2 are installed from top to bottom, the screw top of framework of steel reinforcement 1 is connected with some Guan Liangs and connects pre-buried set Cylinder 4(Model M24);
(ii) concrete prefabricated square pile is connected with Guan Liang
4)After concrete prefabricated square pile to be interpolated is completed and reaches design strength, four sides of concrete prefabricated square pile periphery formed with The soil cement solidification layer 7 that preexisting hole wall is adapted, then carry out concrete prefabricated square pile stake top Guan Liang foundation trench and excavate;
5)After the completion of concrete prefabricated square pile stake top Guan Liang foundation trench excavates, stake top is cleared up, at the same it is pre- in interpolation concrete Guan Liang embedded ribs are installed on the Guan Liang connection embedded sleeve barrel 4 of square pile processed(Φ 22mm, L50cm)5, Guan Liang embedded ribs 5 and Guan Liang 9 Overall skeleton connects, and pours the concrete of Guan Liang 9, forms integrative-structure;
(iii) concrete prefabricated square pile is connected with side wall
6)After the completion of concrete prefabricated square pile to be interpolated, when side wall 8 is constructed, the cement of concrete prefabricated square pile one side periphery is cut Native solidification layer 7(Hatched example areas as shown in Figure 2), side wall embedded ribs 3 are installed on side wall connection embedded sleeve barrel 2(Φ 22mm, L35cm), side wall embedded ribs 3 are connected with side wall framework of steel reinforcement, pour the concrete of side wall 8, form overall structure.
Specifically, as shown in figure 3, the side wall is connected outside crossbeam of the embedded sleeve barrel 2 by bar connecting to framework of steel reinforcement 1 Side.
Specifically, as shown in Fig. 2 Guan Liang connection embedded sleeve barrel 4 is connected at the top of the longeron of framework of steel reinforcement 1.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained Cover within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (7)

1. a kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure, it is characterised in that comprise the following steps:
(i) the construction of the concrete prefabricated square pile of interpolation
1)After rotary drilling rig movement is in place, drill bit is accurately aimed at stake position center, stops drilling after piercing preexisting hole depth, and with clearly Slag drilling bucket borehole cleaning is to design requirement;
2)Drilling rod is proposed after the sediment of rotated inside unit head cleaning hole bottom in situ after the completion of drilling, with crawler crane the filling assembled Starch under pipe to bottom hole, soil cement is pumped into preexisting hole by grout pipe using pumping equipment;
3)Concrete prefabricated square pile is transferred into designed elevation using crawler crane, stake top absolute altitude is checked, is checked before lifting by crane Side wall connects embedded sleeve barrel(2)Whether towards side wall(8)Design attitude;The concrete prefabricated square pile is with framework of steel reinforcement (1)Concrete prefabricated square pile, framework of steel reinforcement(1)One side on the outside of to be provided with the connection of some side walls from top to bottom by reinforcing bar pre- Bury sleeve(2), framework of steel reinforcement(1)Screw top is connected with some Guan Liang connection embedded sleeve barrels(4);
(ii) concrete prefabricated square pile is connected with Guan Liang
4)After concrete prefabricated square pile to be interpolated is completed and reaches design strength, four sides of concrete prefabricated square pile periphery formed with The soil cement solidification layer that preexisting hole wall is adapted(7), then carry out concrete prefabricated square pile stake top Guan Liang foundation trench and excavate;
5)After the completion of concrete prefabricated square pile stake top Guan Liang foundation trench excavates, stake top is cleared up, at the same it is pre- in interpolation concrete The Guan Liang connection embedded sleeve barrel of square pile processed(4)Upper installation Guan Liang embedded ribs(5), Guan Liang embedded ribs(5)With Guan Liang(9)Overall bone Frame connects, and pours Guan Liang(9)Concrete, formed integrative-structure;
(iii) concrete prefabricated square pile is connected with side wall
6)Treat Guan Liang(9)After the completion of construction, side wall(8)During construction, the soil cement for cutting concrete prefabricated square pile one side periphery coagulates Gu layer(7), embedded sleeve barrel is connected in side wall(2)Upper installation side wall embedded ribs(3), side wall embedded ribs(3)With side wall framework of steel reinforcement Connection, pours side wall(8)Concrete, formed overall structure.
2. a kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure according to claim 1, its feature It is, the side wall connects embedded sleeve barrel(2)Pass through bar connecting to framework of steel reinforcement(1)Cross rail outer.
3. a kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure according to claim 1 or 2, it is special Sign is that the Guan Liang connects embedded sleeve barrel(4)It is connected to framework of steel reinforcement(1)Longeron at the top of.
4. a kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure according to claim 1, its feature It is, center and the stake position centre deviation≤20mm of described drill bit.
5. a kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure according to claim 1, its feature It is, unit head pressure≤24Mpa on the inside of described drilling process.
6. a kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure according to claim 1, its feature It is, the design requirement of described borehole cleaning is scarfing cinder drilling bucket borehole cleaning to bottom hole sediment≤50mm.
7. a kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure according to claim 1, its feature It is, the soil cement that described soil cement is prepared for following ratio, cement:Dry ground:Water:The mass ratio of waterglass is 2:1: 1.75:2.5。
CN201711037063.4A 2017-10-30 2017-10-30 A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure Pending CN107740427A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711037063.4A CN107740427A (en) 2017-10-30 2017-10-30 A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711037063.4A CN107740427A (en) 2017-10-30 2017-10-30 A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure

Publications (1)

Publication Number Publication Date
CN107740427A true CN107740427A (en) 2018-02-27

Family

ID=61233570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711037063.4A Pending CN107740427A (en) 2017-10-30 2017-10-30 A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure

Country Status (1)

Country Link
CN (1) CN107740427A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158615A (en) * 2019-06-17 2019-08-23 中交第三公路工程局有限公司 High water level system of deep foundation pit support and its construction method
CN112504599A (en) * 2020-11-20 2021-03-16 陕西煤业化工技术研究院有限责任公司 Friction energy-absorbing plate collision test wall and prefabricating and construction installation process thereof
CN114086548A (en) * 2021-12-09 2022-02-25 江苏宏强新型建材有限公司 Pile-wall combined inner-inserting assembly type precast concrete square pile
CN114108695A (en) * 2021-11-15 2022-03-01 中冶集团武汉勘察研究院有限公司 Assembled underground cylinder structure and construction method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1776112A (en) * 2005-11-30 2006-05-24 王平 High-performance cement soil continuous wall construction method
CN106677162A (en) * 2017-02-13 2017-05-17 上海强劲地基工程股份有限公司 Stiff composite precast sheet pile envelope structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1776112A (en) * 2005-11-30 2006-05-24 王平 High-performance cement soil continuous wall construction method
CN106677162A (en) * 2017-02-13 2017-05-17 上海强劲地基工程股份有限公司 Stiff composite precast sheet pile envelope structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158615A (en) * 2019-06-17 2019-08-23 中交第三公路工程局有限公司 High water level system of deep foundation pit support and its construction method
CN112504599A (en) * 2020-11-20 2021-03-16 陕西煤业化工技术研究院有限责任公司 Friction energy-absorbing plate collision test wall and prefabricating and construction installation process thereof
CN112504599B (en) * 2020-11-20 2023-09-22 陕西煤业化工技术研究院有限责任公司 Friction energy absorption plate collision test wall and prefabrication and construction installation process thereof
CN114108695A (en) * 2021-11-15 2022-03-01 中冶集团武汉勘察研究院有限公司 Assembled underground cylinder structure and construction method thereof
CN114086548A (en) * 2021-12-09 2022-02-25 江苏宏强新型建材有限公司 Pile-wall combined inner-inserting assembly type precast concrete square pile

Similar Documents

Publication Publication Date Title
CN101614125B (en) Construction method of V-level surrounding rock tunnel
CN107740427A (en) A kind of construction method of interpolation concrete prefabricated square stake foundation pit enclosure structure
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN103821219A (en) Top pipe construction modification inspection well construction method
CN108360543A (en) A kind of big pre-cast sink well structure of depth and its installation method
CN203729424U (en) Modified horseback-riding inspection well for top pipe construction
CN103669365A (en) External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof
CN110331727A (en) The supporting construction and construction method that bored concrete pile and diaphram wall combine
CN108547641A (en) The bottom stab ilization system and its construction method in rich water soft stratum heavy haul railway tunnel
CN105545323A (en) Construction method for open cut tunnel lining
CN104404983A (en) Horse riding type well device for pipe jacking construction and construction method thereof
CN104895093B (en) A kind of half coercion underground continuous wall and its construction method
CN106337391A (en) Long piled wharf panel bottom large-area damage repairing construction method
CN104631440A (en) Stiffening core lengthening foundation pit support structure for existing large-diameter bored concrete pile and construction method
CN105442605A (en) Construction method for drawing out prestress high concrete (PHC) pile and reusing PHC pile for retaining in deep excavation
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
CN106480891B (en) A kind of shaft construction method
CN105735323A (en) Shotcrete reverse construction and punching pile combined deep foundation pit retaining structure and construction method thereof
CN101899831B (en) Active variable-stiffness leveling pile and construction method thereof
CN216342131U (en) Shield tunnel invades limit stake and handles reinforced structure
CN106193644B (en) Basement reconstruction structure with raft foundation building
CN108086307B (en) Steel pipe concrete hole digging and pouring composite miniature pile
CN112012761B (en) Construction method of anti-disturbance double-arch tunnel structure
CN110080779A (en) Tunnel tunnel bottom karst cave treatment construction method
CN104074197A (en) Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180227

RJ01 Rejection of invention patent application after publication