CN101285384A - 大直径深孔不拉底采矿法 - Google Patents
大直径深孔不拉底采矿法 Download PDFInfo
- Publication number
- CN101285384A CN101285384A CNA2008100584996A CN200810058499A CN101285384A CN 101285384 A CN101285384 A CN 101285384A CN A2008100584996 A CNA2008100584996 A CN A2008100584996A CN 200810058499 A CN200810058499 A CN 200810058499A CN 101285384 A CN101285384 A CN 101285384A
- Authority
- CN
- China
- Prior art keywords
- large diameter
- deep
- ore
- mining method
- undercutting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 27
- 238000005065 mining Methods 0.000 title claims abstract description 16
- 238000005553 drilling Methods 0.000 claims abstract description 16
- 238000005520 cutting process Methods 0.000 claims abstract description 13
- 238000005422 blasting Methods 0.000 claims abstract description 8
- 238000004880 explosion Methods 0.000 claims description 5
- 238000005096 rolling process Methods 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 239000003245 coal Substances 0.000 abstract 2
- 238000011084 recovery Methods 0.000 abstract 2
- 230000002860 competitive effect Effects 0.000 abstract 1
- 239000002360 explosive Substances 0.000 description 2
- 239000011435 rock Substances 0.000 description 1
- 239000011378 shotcrete Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Images
Abstract
本发明公开了大直径深孔不拉底采矿法,为一种不拉底的大直径深孔侧向崩矿采法,该法主要适用于缓倾斜极厚大矿体和急倾斜厚矿体。对缓倾斜极厚大矿体而言,将矿体划分为盘区,然后在倾斜方向将盘区划分为矿段,以矿段为单元进行回采。先在矿段的顶部切顶形成凿岩硐室,尔后以一定的炮孔布置参数向下钻大直径深孔。由于不拉底,为避免底部留残根,深孔要求超深1~2米。大量崩矿前,用深孔爆破形成切割槽。矿段采完后需先充填,再回采下一个矿段。该法的劳动生产率高,成本低,是一种安全高效的采矿法。由于生产成本低,方法优异,因此具有很强的市场竞争能力和推广应用价值。
Description
技术领域:
本发明涉及一种地下矿床开采方法,适用于缓倾斜极厚大矿体和急倾斜厚矿体,矿岩中等稳固以上。
技术背景:目前对于缓倾斜极厚大矿体多采用分段空场法,分段空场法需掘进多条分段凿岩道,并需切槽,拉底,其采准切割工作量大。由于使用扇形中深孔,通常大块率较高,增加了二次爆破工作量和通风成本,也降低了采场出矿效率。
发明内容:
本发明要解决的问题是:针对缓倾斜极厚大矿体,提供一种高效,安全的采矿方法。特点是大块率低,采准切割简单且工作量较小,作业成本低,是一种特别适于缓倾斜极厚大矿体大规模地下开采的采矿方法。
该法主要适用于缓倾斜极厚大矿体和急倾斜厚矿体,对缓倾斜极厚大矿体而言,将矿体划分为盘区,然后在倾斜方向将盘区划分为矿段,以矿段为单元进行回采。先在矿段的顶部切顶形成凿岩硐室,尔后以一定的炮孔布置参数向下钻大直径深孔。由于不拉底,为避免底部留残根,深孔要求超深1~2米。大量崩矿前,用深孔爆破形成切割槽。矿段采完后需先充填,再回采下一个矿段。该法的劳动生产率高,成本低,是一种安全高效的采矿法。本发明的技术方案如下:
(1)先掘进通往凿岩硐室的铲运机斜坡道;
(2)切顶形成凿岩硐室,硐室中留适当条柱或点柱;
(3)在凿岩硐室中向下钻大直径深孔;
(4)用VCR法形成切割天井,以切割天井为自由面爆破形成切割槽;
(5)在底部掘进铲运机出矿巷道;
(6)上述工作完成后,就可大量落矿;
(7)大型铲运机出矿,遥控铲运机收残;
(8)矿石出完后,用尾砂进行充填;
(9)转入下一矿段开采。
本发明优点在于:结构简单,采切工作量较小;大块率在5%左右,二次爆破工作量小;采场效率高,产量大,试验采场平均日出矿1500吨;炸药单耗小,平均炸药单耗为0.38公斤/吨;资源利用率高;采矿成本低,作业安全,劳动生产率高。
附图说明
图1为试验采场纵剖面图,图中1为炮孔,2为铲运横巷,3为出矿平巷,4为溜井,5为中段运输巷道。
图2为试验采场横剖面图,图中6为间柱,7为崩落矿石,8为充填体。
具体实施方式
(1)先掘进通往凿岩硐室的铲运机斜道;
(2)切顶形成凿岩硐室,硐室中留适当条柱或点柱;
(3)在凿岩硐室中向下钻大直径深孔;
(4)用VCR法形成切割天井,以切割天井为自由面爆破形成切割槽;
(5)在底部掘进铲运机出矿巷道;
(6)上述工作完成后,就可大量落矿;
(7)大型铲运机出矿,遥控铲运机收残;
(8)矿石出完后,用尾砂进行充填;
(9)转入下一矿段开采。
下面将结合实施步骤进一步说明本发明的实质。
实施步骤是:先掘进通往盘区的大巷和铲运机斜坡道,然后切顶形成凿岩硐室,硐室中留适当点柱(或条柱),并用喷锚支护;同时在底部掘进出矿平巷和横巷,在凿岩硐室中向下钻大直径深孔,用VCR法(或常规办法)形成切割天井,向切割天井爆破形成切割立槽,尔后向切割槽方向崩矿,一次引爆3-8排炮孔,崩落矿石由大型铲运机出矿,遥控铲运机收残,整个采场出空后,用分级尾砂充填。
该法主要适用于缓倾斜极厚大矿体和急倾斜厚矿体,对缓倾斜极厚大矿体而言,将矿体划分为盘区,然后在倾斜方向将盘区划分为矿段,以矿段为单元进行回采。先在矿段的顶部切顶形成凿岩硐室,尔后以一定的炮孔布置参数向下钻大直径深孔。由于不拉底,为避免底部留残根,深孔要求超深1~2米。大量崩矿前,用深孔爆破形成切割槽。矿段采完后需先充填,再回采下一个矿段。该法的劳动生产率高,成本低,是一种安全高效的采矿法。
Claims (4)
1、一种大直径深孔不拉底采矿法,其特征在于:以大直径深孔落矿,不拉底,用大直径深孔爆破形成切割槽,大型铲运机出矿,遥控铲运机收残,具体步骤如下:
(1)先掘进通往凿岩硐室的铲运机斜道;
(2)切顶形成凿岩硐室,硐室中留适当条柱或点柱;
(3).在凿岩硐室中向下钻大直径深孔;
(4)用深孔爆破形成切割槽;
(5)在底部掘进铲运机出矿巷道;
(6)上述工作完成后,就可大量落矿;
(7)大型铲运机出矿,遥控铲运机收残;
(8)矿石出完后,用尾砂进行充填;
(9)转入下一矿段开采。
2、根据权利要求1所述的大直径深孔不拉底采矿法,其特征在于:深孔要求超深1~2米。
3、根据权利要求1所述的大直径深孔不拉底采矿法,其特征在于:深孔爆破形成切割槽是指用VCR法或常规办法形成切割天井,以切割天井为自由面爆破形成切割槽。
4、根据权利要求1所述的大直径深孔不拉底采矿法,其特征在于:该方法应用于缓倾斜极厚大矿体或急倾斜厚矿体。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100584996A CN101285384B (zh) | 2008-06-05 | 2008-06-05 | 大直径深孔不拉底采矿法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100584996A CN101285384B (zh) | 2008-06-05 | 2008-06-05 | 大直径深孔不拉底采矿法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101285384A true CN101285384A (zh) | 2008-10-15 |
CN101285384B CN101285384B (zh) | 2013-06-12 |
Family
ID=40057766
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008100584996A Expired - Fee Related CN101285384B (zh) | 2008-06-05 | 2008-06-05 | 大直径深孔不拉底采矿法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101285384B (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102003185A (zh) * | 2010-11-05 | 2011-04-06 | 中蓝连海设计研究院 | 分段条带回采尾盐干式充填采矿法 |
CN102425416A (zh) * | 2011-09-12 | 2012-04-25 | 山东科技大学 | 煤矿高应力区域巷道掘进工作面冲击地压防治方法 |
CN102587916A (zh) * | 2012-02-01 | 2012-07-18 | 金建工程设计有限公司 | 一种崩矿嗣后充填采矿方法 |
CN101514630B (zh) * | 2009-04-11 | 2012-07-25 | 中冶京诚(秦皇岛)工程技术有限公司 | 板式放矿崩落采矿法 |
CN101943000B (zh) * | 2009-07-07 | 2012-11-07 | 中国瑞林工程技术有限公司 | 一种爆力运搬出矿方法 |
CN104213934A (zh) * | 2014-07-31 | 2014-12-17 | 昆明理工大学 | 一种地下采矿出矿系统 |
CN104594903A (zh) * | 2014-11-19 | 2015-05-06 | 攀钢集团工程技术有限公司 | 用于全段高组合凿岩爆破的落矿方法 |
CN108086979A (zh) * | 2017-11-27 | 2018-05-29 | 西北矿冶研究院 | 一种垂直深孔柱状药包落矿阶段矿房法采矿工艺 |
CN112282837A (zh) * | 2020-10-27 | 2021-01-29 | 中冶沈勘秦皇岛工程设计研究总院有限公司 | 一种新型地下矿采充布置形式 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1260460C (zh) * | 2003-06-06 | 2006-06-21 | 中南大学 | 顶底柱超前回采深孔落矿连续采矿法 |
CN100504028C (zh) * | 2006-04-11 | 2009-06-24 | 云南锡业集团有限责任公司 | 一种w堑沟型有底部结构受矿巷道以及形成工艺 |
-
2008
- 2008-06-05 CN CN2008100584996A patent/CN101285384B/zh not_active Expired - Fee Related
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101514630B (zh) * | 2009-04-11 | 2012-07-25 | 中冶京诚(秦皇岛)工程技术有限公司 | 板式放矿崩落采矿法 |
CN101943000B (zh) * | 2009-07-07 | 2012-11-07 | 中国瑞林工程技术有限公司 | 一种爆力运搬出矿方法 |
CN102003185A (zh) * | 2010-11-05 | 2011-04-06 | 中蓝连海设计研究院 | 分段条带回采尾盐干式充填采矿法 |
CN102003185B (zh) * | 2010-11-05 | 2012-12-19 | 中蓝连海设计研究院 | 分段条带回采尾盐干式充填采矿法 |
CN102425416B (zh) * | 2011-09-12 | 2013-09-25 | 山东科技大学 | 煤矿高应力区域巷道掘进工作面冲击地压防治方法 |
CN102425416A (zh) * | 2011-09-12 | 2012-04-25 | 山东科技大学 | 煤矿高应力区域巷道掘进工作面冲击地压防治方法 |
CN102587916A (zh) * | 2012-02-01 | 2012-07-18 | 金建工程设计有限公司 | 一种崩矿嗣后充填采矿方法 |
CN102587916B (zh) * | 2012-02-01 | 2015-11-25 | 金建工程设计有限公司 | 一种崩矿嗣后充填采矿方法 |
CN104213934A (zh) * | 2014-07-31 | 2014-12-17 | 昆明理工大学 | 一种地下采矿出矿系统 |
CN104213934B (zh) * | 2014-07-31 | 2016-08-03 | 昆明理工大学 | 一种地下采矿出矿系统 |
CN104594903A (zh) * | 2014-11-19 | 2015-05-06 | 攀钢集团工程技术有限公司 | 用于全段高组合凿岩爆破的落矿方法 |
CN108086979A (zh) * | 2017-11-27 | 2018-05-29 | 西北矿冶研究院 | 一种垂直深孔柱状药包落矿阶段矿房法采矿工艺 |
CN112282837A (zh) * | 2020-10-27 | 2021-01-29 | 中冶沈勘秦皇岛工程设计研究总院有限公司 | 一种新型地下矿采充布置形式 |
Also Published As
Publication number | Publication date |
---|---|
CN101285384B (zh) | 2013-06-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101285384B (zh) | 大直径深孔不拉底采矿法 | |
CN1260461C (zh) | 阶梯式分段挤压崩矿跟随充填连续采矿法 | |
CN102635356B (zh) | 急倾斜薄矿脉多爆破自由面中深孔采矿法 | |
CN103590831B (zh) | 一种缓倾斜薄-中厚矿体的新型采矿方法 | |
CN102619513B (zh) | 同在原岩中布置底部出矿结构的房柱式中深孔充填采矿法 | |
CN101105129B (zh) | 采矿环境再造连续采矿嗣后充填采矿法 | |
CN101338674B (zh) | 直接装运矿石的无底柱分段崩落采矿法 | |
CN102844522B (zh) | 地下采矿 | |
CN109989754A (zh) | 超大规模采场大直径深孔高阶段空场嗣后充填采矿法及应用 | |
CN108625856A (zh) | 一种地下矿山相邻两个采场一条出矿巷的采矿方法 | |
CN104453901A (zh) | 一种薄矿体中深孔崩矿分段空场嗣后充填采矿方法 | |
CN102953732A (zh) | 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法 | |
CN104989404A (zh) | 急倾斜薄矿体脉内伪倾斜落矿中深孔采矿法 | |
CN1982649A (zh) | 一种采矿方法 | |
CN106223956B (zh) | 中深孔天井采矿嗣后充填法 | |
CN104481539A (zh) | 自拉槽挤压爆破崩落采矿法 | |
CN102720500A (zh) | 一种急倾斜薄矿体机械化地下开采方法 | |
CN101368482B (zh) | 缓倾斜矿体全面采矿法的新工艺 | |
CN107975373B (zh) | 一种液气相变诱导下机械化连续采掘硬岩矿方法 | |
CN111058847B (zh) | 一种厚大矿体连续大孔径深孔爆破机械化开采方法 | |
CN101725350A (zh) | 下盘沿脉凿岩穿脉进路出矿式崩落采矿法 | |
CN104481543A (zh) | 阶段留矿崩落采矿法 | |
CN105952450A (zh) | 一种地下矿山井下双采场协同开采的新方法 | |
CN108049870B (zh) | 上盘含不稳岩层的急倾斜中厚矿体的诱导冒落采矿方法 | |
CN101725351A (zh) | 充填法采场底柱回收采矿法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130612 Termination date: 20150605 |
|