CN108612221A - Construction wall structure - Google Patents

Construction wall structure Download PDF

Info

Publication number
CN108612221A
CN108612221A CN201810583089.7A CN201810583089A CN108612221A CN 108612221 A CN108612221 A CN 108612221A CN 201810583089 A CN201810583089 A CN 201810583089A CN 108612221 A CN108612221 A CN 108612221A
Authority
CN
China
Prior art keywords
connector
screw
engaging lug
threaded tube
splice
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810583089.7A
Other languages
Chinese (zh)
Other versions
CN108612221B (en
Inventor
吴庆华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longyuan Mingzhu Science and Technology Co., Ltd.
Original Assignee
吴庆华
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 吴庆华 filed Critical 吴庆华
Priority to CN201810583089.7A priority Critical patent/CN108612221B/en
Publication of CN108612221A publication Critical patent/CN108612221A/en
Application granted granted Critical
Publication of CN108612221B publication Critical patent/CN108612221B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground

Abstract

The invention discloses a kind of construction wall structures, include that the wall formed is superimposed by one group or more of splice up and down, every group of splice includes the first connector and the second connector, the opposite face of first connector and the second connector opens up a cavity, the open end of two cavitys is oppositely arranged, and two cavitys are spliced into a closed rectangular cavity;The both sides of first connector are each provided with first engaging lug, each one the second engaging lug of setting in the both sides of second connector, are vertically connected between ear and contact with each other.The construction wall structure of the present invention has very high intensity, assembly can be completed without concrete material, each building block can recycle after it is dismantled, with extraordinary shock strength, while being vertically connected with fixed by threaded tube realization, it can realize the heat exchange to building body in hot weather again, and not interfere with the intensity of building body.

Description

Construction wall structure
Technical field
The present invention relates to building fields, and in particular to a kind of construction wall structure.
Background technology
Construction wall in the prior art is built by building block, then between building block and building block in order to protect Intensity is demonstrate,proved, meeting fill concrete forms wall after concrete is solid.But this wall is by building block due to being built, this Kind wall can not exchange heat to it, also can not just cool down in hot weather, lead to the bulk temperature of whole building body very It is high.
Furthermore the wall that concrete is built, antidetonation and impact resistance are very poor, and not certain cushion performance, and And building block is less able to be recycled again, if using all steel material system after removal due to having adhered to a large amount of concrete Make wall, although intensity is high, it needs to expend a large amount of steel, and cost is too big.
Invention content
Technical problem to be solved by the invention is to provide a kind of construction wall structure, have extraordinary shock resistance and Shock resistance, reasonable combination steel and building block, can be completed without concrete perfusion, and can be the case where not influencing strength of wall body Heat exchange of the lower realization to whole building wall, can effectively solve the problem that deficiency in the prior art.
The present invention is achieved through the following technical solutions:A kind of construction wall structure includes by one group or more of spelling Fitting up and down be superimposed composition wall, every group of splice include the first connector and the second connector, the first connector with The opposite face of second connector opens up a cavity, and the open end of two cavitys is oppositely arranged, and two cavitys are spliced into one Closed rectangular cavity;
The both sides of first connector are each provided with first engaging lug, the both sides respectively setting one of second connector Second engaging lug is vertically connected between ear and contacts with each other, screw hole, the connection of every group of splice are offered on each engaging lug It is locked by being inserted into long thumb screw between ear, the screw hole of long thumb screw from upper end engaging lug is inserted through the screw of bottom Hole stretches out in the lower end of bottom engaging lug, and forms first salient point, and the nut of long thumb screw stretches out in upper end engaging lug Upper surface, and second salient point is formed, it is respectively formed an installation cavity, each installation cavity between upper and lower side two adjacent groups engaging lug It is inside packed into a matched building block, the centre of each group splice is provided through center screw from top to bottom, in Through a piece threaded tube of setting in heart screw hole.
The outer wall of the threaded tube is both provided with the outer spiral shell to match with center screw as a preferred technical solution, Line, threaded tube are inserted in center screw and are engaged by screw thread and connected, and there are one cooling logical for the intermediate setting of threaded tube Road, the input terminal of threaded tube stretch out in the upper end of wall or lower end and access external output water source.
The upper and lower side of the building block faces the first salient point as a preferred technical solution, and the position of the second salient point is equal Positioning aperture is offered, the first, second salient point buckles into the positioning aperture of building block positive and negative.
The outboard end of the connector is respectively provided with a rounded corners as a preferred technical solution, and each connector is all made of Steel are made.
The threaded tube is integrally made of metal material as a preferred technical solution,.
The beneficial effects of the invention are as follows:One, the present invention is using one group or more of splice and the combination of building block, nothing Any concrete need to be used, is arranged in pairs or groups mutually using screw and the thread locking structure of the threaded tube of insertion, forms one The wall of high intensity can be solved the problem of wall antidetonation and impact resistance difference using a small amount of steel;
Two, the present invention utilizes the outer wall thread of threaded tube due to being passed through a threaded tube between each group splice The threaded connection of realization and each group splice so that the splice of upper the following group can be realized locking connection and be determined by threaded tube Position, it is more simple in this way in connection, ensure bonding strength without using excessive screw;
Three, the present invention can be passed through cold water due to being passed through a threaded tube in hot weather, be carried out to whole building body Heat exchange, and do not interfere with the normal intensity of wall;
Four, building block of the invention can complete positioning assembly by the external part of the screw for locking engaging lug, save The screw locking structure between building block and splice has been gone, it is very rationally, all after each group splice is spliced into wall Building block can be positioned, and can not be taken out, and not need extra screw and concrete completion fixation.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Obtain other attached drawings according to these attached drawings.
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the structural schematic diagram of the building block of the present invention;
Fig. 3 is the vertical view of the splice of the present invention.
Coding in figure is respectively:1 is the first engaging lug, and 2 be the second engaging lug, and 3 be building block, and 4 be long thumb screw, and 5 are Rectangular cavity, 6 be cavity, and 7 be installation cavity, and 8 be nut, and 9 be the second connector, and 11 be rounded corners, and 12 be threaded tube, and 13 are First connector, screw hole centered on 15,16 be screw hole, and 17 be positioning aperture.
Specific implementation mode
As shown in figures 1 and 3, this construction wall structure includes being superimposed the wall formed up and down by one group or more of splice Body, every group of splice include the first connector 13 and the second connector 9, the phase of the first connector 13 and the second connector 9 Opposite opens up a cavity 6, and the open end of two cavitys 6 is oppositely arranged, and two cavitys 6 are spliced into a closed rectangular cavity 5;
The both sides of first connector 13 are each provided with first engaging lug 1, the both sides respectively setting one of the second connector 9 Second engaging lug 2 is vertically connected between ear and contacts with each other, and offers screw hole 16 on each engaging lug, every group of splice It is locked by being inserted into long thumb screw 4 between engaging lug, long thumb screw 4 is inserted through bottom from the screw hole 16 of upper end engaging lug The screw hole 16 in portion stretches out in the lower end of bottom engaging lug, and forms first salient point, and the nut 8 of long thumb screw stretches out in The upper surface of engaging lug is held, and forms second salient point, an installation cavity is respectively formed between upper and lower side two adjacent groups engaging lug 7, a matched building block 3 is packed into each installation cavity 7, setting is run through in the centre of each group splice from top to bottom Center screw 15, center screw 15 are interior through a piece threaded tube 12 of setting.
Wherein, the outer wall of threaded tube 12 is both provided with the external screw thread to match with center screw 15, and threaded tube 12 is inserted Enter in center screw 15 and engage by screw thread to connect, the intermediate setting of threaded tube 12 (is not schemed there are one cooling duct Show), the input terminal of threaded tube 12 stretches out in the upper end of wall or lower end and accesses external output water source.Outside summer When temperature is very high, we can open external water source, input in a large amount of cold water to threaded tube, since screwed pipe is equal with splice For metalwork, therefore fast cooling and cooling may be implemented.
Again since splice has significantly hollowness, and it is filled with building block, therefore the steel of whole building wall make Dosage is not very big, and the splice of hollow-core construction has good anti seismic efficiency, has the ability for bearing vibration.
Wherein, as shown in Fig. 2, the upper and lower side of building block 3 faces the first salient point and the position of the second salient point offers Aperture 17 is positioned, the first, second salient point buckles into the positioning aperture 17 of building block positive and negative.Fixation passes through spiral shell between each connector Silk is fixed, thus the use of the screw just form upper and lower side buckle point structure, as long as carrying out one simply to building block in this way Improvement, just can building block be reasonably subjected to positioning assembly, and the connection between splice positions and then passes through loading up and down Threaded tube is attached fixation, the threaded tube that the relative position up and down between splice will be fixed, and be passed through in this way It can realize to the cooling of whole building body, kill two birds with one stone again.
In the present embodiment, the outboard end of connector is respectively provided with a rounded corners 11, and each connector is all made of steel and is made.If Setting rounded corners mainly allows the tool of the both sides between being vertically connected with part there are one making a concession, and when being pressurized, can there is the slow of a yielding Rush space.
In the present embodiment, threaded tube 12 is whole to be made of metal material.Threaded tube 12 uses steel, one is Ensure the bonding strength between each splice after being packed into, the other is realizing fast endothermic and heat exchange.
The beneficial effects of the invention are as follows:One, the present invention is using one group or more of splice and the combination of building block, nothing Any concrete need to be used, is arranged in pairs or groups mutually using screw and the thread locking structure of the threaded tube of insertion, forms one The wall of high intensity can be solved the problem of wall antidetonation and impact resistance difference using a small amount of steel;
Two, the present invention utilizes the outer wall thread of threaded tube due to being passed through a threaded tube between each group splice The threaded connection of realization and each group splice so that the splice of upper the following group can be realized locking connection and be determined by threaded tube Position, it is more simple in this way in connection, ensure bonding strength without using excessive screw;
Three, the present invention can be passed through cold water due to being passed through a threaded tube in hot weather, be carried out to whole building body Heat exchange, and do not interfere with the normal intensity of wall;
Four, building block of the invention can complete positioning assembly by the external part of the screw for locking engaging lug, save The screw locking structure between building block and splice has been gone, it is very rationally, all after each group splice is spliced into wall Building block can be positioned, and can not be taken out, and not need extra screw and concrete completion fixation.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention Protection domain should be determined by the scope of protection defined in the claims.

Claims (5)

1. a kind of construction wall structure, it is characterised in that:Include that the wall formed is superimposed by one group or more of splice up and down, often Group splice includes the first connector and the second connector, and the opposite face of the first connector and the second connector opens up one The open end of a cavity, two cavitys is oppositely arranged, and two cavitys are spliced into a closed rectangular cavity;
The both sides of first connector are each provided with first engaging lug, the both sides respectively setting one of second connector Second engaging lug is vertically connected between ear and contacts with each other, screw hole, the connection of every group of splice are offered on each engaging lug It is locked by being inserted into long thumb screw between ear, the screw hole of long thumb screw from upper end engaging lug is inserted through the screw of bottom Hole stretches out in the lower end of bottom engaging lug, and forms first salient point, and the nut of long thumb screw stretches out in upper end engaging lug Upper surface, and second salient point is formed, it is respectively formed an installation cavity, each installation cavity between upper and lower side two adjacent groups engaging lug It is inside packed into a matched building block, the centre of each group splice is provided through center screw from top to bottom, in Through a piece threaded tube of setting in heart screw hole.
2. construction wall structure as described in claim 1, it is characterised in that:The outer wall of the threaded tube is both provided with in The external screw thread that heart screw hole matches, threaded tube is inserted in center screw and is engaged by screw thread and connected, in threaded tube Between setting there are one cooling duct, the input terminal of threaded tube stretches out in the upper end of wall or lower end and accesses external output Water source.
3. construction wall structure as described in claim 1, it is characterised in that:The upper and lower side of the building block faces the first salient point And second the position of salient point offer positioning aperture, the first, second salient point buckles into the positioning aperture of building block positive and negative.
4. construction wall structure as described in claim 1, it is characterised in that:The outboard end of the connector is respectively provided with a circle Chamfering, each connector are all made of steel and are made.
5. construction wall structure as described in claim 1, it is characterised in that:The threaded tube integrally uses metal material system At.
CN201810583089.7A 2018-06-07 2018-06-07 Construction wall structure Active CN108612221B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810583089.7A CN108612221B (en) 2018-06-07 2018-06-07 Construction wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810583089.7A CN108612221B (en) 2018-06-07 2018-06-07 Construction wall structure

Publications (2)

Publication Number Publication Date
CN108612221A true CN108612221A (en) 2018-10-02
CN108612221B CN108612221B (en) 2019-11-05

Family

ID=63664857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810583089.7A Active CN108612221B (en) 2018-06-07 2018-06-07 Construction wall structure

Country Status (1)

Country Link
CN (1) CN108612221B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763298A (en) * 2019-03-13 2019-05-17 Tcl家用电器(合肥)有限公司 Adapter frame, care device and washing machine

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2213769Y (en) * 1994-07-14 1995-11-29 林同中 Self-lock brick
DE29710217U1 (en) * 1996-06-18 1998-02-26 Dieter Rest Gmbh Flat anchors for connecting masonry
CN1458358A (en) * 2003-05-27 2003-11-26 曲长贵 Wall building method
CN101111651A (en) * 2004-12-30 2008-01-23 美国石膏公司 Non-combustible reinforced cementitious lightweight panels and metal frame system for flooring
CN201137234Y (en) * 2007-07-13 2008-10-22 邝文达 Building block brick and its splicing structure
CN201507041U (en) * 2009-08-28 2010-06-16 王建军 Structure union body for sandwich heat preservation composite block
CN201598763U (en) * 2010-01-05 2010-10-06 梁林华 Insulating wall body module and insulating wall body built by the module
US20120144765A1 (en) * 2008-09-08 2012-06-14 Leblang Dennis Structural Insulating Core Wall With A Reverse Lip Channel
CN102535724A (en) * 2010-12-30 2012-07-04 湖南高岭建设集团股份有限公司 Hollow block for building
CN103015605A (en) * 2011-09-21 2013-04-03 李义厚 Screw-connected concrete wall block
US9523201B2 (en) * 2014-09-12 2016-12-20 Sergei V. Romanenko Construction components having embedded internal support structures to provide enhanced structural reinforcement for, and improved ease in construction of, walls comprising same

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2213769Y (en) * 1994-07-14 1995-11-29 林同中 Self-lock brick
DE29710217U1 (en) * 1996-06-18 1998-02-26 Dieter Rest Gmbh Flat anchors for connecting masonry
CN1458358A (en) * 2003-05-27 2003-11-26 曲长贵 Wall building method
CN101111651A (en) * 2004-12-30 2008-01-23 美国石膏公司 Non-combustible reinforced cementitious lightweight panels and metal frame system for flooring
CN201137234Y (en) * 2007-07-13 2008-10-22 邝文达 Building block brick and its splicing structure
US20120144765A1 (en) * 2008-09-08 2012-06-14 Leblang Dennis Structural Insulating Core Wall With A Reverse Lip Channel
CN201507041U (en) * 2009-08-28 2010-06-16 王建军 Structure union body for sandwich heat preservation composite block
CN201598763U (en) * 2010-01-05 2010-10-06 梁林华 Insulating wall body module and insulating wall body built by the module
CN102535724A (en) * 2010-12-30 2012-07-04 湖南高岭建设集团股份有限公司 Hollow block for building
CN103015605A (en) * 2011-09-21 2013-04-03 李义厚 Screw-connected concrete wall block
US9523201B2 (en) * 2014-09-12 2016-12-20 Sergei V. Romanenko Construction components having embedded internal support structures to provide enhanced structural reinforcement for, and improved ease in construction of, walls comprising same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763298A (en) * 2019-03-13 2019-05-17 Tcl家用电器(合肥)有限公司 Adapter frame, care device and washing machine

Also Published As

Publication number Publication date
CN108612221B (en) 2019-11-05

Similar Documents

Publication Publication Date Title
CN108612221B (en) Construction wall structure
CN105220765A (en) Space configuration formula flute profile node structure
CN209709656U (en) A kind of cable intermediate joint waterproof anti-explosion box
CN109162374A (en) A kind of silent tee section connector and heat-preserving wall and its construction method
CN210462827U (en) Intelligent street lamp for smart city and applying solar power generation
CN208235790U (en) A kind of shop office construction sound insulation template
CN210664617U (en) Wireless ultrasonic water meter
CN211114170U (en) Anchor bolt is moulded to special steel of insulation construction integration
CN209040282U (en) A kind of connecting node of assembly concrete frame beam column
CN206737208U (en) A kind of steel construction assembled wallboard node
CN206233457U (en) Building house PC with end cap is incubated girder construction
CN206401863U (en) A kind of reusable communication pipe
CN214657888U (en) Building antidetonation energy-saving insulation board
CN205248505U (en) New energy automobile power line device
CN219223459U (en) Heat transfer tube of heat exchanger
CN210288777U (en) Building enclosure structure with ultralow energy consumption
CN215419402U (en) Corrosion-resistant pipeline for 5G engineering
CN210117825U (en) Passive house heat preservation type wall structure
CN215761264U (en) Anti-seismic glass structure
CN209011385U (en) A kind of steel construction assembled wallboard
CN213473880U (en) Storage carrier for chip
CN217634483U (en) Water inlet tee joint with multipurpose and novel structure
CN211948986U (en) Novel composite energy dissipation support
CN217461085U (en) Isobaric waterproof novel unitized curtain wall
CN212896848U (en) Light steel house building structure connecting piece

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20191010

Address after: Room 1514, No. 275 Xintuo Road, Daxie Development Zone, Ningbo City, Zhejiang Province

Applicant after: Longyuan Mingzhu Science and Technology Co., Ltd.

Address before: 322104 Wu Liang village, six stone street, Dongyang City, Jinhua, Zhejiang 11-56

Applicant before: Wu Qing Hua

TA01 Transfer of patent application right
GR01 Patent grant