CN1333136C - Construction technology of suspensing truss crossing river - Google Patents

Construction technology of suspensing truss crossing river Download PDF

Info

Publication number
CN1333136C
CN1333136C CNB2004100407090A CN200410040709A CN1333136C CN 1333136 C CN1333136 C CN 1333136C CN B2004100407090 A CNB2004100407090 A CN B2004100407090A CN 200410040709 A CN200410040709 A CN 200410040709A CN 1333136 C CN1333136 C CN 1333136C
Authority
CN
China
Prior art keywords
river
truss
crossing
traction
construction technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2004100407090A
Other languages
Chinese (zh)
Other versions
CN1598154A (en
Inventor
廖扬忠
杨胜金
邓永蛟
李卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Sichuan Petroleum Administration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Petroleum Administration Bureau filed Critical Sichuan Petroleum Administration Bureau
Priority to CNB2004100407090A priority Critical patent/CN1333136C/en
Publication of CN1598154A publication Critical patent/CN1598154A/en
Application granted granted Critical
Publication of CN1333136C publication Critical patent/CN1333136C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to a suspending crossing construction technique of a river crossing truss, which is used for the construction of river crossing pipelines and belongs to the technical field of the river crossing construction of oil and natural gas pipelines. The present invention effectively satisfies the requirements of the traffic condition of river banks and the basic condition of a large ship and a floating crane with lifting ability. Artificial islands are constructed on both banks of the river; then the river crossing truss is assembled; a portal frame on the other bank linearly and parallelly tows the assembled truss to cross the river; after being transversely moved to reach an upright lifting position, the assembled truss is lifted and arranged on the pier by a portal crane on the pier. The present invention does not need a large ship or a floating crane; meanwhile, because the river crossing truss is linearly and parallelly towed to cross the river, the river crossing truss can not fall into the river due to great swing.

Description

Cross the construction technology that river truss suspention is crossed over
Technical field: a kind of construction technology of crossing river truss suspention leap, be used for the construction that the large-scale petroleum natural gas is crossed the river pipeline, belong to petroleum natural gas pipeline and cross the large-scale leap construction technology technology field of crossing the river truss of river leap construction.
Background technology: in the construction project of petroleum gas long-distance transport pipes, each bar pipeline all can run into the engineering that the rivers pipeline is crossed over, therefore all to carry out the leap construction of river truss, narrow and the not anxious more or less freely solution in river of current of river surface, the river of crossing of multispan trussed construction is different from the suspension cable leap, when running into great rivers, the leap construction of crossing the river truss is just relatively more difficult, the construction technology of using mainly contains at present: the cabling construction technology, this construction technology need be made cabling Sarasota and gravity earth anchor by oneself, the opposite bank transportation condition is bad crossing over, and when not having available Sarasota and anchoring pier, is unfavorable for problems such as entering of main equipment with regard to existence; Transportation by driving technology: this technology can solve the difficult problem that the truss that crosses the river sends, but needs large vessel and have the primary condition of the crane barge of suitable crane capacity, and erects the vertical lifting portal frame on the water and also be difficult to realize; Trestle adds the technology of vertical lifting: to be the truss that will make on the bank be transported in the water between two bridge piers along the trestle that sets up this technology, in place with the vertical lifting of hanging device that is erected in advance on the bridge pier then, but a difficult problem is to set up supporting capacity to reach required tonnage and can resist the trestle that flood impacts and need great deal of steel, and being provided with of trestle supporting pile needs barge container to cooperate, and also has the navigation problem that influences.
The objective of the invention is the problem that exists according to above-mentioned prior art, adopt two sides to build a dam, made river truss scheme in place step by step, design a kind of river truss straight line of will crossing and be pulled through Jiang Houzai and vertically hang the construction technology of crossing river truss suspention leap that puts in place.
Summary of the invention: technology of the present invention is divided into several steps and carries out: fixing bridge pier, man-made island is built in the rivers two sides that need to cross over, in order not influence navigation, keep unimpeded between two bridge piers of main channel, assembled the river truss at a bank in river then, build truss traction Entada phaseoloides door frame at another bank in river, and installation traction power-equipment and cable wire, then, the Entada phaseoloides door frame straight line parallel traction that the river truss excessively that will assemble is earlier set up by the opposite bank is crossed the river, after laterally moving, arrive vertical lifting position, by being arranged on the straddle truck of crossing on the bridge pier truss is lifted on the bridge pier at last; Advantage of the present invention is: owing to be to assemble the river truss on man-made island, and will cross the river truss by the traction Entada phaseoloides door frame straight line that sets up specially and drag the river to go, so do not need barge container and crane barge, simultaneously owing to be that the straight line parallel traction is crossed the river, so, when crossing the river, cross the river truss and can not fall into danger in the river because of swing cause the river truss too greatly.
Marginal data:
Fig. 1 crosses river step schematic diagram for the present invention.
Specific implementation method: provide most preferred embodiment of the present invention below in conjunction with accompanying drawing: this large-scale leap construction technology of crossing the river truss is carried out according to the following steps, the first step is built man-made island 6 in the rivers two sides that upstream one side of fixing bridge pier need be crossed over, in order not influence navigation, the riverbed 8 between two bridge piers of main channel keeps unimpeded; Second step was assembled river truss 1 on the man-made island 6 that constructs, building the traction truss simultaneously on another bank man-made island in river crosses the portal frame 5 in river and traction power-equipment and cable wire is installed, assembly pulley on the Entada phaseoloides door frame 5 is the 5-5 assembly pulley, and effectively working rope is 10; The 3rd step was installed the traction rigging at river truss 1 front end of crossing that assembles, and the rear end is installed and hung the pygochord tool, and the bottom is provided with rolling bar 2; The traction wire rope pulley group 4 of the 4th step with opposite bank Entada phaseoloides door frame 5 was hooked on the traction rigging hook of river truss 1 front end, the slide tail is hung over hanging on the pygochord tool of rear end installation, start the traction power-equipment of portal frame 5 on opposite bank and the slide tail equipment of afterbody simultaneously, to cross river truss 1 straight line parallel traction and cross the river, cross in the process in river at traction, the power-equipment of traction and slide tail will be kept strokes, traction speed will be stablized, and the front end of crossing river truss 1 will prevent nose, the phenomenon of sticking up tail and swinging in running; The 5th step, having served as the river truss was pulled behind the river, the truss that adopts rolling bar will cross the river moves laterally to and reaches vertical lifting position, do not pressed for the both sides of the man-made island built and to stride by truss, riverbank by bowlder stone 7 or clump to be set on the both sides of man-made island, utilize the vertical lifting device 3 that sets in advance on bridge pier that truss lifting is in place at last.

Claims (2)

1. cross the construction technology that river truss suspention is crossed over for one kind, it is characterized in that: the present invention is undertaken by following construction technology step:
The first step is built man-made island in one side two sides in the bridge pier upstream;
Second step was assembled the river truss on man-made island, build portal frame on another bank man-made island, and assembly pulley and power-equipment are installed;
The 3rd step was crossing river truss front end installation traction rigging, and the rear end is installed and hung the pygochord tool, and the bottom is provided with rolling bar;
The traction wire rope pulley group of the 4th step with opposite bank Entada phaseoloides door frame was hooked on the traction rigging hook of river truss front end, the slide tail is hung over hanging on the pygochord tool of rear end installation, start the traction power-equipment of opposite bank portal frame and the slide tail equipment of afterbody then simultaneously;
The 5th went on foot the river truss was pulled behind the river, and the truss that will cross the river by rolling bar moves laterally to the position of vertical lifting, and is with the vertical lifting device on the bridge pier that truss lifting is in place at last.
2. a kind of construction technology that river truss suspention is crossed over of crossing according to claim 1, its spy is: the assembly pulley that is provided with on the described portal frame is the 5-5 assembly pulley, effectively working rope is 10.
CNB2004100407090A 2004-09-20 2004-09-20 Construction technology of suspensing truss crossing river Expired - Fee Related CN1333136C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100407090A CN1333136C (en) 2004-09-20 2004-09-20 Construction technology of suspensing truss crossing river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100407090A CN1333136C (en) 2004-09-20 2004-09-20 Construction technology of suspensing truss crossing river

Publications (2)

Publication Number Publication Date
CN1598154A CN1598154A (en) 2005-03-23
CN1333136C true CN1333136C (en) 2007-08-22

Family

ID=34664760

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100407090A Expired - Fee Related CN1333136C (en) 2004-09-20 2004-09-20 Construction technology of suspensing truss crossing river

Country Status (1)

Country Link
CN (1) CN1333136C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852339A (en) * 2012-10-16 2013-01-02 中国十七冶集团有限公司 River-crossing member hanging method
CN104195948B (en) * 2014-08-12 2016-04-06 中国十七冶集团有限公司 Bridge suspension pipe pushing installation construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01210510A (en) * 1988-02-18 1989-08-24 Shinko Kosen Kogyo Kk Method of installation construction of structure such as bridge
CN2150185Y (en) * 1993-01-19 1993-12-22 山西省电力公司电力建设三公司 Attached lifting front-frame for constructing concrete cylinder

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01210510A (en) * 1988-02-18 1989-08-24 Shinko Kosen Kogyo Kk Method of installation construction of structure such as bridge
CN2150185Y (en) * 1993-01-19 1993-12-22 山西省电力公司电力建设三公司 Attached lifting front-frame for constructing concrete cylinder

Also Published As

Publication number Publication date
CN1598154A (en) 2005-03-23

Similar Documents

Publication Publication Date Title
CN104746437A (en) Self-anchoring type mounting method of suspension bridge
CN103669216A (en) Steel box girder scattered-splicing sliding device and installation method
CN104480865B (en) A kind of Large Steel open caisson accurate positioning method
CN106192755A (en) A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation
CN101392501A (en) Erection method for wide span steel box bridge
CN102878007A (en) (Ultra-large) hydroelectric power plant
CN101078211A (en) Underwater anchorage system auxiliary wooden stool structure platform and construction method thereof
CN107761738B (en) The mask gabion string bag is without throwing construction method of colliding with
CN201102544Y (en) Hanging train traffic system of hanging rail
CN1333136C (en) Construction technology of suspensing truss crossing river
CN101913534B (en) Fixed double-suspending point cantilever track type purlin suspender
CN201411630Y (en) Bridge hydraulic pressure automatic adjusting mechanism for asymmetrical sedimentation ground
CN209798721U (en) Bridge-rail ferry device for crossing river in canal
CN104002936B (en) A kind of shoal, strand drilling platform
CN209836981U (en) Lower suspension bridge crossing device for crossing river in canal
CN113585343B (en) Cable-stayed suspension tunnel with cable flow pier and construction method thereof
CN204802032U (en) Transportation by driving ship that transportation by driving was turned and is erect steel longeron
CN210529503U (en) Positioning device for beam-transporting ship of suspension bridge
CN201746247U (en) Fixed double hoisting cantilever rail girder hanger
CN211898417U (en) Construction structure based on cutter-suction type ground is wall local to replace campshed and is strutted
CN203361176U (en) Vertical rotation connection structure
CN206887644U (en) A kind of medium-and low-speed maglev single line beam job platform and edge protection device
CN202865794U (en) Reciprocating moving type riverway dredging device
CN106256964A (en) Multipurpose over-water platform
CN109914374A (en) The bridge rail ferryboat device in river is crossed in Canal Waterway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA PETROLEUM GROUP CHUANQING DRILLING ENGINEER

Free format text: FORMER OWNER: SICHUAN PETROLEUM ADMINISTRATION

Effective date: 20081017

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081017

Address after: The 1 section of No. 3 company Chuanqing drilling technology information office overlooking the green road in Chengdu city of Sichuan Province

Patentee after: Chuanqing Drilling Engineering Co., Ltd. of China National Petroleum Corporation

Address before: Sichuan Petroleum Administration Bureau No.1 Bridge, Chengdu, Sichuan

Patentee before: Sichuan Petroleum Administration

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070822

Termination date: 20170920