CN1262362A - 预制装配格构式封闭梁水平支护结构及施工方法 - Google Patents

预制装配格构式封闭梁水平支护结构及施工方法 Download PDF

Info

Publication number
CN1262362A
CN1262362A CN 99100575 CN99100575A CN1262362A CN 1262362 A CN1262362 A CN 1262362A CN 99100575 CN99100575 CN 99100575 CN 99100575 A CN99100575 A CN 99100575A CN 1262362 A CN1262362 A CN 1262362A
Authority
CN
China
Prior art keywords
negative
top board
construction
lattice
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 99100575
Other languages
English (en)
Inventor
杜有亮
李建军
丁克胜
赵锡明
靳彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN YIJIANG CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
TIANJIN YIJIANG CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN YIJIANG CONSTRUCTION ENGINEERING Co Ltd filed Critical TIANJIN YIJIANG CONSTRUCTION ENGINEERING Co Ltd
Priority to CN 99100575 priority Critical patent/CN1262362A/zh
Publication of CN1262362A publication Critical patent/CN1262362A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明涉及一种建筑工程深基坑支护施工技术,它是一种预制装配格构式封闭梁水平支护结构及施工方法。该方法是在设定的施工区域内先做支撑桩、插钢制格构件,然后逐层开挖土方,并建立结构顶板,做现浇砼小梁,焊接封闭式格构件,再返回施工做结构柱和砼板。本方法中格构件可重复使用,施工中砸掉的砼小梁浪费小,工期短,节省人力、物力。

Description

预制装配格构式封闭梁水平支护结构及施工方法
本发明涉及一种建筑工程深基坑支护施工技术,它是一种预制装配格构式封闭梁水平支护结构及施工方法。
随着城市建设的不断发展,建筑物的楼层和设计结构也在不断增高和现代化,因此建筑物的地基要求也越来越先进及多用化。但是现在的城市建设中的深基础施工,为解决基抗开挖需要占用大量地界并要采取合理的支护措施。如软土地基、地下水位较高,土的粘聚力及摩擦角较小,则深基坑的支护一般采用桩或地连墙做围挡结构。而围挡结构的悬臂高度及内力往往是通过设置一道或几道水平支撑的手段来达到的。目前常用的水平支撑系统是现浇砼构件,其截面及配筋较大,再者由于该系统是临时支撑系统,因此在基础工程施工到一定部位时还需将水平支撑系统砸掉,占用大量工期和投资。
本发明的目的在于提供一种预制装配格构式封闭梁水平支护结构及施工方法。它减少工期和投资,其格构式构件可反复使用。
本发明的技术方案是这样的:预制装配格构式封闭梁水平支护结构及施工方法,施工方法的第一步是在建筑物外墙轴线设置地连墙,并在预先设定位置设置一定数量支撑桩,桩顶插钢格构柱,做垂直支撑;第二步在开挖的地连墙内的土方至负二层结构顶板(第一层水平支撑)标高;做水平支撑的支模板、绑钢筋,在砼小梁内侧位置设置作好的预制格构式构件,浇筑负二层结构顶板及砼小梁,第三步,在负二层结构顶板的砼内向下开挖负三层结构顶板,其方法如负二层结构顶板;第四步,在负三层结构顶板的砼内开挖最后一步土方至基坑底,在基坑底做垫层,基础底板支模、绑筋及浇砼;在基底上做负三层结构柱施工,在负三层结构顶板上浇筑圆环内砼板,再将负三层结构板中的格构式封闭梁中的两圈砼小梁砸掉,并取出格构件留做以后继续使用;在负三层结构板上做负二层结构柱施工,做负二层结构顶板上浇筑圆环内砼板,并砸掉负二层格构式封闭梁中的砼小梁,取出格构件保留;最后继续向上施工。
本发明的特点是:采用本方法施工可大量节省砼构件总断面面积,开挖土方量小,仅有少数砼需要砸掉,可节省大量工期和人力。此施工方法受力合理,水平支护体系总体变形小,刚度大,与水平结构楼板结合效果更佳。预制格构件可重复使用。因此该方法投资小、具有较好的经济效益和社会效益。
下面结合附图介绍本发明实施过程:
附图1、预制装配格构式封闭梁水平支护结构示意图。
图中:1地连墙,2结构顶板,3砼小梁,5格构件。
如图示,第一步按照设计图纸,在建筑物外墙轴线设置地连墙,在浇筑好的地连墙1预先设定位置设置均匀分布的支撑桩,桩顶插钢格构柱,做垂直支撑。第二步在浇筑好的地连墙1内开挖土方靠地连墙10m宽度内开始挖至负一层结构主梁底加100mm;然后开挖土方至负二层结构主梁底加1·8m。开始制作负二层结构顶板2和水平支撑的支模板,绑钢筋,在砼小梁3内侧位置设置作好的预制格构式格构件5,浇筑负二层结构顶板2和砼小梁3,其中砼小梁3浇筑成圆形,第二步再如上述方法从负二层结构顶板中砼小梁3内圆环处继续向下开挖土方至负三层结构顶板标高处,并如法制作负三层结构顶板和格构封闭式梁;第四步再次从负三层结构顶板的格构式封闭梁圆环内开挖土方至基坑底;做基底垫层,基础底板支模、绑筋及浇砼;然后开始在基底上做负三层结构柱施工,施工完毕后在负三层结构顶板上浇筑圆环内砼板,同时将负三层中的格构式封闭梁中砼小梁3砸掉,取出格构件5保留;再在负三层结构顶板2上做负二层结构柱并在负二层结构顶板上浇筑圆环内砼板,拆除负二层结构顶板2中的砼小梁3,取出格构件5,最后按图纸要求制作负一层结构顶板并继续向上建造。

Claims (1)

1、一种预制格构式封闭梁水平支护结构及施工方法,其特征在于该施工方法的步骤为:
第一步是在建筑物外墙轴线设置地连墙,并在预先设定位置设置一定数量支撑桩,桩顶插钢格构柱,做垂直支撑;第二步在开挖的地连墙内的土方至负二层结构顶板(第一层水平支撑)标高;做水平支撑支模板、绑钢筋,在砼小梁内侧位置设置作好的预制格构式构件,浇筑负二层结构顶板及砼小梁,第三步,在负二层结构顶板的砼内向下开挖负三层结构顶板。其方法如负二层结构顶板;第四步,开挖在负三层结构顶板下最后一步土方至基坑底,在基坑底做垫层,基础底板支模、绑筋及浇砼;在基底上做负三层结构柱施工,在负三层结构顶板上浇筑圆环内砼板,再将负三层结构板中的格构式封闭梁中的两圈砼小梁砸掉,并取出格构件留做以后继续使用;在负三层结构板上做负二层结构柱施工,做负二层结构顶板上浇筑圆环内砼板,并砸掉负二层格构式封闭梁中的砼小梁,取出格构件保留;最后继续向上施工。
CN 99100575 1999-02-04 1999-02-04 预制装配格构式封闭梁水平支护结构及施工方法 Pending CN1262362A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 99100575 CN1262362A (zh) 1999-02-04 1999-02-04 预制装配格构式封闭梁水平支护结构及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 99100575 CN1262362A (zh) 1999-02-04 1999-02-04 预制装配格构式封闭梁水平支护结构及施工方法

Publications (1)

Publication Number Publication Date
CN1262362A true CN1262362A (zh) 2000-08-09

Family

ID=5270074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 99100575 Pending CN1262362A (zh) 1999-02-04 1999-02-04 预制装配格构式封闭梁水平支护结构及施工方法

Country Status (1)

Country Link
CN (1) CN1262362A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101153492B (zh) * 2006-09-27 2010-09-01 八路建设技术株式会社 水平骨架结构和利用该水平骨架结构的地下围护工法
CN101913753A (zh) * 2010-07-31 2010-12-15 中国洛阳浮法玻璃集团有限责任公司 大中型玻璃窑炉的大碹胎支法
CN112609702A (zh) * 2020-12-01 2021-04-06 中国建筑第八工程局有限公司 早拆围护体系及其施工方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101153492B (zh) * 2006-09-27 2010-09-01 八路建设技术株式会社 水平骨架结构和利用该水平骨架结构的地下围护工法
CN101913753A (zh) * 2010-07-31 2010-12-15 中国洛阳浮法玻璃集团有限责任公司 大中型玻璃窑炉的大碹胎支法
CN101913753B (zh) * 2010-07-31 2012-08-15 中国洛阳浮法玻璃集团有限责任公司 大中型玻璃窑炉的大碹胎支法
CN112609702A (zh) * 2020-12-01 2021-04-06 中国建筑第八工程局有限公司 早拆围护体系及其施工方法
CN112609702B (zh) * 2020-12-01 2022-06-28 中国建筑第八工程局有限公司 早拆围护体系及其施工方法

Similar Documents

Publication Publication Date Title
CN106968256B (zh) 基坑装配式钢栈桥施工方法
CN206721894U (zh) 一种用于基坑支护的可调节预应力装置
CN101092850A (zh) 一种建筑物或古建筑物/群整体顶升的方法和装置
CN101914925A (zh) 利用优化复合预制拱墙作外墙的地下室
CN102162258B (zh) 一种塔吊钢管混凝土高桩塔基结构及构建方法
CN101240550A (zh) 格构式钢柱塔吊基础座的施工方法
CN108005399A (zh) 一种既有建筑群下加建多层地下空间的施工方法
CN110397043A (zh) 一种基坑支护内支撑体系与地下室结构体系三合一的方法
CN201991013U (zh) 一种塔吊钢管混凝土高桩塔基结构
CN203475289U (zh) 桩柱式连续刚构桥梁
CN113585336B (zh) 软弱地基环境中下沉式混凝土拌合站的快速施工方法
CN110847188A (zh) 一种超深基坑土方开挖平台结构及其施工方法
CN1262362A (zh) 预制装配格构式封闭梁水平支护结构及施工方法
CN116289979A (zh) 地下顺逆同步施工的深基坑支护施工方法
CN215211056U (zh) 一种装配式多层内支撑结构
CN215211151U (zh) 一种基于挡土结构的架空式支撑构造
CN112575771B (zh) 逆作地下工程钢砼以桩兼柱竖向支承体系的绿色建造方法
KR200263526Y1 (ko) 매달아 내려치고 되올려치는 콘크리트 구조물 구축장치
CN212052780U (zh) 一种斜支式深基坑支护结构
JP3345598B2 (ja) 廃棄物の埋立ストック設備
CN211395691U (zh) 一种用于提高竖托节点的构造
CN112942377A (zh) 一种新型支撑抗剪结构及其施工方法
CN213952237U (zh) 一种带四角支撑梁的基坑支护结构
Marchand A DEEP BASEMENT IN ALDERSGATE STREET, LONDON. PART 1: CONTRACTOR'S DESIGN AND PLANNING.
CN110924318A (zh) 一种t构托换原有桥台桩基加固刚构桥施工结构及方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication