CN1273687C CN 200310118985 CN200310118985A CN1273687C CN 1273687 C CN1273687 C CN 1273687C CN 200310118985 CN200310118985 CN 200310118985 CN 200310118985 A CN200310118985 A CN 200310118985A CN 1273687 C CN1273687 C CN 1273687C
Authority
CN
China
Prior art keywords
loess
soil
collecting
face
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200310118985
Other languages
Chinese (zh)
Other versions
CN1546797A (en
Inventor
高建恩
吴普特
岳宝蓉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute Of Soil And Water Conservation Ministry Of Water Resources Chinese Academy Of Sciences
National Engineering Research Center Of Water Saving Irrigation Yangling
Northwest A&F University
Original Assignee
Institute Of Soil And Water Conservation Ministry Of Water Resources Chinese Academy Of Sciences
National Engineering Research Center Of Water Saving Irrigation Yangling
Northwest A&F University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute Of Soil And Water Conservation Ministry Of Water Resources Chinese Academy Of Sciences, National Engineering Research Center Of Water Saving Irrigation Yangling, Northwest A&F University filed Critical Institute Of Soil And Water Conservation Ministry Of Water Resources Chinese Academy Of Sciences
Priority to CN 200310118985 priority Critical patent/CN1273687C/en
Publication of CN1546797A publication Critical patent/CN1546797A/en
Application granted granted Critical
Publication of CN1273687C publication Critical patent/CN1273687C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a loess flow-collecting field surface flow-increasing, roughness-reducing and solidifying method, which comprises the following steps of firstly removing soil impurities on the surface layer of a ground surface, digging soil loose, removing weeds and impurities: the soil curing agent and the loess are prepared according to the weight ratio of 1: 6-1: 8, are uniformly mixed by sprinkling water, are paved and tamped to ensure that the dry density is more than 1.60g/cm3(ii) a Beating slurry on the tamped collecting surface, spreading pure curing agent on the slurry to smooth the collecting surface, and enabling the roughness to reach 0.012: and (5) regularly sprinkling water on the surface of the prepared current collecting field for maintenance. The loess sloping field collecting surface constructed by the invention has the advantages that the collecting efficiency can reach 80-90 percent, the service life is 15-20 years, the collecting efficiency is basically the same as that of a concrete collecting surface, the loess sloping field collecting surface has no pollution to the environment, the construction cost is 3-5 yuan/square meter, and is only one third of the construction cost of the concrete collecting surface; can be widely applied to vast loess plateau and other areas without sand and stone, and has important practical significance and practical value for promoting the development of drought area rainwater collection and recharge agriculture.

Description

A kind of curing loess afflux face is incremental to subtract rough job practices
Technical field
The invention belongs to drought-hit area agricultural production and improvement of the ecological environment water saving, retaining and water conservation technical field, relate generally to that a kind of curing loess afflux face of building at hillside fields, loess plateau afflux face is incremental to subtract rough job practices.
Background technology
There is 1,200,000,000 mu in dry farming farmland in China, and no irrigating facility and water condition can only rely on the natural rainfall resource to keep plant growth.The essential measure of realizing dry farming field-crop high yield, stable yields is utilization rate and the utilization ratio that how effectively to improve the natural rainfall resource.Facts have proved that collection rain supplement irrigation agricultural is to realize the effective way of above-mentioned target.The afflux face is an important content of implementing the supplementary irrigation with catchment rainfall technical system, also is one of its key technology.At present, in the few stone area of scarce sand such as loess plateau, adopting soil-solidified-agent to prepare current collecting field is a developing direction.Practice shows and since curing compound fixed be loess, improper as job practices, perhaps surface irregularity is perhaps surperficial dry and cracked, thereby causes poor surface smoothness, has a strong impact on the afflux water catchment efficiency.
Summary of the invention
The objective of the invention is to, seek a kind of smooth surface, rugosity is little, and the curing loess afflux face that water catchment efficiency is high is incremental to subtract rough job practices, adopts this method to solidify loess afflux face, can improve the water catchment efficiency of rainwater.
The technical solution that realizes the foregoing invention purpose is: loess current collecting field surface is incremental to subtract rough curing, at first removes the assorted soil in top layer, the face of land soil is dug pine, removes weeds, foreign material; Be characterized in that soil-solidified-agent and loess are mixed by weight preparation, and the watering mix is even, compacting and piecemeal; Afflux face arsis in compacting goes out slurries, spreads pure curing compound on slurries, receives the face troweling, makes its roughness reach requirement and watering maintenance regularly.
The loess hillside fields afflux face that adopts method of the present invention to build, water catchment efficiency can reach 80%-90%, be 15-20 application life, basic identical with concrete afflux face water catchment efficiency, and environmentally safe, its construction cost be 3-5 unit/square metre, only be 1/3rd of concrete afflux face construction cost; This invention can be widely used in vast loess plateau and other no sand, building stones area, has important and practical meanings and practical value to promoting drought-hit area supplementary irrigation with catchment rainfall Agricultural Development.
The specific embodiment
The present invention is described in further detail by embodiment that technique scheme provides below in conjunction with the inventor.Need to prove that these embodiment are the more excellent example that the inventor provides, the present invention is not limited to these embodiment.
Embodiment 1: preparation clay hillside fields afflux face
May further comprise the steps:
1) at first removes the assorted soil in top layer, the face of land, soil is dug pine, remove weeds, foreign material;
2) soil-solidified-agent and loess were prepared by weight 1: 6~1: 8, the watering mix is even, and wherein water content is 16%~20%;
3) pave compacting, make its dry density greater than 1.60g/cm 3, thickness is greater than 5cm;
4) with the afflux face dividing, block size is 1.5m * 1.5m, goes out slurries at the afflux face arsis of tamping, and is not more than 500g by every square meter and spreads pure curing compound on slurries, receives the face troweling, makes its roughness be less than 0.012;
5) after new solidified earth current collecting field initial set, the surface coverage layer of preserving moisture, the layer of preserving moisture can be wheat straw or straw bag or straw etc., the watering maintenance during torridity summer construction, must not sprinkle water less than 5 times more than 7 days every day.
Embodiment 2: preparation clay hillside fields afflux face
May further comprise the steps:
1) removes the assorted soil in top layer, the face of land, soil is dug pine, remove weeds, foreign material;
2) select for use commercially available soil-solidified-agent and clay by weight preparation in 1: 7, the watering mix is even, makes water content about 20%;
3) pave compacting, make its dry density greater than 1.60g/cm 3, thickness is greater than 5cm;
4) with the afflux face dividing, block size is 1.5m * 1.5m, goes out slurries at the afflux face arsis of tamping, and is not more than 500g/m by every square meter on slurries 2Spread pure curing compound, receive the face troweling, make its roughness be less than 0.012;
5) after new solidified earth current collecting field initial set, the surface coverage layer of preserving moisture, the layer of preserving moisture can be wheat straw or straw bag or straw etc., the watering maintenance during torridity summer construction, must not sprinkle water less than 5 times more than 7 days every day.
Embodiment 3: preparation sandy soil hillside fields afflux face
May further comprise the steps:
1) removes the assorted soil in top layer, the face of land, soil is dug pine, remove weeds, foreign material;
2) select for use commercially available soil-solidified-agent and clay by weight preparation in 1: 6, the watering mix is even, makes water content about 18%;
3) pave compacting, make its dry density greater than 1.60g/cm 3, thickness is greater than 5cm;
4) with the afflux face dividing, block size is 1.5m * 1.5m, goes out slurries at the afflux face arsis of tamping, and is not more than 500g by every square meter and spreads pure curing compound on slurries, receives the face troweling, makes its roughness be less than 0.012;
5) after new solidified earth current collecting field initial set, the surface coverage layer of preserving moisture, the layer of preserving moisture can be wheat straw or straw bag or straw etc., the watering maintenance during torridity summer construction, must not sprinkle water less than 5 times more than 7 days every day.

Claims (2)

1. loess current collecting field surface is incremental subtracts rough curing, comprising:
1) at first removes the assorted soil in top layer, the face of land, soil is dug pine, remove weeds, foreign material;
2) soil-solidified-agent and loess were prepared by weight 1: 6~1: 8, the watering mix is even, and wherein water content is 16%~20%;
3) pave compacting, make its dry density greater than 1.60g/cm 3, thickness is greater than 5cm;
It is characterized in that, further comprising the steps of:
4) with the afflux face dividing, block size is 1.5m * 1.5m, goes out slurries at the afflux face arsis of tamping, and is not more than 500g by every square meter and spreads pure curing compound on slurries, receives the face troweling, makes its roughness be less than 0.012;
5) after new solidified earth current collecting field initial set, the surface coverage layer of preserving moisture, normal temperature watering maintenance down get final product more than 7 days, when torridity summer is constructed, must not sprinkle water every day less than 5 times.
2. curing loess current collecting field surface as claimed in claim is incremental subtracts rough method, it is characterized in that described loess is clay or sandy soil; When adopting sandy soil, the ratio of its soil-solidified-agent and sandy soil is 1: 6.
CN 200310118985 2003-12-11 2003-12-11 Flow-increasing and roughness-reducing construction method for solidified loess flow-collecting surface Expired - Fee Related CN1273687C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200310118985 CN1273687C (en) 2003-12-11 2003-12-11 Flow-increasing and roughness-reducing construction method for solidified loess flow-collecting surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200310118985 CN1273687C (en) 2003-12-11 2003-12-11 Flow-increasing and roughness-reducing construction method for solidified loess flow-collecting surface

Publications (2)

Publication Number Publication Date
CN1546797A CN1546797A (en) 2004-11-17
CN1273687C true CN1273687C (en) 2006-09-06

Family

ID=34338102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200310118985 Expired - Fee Related CN1273687C (en) 2003-12-11 2003-12-11 Flow-increasing and roughness-reducing construction method for solidified loess flow-collecting surface

Country Status (1)

Country Link
CN (1) CN1273687C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107353905A (en) * 2017-06-27 2017-11-17 常州市协旺纺织品有限公司 A kind of modification method for preparing of solidified earth

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107353905A (en) * 2017-06-27 2017-11-17 常州市协旺纺织品有限公司 A kind of modification method for preparing of solidified earth

Also Published As

Publication number Publication date
CN1546797A (en) 2004-11-17

Similar Documents

Publication Publication Date Title
CN1182770C (en) Mixed planting material for rocky slope and its prepn and construction process
CN102995843B (en) Method for greening low-maintenance ecological slope roof
CN101796913B (en) Alien soil for slope protection of loess slope plants
CN104770257B (en) Method for recovering vegetation through micropore thin films
CN1152177C (en) Method for consolidating soil, protecting slope and planting vegetation on rock slope
CN101748719A (en) Method of vegetation restoration and reconstruction of bare rock slope in East China
CN102204434A (en) Method for preventing water erosion desertification by using biological crust
CN102138508B (en) Method for greening and protecting steep road side slope by using biological crust
CN102926391A (en) Loess slope ecological protection method
CN206289491U (en) A kind of pavement, greenery patches harvest water system
CN103708776A (en) Ecological recovery method with combination application of planting ecological concrete and high-molecular aggregates
CN102337744A (en) Preparation and construction method of BSC (Bio-substrate concrete) biological matrix fine aggregate plant-growing concrete
CN110258447A (en) A kind of ecological afforestation concrete cast-in-situ slope protection construction method
CN210315594U (en) Cast-in-place ecological bank protection of concrete
CN113396795B (en) Foreign soil and soil layer structure based on river and lake bottom mud and phosphorite solid waste and preparation method
CN212896172U (en) River course slope protection and canal bottom structure for ecological reconstruction of black and odorous river course
CN1273687C (en) Flow-increasing and roughness-reducing construction method for solidified loess flow-collecting surface
CN110130368A (en) Flinty slope original position ecological afforestation concrete remodeling method
CN108677973A (en) A kind of climing combination bank protecting method of celluar concrete grass
CN110777820B (en) Construction method for performing ecological protection on stone slope by adopting composite vegetation concrete
CN113785750A (en) B-type phosphogypsum plant growing material
CN101182176B (en) Rainwater catching surface synergy coating and preparation method thereof
CN113951091A (en) A-type phosphogypsum plant growing material
JP2009121173A (en) Ground coating work and ground coating construction method
KR20060009068A (en) A method of construction use be sloped protection of a road the edge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant