CN108677935A - A kind of construction method of the compound construction stake of building - Google Patents

A kind of construction method of the compound construction stake of building Download PDF

Info

Publication number
CN108677935A
CN108677935A CN201810509490.6A CN201810509490A CN108677935A CN 108677935 A CN108677935 A CN 108677935A CN 201810509490 A CN201810509490 A CN 201810509490A CN 108677935 A CN108677935 A CN 108677935A
Authority
CN
China
Prior art keywords
pile
construction
drilling
cement
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810509490.6A
Other languages
Chinese (zh)
Inventor
张松柯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810509490.6A priority Critical patent/CN108677935A/en
Publication of CN108677935A publication Critical patent/CN108677935A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds

Abstract

The invention discloses a kind of construction methods of the compound construction stake of building, include the following steps:1), in pre- fixed pile, using drill hole of drilling machine, pressure fills and bonds material to set depth and into the drilling, and described to bond material and constituted by one or more in the cement, soil cement, cement mortar, fine-stone concrete and the cement & fly ash mixture that meet pumping requirements and bonded material be liquid;2), prefabricated pile is inserted into above-mentioned drilling to the construction for completing composite pile, the inserted mode of the prefabricated pile is that hammering is inserted into, static pressure is inserted into or is shaken insertion using the vibration hammer with hydraulically operated fixture, prefabricated pile bottom end is inserted into drilling bottommost, the construction method is simple and easy to do, it is high-quality, low cost, short time limit are extremely suitable for using in the engineering geology of coastal " phreatic high " " upper soft lower hard ".

Description

A kind of construction method of the compound construction stake of building
Technical field
The present invention relates to technical field of civil engineering, and in particular to a kind of construction method of the compound construction stake of building.
Background technology
Due to the aspects such as soil nature, Processes and apparatus, belongs to prefabricated (solid or hollow) stake of Squeezing Soil Pile, often go out Existing irregular pile body is not in place and the long problem that differs greatly of stake, seriously affects construction quality and there are great security risks.
In the prior art, common composite pile is that cement earth pile is inserted into after completing especially with powder pressure spray process Prefabricated pile forms stiff composite pile, subsequent construction of prefabricated piles difficulty bigger, theoretic composite pile high-bearing capacity, in reality It is but difficult to ensure in trampling.
Invention content
(1) technical problems to be solved
In order to overcome the shortage of prior art, it is proposed that a kind of construction method of the compound construction stake of building, construction method letter Easy row, high-quality, low cost, short time limit are extremely suitable in the engineering geology of coastal " phreatic high " " upper soft lower hard " It uses.
(2) technical solution
The present invention is achieved through the following technical solutions:The present invention proposes a kind of construction method of the compound construction stake of building, Include the following steps:1), in pre- fixed pile, filling is pressed to bond material using drill hole of drilling machine to set depth and into the drilling Material, the material that bonds is by meeting cement, soil cement, cement mortar, fine-stone concrete and the cement & fly ash mixture of pumping requirements In one or more compositions and bond material be liquid;2), prefabricated pile is inserted into above-mentioned drilling and completes applying for composite pile Work, the inserted mode of the prefabricated pile is that hammering is inserted into, static pressure is inserted into or is shaken insertion using the vibration hammer with hydraulically operated fixture, prefabricated Stake bottom end is inserted into drilling bottommost.
Further, the prefabricated pile can select square pile, pile pile or Bamboo-shaped stake.
(3) advantageous effect
The present invention compared with the existing technology, has the advantages that:
A kind of construction method for the compound construction stake of building that the present invention mentions, control bond the pressure filling amount of material, not only keep away The material that bonds excessive when pile body is put into is exempted from and has overflowed drilling, to cause the waste of engineering material, while stake will not have been caused again The body whole body bonds material utilization amount deficiency, and the compacted degree of pile peripheral earth is not up to standard, to affect the quality of construction, bright combination The advantage of two kinds of different process technologies, it can be ensured that construction of prefabricated piles in place, improves the bearing capacity of foundation pile, it is ensured that engineering matter Amount;Meanwhile simple and easy to do, high-quality, low cost of the invention, short time limit, it is extremely suitable for coastal " phreatic high ", " goes up soft It is used in engineering geology down firmly ".
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with and embodiment, to this hair It is bright to be further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and do not have to It is of the invention in limiting.
A kind of construction method of the compound construction stake of building, includes the following steps:1), in pre- fixed pile, drilling machine is utilized Drilling pressure to set depth and into the drilling, which fills, bonds material, and the material that bonds is by meeting cement, the water of pumping requirements One or more compositions in soil, cement mortar, fine-stone concrete and cement & fly ash mixture and to bond material be liquid;2)、 Prefabricated pile is inserted into above-mentioned drilling to the construction for completing composite pile, the inserted mode of the prefabricated pile is hammering insertion, static pressure It is inserted into or is shaken insertion using the vibration hammer with hydraulically operated fixture, prefabricated pile bottom end is inserted into drilling bottommost.
Wherein, the prefabricated pile can select square pile, pile pile or Bamboo-shaped stake.
A kind of construction method for the compound construction stake of building that the present invention mentions, utilizes applying for the composite pile designed by the present invention Work method can complete the construction of the composite pile based on square pile, pile pile or Bamboo-shaped stake in actual construction, carry significantly Efficiency in high practice of construction, meanwhile, it ensure that construction quality, improve cost performance.
The above-described embodiments are merely illustrative of preferred embodiments of the present invention, not to the structure of the present invention Think and range is defined.Under the premise of not departing from design concept of the present invention, technology of the ordinary people in the field to the present invention The all variations and modifications that scheme is made, should all drop into protection scope of the present invention, the claimed technology contents of the present invention, It has all recorded in detail in the claims.

Claims (2)

1. a kind of construction method of the compound construction stake of building, it is characterised in that:Include the following steps:1), in pre- fixed pile, It presses to fill using drill hole of drilling machine to set depth and into the drilling and bonds material, the material that bonds is by meeting pumping requirements One or more compositions in cement, soil cement, cement mortar, fine-stone concrete and cement & fly ash mixture and to bond material be liquid State;2), prefabricated pile is inserted into above-mentioned drilling to the construction for completing composite pile, the inserted mode of the prefabricated pile is that hammering is inserted Enter, static pressure is inserted into or is shaken insertion using the vibration hammer with hydraulically operated fixture, prefabricated pile bottom end is inserted into drilling bottommost.
2. a kind of construction method of compound construction stake of building according to claim 1, it is characterised in that:The prefabricated pile energy Enough select square pile, pile pile or Bamboo-shaped stake.
CN201810509490.6A 2018-05-24 2018-05-24 A kind of construction method of the compound construction stake of building Pending CN108677935A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810509490.6A CN108677935A (en) 2018-05-24 2018-05-24 A kind of construction method of the compound construction stake of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810509490.6A CN108677935A (en) 2018-05-24 2018-05-24 A kind of construction method of the compound construction stake of building

Publications (1)

Publication Number Publication Date
CN108677935A true CN108677935A (en) 2018-10-19

Family

ID=63808255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810509490.6A Pending CN108677935A (en) 2018-05-24 2018-05-24 A kind of construction method of the compound construction stake of building

Country Status (1)

Country Link
CN (1) CN108677935A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424437A (en) * 2019-08-13 2019-11-08 中国电建集团山东电力建设有限公司 Photo-voltaic power generation station installation foundation construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424437A (en) * 2019-08-13 2019-11-08 中国电建集团山东电力建设有限公司 Photo-voltaic power generation station installation foundation construction method

Similar Documents

Publication Publication Date Title
CN105386433B (en) A kind of microorganism soil-fixing CFG pile composite foundations and construction method
CN102011399B (en) PHC pile-based multiple high jet pedestal pile construction method
CN101736738B (en) Production method of pressure resistance and pull-out resistance grouted gravel pile
CN102900079A (en) High-frequency hydraulic vibratory construction method for cement-soil core-inserted combined pile
CN107938650A (en) The method for filling and treating of underground karst cavity
CN111636417A (en) Grouting type steel pipe pile and construction method thereof
CN106192999A (en) The construction method of uplift pile
CN102535458A (en) Reinforced cement-soil anchor bolt and construction method thereof
CN106996104A (en) Injection forming club-footed pile and its construction method
CN104153357A (en) Construction method of composite pile
CN201581394U (en) Large pile toe grout-injection precast pile
CN108677935A (en) A kind of construction method of the compound construction stake of building
CN206289627U (en) A kind of post jacking pile tube
CN105297737A (en) Grouting scope-controllable bag type micro bearing pile
CN107938652A (en) A kind of embedding lithotype steel cement mixing wall and its construction method
CN104404947A (en) Construction method for composite pile
CN209243732U (en) A kind of efficient mini steel-pipe pile constructing structure
CN110306529A (en) A kind of method that bridge pile foundation solution cavity layering throwing blocks
CN204608755U (en) A kind of composite pile
CN208949893U (en) A kind of oblique suspension device of the auxiliary of foundation pit
CN100363562C (en) Preventing plate with spreading and deep layer rotating spraying mixture head with diffusion preventing plate and guniting mouth
CN204370413U (en) A kind of steel pile casting
CN203174586U (en) Concrete pipe pile for reinforcing railway soft soil foundation
CN208039240U (en) A kind of built pile
CN201512782U (en) Softening prevention pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181019

WD01 Invention patent application deemed withdrawn after publication