CN1598154A - Construction technology of suspensing truss crossing river - Google Patents

Construction technology of suspensing truss crossing river Download PDF

Info

Publication number
CN1598154A
CN1598154A CN 200410040709 CN200410040709A CN1598154A CN 1598154 A CN1598154 A CN 1598154A CN 200410040709 CN200410040709 CN 200410040709 CN 200410040709 A CN200410040709 A CN 200410040709A CN 1598154 A CN1598154 A CN 1598154A
Authority
CN
China
Prior art keywords
river
truss
cross
construction technology
traction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200410040709
Other languages
Chinese (zh)
Other versions
CN1333136C (en
Inventor
廖扬忠
杨胜金
邓永蛟
李卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Sichuan Petroleum Administration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Petroleum Administration Bureau filed Critical Sichuan Petroleum Administration Bureau
Priority to CNB2004100407090A priority Critical patent/CN1333136C/en
Publication of CN1598154A publication Critical patent/CN1598154A/en
Application granted granted Critical
Publication of CN1333136C publication Critical patent/CN1333136C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A suspension crossover construction technology of cross-river truss. It uses in the construction of cross-river pipe-line belongs to process engineering field of petroleum natural gas pipe-line cross-river crossover construction. The invention builds manmade islands at the both sides of the river, and constructs cross-river truss which is straightly towed across the river by the gantry frame on the other side. And it arrives at the vertically derricking up location after cross movement. Then, the truss would be equipped onto the pier by the gantry frame. The invention needs not large barge and barge crane. Because straightly towed across the river, the cross-river truss would not drop into river because of vibrating.

Description

Cross the construction technology that river truss suspention is crossed over
Technical field: a kind of construction technology of crossing river truss suspention leap, be used for the construction that the large-scale petroleum natural gas is crossed the river pipeline, belong to petroleum natural gas pipeline and cross the large-scale leap construction technology technology field of crossing the river truss of river leap construction.
Background technology: in the construction project of petroleum gas long-distance transport pipes, each bar pipeline all can run into the engineering that the rivers pipeline is crossed over, therefore all to carry out the leap construction of river truss, narrow and the not anxious more or less freely solution in river of current of river surface, the river of crossing of multispan trussed construction is different from the suspension cable leap, when running into great rivers, the leap construction of crossing the river truss is just relatively more difficult, the construction technology of using mainly contains at present: the cabling construction technology, this construction technology need be made cabling Sarasota and gravity earth anchor by oneself, the opposite bank transportation condition is bad crossing over, and when not having available Sarasota and anchoring pier, is unfavorable for problems such as entering of main equipment with regard to existence; Transportation by driving technology: this technology can solve the difficult problem that the truss that crosses the river sends, but needs large vessel and have the primary condition of the crane barge of suitable crane capacity, and erects the vertical lifting portal frame on the water and also be difficult to realize; Trestle adds the technology of vertical lifting: to be the truss that will make on the bank be transported in the water between two bridge piers along the trestle that sets up this technology, in place with the vertical lifting of hanging device that is erected in advance on the bridge pier then, but a difficult problem is to set up supporting capacity to reach required tonnage and can resist the trestle that flood impacts and need great deal of steel, and being provided with of trestle supporting pile needs barge container to cooperate, and also has the navigation problem that influences.
The objective of the invention is the problem that exists according to above-mentioned prior art, adopt two sides to build a dam, made river truss scheme in place step by step, design a kind of river truss straight line of will crossing and be pulled through Jiang Houzai and vertically hang the construction technology of crossing river truss suspention leap that puts in place.
Summary of the invention: technology of the present invention is divided into several steps and carries out: fixing bridge pier, man-made island is built in the rivers two sides that need to cross over, in order not influence navigation, keep unimpeded between two bridge piers of main channel, assembled the river truss at a bank in river then, build truss traction Entada phaseoloides door frame at another bank in river, and installation traction power-equipment and cable wire, then, the Entada phaseoloides door frame straight line parallel traction that the river truss excessively that will assemble is earlier set up by the opposite bank is crossed the river, after laterally moving, arrive vertical lifting position, by being arranged on the straddle truck of crossing on the bridge pier truss is lifted on the bridge pier at last; Advantage of the present invention is: owing to be to assemble the river truss on man-made island, and will cross the river truss by the traction Entada phaseoloides door frame straight line that sets up specially and drag the river to go, so do not need barge container and crane barge, simultaneously owing to be that the straight line parallel traction is crossed the river, so, when crossing the river, cross the river truss and can not fall into danger in the river because of swing cause the river truss too greatly.
Marginal data:
Fig. 1 crosses river step schematic diagram for the present invention.
Specific implementation method: provide most preferred embodiment of the present invention below in conjunction with accompanying drawing: this large-scale leap construction technology of crossing the river truss is carried out according to the following steps, the first step is built man-made island 6 in the rivers two sides that upstream one side of fixing bridge pier need be crossed over, in order not influence navigation, the riverbed 8 between two bridge piers of main channel keeps unimpeded; Second step was assembled river truss 1 on the man-made island 6 that constructs, building the traction truss simultaneously on another bank man-made island in river crosses the portal frame 5 in river and traction power-equipment and cable wire is installed, assembly pulley on the Entada phaseoloides door frame 5 is the 5-5 assembly pulley, and effectively working rope is 10; The 3rd step was installed the traction rigging at river truss 1 front end of crossing that assembles, and the rear end is installed and hung the pygochord tool, and the bottom is provided with rolling bar 2; The traction wire rope pulley group 4 of the 4th step with opposite bank Entada phaseoloides door frame 5 was hooked on the traction rigging hook of river truss 1 front end, the slide tail is hung over hanging on the pygochord tool of rear end installation, start the traction power-equipment of portal frame 5 on opposite bank and the slide tail equipment of afterbody simultaneously, to cross river truss 1 straight line parallel traction and cross the river, cross in the process in river at traction, the power-equipment of traction and slide tail will be kept strokes, traction speed will be stablized, and the front end of crossing river truss 1 will prevent nose, the phenomenon of sticking up tail and swinging in running; The 5th step, having served as the river truss was pulled behind the river, the truss that adopts rolling bar will cross the river moves laterally to and reaches vertical lifting position, do not pressed for the both sides of the man-made island built and to stride by truss, riverbank by bowlder stone 7 or clump to be set on the both sides of man-made island, utilize the vertical lifting device 3 that sets in advance on bridge pier that truss lifting is in place at last.

Claims (2)

1. cross the construction technology that river truss suspention is crossed over for one kind, it is characterized in that: the present invention is undertaken by following construction technology step:
The first step is built man-made island in one side two sides in the bridge pier upstream;
Second step was assembled the river truss on man-made island, build portal frame on another bank man-made island, and assembly pulley and power-equipment are installed;
The 3rd step was crossing river truss front end installation traction rigging, and the rear end is installed and hung the pygochord tool, and the bottom is provided with rolling bar;
The 4th step hung over the traction rigging that the traction wire rope pulley group of opposite bank Entada phaseoloides door frame was hooked on river truss front end, the slide tail is hung over hanging on the pygochord tool of rear end installation, start the traction power-equipment of opposite bank portal frame and the slide tail equipment of afterbody then simultaneously;
The 5th went on foot the river truss was pulled behind the river, and the truss that will cross the river by rolling bar moves laterally to the position of vertical lifting, and is with the vertical lifting device on the bridge pier that truss lifting is in place at last.
2. a kind of large-scale leap construction technology of crossing the river truss according to claim 1, its spy is: the assembly pulley of the setting on the described portal frame is the 5-5 assembly pulley, effectively working rope is 10.
CNB2004100407090A 2004-09-20 2004-09-20 Construction technology of suspensing truss crossing river Expired - Fee Related CN1333136C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2004100407090A CN1333136C (en) 2004-09-20 2004-09-20 Construction technology of suspensing truss crossing river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2004100407090A CN1333136C (en) 2004-09-20 2004-09-20 Construction technology of suspensing truss crossing river

Publications (2)

Publication Number Publication Date
CN1598154A true CN1598154A (en) 2005-03-23
CN1333136C CN1333136C (en) 2007-08-22

Family

ID=34664760

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2004100407090A Expired - Fee Related CN1333136C (en) 2004-09-20 2004-09-20 Construction technology of suspensing truss crossing river

Country Status (1)

Country Link
CN (1) CN1333136C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852339A (en) * 2012-10-16 2013-01-02 中国十七冶集团有限公司 River-crossing member hanging method
CN104195948A (en) * 2014-08-12 2014-12-10 中国十七冶集团有限公司 Bridge hanging pipeline pushing installation and construction method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2578152B2 (en) * 1988-02-18 1997-02-05 神鋼鋼線工業株式会社 Construction method for bridges and other structures
CN2150185Y (en) * 1993-01-19 1993-12-22 山西省电力公司电力建设三公司 Attached lifting front-frame for constructing concrete cylinder

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852339A (en) * 2012-10-16 2013-01-02 中国十七冶集团有限公司 River-crossing member hanging method
CN104195948A (en) * 2014-08-12 2014-12-10 中国十七冶集团有限公司 Bridge hanging pipeline pushing installation and construction method
CN104195948B (en) * 2014-08-12 2016-04-06 中国十七冶集团有限公司 Bridge suspension pipe pushing installation construction method

Also Published As

Publication number Publication date
CN1333136C (en) 2007-08-22

Similar Documents

Publication Publication Date Title
CN101418543B (en) Self-anchored rope-suspension bridge inclined drawing construction method
CN103669216A (en) Steel box girder scattered-splicing sliding device and installation method
CN104746437B (en) A kind of self-anchored suspension bridge installation method
CN103088750A (en) Especial-big span suspension bridge of uniparted hyperboloid space rope net main cable and construction method thereof
CN101392501A (en) Erection method for wide span steel box bridge
CN103123016B (en) Construction method for laying gas pipelines along bridge
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN106192755A (en) A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation
CN101509229B (en) Shelf beam support -free construction method for edge span beam section of large-span steel case beam stayed-cable bridge
CN201102544Y (en) Hanging train traffic system of hanging rail
CN109972623A (en) A kind of construction method and device carrying out pipeline suspension using Bailey beam
CN107761568B (en) A kind of steel structure bridge installation method using air bag carrying
JP2009127317A (en) Bridge construction apparatus
CN101913534B (en) Fixed double-suspending point cantilever track type purlin suspender
CN201411630Y (en) Bridge hydraulic pressure automatic adjusting mechanism for asymmetrical sedimentation ground
CN1333136C (en) Construction technology of suspensing truss crossing river
CN209798721U (en) Bridge-rail ferry device for crossing river in canal
CN102061681B (en) Fixed dual-hoisting point cantilever track type joist truss installing method
CN202090349U (en) Device for removing square pile
CN206887644U (en) A kind of medium-and low-speed maglev single line beam job platform and edge protection device
CN102409623B (en) Floating bridge removing method
CN205907586U (en) Device of concrete is carried in wide riverway water facial height platform
CN209836981U (en) Lower suspension bridge crossing device for crossing river in canal
CN108018778A (en) The cat road rope in navigable waters does not set up trailer system and cat road rope fast erecting method
CN201746247U (en) Fixed double hoisting cantilever rail girder hanger

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA PETROLEUM GROUP CHUANQING DRILLING ENGINEER

Free format text: FORMER OWNER: SICHUAN PETROLEUM ADMINISTRATION

Effective date: 20081017

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081017

Address after: The 1 section of No. 3 company Chuanqing drilling technology information office overlooking the green road in Chengdu city of Sichuan Province

Patentee after: CNPC CHUANQING DRILLING ENGINEERING Co.,Ltd.

Address before: Sichuan Petroleum Administration Bureau No.1 Bridge, Chengdu, Sichuan

Patentee before: Sichuan Petroleum Administration

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070822

Termination date: 20170920

CF01 Termination of patent right due to non-payment of annual fee