CN1313349C - 建筑施工期间装设电梯的方法和设备 - Google Patents
建筑施工期间装设电梯的方法和设备 Download PDFInfo
- Publication number
- CN1313349C CN1313349C CNB200380100880XA CN200380100880A CN1313349C CN 1313349 C CN1313349 C CN 1313349C CN B200380100880X A CNB200380100880X A CN B200380100880XA CN 200380100880 A CN200380100880 A CN 200380100880A CN 1313349 C CN1313349 C CN 1313349C
- Authority
- CN
- China
- Prior art keywords
- machine room
- elevator
- guide rail
- construction
- bont
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 238000000034 method Methods 0.000 title claims abstract description 21
- 101100272852 Clostridium botulinum (strain Langeland / NCTC 10281 / Type F) F gene Proteins 0.000 claims description 10
- 230000001737 promoting effect Effects 0.000 claims description 4
- 238000009434 installation Methods 0.000 description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 230000003111 delayed effect Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000005286 illumination Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Types And Forms Of Lifts (AREA)
- Blast Furnaces (AREA)
Abstract
本发明涉及一种用于在建筑物施工阶段装设配有机房并由各提升绳索悬吊和沿着各导轨移动的电梯的方法。电梯配有提升驱动装置,借助于它,起始安放在电梯竖井下部中的机房在竖井中一次被提升起经过一或多个层与层间距离,其方式是,至少由于提升起而造成的铅直力量基本上经由已经固牢的各导轨被传送给建筑物的底部结构。本发明涉及一种设备,用于在施工阶段期间在建筑中装设配有机房和提升绳索并沿着导轨移动的电梯,所述设备包括至少一部提升装置,用来提升暂时安放在电梯竖井之中的机房,其特征在于,提升装置连接于已经装设在电梯中的各导轨,使得至少由提升造成的铅直力经由各导轨被传递给建筑物的底部结构。
Description
技术领域
本发明涉及一种在建筑施工期间装设电梯的方法并涉及一种设备,用于在建筑施工期间装设电梯。
背景技术
在高层建筑中,在建筑完工之前的施工阶段期间往往需要一些电梯。电梯需要比如供施工时期之用以允许施工人员利用电梯抵达建筑中尽可能高的高度。同样,当建筑的下面各层在上面各层之前完工时,电梯必须可供已经使用已完工各层的人们使用。随着施工作业不断进行,电梯必须能够为尽可能高的各楼层服务。
先前技术中的用于这种类型的施工时间期用的解决方案是所谓跃层提升,其中电梯的提升高度当施工作业相对于前次跃升已经抵达某一充分高度时每次分步增高一或多个楼层。电梯机房以上述楼层数被向上挪动,而所有依赖于于提升高度的部件,诸如轿厢电缆、超速调节器绳索和其他装在竖井中的各部件、竖井中的电气设备、竖井电缆、补偿绳索等等,都予以延伸以扩及整个已完工竖井的高度。
在先前技术中,除了其他诸项之外,机房利用建筑物自身的施工升降机予以提升。在此情况下的问题是,电梯装设依赖于施工升降机的使用。同时,建筑工地上别的地方可能需要施工升降机,在此情况下,升降机将在所需的时间上或在足够长的时间内无法获得使用。同样,可能很难得到机会利用施工升降机以供临时之需。
另一种用于装设电梯的先前技术中的解决方案披露在PCT技术说明书WO 00/07923号之中,其中,不是利用施工升降机,电梯机房通过利用一推力平台和提升液缸或对等装置而一次被抬升一高度。这种解决方案的问题是,推力平台和机房在施工时期固定于建筑的各楼层。由若干电梯构成的电梯组可能具有几千公斤的总重,对于仍然部分未完成的各楼层来说,这是过大而有风险的负荷。比如,四部电梯一组的各电梯之间的顶板是比较薄弱的而不能经受这种负荷。另一问题是,施工人员可能必须在各构件上做出额外的一些孔口以容放装设时期的各增强件。这种解决方案的再一问题是,机房一次只能被抬升一个层间距离,而这意味着每次提升作业总是包含同样一些附加的备用装置和准备工作,这样总共需要大量额外的施工时间。
发明内容
本发明的目的是,克服上述各项缺点而通过提供一种简易可行的经济而又可靠的在施工时期装设电梯的方法来促进和加速施工时期的电梯装设。另一目的是,提供一种能够在施工时期装设电梯的设备。
本发明用于施工时期装设电梯的方法,该方法用于在施工阶段期间在建筑中装设配有机房和提升绳索并沿着导轨移动的电梯,其特征在于,起初安放在电梯竖井下部的机房在竖井中一次被提升经过一或多个层间距离,使得至少由于提升而造成的铅直力经由已经固定的各导轨被传递给建筑的底部结构。
本发明涉及一种设备,用于在施工阶段期间在建筑中装设配有机房和提升绳索并沿着导轨移动的电梯,所述设备包括至少一部提升装置,用来提升暂时安放在电梯竖井之中的机房,其特征在于,提升装置连接于已经装设在电梯中的各导轨,使得至少由提升造成的铅直力经由各导轨被传递给建筑物的底部结构。
应用本发明,可以实现除了别的以外一或多项以下的优点:
电梯的装设可以开始于很早的施工阶段;
电梯机房和所有设备采用一种为电梯研制的单独的提升装置来予以提升;
建筑的施工升降机不需使用,从而其他施工作业不受干扰或不被延搁;
电梯装设不依赖于使用建筑吊车;
机房不需要支承在电梯竖井各竖井壁上或各中间楼层层板上;
机房、电梯轿厢和对重的所有或至少部分重量在电梯装设期间可以由各电梯导轨承担。
电梯装设不在各竖井壁和各中间楼层层板上造成额外的负荷;
不需要在建筑的各混凝土构件上做出额外的孔口和增强件用于电梯装设;
本发明能使运输能力和后勤利用至少四倍地优于先前技术中施工时期的电梯;
使施工人员与次级承包人节省时间并导致较快地完成建筑项目;
升降机房所需的工作量较少;
电梯装设时间缩短和总的装设成本降低;
装设环境比较安全;
完成的楼层在其完工之后很快地准备好用于正常的电梯作业;
可以较之以往更早地完成建筑的正面;
与先前技术中的方法相比能耗较低;
需要较小的建筑外部空间;
易于确立成为一种标准的装设方法。
附图说明
以下,本发明将参照附图借助于实施例详细地予以说明。
图1显示符合本发明的一种电梯装设状况的前视简图,其中电梯轿厢已经装设在基础楼层上;
图2显示符合本发明的一种电梯装设状况的前视简图,其中电梯轿厢已经被提升到第一层;
图3显示符合本发明的一种电梯装设状况的前视简图,其中一跃层提升已经进行而电梯轿厢已经被提升到第六层;以及
图4显示符合本发明的一种电梯装设的前视简图,其中一跃层提升已经进行各电梯提升绳索以及超速调节器绳索已经被装设在此高度处。
具体实施方式
按照本发明的方法,电梯装设过程的各主要步骤如下。在施工人员已经首先在竖井1中安装了可移动和防水的支承平台7之后一此平台固定于比如第五楼层的楼层层板,实际的电梯装设作业就开始了。首先,工作平台8和用于提升电梯各部件的一辅助升降机被固定于支承平台7。其次,工作平台8配有各滑瓦,借助于它们,工作平台由各电梯导轨予以导引。在此之后,在实际的第一装设阶段中,各电梯导轨2和各对重导轨—后者从附图中删去以便清晰,被固定于竖井1的下部。在此阶段期间,五根导杆被上下安装起来,其中最底下和最顶上的两导杆10短于具有相等长度的其他三根导杆。对于通常楼层高度,各导轨此时几乎延伸到第五楼层的高度。
在装设过程的第二阶段中,对重框架11、各楼层门以及竖井的照明和用电设施在此阶段装设至尽可能高的高度。在此实例中,设备装设至第五楼层的高度。
在装设的第三阶段中,为电梯机房4建造一临时框架,而机房连同曳引机5以及控制面板一起安装在此框架之中并安放在电梯的基础楼层上。同时,一超速调节器装设在机房之中,而用作提升装置的升降机17也是同样,借助升降机17进行随后的跃层提升。升降机的提升绳索18或等同物的各提升点借助于一种为此目的设计的专用的易于解脱的固紧构件19固定于各电梯导轨的上端。升降机17本身很好地固定于机房并用以借助于由各电梯导轨上端支承的提升绳索或等同物结合一次跃层提升而向上拉拽机房。如果工作平台8对于固紧构件19的运动是一种阻碍,它可以在进行跃层提升时被搬移到一适当的地方。
图1图示装设的第四阶段,其中机房4已经被提升到第二楼层的高度,而电梯轿厢3,通过建造一电梯轿厢框架并将电梯轿厢的壁部、顶板和地板各件彼此固紧并固紧于电梯轿厢框架,于竖井之中被装设在基础楼层上。在此阶段上,电梯轿厢的用电设施也可以进行配置。其次,电梯轿厢配以电梯门并完成电梯轿厢的精装。在此阶段上,电梯还配有至此仍盘卷在绳索卷筒上的提升绳索。与第四阶段相关联,电梯轿厢3也可以比如借助于各链条6连接于机房4以进行跃层提升。
在一如图2所示的第五阶段中,机房与电梯轿厢的组合借助于升降机17被向上提升经过一个层间距离并被固定于业已装设的各电梯导轨2。同样在此阶段上,各电梯导轨的当前最高的垫板(tie plate)被牢牢地固定就位。
在装设的第六阶段中,防水的支承平台7被向上升高五个楼层以便此后的跃层提升并固紧于楼层层板。装设过程此时通过在下一个五楼层段中安装所需的管系和电气设备以及各电梯导轨2、各对重导轨和各楼层门而予以继续。
在一如图3所示的第七阶段中,进行实际的跃层提升。电梯机房4连同电梯轿厢3一起被向上拉拽经过五个层间距离,电梯轿厢因而从第一层高度被提升到第六层高度。提升是借助于升降机17予以实现的,提升力由各电梯导轨2上端的各支承点予以承受。因而,由提升造成的负荷均匀地分布在各电梯导轨2上,使得提升并不在建筑的自身结构上,诸如壁部、中间楼层层板或电梯竖井壁上,产生任何应力。在跃层提升已经进行之后,机房与电梯轿厢的组合被均匀地固紧于业已装设的各电梯导轨2。此外,当前最高的各电梯导轨垫板再次被牢牢地固定就位。
图4图示装设的第八阶段,其中进行所需的绕绳。各电梯绳索13离开曳引机5的牵引绳轮并绕过电梯轿厢框架上的转向滑轮14而走向它们的固定点,而类似地,各对重绳索15绕过对重11框架上的转向滑轮16而走向它们的固定点。此外,还进行超速调节器绳索12的装设。在此阶段期间,电梯还通过添加所需重量于对重框架而使之平衡。此外,还装设所需的各种竖井部件和开关,因此,电梯准备好了在最下面六层范围内进行检测和运作。
在下一阶段中,防水的支承平台7再次被向上升高五个楼层用于此后的跃层提升并固定于楼层层板。装设过程此时以对应于上述阶段6-8的方式对向上的下一个五层予以继续。装设作业以每次五层的迁移用这种方法进行下去,使得电梯随着施工作业的进展而准备好在建筑中向上越来越高的各个高度上从事运作。
对于本技术领域中的熟练人员来说,显然的是,本发明的各不同实施例并不限于上述的实例,而是它们可以在下面提出的各项权利要求的范畴之内予以变更。按照上述各实例,熟练人员可以比如通过采用一次跃层提升距离不是所述五个楼层距离来改变本发明的一项实施例。视情况而定,对等于楼层高度的任何距离都可以是最适当的距离。因此,可以提出1-8个之间,而适当地比如3-7个之间或4-6个之间的所有层间距离。
对于熟练人员来说显然的是,可以改变装设方法以及作业方法各不同细节的顺序。同样,用于升降机房的升降机的使用和模式或运作,可以不同于以上说明。
Claims (9)
1.一种方法,用于在施工阶段期间在建筑中装设配有机房和提升绳索(15)并沿着导轨(12)移动的电梯,其特征在于,起初安放在电梯竖井(1)下部的机房(4)在竖井中一次被提升经过一或多个层间距离,使得至少由于提升而造成的铅直力经由已经固定的各导轨(2)被传递给建筑的底部结构。
2.按照权利要求1所述的方法,其特征在于,与机房(4)的升降相关联,装在机房(4)上的提升装置(17)经由提升绳索(18)被连接于由各电梯导轨(2)的上端予以支承的固紧构件(19)。
3.按照权利要求1或2所述的方法,其特征在于,与机房(4)的提升相结合,临时连接于机房的电梯轿厢(3)同时被向上提升经过相应的距离。
4.按照权利要求1或2所述的方法,其特征在于,机房(4)和电梯轿厢(3)一次被提升经过对应于1-8个层间距离,适当地3-7个层间距离,以及5个层间距离的距离。
5.按照权利要求1或2所述的方法,其特征在于,每次在机房(4)和电梯轿厢(3)被提升之后,机房和电梯轿厢被固紧于各导轨(2),从而提升装置(17)的固紧构件(19)被从各导轨(2)的上端解脱。
6.一种设备,用于在施工阶段期间在建筑中装设配有机房和提升绳索(15)并沿着导轨(2)移动的电梯,所述设备包括至少一部提升装置(17),用来提升暂时安放在电梯竖井之中的机房(4),其特征在于,提升装置(17)连接于已经装设在电梯中的各导轨(2),使得至少由提升造成的铅直力经由各导轨(2)被传递给建筑物的底部结构。
7.按照权利要求6所述的设备,其特征在于,提升装置(17)是一升降机,固定于机房(4)的一构件并经由提升绳索(18)连接于已经装设的各导轨(2)的上端。
8.按照权利要求6或7所述的设备,其特征在于,提升装置(17)借助于可解脱的固紧构件(19)连接于已经装设的各导轨(2)的上端,此构件设置用来将由提升造成的力均匀地分配在两条导轨(2)上。
9.按照权利要求6或7所述的设备,其特征在于,提升设备(17)的提升绳索(18)的长度配设成机房(4)可以一次提升经过至少1-8个层间距离。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FI20022122A FI114458B (fi) | 2002-12-02 | 2002-12-02 | Menetelmä ja laitteisto hissin asentamiseksi rakennuksen rakentamisvaiheessa |
FI20022122 | 2002-12-02 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1703367A CN1703367A (zh) | 2005-11-30 |
CN1313349C true CN1313349C (zh) | 2007-05-02 |
Family
ID=8565016
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB200380100880XA Expired - Lifetime CN1313349C (zh) | 2002-12-02 | 2003-11-26 | 建筑施工期间装设电梯的方法和设备 |
Country Status (9)
Country | Link |
---|---|
EP (1) | EP1583710B1 (zh) |
CN (1) | CN1313349C (zh) |
AT (1) | ATE385987T1 (zh) |
AU (1) | AU2003283459B2 (zh) |
DE (1) | DE60319143T2 (zh) |
ES (1) | ES2297237T3 (zh) |
FI (1) | FI114458B (zh) |
HK (1) | HK1080822A1 (zh) |
WO (1) | WO2004050526A1 (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11396442B2 (en) | 2020-05-09 | 2022-07-26 | Otis Elevator Company | Low cost roped jump lift concept |
Families Citing this family (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI20041044A (fi) | 2004-07-30 | 2006-02-08 | Kone Corp | Hissi |
FI117335B (fi) * | 2004-07-30 | 2006-09-15 | Kone Corp | Menetelmä hissin asentamiseksi ja hissi |
FI118335B (fi) | 2004-07-30 | 2007-10-15 | Kone Corp | Hissi |
SG132591A1 (en) | 2005-11-09 | 2007-06-28 | Inventio Ag | Method of constructing a lift installation, and lift installation for that purpose |
EP1785386A1 (de) * | 2005-11-09 | 2007-05-16 | Inventio Ag | Verfahren zum Aufbau einer Aufzuganlage und Aufzugsanlage hierfür |
FI118644B (fi) * | 2006-11-17 | 2008-01-31 | Kone Corp | Menetelmä ja laitteisto konehuoneettoman hissin asentamiseksi rakennuksen rakentamisvaiheessa |
FI20090085L (fi) * | 2009-03-06 | 2010-09-30 | Kone Corp | Hissijärjestely ja menetelmä |
FI20090134A (fi) * | 2009-04-06 | 2010-10-07 | Kone Corp | Hissijärjestely ja menetelmä |
FI121666B (fi) | 2009-05-28 | 2011-02-28 | Kone Corp | Menetelmä hissin nostoköysistön asentamiseksi |
FI20100223A0 (fi) * | 2010-05-28 | 2010-05-28 | Kone Corp | Menetelmä ja hissijärjestely |
FI20106273A (fi) * | 2010-12-01 | 2012-06-02 | Kone Corp | Hissijärjestely ja menetelmä |
CN102502378A (zh) * | 2011-11-15 | 2012-06-20 | 中建三局建设工程股份有限公司 | 建筑施工中的爬升式电梯 |
FI20116190L (fi) * | 2011-11-28 | 2013-05-29 | Kone Corp | Hissijärjestely ja menetelmä |
EP2636629B1 (en) * | 2012-03-06 | 2015-05-06 | KONE Corporation | A method and an elevator arrangement |
US9388020B2 (en) | 2012-03-06 | 2016-07-12 | Kone Corporation | Method and an elevator arrangement |
CN104340813B (zh) * | 2014-10-30 | 2016-09-14 | 中国建筑股份有限公司 | 一种电梯安装施工方法 |
EP3127847B1 (en) * | 2015-08-07 | 2017-12-20 | KONE Corporation | An arrangement and a method for measuring the position of an installation platform in an elevator shaft |
CN105668472A (zh) * | 2016-04-25 | 2016-06-15 | 上海爱登堡电梯(宜昌)有限公司 | 超高层建筑电梯的安装装置 |
DE102018208588A1 (de) * | 2018-05-30 | 2019-07-04 | Thyssenkrupp Ag | Installation einer Aufzugsanlage mit Linearmotor |
JP6813123B2 (ja) * | 2018-08-16 | 2021-01-13 | 三菱電機株式会社 | エレベーターの揚程延長技術の適用方法 |
WO2020081046A1 (en) * | 2018-10-15 | 2020-04-23 | Kone Corporation | Method and arrangement |
CN109436985A (zh) * | 2018-11-15 | 2019-03-08 | 上海建工建集团有限公司 | 一种用于提升电梯的模架及其施工方法 |
CN111302187B (zh) * | 2018-12-11 | 2022-09-27 | 奥的斯电梯公司 | 提升组件、跃层电梯和跃层方法 |
CN109592545B (zh) * | 2019-01-18 | 2024-10-15 | 通力电梯有限公司 | 用于跃层电梯的临时机房和跃层电梯 |
WO2021038629A1 (ja) * | 2019-08-23 | 2021-03-04 | 株式会社日立製作所 | 工事用エレベーター装置 |
CN110817661A (zh) * | 2019-10-22 | 2020-02-21 | 日立电梯(上海)有限公司 | 一种在构建时所用的电梯系统 |
EP3865448A1 (en) * | 2020-02-12 | 2021-08-18 | KONE Corporation | Method for constructing elevator |
US11383959B1 (en) * | 2021-02-03 | 2022-07-12 | Otis Elevator Company | Method for expanding a rise of an elevator hoistway |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3298462A (en) * | 1966-01-17 | 1967-01-17 | Beaver Advance Corp | Traction lift for scaffolding towers |
US3519101A (en) * | 1968-01-10 | 1970-07-07 | Otis Elevator Co | Construction elevator system |
US3759349A (en) * | 1972-03-13 | 1973-09-18 | Otis Elevator Co | Elevator system with temporary hoistway structure and method for use thereof |
JPH07237847A (ja) * | 1994-03-01 | 1995-09-12 | Otis Elevator Co | エレベーターの据付工法 |
CN2236477Y (zh) * | 1995-05-08 | 1996-10-02 | 大连第二建筑工程公司 | 高层散料提升机 |
-
2002
- 2002-12-02 FI FI20022122A patent/FI114458B/fi not_active IP Right Cessation
-
2003
- 2003-11-26 CN CNB200380100880XA patent/CN1313349C/zh not_active Expired - Lifetime
- 2003-11-26 WO PCT/FI2003/000903 patent/WO2004050526A1/en active IP Right Grant
- 2003-11-26 AT AT03775427T patent/ATE385987T1/de not_active IP Right Cessation
- 2003-11-26 DE DE60319143T patent/DE60319143T2/de not_active Expired - Lifetime
- 2003-11-26 ES ES03775427T patent/ES2297237T3/es not_active Expired - Lifetime
- 2003-11-26 AU AU2003283459A patent/AU2003283459B2/en not_active Ceased
- 2003-11-26 EP EP03775427A patent/EP1583710B1/en not_active Expired - Lifetime
-
2006
- 2006-01-19 HK HK06100872A patent/HK1080822A1/xx not_active IP Right Cessation
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3298462A (en) * | 1966-01-17 | 1967-01-17 | Beaver Advance Corp | Traction lift for scaffolding towers |
US3519101A (en) * | 1968-01-10 | 1970-07-07 | Otis Elevator Co | Construction elevator system |
US3759349A (en) * | 1972-03-13 | 1973-09-18 | Otis Elevator Co | Elevator system with temporary hoistway structure and method for use thereof |
JPH07237847A (ja) * | 1994-03-01 | 1995-09-12 | Otis Elevator Co | エレベーターの据付工法 |
CN2236477Y (zh) * | 1995-05-08 | 1996-10-02 | 大连第二建筑工程公司 | 高层散料提升机 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11396442B2 (en) | 2020-05-09 | 2022-07-26 | Otis Elevator Company | Low cost roped jump lift concept |
Also Published As
Publication number | Publication date |
---|---|
HK1080822A1 (en) | 2006-05-04 |
EP1583710A1 (en) | 2005-10-12 |
FI20022122A0 (fi) | 2002-12-02 |
ES2297237T3 (es) | 2008-05-01 |
FI114458B (fi) | 2004-10-29 |
EP1583710B1 (en) | 2008-02-13 |
AU2003283459A1 (en) | 2004-06-23 |
WO2004050526A1 (en) | 2004-06-17 |
DE60319143T2 (de) | 2008-05-21 |
ATE385987T1 (de) | 2008-03-15 |
AU2003283459B2 (en) | 2009-11-05 |
DE60319143D1 (de) | 2008-03-27 |
CN1703367A (zh) | 2005-11-30 |
FI20022122A (fi) | 2004-06-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1313349C (zh) | 建筑施工期间装设电梯的方法和设备 | |
US7635049B2 (en) | Method and apparatus for installing an elevator during the construction of a building | |
AU2019409113B2 (en) | Building site device having a climbing formwork and an elevator system | |
AU2010309661B2 (en) | Method in the manufacture of an elevator | |
CN1993290A (zh) | 电梯安装方法以及电梯 | |
US8291568B2 (en) | Method of installing an elevator | |
CN1236992C (zh) | 电梯结构装置 | |
CN114555509B (zh) | 在建筑物建造期间使用的自爬式电梯装置 | |
US9415974B2 (en) | Method and arrangement for moving a heavy load | |
US8720032B2 (en) | Method for installing the hoisting roping of an elevator | |
CN1256266C (zh) | 安装竖井设备的安装电梯和安装竖井设备的方法 | |
CN114555508B (zh) | 在建筑物建造期间使用的自爬式机房 | |
EP4039632A1 (en) | Method for expanding a rise of an elevator hoistway | |
CN118547591A (zh) | 一种四主缆悬索桥加劲梁的安装方法 | |
SU922255A1 (ru) | Устройство дл подъема перекрытий и этажей | |
JPH05201648A (ja) | エレベータの据付方法 | |
JPH09302936A (ja) | 建物の施工方法 | |
JPH0388684A (ja) | エレベータの据付工法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
REG | Reference to a national code |
Ref country code: HK Ref legal event code: DE Ref document number: 1080822 Country of ref document: HK |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20070502 |
|
CX01 | Expiry of patent term |