CN1330186A CN 01113927 CN01113927A CN1330186A CN 1330186 A CN1330186 A CN 1330186A CN 01113927 CN01113927 CN 01113927 CN 01113927 A CN01113927 A CN 01113927A CN 1330186 A CN1330186 A CN 1330186A
Authority
CN
China
Prior art keywords
water
layer
playground
adopts
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 01113927
Other languages
Chinese (zh)
Inventor
邵龙潭
祝艳凤
娄启倞
单宗岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CN 01113927 priority Critical patent/CN1330186A/en
Publication of CN1330186A publication Critical patent/CN1330186A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

A sports field without dust fly is composed of surface layer, water-filtering layer made of sand, cobble, or earthwork cloth, water-bearing layer made up of cobble, broken rock, cinder, or high-porosity water-permeable material, impervious layer made of earthwork film, clay, asphalt concrete, or plastic film, and water supply and drainage ditches at one side or periphery of said sports field.

Description

Sports field without dust fly
The present invention relates to native playground earth construction, particularly can prevent the playground surface layer structure of ground dust storm airborne dust.
At present, ground, known native playground surface layer is to adopt clay, slag and the composite tabia making of quicklime, simplification also can directly adopt sandy loam or clay making.The bottom of surface layer is a macadam, plays the effect of drainage and anti-freeze expansion.That simplifies also can not establish macadam.Therefore, the earth construction on conventional native playground is made up of macadam and tabia.This native playground is laid easy, and required expense is less, but a very important shortcoming is serious at dry and rainless dust from land surface in season, and ground stirs up a cloud of dust when wind is big, and the student moves on the playground and also can raise a huge cloud of dust in the time of even without wind.Particularly in the season in spring and autumn of northern China, the dust from land surface personnel that make in playground are difficult to admission, influence the use on playground.When rainy season, because of rainwater is too big, native playground is muddy to can't bear, and can not use.Adopt the playground of plastic coat or artificial grass surface layer can solve the dust from land surface problem, but expense is very high, is difficult at present popularize; Adopt natural sod ground also can solve the airborne dust problem, because can not full-time opening,, move maintenance costs simultaneously again also than higher so be not suitable for student movement.Adopt the method for surface watering, when the watering amount more after a little while, it is very short that the moistening time is kept on ground, can not really solve the airborne dust problem; When the watering amount more for a long time because the soil layer seepage velocity is very slow, tend to cause water loss at ground surface.Excessive trickle can make ground, playground mire, makes the personnel can not the admission activity.On the other hand, part moisture can be lost in the air in the watering process, and surface evaporation speed can cause the waste of water resource also than comparatively fast.Test shows that also the top layer watering can cause soil layer loose, easier airborne dust after drying.In the surface layer of playground, lay equipment of sprinkler irrigation, can realize control watering automatically, but have the problems referred to above equally.
The purpose of this invention is to provide a kind of problem that can effectively solve the playground dust from land surface, water-saving, operation maintenance are easy, the sports field without dust fly that ground is not muddy.
The object of the present invention is achieved like this, and ground, playground is made of surface layer, drainage layer, water storage layer and impervious barrier and water supply and draining ditch.Be surface layer topmost, surface layer according to the earth material situation of locality can be with tabia, be stained with, making on loam or the sandy loam; Be the drainage layer below the surface layer, the drainage layer can adopt sandy gravel to lay by artificial loaded filter requirement in the hydraulic engineering, also can directly adopt geotextiles, and its effect is that the soil body of surface layer and water storage layer are isolated, and prevents that the water storage layer is silted up; The water storage layer can adopt cobble, evenly rubble, slag or other macroporosity seepy material of grating are laid, and the rubble diameter is 10~30mm, and its effect is water and can makes water be easy to flow to replenish the water source; Be impervious barrier below the water storage layer, its effect is that to prevent that water in the water storage layer is penetrated into underground, and impervious barrier can adopt geomembrane or composite geo-membrane, clay, bituminous concrete or plastic film material to lay.For the permeability that keeps soil layer below the impervious barrier with prevent that geomembrane etc. is punctured, and also can lay certain thickness layer of sand or flyash under impervious barrier.
Advantage of the present invention is: owing to be based on the soil suction characteristic, make moisture rise to the surface layer soil body from the water storage layer, so moisture distribution is very even, under the condition of the porosity of controlling the thickness of the layer and the soil body prevailingly, water supply water surface elevation and output, can guarantee neither muddy, the also airborne dust not of layer of ground soil.Because from the bottom suction, can not destroy the surface soil structure, during local area water of while (as rainfall), the water in the surface layer can also enter the water storage layer by the drainage layer and also can be got rid of by irrigation canals and ditches that supply water or water pipe.Preliminary test shows: in the spring of China the Northeast, a water storage can be kept two weeks or longer time airborne dust not.Simultaneously because the deck that increases newly has drainage and drain function, so can also cancel macadam.
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is a playground of the present invention earth construction sectional drawing.
Fig. 2 is the I-I sectional view of Fig. 1.
Fig. 3 is the local enlarged diagram that indicates the position among Fig. 1.
The sports field without dust fly earth construction as shown in Figure 1, Figure 2, Figure 3 and Figure 4. Playground periphery or certain Side is established the gutter, establishes in the gutter 6 for ditch 9, adopts for ditch and ground, playground water storage layer 3 sides adjacent With permeable barricade 8, will separate for ditch and water storage layer, guarantee that simultaneously water can be easy to see through barricade and annotate Enter the water storage layer. Base plate and 4 airtight connections of ground, playground impervious barrier for the ditch. Connect water supply for the ditch System, water supply can be adopted rainwater or the treated urban water of underground water, collection. For the ditch Opposite side be waterproof barricade 10, waterproof wall height can be in order to control at the water storage layer more than 3 Feed water level regulation processed makes on the highest height that remains on waterproof barricade of level of ground water in the water storage layer. When To in the ditch during water-filling, water can very fast inflow water storage layer, surpasses the height of waterproof barricade when water level When spending, will automatic overflow enter the gutter 6 in the outside for the water in the ditch, discharge pipe line is passed through in the gutter Insert sewerage system 7. Therefore drainage layer 2 and water storage layer also have drainage during rainfall, thereby Can very fast admission after the assurance rainfall. On the ditch, be provided with permeable cover plate 11.
The design content of playground of the present invention earth construction comprises: (1) is by testing the physical force of conventional soil Learn the test of attribute testing and soil moisture characteristic, reasonably determine thickness, the earth material of surface layer grating, Compacted density and porosity; (2) design drainage layer, water storage layer and impervious barrier are according to the actual feelings at scene Condition is determined each layer material therefor. When selecting geomembrane as impervious barrier, optionally can select a cloth The compound upper worker's film of one film or two cloth, one film is wanted the tension of verification geomembrane and resists to puncture intensity during construction, When the drainage layer uses upper worker's cloth, can select the lower geotextiles of mass area ratio with joint as far as possible The investment-saving, but verification tensile strength and the anti-intensity that punctures also wanted when constructing; (3) design playground periphery supplies Drainage system.
Embodiment 1
Playground surface layer 1 adopts three to close, and drainage layer 2 adopts worker's cloth on the long fibre nonwoven, and water storage layer 3 adopts thick slag, and impervious barrier 4 adopts compound worker's film, the following laying layer of sand of last worker's film gone up.
Embodiment 2
Playground surface layer 1 adopts clay, and drainage layer 2 adopts the long fibre nonwoven geotextiles, and water storage layer 3 adopts rubble, and the rubble diameter is about 20mm, and impervious barrier 4 adopts argillic horizon.
Embodiment 3
Playground surface layer 1 adopts tabia, and drainage layer 2 adopts the ore deposit cobble to lay by artificial loaded filter, and water storage layer 3 adopts cobble, and impervious barrier 4 adopts thickening plastic sheeting, the top and following fine coal grieshoch 5 that all is covered with of plastic sheeting.
When making by the water supply ditch in the water storage layer behind the water-filling, the water under capillarity in the water storage layer can see through the ground motion of drainage course, makes the playground surface layer moistening.The water content of surface layer reduces from bottom to top gradually, to the ground surface minimum.The thickness of control surface layer, the water surface elevation of feedwater and confluent be the moistening degree of water content of face soil controllably.Impervious barrier has guaranteed that water can be to following infiltration.Test shows, moistening can the keeping the long period of once feeding water.

Claims (2)

1, sports field without dust fly, by surface layer, the drainage layer, the water storage layer, impervious barrier and water supply and draining ditch constitute, it is characterized in that: be surface layer [1] above the drainage layer [2], drainage layer [2] adopts sandy gravel or geotextiles, water storage layer [3] adopts cobble, the rubble of even grating, slag or macroporosity seepy material are laid, impervious barrier [4] adopts geomembrane or composite geo-membrane, clay, bituminous concrete or plastic film material are laid, establish gutter [6] at playground periphery or certain side, in the gutter, establish water supply ditch [9], the sides adjacent on water supply ditch and ground, playground adopts permeable barricade [8], opposite side is highly controlled water level with waterproof abutment wall [10] with it.
2, sports field without dust fly according to claim 1 is characterized in that: playground periphery or certain side are established and are supplied water and drainage system [7].
CN 01113927 2001-04-29 2001-04-29 Sports field without dust fly Pending CN1330186A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01113927 CN1330186A (en) 2001-04-29 2001-04-29 Sports field without dust fly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01113927 CN1330186A (en) 2001-04-29 2001-04-29 Sports field without dust fly

Publications (1)

Publication Number Publication Date
CN1330186A true CN1330186A (en) 2002-01-09

Family

ID=4660622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01113927 Pending CN1330186A (en) 2001-04-29 2001-04-29 Sports field without dust fly

Country Status (1)

Country Link
CN (1) CN1330186A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100336978C (en) * 2002-12-30 2007-09-12 张汝栋 Temperature reducing type artificial turf foundation and its constructing method
CN100419163C (en) * 2006-07-24 2008-09-17 李镇维 Structural layer for playground track and materials used for track pavings
CN105133459A (en) * 2015-09-25 2015-12-09 潍坊友容实业有限公司 Geology granular composition capable of preventing ground waterlogging and manufacturing method thereof
CN105350419A (en) * 2015-09-25 2016-02-24 潍坊友容实业有限公司 Geological grading for improving water content and manufacturing method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100336978C (en) * 2002-12-30 2007-09-12 张汝栋 Temperature reducing type artificial turf foundation and its constructing method
CN100419163C (en) * 2006-07-24 2008-09-17 李镇维 Structural layer for playground track and materials used for track pavings
CN105133459A (en) * 2015-09-25 2015-12-09 潍坊友容实业有限公司 Geology granular composition capable of preventing ground waterlogging and manufacturing method thereof
CN105350419A (en) * 2015-09-25 2016-02-24 潍坊友容实业有限公司 Geological grading for improving water content and manufacturing method
CN105350419B (en) * 2015-09-25 2018-08-24 潍坊友容实业有限公司 A kind of geology grading layer that can improve moisture content and its manufacturing method

Similar Documents

Publication Publication Date Title
CN106869237B (en) A kind of gardens rainwater-collecting water storage system and its construction method
CN207793788U (en) A kind of porous pavement rain infiltration structure
CN106759825A (en) A kind of construction method of sponge urban green space water storage system
CN206752614U (en) A kind of sponge-type road sinks formula afforests dividing strip Rainwater collection system
CN109763393A (en) A kind of gardens sponge-type road pavement structure and its construction method
CN207700330U (en) A kind of concave herbaceous field grass-planting ecological ditch
CN104695298A (en) Complete permeable compound type road surface structure
CN207228292U (en) One kind omits water system in printing slowly after first catchmenting
CN208501715U (en) A kind of Rain Garden
CN1330186A (en) Sports field without dust fly
CN207793792U (en) A kind of road surface permeable pavement structure
CN208362838U (en) A kind of porous pavement
JP2802282B2 (en) Rechargeable storage facility
CN109618884A (en) A kind of phreatic water seepage flow catchments hidden pipe structure
CN107558587A (en) One kind omits water system in printing slowly after first catchmenting
CN109056897A (en) Radial pattern rain-water accumulating releases seepage well system
KR100352143B1 (en) Planting belts construction method for street trees
CN214301528U (en) Sponge transformation system for urban river retaining wall
CN213417454U (en) Permeable pavement
CN104145673A (en) Integrated green belt system based on flood drainage and water conservation and flood drainage and water conservation method
CN204589747U (en) A kind of water permeability composite pavement structure completely
CN208266930U (en) The shed deckhead waterproof construction of sponge urban design
CN208152219U (en) A kind of dry depression for sponge city
CN209227664U (en) Radial pattern rain-water accumulating releases seepage well system
CN206941335U (en) A kind of road for storing rainwater

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication