CN102817614B - 一种适于地下矿山嗣后充填的采场结构布置方式 - Google Patents
一种适于地下矿山嗣后充填的采场结构布置方式 Download PDFInfo
- Publication number
- CN102817614B CN102817614B CN201210169627.0A CN201210169627A CN102817614B CN 102817614 B CN102817614 B CN 102817614B CN 201210169627 A CN201210169627 A CN 201210169627A CN 102817614 B CN102817614 B CN 102817614B
- Authority
- CN
- China
- Prior art keywords
- panel
- stope
- filling
- tunnel
- stopes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005422 blasting Methods 0.000 claims abstract description 4
- 230000004888 barrier function Effects 0.000 claims description 14
- 238000007599 discharging Methods 0.000 claims description 11
- 238000005520 cutting process Methods 0.000 claims description 3
- 239000011435 rock Substances 0.000 claims description 2
- 238000005065 mining Methods 0.000 abstract description 26
- 238000004519 manufacturing process Methods 0.000 abstract description 22
- 238000009826 distribution Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 22
- 238000010586 diagram Methods 0.000 description 2
- 229910052500 inorganic mineral Inorganic materials 0.000 description 2
- 239000011707 mineral Substances 0.000 description 2
- 238000011084 recovery Methods 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000012895 dilution Substances 0.000 description 1
- 238000010790 dilution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Abstract
本发明公开了一种适于地下矿山嗣后充填的采场结构布置方式,在盘区(1)内划分3~6个连续的盘区采场(2)和一个盘区间柱(3),垂直方向上布置有盘区顶柱(4)和盘区底柱(5),盘区采场(2)内矿石(7)通过爆破落到采场堑沟(11)中,铲运机通过出矿巷道(10),在出矿进路(12)中装矿,运至沿脉巷道(8)卸入溜井(14)。回采出矿完毕后,尾砂通过充填巷道(15)充填至空区,形成盘区充填体(6)。盘区采场(2)充填完毕后,再回采相邻盘区采场(2)并嗣后充填形成的空区。相邻盘区采场(2)充填完毕后,再回收部分盘区间柱(3),并加以充填。本发明可以利用有限矿体分布面积提高开采强度,扩大生产能力,降低采矿生产和空区充填处理成本。
Description
技术领域
本发明涉及一种地下矿山采矿方法,尤其是涉及一种适于大型地下矿山高效开采的嗣后充填采矿方法的采场结构布置。适用于非煤井下矿山利用有限矿体分布面积提高开采强度,扩大生产能力,降低采矿生产和空区充填处理成本。
背景技术
金属矿山地下开采采矿方法有三类基本方法:一是空场法,二是崩落法,三是充填法。各种采矿方法具有各自使用条件:空场采矿方法,生产能力大,采矿成本低,安全性差;充填采矿方法生产能力低,生产成本高,常用于开采高价值矿石;崩落采矿方法生产能力高,但损失贫化大,要求地表允许塌陷。在我国矿产资源以低品位矿石为主的前提下,选用生产能力高,开采成本低的采矿方法具有广泛的应用前景。
目前国内试验了空场采矿嗣后充填的采矿方法,取得了显著的成绩,主要有下向大孔阶段空场采矿嗣后充填采矿方法、分段空场采矿嗣后充填采矿方法、矿房采矿嗣后充填采矿方法等,但是还是普遍存在着生产能力和生产成本的限制,主要是采场采用二步骤回采,在一步骤回采后要采用高强度尾砂进行胶结处理采空区,为二步骤回采创造条件,这样造成成本的增加和工艺复杂,阻碍了地下矿山的进一步提高产能。
发明内容
本发明的目的就是针对现有技术中存在的上述缺陷,而提供一种适于地下矿山嗣后充填的采场结构布置方式。利用盘区空场嗣后充填的开采方法,对井下矿段划分成盘区开采,盘区内划分连续的盘区采场进行回采,利用尾砂对整个盘区内采空区进行充填处理,既解决井下充填开采生产能力低的矛盾,又降低了采场充填成本,大大简化盘区生产的工序,减少了尾砂充填胶结材料的用量,同时消除空区存在的安全隐患。
为实现本发明上述目的,本发明一种适于地下矿山嗣后充填的采场结构布置方式通过以下技术方案来实现:
将井下厚大矿段组合划分为多个盘区,在各个盘区划分成3~6个连续的盘区采场,在盘区边缘划出一个盘区间柱,垂直方向上布置有盘区顶柱和盘区底柱,盘区底柱的侧面为斜面;沿脉巷道布置在采场的两侧,沿脉巷道的侧边布设有溜井和人行通风天井。所述的盘区顶柱内设有充填巷道;在沿脉巷道之间的设有穿脉巷道、出矿巷道、拉底巷道,穿脉巷道位于盘区间柱底部,出矿巷道位于盘区底柱内;拉底巷道位于盘区底柱之间,拉底巷道采用中深孔爆破、切割形成拉底空间,最终形成采场堑沟;在采场堑沟、出矿巷道之间设有出矿进路。
所述盘区长度60~100m、盘区间柱宽度20~30m;每个盘区采场宽度10~18m、长度30~90m、高度40~90m;盘区顶柱(4)和盘区底柱(5)的高度分别为10~15m。采用这种参数,既有利于提高开采效率,又可保证采场安全。
所述盘区所处矿段矿体和围岩坚固稳定、完整性好,完整性系数不小于0.8,抗压强度不小于80MPa。
所述的盘区采场数量以4~6个为佳。
采矿方法通过以下技术方案来实现:
1)将厚大矿段组合划分为多个盘区;
2)在各个盘区划分成3~6个连续的盘区采场,在盘区边缘划出一个盘区间柱;
3)逐步盘区内采场,直至盘区内采场开采结束;
4)封闭盘区通道,采用尾砂充填空区;
5)按照设计条件,回收部分盘区间柱并加以处理空区。
“盘区空场”是在将厚大矿段划分成盘区,采用空场法采矿,简化回采工艺,提高采场生产能力。
本发明一种适于地下矿山嗣后充填的采场结构布置方式通过以上技术方案具有以下积极效果:
1)采用盘区空场嗣后充填的开采方法,对井下矿段划分成盘区开采,解决井下充填法开采生产能力低的矛盾;
2)利用尾砂对已有采空区进行充填处理,降低了采场充填成本,简化盘区生产的工序;
3)将尾矿(尾砂)充填于地下采空区,减少了向尾矿库排放的尾矿量,实现了少废或无废开采,为建设生态矿山起了示范作用。
附图说明
图1 为本发明一种适于地下矿山嗣后充填的采场结构布置方式的原理与布置纵向投影图。
图2为本发明一种适于地下矿山嗣后充填的采场结构布置方式的原理与底部结构布置图。
附图标记为:
1-盘区;2-盘区采场;3-盘区间柱;4-盘区顶柱;5-盘区底柱;6-盘区充填体;7-矿石;8-沿脉巷道;9-穿脉巷道;10-出矿巷道;11-采场堑沟;12-出矿进路;13-人行通风天井;14-溜井;15-充填巷道;16-拉底巷道。
具体实施方式
为进一步描述本发明,下面结合附图和实施例对本发明一种适于地下矿山嗣后充填的采场结构布置方式作进一步详细描述。
由图1所示的本发明一种适于地下矿山嗣后充填的采场结构布置方式的原理与布置纵向投影图和图2所示的本发明一种适于地下矿山嗣后充填的采场结构布置方式的原理与底部结构布置图看出,本发明将井下厚大矿段组合划分为多个盘区1,在各个盘区划分成3~6个连续的盘区采场2,在盘区1边缘划出一个盘区间柱3,垂直方向上布置有盘区顶柱4和盘区底柱5,盘区底柱5的侧面为斜面。沿脉巷道8布置在采场的两侧,沿脉巷道8的侧边布设有溜井14和人行通风天井13;所述的盘区顶柱4内设有充填巷道15;在沿脉巷道8之间的设有穿脉巷道9、出矿巷道10、拉底巷道16,穿脉巷道9位于盘区间柱3底部,出矿巷道10位于盘区底柱5内;拉底巷道16位于盘区底柱5之间,拉底巷道16采用中深孔爆破、切割形成拉底空间,最终形成采场堑沟11;在采场堑沟11、出矿巷道10之间设有出矿进路12。
所述盘区1长度60~100m、盘区间柱3宽度20~30m;盘区采场2数量4~6个;每个盘区采场2宽度10~18m、长度30~90m、高度40~90m;盘区顶柱4和盘区底柱5的高度分别为10~15m。采用这种参数,既有利于提高开采效率,又可保证采场安全。
盘区采场2内矿石7通过爆破落到采场堑沟11中,铲运机通过出矿巷道10,在出矿进路12中装矿,运至沿脉巷道8卸入溜井14。回采出矿完毕后,尾砂通过充填巷道15,经过管道充填至空区,形成盘区充填体6。盘区采场2充填完毕后,再回采相邻盘区采场2并嗣后充填形成的空区。相邻盘区采场2充填完毕后,再行回收部分盘区间柱3,并对盘区间柱形成的空区加以充填,最终消除空区。
Claims (2)
1.一种适于地下矿山嗣后充填的采场结构布置方式,沿脉巷道(8)布置在采场的两侧,沿脉巷道(8)的侧边布设有溜井(14)和人行通风天井(13),其特征在于:将井下厚大矿段组合划分为多个盘区(1),在各个盘区划分成3~6个连续的盘区采场(2),在盘区(1)边缘划出一个盘区间柱(3),垂直方向上布置有盘区顶柱(4)和盘区底柱(5),盘区底柱(5)的侧面为斜面;所述的盘区顶柱(4)内设有充填巷道(15);在沿脉巷道(8)之间的设有穿脉巷道(9)、出矿巷道(10)、拉底巷道(16),穿脉巷道(9)位于盘区间柱(3)底部,出矿巷道(10)位于盘区底柱(5)内;拉底巷道(16)位于盘区底柱(5)之间,拉底巷道(16)采用中深孔爆破、切割形成拉底空间,最终形成采场堑沟(11);在采场堑沟(11)、出矿巷道(10)之间设有出矿进路(12);所述盘区(1)所处矿段矿体和围岩坚固稳定、完整性好,完整性系数不小于0.8,抗压强度不小于80MPa。
2.如权利要求1所述的一种适于地下矿山嗣后充填的采场结构布置方式,其特征在于:所述盘区(1)长度60~100m、盘区间柱(3)宽度20~30m;盘区采场(2)数量4~6个;每个盘区采场(2)宽度10~18m、长度30~90m、高度40~90m;盘区顶柱(4)和盘区底柱(5)的高度分别为10~15m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210169627.0A CN102817614B (zh) | 2012-05-29 | 2012-05-29 | 一种适于地下矿山嗣后充填的采场结构布置方式 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210169627.0A CN102817614B (zh) | 2012-05-29 | 2012-05-29 | 一种适于地下矿山嗣后充填的采场结构布置方式 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102817614A CN102817614A (zh) | 2012-12-12 |
CN102817614B true CN102817614B (zh) | 2014-12-17 |
Family
ID=47302015
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210169627.0A Active CN102817614B (zh) | 2012-05-29 | 2012-05-29 | 一种适于地下矿山嗣后充填的采场结构布置方式 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102817614B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103821558B (zh) * | 2014-02-14 | 2016-02-24 | 安徽理工大学 | 煤矿采空区充填采矿及沿空留巷充填工艺 |
CN103967493B (zh) * | 2014-05-23 | 2015-12-02 | 山东黄金矿业(莱州)有限公司三山岛金矿 | 一种缓倾斜薄矿体矿柱采矿法 |
CN112502728B (zh) * | 2020-11-27 | 2023-09-22 | 湖南柿竹园有色金属有限责任公司 | 一种回采高阶段矿房间柱及顶柱的采矿装置 |
CN114718571B (zh) * | 2022-04-15 | 2023-05-02 | 武汉理工大学 | 一种适用于近距离多层磷矿的采矿方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4377353A (en) * | 1978-08-03 | 1983-03-22 | Granges Ab | Method of selective underground mining and stabilization of rock cavities |
CN1456788A (zh) * | 2003-06-06 | 2003-11-19 | 中南大学 | 顶底柱超前回采深孔落矿连续采矿法 |
CN101881169A (zh) * | 2010-06-25 | 2010-11-10 | 东北大学 | 一种分段留矿崩落阶段空场嗣后充填采矿法 |
CN102011590A (zh) * | 2010-10-29 | 2011-04-13 | 中钢集团马鞍山矿山研究院有限公司 | 一种矿山井下双采场底部结构 |
CN102011589A (zh) * | 2010-10-29 | 2011-04-13 | 中钢集团马鞍山矿山研究院有限公司 | 一种适于井下二步骤回采的采场底部结构及其生产工艺 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AP1516A (en) * | 2000-05-19 | 2005-12-09 | Eskom | Underground mining method. |
-
2012
- 2012-05-29 CN CN201210169627.0A patent/CN102817614B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4377353A (en) * | 1978-08-03 | 1983-03-22 | Granges Ab | Method of selective underground mining and stabilization of rock cavities |
CN1456788A (zh) * | 2003-06-06 | 2003-11-19 | 中南大学 | 顶底柱超前回采深孔落矿连续采矿法 |
CN101881169A (zh) * | 2010-06-25 | 2010-11-10 | 东北大学 | 一种分段留矿崩落阶段空场嗣后充填采矿法 |
CN102011590A (zh) * | 2010-10-29 | 2011-04-13 | 中钢集团马鞍山矿山研究院有限公司 | 一种矿山井下双采场底部结构 |
CN102011589A (zh) * | 2010-10-29 | 2011-04-13 | 中钢集团马鞍山矿山研究院有限公司 | 一种适于井下二步骤回采的采场底部结构及其生产工艺 |
Also Published As
Publication number | Publication date |
---|---|
CN102817614A (zh) | 2012-12-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102704934B (zh) | 适于大型地下矿山开采的嗣后充填采矿方法 | |
CN106223958B (zh) | 倾斜中厚矿体分区凿岩阶段落矿嗣后充填协同采矿法 | |
CN107339104B (zh) | 保安隔离矿柱回收方法 | |
CN105587318B (zh) | 一种缓倾斜平行中厚矿体群连续回采的充填采矿法 | |
CN102011589B (zh) | 一种适于井下二步骤回采的采场底部结构及其生产工艺 | |
CN101737052B (zh) | 一种分段充填采矿方法 | |
CN107829742B (zh) | 一种崩落-充填-空场-崩落采矿方法 | |
CN105041314B (zh) | 一种深部嗣后回采矿房—分层回采矿柱的联合采矿法 | |
CN103089266B (zh) | 露天转地下过渡期无底柱分段空场崩落采矿方法 | |
CN102953732A (zh) | 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法 | |
CN103362510B (zh) | 分段凿岩并段出矿分段矿房采矿法 | |
CN104806244A (zh) | 一种倾斜中厚矿体充填采矿方法 | |
CN103590831A (zh) | 一种缓倾斜薄-中厚矿体的新型采矿方法 | |
CN203452793U (zh) | 近地表厚大、较倾斜矿体开采用浅孔留矿法的矿房结构 | |
CN101105129A (zh) | 采矿环境再造连续采矿嗣后充填采矿法 | |
CN102168579A (zh) | 中厚倾斜破碎矿体脉内采准无间柱连续分段充填法 | |
CN103437768B (zh) | 一种不留顶底柱预置空间充填采矿法 | |
CN110714760B (zh) | 一种煤铝共生分层诱导协同开采的采矿方法 | |
CN113202475B (zh) | 一种充填崩落采矿法 | |
CN102979526B (zh) | 中深孔分段采矿出矿堑沟充填法构筑工艺 | |
CN106194188A (zh) | 电耙‑爆力协同搬运伪倾斜房柱采矿法 | |
CN102817614B (zh) | 一种适于地下矿山嗣后充填的采场结构布置方式 | |
CN111852478B (zh) | 留设h形间柱结构的厚大稳固矿体充填开采方法 | |
CN108625855B (zh) | 一种充填体下的采矿方法 | |
CN102011590B (zh) | 一种矿山井下双采场底部结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666 Patentee after: MAANSHAN Mine Research Institute Co.,Ltd. Address before: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666 Patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH Co.,Ltd. |