CN1260460C - 顶底柱超前回采深孔落矿连续采矿法 - Google Patents

顶底柱超前回采深孔落矿连续采矿法 Download PDF

Info

Publication number
CN1260460C
CN1260460C CNB031244939A CN03124493A CN1260460C CN 1260460 C CN1260460 C CN 1260460C CN B031244939 A CNB031244939 A CN B031244939A CN 03124493 A CN03124493 A CN 03124493A CN 1260460 C CN1260460 C CN 1260460C
Authority
CN
China
Prior art keywords
ore
ore deposit
artificial
deep hole
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB031244939A
Other languages
English (en)
Other versions
CN1456788A (zh
Inventor
古德生
周科平
李夕兵
罗周全
徐国元
陈建宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CNB031244939A priority Critical patent/CN1260460C/zh
Publication of CN1456788A publication Critical patent/CN1456788A/zh
Application granted granted Critical
Publication of CN1260460C publication Critical patent/CN1260460C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

本发明公开了一种顶底柱超前回采深孔落矿连续采矿法,先将矿体划分为盘区,然后划分为矿段,以矿段为回采单元,在矿段中的顶柱与底柱的部位,用浅孔落矿法分别回采一个分层,然后,用混凝土充填分层空区,形成人工顶柱和人工底柱,在人工顶柱下面形成深孔凿岩硐室,在人工底柱的上部,形成深孔落矿的补偿空间和自由面;在凿岩硐室中钻凿下向大直径深孔;随后深孔落矿,矿段的大量放矿结束后,通过人工顶柱中的充填小井下放充填料充填采空区,充填结束随即转入下一矿段的回采;本发明的采矿法安全条件可靠、工作面劳动生产率高、作业成本低,特别适用于急倾斜中厚以上、品位较高、矿石不稳固的金属矿床回采的顶底柱超前回采深孔落矿连续采矿。

Description

顶底柱超前回采深孔落矿连续采矿法
技术领域:本发明涉及金属矿床地下开采的采矿方法。它主要适用于回采矿体不稳固、围岩中等稳固、矿石价值较高(品位高)的急倾斜中厚以上矿体。
背景技术:矿体不稳固、价值较高的急倾斜中厚以上金属矿床,通常采用分层充填采矿法回采。开采中厚以上矿体的分层充填采矿方法,一般将矿体划分成矿房、矿柱,矿柱包括间柱、底柱和顶柱。先回采矿房,后采矿柱。
传统的分层充填采矿法可分为“上向分层充填采矿法”和“下向分层充填采矿法”两种,其分层高度约2.5-4.0m,它们分别以上向和下向的方式逐层进行矿房回采。
“上向分层充填采矿法”的特点是:自下而上一层一层地往上回采,每采完一个分层(或者二个分层),随即用充填材料充填分层空区,然后再回采上一分层;充填体的作用在于支护上、下盘围岩,并作为上层回采作业的工作平台。采用这种方法回采时,人员、设备在空顶高达5-7m的顶板暴露面下工作,生产安全性差。
“下向分层充填采矿法”与上述采矿法的回采方向正相反,它是自上而下一层一层地往下回采,每采完一个分层就用混凝土进行分层胶结充填,充填体作为下一分层回采的人工顶板;用混凝土作充填料时,需要布设钢筋,工艺复杂,充填成本很高,采矿效率低。
上述传统的分层充填采矿法的作业循环包括:凿岩爆破、出矿、充填和护顶,完成一个作业循环后,转入另一分层的回采。因此,这种采矿方法的回采工艺十分复杂、安全条件不好、工作面劳动生产率较低、作业成本高、矿块生产能力也受到很大限制,为了完成产量,同时回采的矿块数多,井下工作线长,生产组织管理复杂。
为了维护矿体上、下盘和采场顶板的稳定性,传统的分层充填采矿法在回采的过程中需留下大量的矿柱,这些矿柱(包括间柱、顶柱和底柱)由于受到地压破坏和矿房回采时的爆破损伤,致使后期回收的生产效率更低、安全性更差、成本更高,矿石资源损失量更大;此外,由于充填过程中都存在接顶不好的问题,从而给矿山的生产安全留下重大隐患。
发明内容:本发明所要解决的技术问题是:克服传统的分层充填采矿法所存在的问题,提供一种安全条件可靠、工作面劳动生产率高、作业成本低,特别适用于急倾斜中厚以上、品位较高、矿石不稳固的金属矿床回采的顶底柱超前回采深孔落矿连续采矿法。
本发明的技术方案如下:先将矿体划分为盘区,然后划分为矿段,以矿段为回采单元,其特点是:
1、在矿段中的顶柱与底柱的部位,用浅孔落矿法分别回采一个分层,然后,用混凝土充填,形成人工顶柱和人工底柱;
2、在人工顶柱中预留一定规格的小井,作为回采过程中的通风、人行井和充填采空区的充填井,而在下部的人工底柱中预留放矿口;
3、在人工顶柱下面形成大直径深孔凿岩硐室,在人工底柱的上部,用浅孔落矿法形成深孔落矿的补偿空间和自由面;
4、在凿岩硐室中用剪切式破岩的凿岩设备(或其它类似设备)钻凿下向大直径深孔;
5、回采前,先对几个深孔进行分次爆破,在矿段中形成一条切割槽,然后在阶段全高上实施侧向深孔落矿或球状药包下向崩矿;
6、在人工顶柱下,大量崩落的矿石通过放矿口由铲运机运出,实施强化出矿;
7、矿段大量放矿结束后,通过人工顶柱中的充填小井下放充填料,充填采空区,充填结束后随即转入下一个矿段的回采;
8、采切、落矿、出矿、充填作业分别在相邻的矿段协调地依次平行进行,回采工作面连续推进,后退式回采。
本发明具有如下优点:
1、资源利用率大大提高,作业安全条件好。
本发明实施顶、底柱超前回采,并进行胶结充填分层空区,形成人工顶柱和底柱,这一方面避免了回收顶底矿柱的困难,可大幅度提高矿石回收率,充分利用矿产资源;另一方面,采场作业人员和设备在人工顶柱下工作,安全性大大地提高。
2、工作面劳动生产率较高,作业成本低。
本发明在不稳固的矿岩条件下采用大直径深孔落矿是一大创新,它与传统的浅孔或中深孔落矿的分层充填采矿法相比,落矿效率大幅度提高,从而开创了不稳固矿岩条件下也能采用大量落矿高效率采矿法的先例,矿段的生产能力大幅度提高,采矿作业成本也相应地降低。
3、能够解决传统充填法无法解决的充填接顶不充分的问题。
通过人工顶柱中的多个小井,进行多点下料充填,可较好地解决分层充填采矿法无法解决的充填接顶不充分的问题。
附图说明
图1为本发明采矿法采场结构示意图。
图2为图1的B-B剖视图。
图中:
1-回风巷道 2-人工顶柱 3-充填通风人行井 4-凿岩硐室 5-充填联络道 6-凿岩硐室联络道 7-天井 8-装矿横巷 9-大直径深孔10-低标号胶结料 11-崩落的矿石 12-人工底柱 13-放矿口 14-阶段运输巷道 15-拉底巷道
具体实施方式:
图1-2示出了本发明采矿方法的采场结构。如图所示,采用本发明采矿,先将矿体划分为盘区,然后划分为矿段,以矿段为回采单元。首先掘进一条天井7,将下部的阶段运输巷道14与上部的回风巷道1连通;在矿体的上、下阶段上,自回风巷道1和阶段运输巷道14垂直矿体走向分别掘进充填联络道5和装矿横巷8,直到矿体的上盘边界;然后,在天井7中的凿岩硐室4水平部位,垂直矿体走向掘进一条凿岩硐室联络道6至矿体,并按凿岩硐室4高度加上人工顶柱高度所需的尺寸,用浅孔落矿法上采至充填联络道5的水平,采下的矿石从天井7的下部放出;为保证构筑人工顶柱2所需的空间高度,当矿石放出水平面下降至凿岩硐室4顶板水平时,停止放矿,然后平整矿石,并在矿石上面铺一层薄板和塑料薄膜,随后充填一定标号的混凝土,之前预留多个充填通风人行井3;作为回采过程中的通风、人行和采空区的充填井,混凝土经一段时间养护后,把下面的矿石全部放出,从而自然形成了混凝土人工顶柱2和位于其下方的大直径深孔凿岩硐室4。
自阶段运输平巷14用浅孔落矿法往上采矿石至一定高度,再用胶结充填料如20号混凝土充填,并预留无轨出矿设备的放矿口13(或安装好出矿设备),构筑混凝土人工底柱12;然后,自拉底巷道15进行拉底,并将放矿口13扩大成漏斗;在拉底工作面往上挑顶,形成一定高度的空间,作为深孔落矿的补偿空间或爆破自由面,挑顶高度要保证深孔落矿有足够的补偿空间。
本发明实施顶、底柱超前回采,并进行胶结充填,形成人工顶柱和底柱,这一方面避免了回收顶底矿柱的困难,可大幅度提高矿石回收率,充分利用矿产资源;另一方面,采场作业人员和设备在人工顶柱2下工作,安全性大大地提高。
在人工顶柱2下的凿岩硐室4中,用剪切式破岩的凿岩设备,自凿岩硐室往下钻凿110-165mm的大直径深孔9,并采取相应的护孔措施;回采前,先对几个深孔进行分次爆破,在矿段中形成一条切割槽,然后在阶段全高上实施侧向深孔落矿或球状药包下向崩矿,实现采场在阶段全高上大量落矿,崩落的矿石11通过放矿口13由铲运机经装矿横巷8、阶段运输巷道14运出,实施强化出矿;在混凝土构筑的人工顶柱下凿岩,人工顶板稳固,作业安全;用剪切式破岩的凿岩设备钻凿大直径深孔,它与冲击式破岩的凿岩设备钻孔比较,孔底岩石碎裂程度小,对不稳固的矿体来说,可相应提高护孔效果;在不稳固的矿岩条件下采用大直径深孔落矿,它与传统的浅孔或中深孔落矿的分层充填采矿法相比,落矿效率大幅度提高,这样在不稳固矿岩条件下也能采用大量落矿高效率采矿,矿段的生产能力大幅度提高。
矿段崩落的矿石全部放出后,把放矿口13封闭,作为泄水井,并及时用低成本的低标号胶结充填料10充填整个采空区,然后转入下一矿段的回采循环。
在矿床开采过程中,采切、落矿、出矿、充填作业分别在相邻的矿段协调地依次平行进行,回采工作面连续推进,后退式回采。
本发明采用大量落矿、机械化出矿,采矿效率很高;在全阶段高度上充填采空区(不是一分层一分层地充填),使充填效率大大提高,回采工艺简化,作业循环时间缩短;此外,通过人工顶柱2中的多个充填通风人行井3,进行多点下料充填,可较好地解决分层充填采矿法无法解决的充填接顶不充分的问题。
本发明强调各工序间相互协调、加强护孔、强化出矿、快速充填,从而确保在矿体相对不稳固的条件下、能顺利实现高效率采矿,整个矿体可实现连续回采,有利于实现合理集中作业。

Claims (1)

1、一种顶底柱超前回采深孔落矿连续采矿法,先将矿体划分为盘区,然后划分为矿段,以矿段为回采单元,其特征在于:
1)、在矿段中的顶柱与底柱的部位,用浅孔落矿法分别回采一个分层,然后,用混凝土充填,形成人工顶柱和人工底柱;
2)、在人工顶柱中预留一定规格的小井,作为回采过程中的通风、人行井和采空区的充填井,而在下部的人工底柱中预留放矿口;
3)、在人工顶柱下面形成直径为110~165mm的深孔凿岩硐室,在人工底柱的上部,用浅孔落矿法形成深孔落矿的补偿空间和自由面;
4)、在凿岩硐室中用剪切式破岩的凿岩设备钻凿下向直径为110~165mm的深孔;
5)、回采前,先对几个深孔进行分次爆破,在矿段中形成一条切割槽,然后在阶段全高上实施侧向深孔落矿或球状药包下向崩矿;
6)、在人工顶柱下,大量崩落的矿石通过放矿口由铲运机运出,实施强化出矿;
7)、矿段的大量放矿结束后,通过人工顶柱中的充填小井下放充填料,充填采空区,充填结束后随即转入下一个矿段的回采;
8)、采切、落矿、出矿、充填作业分别在相邻的矿段依次平行进行,回采工作面连续推进,后退式回采。
CNB031244939A 2003-06-06 2003-06-06 顶底柱超前回采深孔落矿连续采矿法 Expired - Fee Related CN1260460C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB031244939A CN1260460C (zh) 2003-06-06 2003-06-06 顶底柱超前回采深孔落矿连续采矿法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB031244939A CN1260460C (zh) 2003-06-06 2003-06-06 顶底柱超前回采深孔落矿连续采矿法

Publications (2)

Publication Number Publication Date
CN1456788A CN1456788A (zh) 2003-11-19
CN1260460C true CN1260460C (zh) 2006-06-21

Family

ID=29411641

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB031244939A Expired - Fee Related CN1260460C (zh) 2003-06-06 2003-06-06 顶底柱超前回采深孔落矿连续采矿法

Country Status (1)

Country Link
CN (1) CN1260460C (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101424186B (zh) * 2007-11-01 2012-05-30 宝钢集团上海梅山有限公司 倾斜矿体上盘矿石回收方法
CN101285384B (zh) * 2008-06-05 2013-06-12 昆明理工大学 大直径深孔不拉底采矿法
WO2014187163A1 (zh) * 2013-05-20 2014-11-27 中国矿业大学 一种特厚煤层倾斜分层固体充填采煤方法

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100353029C (zh) * 2006-09-30 2007-12-05 长沙矿山研究院 盘区卸荷分层充填采矿方法
CN101328809B (zh) * 2008-06-25 2010-12-15 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 无底柱深孔后退式采矿方法
AU2011217748B2 (en) * 2010-02-22 2015-05-07 Technological Resources Pty. Limited Underground mining
CN101818643B (zh) * 2010-05-18 2012-06-27 中南大学 深井特厚大破碎矿体盘区阶梯式无间柱连续充填采矿法
CN102155228A (zh) * 2011-02-21 2011-08-17 中南大学 全分段预裂挤压一次爆破采矿法
CN102226396B (zh) * 2011-05-19 2013-02-06 中南大学 非爆破开挖再造人工群柱深孔崩矿嗣后充填采矿法
CN102269554B (zh) * 2011-07-29 2013-07-03 西北矿冶研究院 利用硐室爆破技术形成覆盖层处理地下矿山采空区的方法
CN102678122B (zh) * 2012-05-21 2014-03-12 山东黄金矿业(莱州)有限公司三山岛金矿 一种改进式散体下厚大破碎顶底柱进路回采方法
CN102817614B (zh) * 2012-05-29 2014-12-17 中钢集团马鞍山矿山研究院有限公司 一种适于地下矿山嗣后充填的采场结构布置方式
CN103244140A (zh) * 2013-05-17 2013-08-14 长沙矿山研究院有限责任公司 一种充填开采中凿岩硐室的布置方法
CN103437766B (zh) * 2013-09-03 2016-03-30 北京矿冶研究总院 一种原地碎裂采矿方法
CN104533422A (zh) * 2014-12-18 2015-04-22 招金矿业股份有限公司夏甸金矿 一种贵金属矿山矿柱回采方法及支护架构
CN105626073B (zh) * 2016-01-28 2018-09-28 贵州开磷集团股份有限公司 一种基于充填采矿法预留切割槽的采矿方法
CN106285677A (zh) * 2016-08-31 2017-01-04 湖北三鑫金铜股份有限公司 超前上向进路扩帮回采分区充填间柱开采方法
CN106761757A (zh) * 2016-12-07 2017-05-31 江西理工大学 一种全阶段组合凿爆落矿高效采矿方法
CN106884658B (zh) * 2017-03-09 2018-11-27 昆明理工大学 一种采场人工底部结构构筑方法
CN107131805B (zh) * 2017-05-23 2019-04-19 西北矿冶研究院 一种用于提高井下崩落法采场出矿品位的采矿方法
CN107829743B (zh) * 2017-11-27 2019-09-20 西北矿冶研究院 一种改进型急倾斜薄矿脉的开采方法
CN109751050B (zh) * 2019-01-17 2020-07-07 福州大学 一种下向凹凸无筋镶嵌连续分层充填采矿法
CN110388209B (zh) * 2019-07-25 2020-11-03 长沙矿山研究院有限责任公司 一种急倾斜双层矿体阶段深孔采矿法
CN110984989B (zh) * 2019-11-19 2021-03-02 中南大学 一种急倾斜中厚矿体的开采方法
CN110905515B (zh) * 2019-11-25 2020-12-25 南华大学 一种复杂矿体的联合充填采矿方法
CN111997616B (zh) * 2020-09-14 2021-05-18 中南大学 一种采用大断面连续回收残留顶底柱的方法
CN112282837B (zh) * 2020-10-27 2023-03-31 中冶沈勘秦皇岛工程设计研究总院有限公司 一种地下矿采充布置形式

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101424186B (zh) * 2007-11-01 2012-05-30 宝钢集团上海梅山有限公司 倾斜矿体上盘矿石回收方法
CN101285384B (zh) * 2008-06-05 2013-06-12 昆明理工大学 大直径深孔不拉底采矿法
WO2014187163A1 (zh) * 2013-05-20 2014-11-27 中国矿业大学 一种特厚煤层倾斜分层固体充填采煤方法

Also Published As

Publication number Publication date
CN1456788A (zh) 2003-11-19

Similar Documents

Publication Publication Date Title
CN1260460C (zh) 顶底柱超前回采深孔落矿连续采矿法
CN1260461C (zh) 阶梯式分段挤压崩矿跟随充填连续采矿法
CN101338674B (zh) 直接装运矿石的无底柱分段崩落采矿法
CN104727820B (zh) 一种两步骤分段空场嗣后充填采矿方法
CN104747190B (zh) 一种薄矿体机械化高分层连续采矿方法
CN101871347B (zh) 采矿环境再造分层分条中深孔落矿采矿法
CN107339104A (zh) 保安隔离矿柱回收方法
CN102953732A (zh) 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法
CN102168579A (zh) 中厚倾斜破碎矿体脉内采准无间柱连续分段充填法
CN106869931A (zh) 一种废石与胶结分层楔合充填采矿工艺及其结构
CN108625856A (zh) 一种地下矿山相邻两个采场一条出矿巷的采矿方法
CN1982649A (zh) 一种采矿方法
CN105909247A (zh) 无底柱分段胶结充填采矿方法
CN107687341A (zh) 一种极厚大不稳固矿体的上向分层点柱式充填采矿方法
CN107893658A (zh) 强地压环境下极厚大矿体阶段空场嗣后充填采矿方法
CN103437769A (zh) 组合再造结构体中深孔落矿协同锚索支护嗣后充填采矿法
CN106223956A (zh) 中深孔天井采矿嗣后充填法
CN101285384A (zh) 大直径深孔不拉底采矿法
CN101725351A (zh) 充填法采场底柱回收采矿法
CN109931063B (zh) 一种上向分步交错式充填采矿方法
CN108625855A (zh) 一种充填体下安全高效的采矿方法
CN102926754B (zh) 双切巷双向分条两步预支护采矿法
CN106522955A (zh) 空区废石充填与顶部围岩崩落协同再造覆盖层的间柱回收方法
CN112177612B (zh) 一种下向高分层胶结充填采矿法
CN1186519C (zh) 一种充填留矿采矿法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Tongling Chemical Group new bridge mining industry Co., Ltd

Assignor: Central South University

Contract record no.: 2010340000164

Denomination of invention: Continuous mining process with deep hole dropping and top-bottom pillars mining in advance

Granted publication date: 20060621

License type: Exclusive License

Open date: 20031119

Record date: 20100817

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060621

Termination date: 20170606

CF01 Termination of patent right due to non-payment of annual fee