CN104481543A - 阶段留矿崩落采矿法 - Google Patents
阶段留矿崩落采矿法 Download PDFInfo
- Publication number
- CN104481543A CN104481543A CN201410736176.3A CN201410736176A CN104481543A CN 104481543 A CN104481543 A CN 104481543A CN 201410736176 A CN201410736176 A CN 201410736176A CN 104481543 A CN104481543 A CN 104481543A
- Authority
- CN
- China
- Prior art keywords
- ore
- ore deposit
- rock
- stage
- nugget
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 23
- 239000011435 rock Substances 0.000 claims abstract description 31
- 238000005065 mining Methods 0.000 claims abstract description 13
- 238000000605 extraction Methods 0.000 claims abstract description 8
- 238000004519 manufacturing process Methods 0.000 claims description 13
- 238000005553 drilling Methods 0.000 claims description 11
- 210000001367 artery Anatomy 0.000 claims description 4
- 210000003462 vein Anatomy 0.000 claims description 4
- 238000005422 blasting Methods 0.000 abstract 1
- 239000004576 sand Substances 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000013467 fragmentation Methods 0.000 description 2
- 238000006062 fragmentation reaction Methods 0.000 description 2
- 230000006698 induction Effects 0.000 description 2
- 229910052500 inorganic mineral Inorganic materials 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 239000011707 mineral Substances 0.000 description 2
- 239000011347 resin Substances 0.000 description 2
- 229920005989 resin Polymers 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000010790 dilution Methods 0.000 description 1
- 239000012895 dilution Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
- E21C41/22—Methods of underground mining; Layouts therefor for ores, e.g. mining placers
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Remote Sensing (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
一种阶段留矿崩落采矿法,在回采过程中不出现大面积采空区,在回采前期利用崩落矿石支撑上盘围岩,在回采后期随着底部出矿,上部覆岩下移充填采空区控制地压,达到安全高效开采,底部结构采用底部堑沟聚矿,底部堑沟采用人字形的无轨装矿进路与运输巷道相连,实现阶段出矿,实施拉底工作时,崩落矿石只出一部分,矿块内松散矿岩维持上盘围岩不垮塌且保证上部落矿有足够自由补偿空间,落矿后从无轨装矿进路出矿,装入矿车运出采场,出矿只出一部分,矿块内松散矿岩维持顶板不垮塌且保证上部落矿有足够自由补偿空间,之后再次落矿,循环直至矿块内的矿石全部爆落,最后进行大放矿,大放矿时,随矿石的不断采出,覆岩不断下移充填采矿区控制地压。
Description
技术领域
本发明属于地下矿山开采技术领域,特别涉及一种阶段留矿崩落采矿法。
背景技术
由于矿床赋存条件复杂多样,矿石和围岩性质多变,在生产实践中应用了种类繁多的采矿方法。按回采时的地压管理方法为依据,采矿方法分为空场采矿法、充填采矿法和崩落采矿法三大类。
空场采矿法回采矿房时形成较大采空区,利用矿柱和矿岩本身的强度维护矿岩稳固。人员作业往往在暴露面积较大的空场作业,在遇到稳固性较差的矿岩时,空场采矿法将不可选。
充填采矿法采用充填料充填矿石采出后形成的采空区,可用支架和充填料配合维护矿岩稳固。充填采矿法成本较高,应用于许多稀贵重矿石的开采。充填采矿法优点是适应性强、贫化损失低、作业较安全、保护地表等;缺点是工艺复杂、成本高、生产效率低。
崩落采矿法在回采矿石后,让顶板和围岩崩落充填采空区,达到管理和控制地压的目的。崩落采矿法主要适用矿岩不稳固的矿体开采,地表允许沉陷。崩落采矿法的优点是机械化程度高、安全、高效、成本低。
在矿床地下开采实践中,当遇到破碎、极不稳固矿岩时,巷道施工非常困难,施工成本高昂。现有的采矿方法由于采准工程量大,围岩暴露面积大,造成很多安全隐患,成本增加,效率低下。
发明内容
为了克服上述现有技术的缺点,本发明的目的在于提供一种阶段留矿崩落采矿法,该方法针对破碎、极不稳固、倾斜矿体开采,具有采准工程量小、围岩暴露面积小、安全高效、成本低的特点,降低了矿石贫化率和损失率,可在冶金、有色、黄金、化工、煤炭等地下开采中灵活应用。
为了实现上述目的,本发明采用的技术方案是:
一种阶段留矿崩落采矿法,在回采过程中不出现大面积采空区,在回采前期利用崩落矿石支撑上盘围岩,在回采后期随着底部出矿,上部覆岩下移充填采空区控制地压。
本发明在矿底采用底部堑沟聚矿,将位于矿底的底部堑沟平巷3采用人字形的无轨装矿进路6与脉外运输平巷1以及脉内运输巷8相连,实现阶段出矿,其中无轨装矿进路6布置于每个矿块底部,底部堑沟平巷3自矿块一端沿矿体走向掘进。
本发明在矿体中央下盘布置一个行人通风天井2,在行人通风天井2内向左右两侧交错布置凿岩硐室7。自底部堑沟平巷3内向上掘进切割天井5,切割天井5为切槽和拉底工作形成自由面和提供补偿空间。
本发明在实施拉底工作及回采过程中,崩落的矿石只出一部分,矿块内的松散矿岩维持顶板围岩不会垮塌,且保证上部落矿有足够的自由补偿空间。
本发明在凿岩硐室7钻凿扇形水平深孔9,每次爆落2~4排实现落矿,落矿后从无轨装矿进路6出矿,装入矿车运出采场,出矿只出一部分,矿块内的松散矿岩维持顶板不会垮塌,且保证上部落矿有足够的自由补偿空间,之后再次落矿,如此循环,直至矿块内的矿石全部爆落,最后进行大放矿,即为阶段出矿。
本发明在大放矿时,随着矿石的不断采出,覆岩不断下移充填采矿区,控制地压。
与现有技术相比,本发明的有益效果是:
1、采切工程量小,采切比小于3m/kt。有效解决了破碎、极不稳固矿岩施工困难和成本过高的问题。
2、回采过程中不出现大面积采空区,回采前期利用崩落矿石支撑上盘围岩稳固。实现了安全开采及有效控制岩石的混入。
3、矿块内所有矿石崩落完后,在底部通过“人”字型无轨装矿进路出矿,实现阶段出矿。生产效率高。
4、采用水平深孔落矿。起到了控制崩落矿石边界的问题,诱导矿块内矿石按照设计要求全部崩落下来。减小了矿石损失率。
5、水平深孔落矿时,爆破起到诱导矿石崩落,实现破碎矿石依靠自重的自然崩落。大大降低了开采成本。
附图说明
图1是沿矿体走向纵剖面图。
图2是矿块横剖面图。
图3是底部结构平面图。
图4是凿岩硐室水平平面图。
具体实施方式
下面结合附图和实施例详细说明本发明的实施方式。
如图1、图2、图3、图4所示,本发明阶段留矿崩落采矿法,主要思路为,在回采过程中不出现大面积采空区,在回采前期利用崩落矿石支撑上盘围岩,在回采后期随着底部出矿,上部覆岩下移充填采空区控制地压,达到安全高效开采。
在具体的实现上,在每个矿块底部布置平底结构的人字形的无轨装矿进路6。矿体中央下盘布置一个行人通风天井2,在行人通风天井2内向左右两侧交错布置凿岩硐室7,单侧凿岩硐室7的垂直间隔为12.5m。自矿块一端沿矿体走向掘进底部堑沟平巷3以及在底部堑沟平巷3一侧的切割平巷4。自底部堑沟平巷3内向上掘进切割天井5。切割天井5主要为切槽和拉底工作形成自由面和提供补偿空间。
崩下矿石从无轨装矿进路6出矿,装入矿车运出采场。出矿只出一部分,矿块内的松散矿岩维持上盘岩体不会垮塌,且保证上部落矿有足够的自由补偿空间。落矿采用潜孔凿岩机在凿岩硐室7钻凿扇形水平深孔9。每次可爆落2~4排,落矿后,从无轨装矿进路6出矿,装入矿车运出采场。出矿只出一部分,矿块内的松散矿岩维持上盘不会垮塌,且保证上部落矿有足够的自由补偿空间。如此循环,直至矿块内的矿石全部爆落,最后进行大放矿。
本发明是根据附图提到的实施例进行了说明,这只是其中的一个实施例,本领域技术人员可以从实施例获得启发,进行变形得到其它实施例。因此本发明的保护范围应该根据权利要求的保护范围来确定。
Claims (8)
1.一种阶段留矿崩落采矿法,其特征在于,在回采过程中不出现大面积采空区,在回采前期利用崩落矿石支撑上盘围岩,在回采后期随着底部出矿,上部覆岩下移充填采空区控制地压。
2.根据权利要求1所述阶段留矿崩落采矿法,其特征在于,在矿底采用底部堑沟聚矿,将位于矿底的底部堑沟平巷(3)采用人字形的无轨装矿进路(6)与脉外运输平巷(1)以及脉内运输巷(8)相连,实现阶段出矿,其中无轨装矿进路(6)布置于每个矿块底部,底部堑沟平巷(3)自矿块一端沿矿体走向掘进。
3.根据权利要求2所述阶段留矿崩落采矿法,其特征在于,所述无轨装矿进路(6)为平底结构。
4.根据权利要求2所述阶段留矿崩落采矿法,其特征在于,在矿体中央下盘布置一个行人通风天井(2),在行人通风天井(2)内向左右两侧交错布置凿岩硐室(7)。
5.根据权利要求4所述阶段留矿崩落采矿法,其特征在于,自底部堑沟平巷(3)内向上掘进切割天井(5),切割天井(5)为切槽和拉底工作形成自由面和提供补偿空间。
6.根据权利要求1或5所述阶段留矿崩落采矿法,其特征在于,在实施拉底工作及回采过程中,崩落的矿石只出一部分,矿块内的松散矿岩维持顶板围岩不会垮塌,且保证上部落矿有足够的自由补偿空间。
7.根据权利要求4所述阶段留矿崩落采矿法,其特征在于,在凿岩硐室(7)钻凿扇形水平深孔(9),每次爆落2~4排实现落矿,落矿后从无轨装矿进路(6)出矿,装入矿车运出采场,出矿只出一部分,矿块内的松散矿岩维持顶板不会垮塌,且保证上部落矿有足够的自由补偿空间,之后再次落矿,如此循环,直至矿块内的矿石全部爆落,最后进行大放矿,即为阶段出矿。
8.根据权利要求7所述阶段留矿崩落采矿法,其特征在于,大放矿时,随着矿石的不断采出,覆岩不断下移充填采矿区,控制地压。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410736176.3A CN104481543B (zh) | 2014-12-05 | 2014-12-05 | 阶段留矿崩落采矿法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410736176.3A CN104481543B (zh) | 2014-12-05 | 2014-12-05 | 阶段留矿崩落采矿法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104481543A true CN104481543A (zh) | 2015-04-01 |
CN104481543B CN104481543B (zh) | 2016-07-06 |
Family
ID=52756135
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410736176.3A Expired - Fee Related CN104481543B (zh) | 2014-12-05 | 2014-12-05 | 阶段留矿崩落采矿法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104481543B (zh) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948819A (zh) * | 2017-05-09 | 2017-07-14 | 长春黄金研究院 | 一种自溜式矿石溜槽出矿的留矿全面采矿法 |
CN107448202A (zh) * | 2017-08-18 | 2017-12-08 | 西北矿冶研究院 | 一种适合急倾斜破碎矿体的连续开采方法 |
CN108005656A (zh) * | 2017-11-27 | 2018-05-08 | 西北矿冶研究院 | 一种超薄急倾斜矿体开采方法 |
CN108104818A (zh) * | 2017-11-27 | 2018-06-01 | 西北矿冶研究院 | 一种厚大块状矿体的地下开采方法 |
CN108561136A (zh) * | 2018-04-18 | 2018-09-21 | 西安建筑科技大学 | 自拉槽自然崩落采矿法 |
CN108590659A (zh) * | 2018-04-13 | 2018-09-28 | 武汉理工大学 | 一种脉内凿岩分层落矿留矿采矿方法 |
CN108678745A (zh) * | 2018-05-11 | 2018-10-19 | 长春黄金研究院有限公司 | 一种薄矿脉砼垫层削壁充填采矿法 |
CN108868768A (zh) * | 2018-08-08 | 2018-11-23 | 中国恩菲工程技术有限公司 | 矿体的出矿水平装矿巷道的布置结构 |
CN109630118A (zh) * | 2018-11-16 | 2019-04-16 | 西北矿冶研究院 | 一种急倾斜不稳固薄矿体开采方法 |
CN113062741A (zh) * | 2021-04-26 | 2021-07-02 | 昆明理工大学 | 一种自然崩落采矿的底部受矿结构及采矿方法 |
CN113216963A (zh) * | 2021-05-18 | 2021-08-06 | 中钢集团马鞍山矿山研究总院股份有限公司 | 一种用于崩落法转充填法过渡开采中存窿矿的回采方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3707307A (en) * | 1970-12-11 | 1972-12-26 | Harry Kristoffersson | Methods in mining by sublevel caving |
CN1963147A (zh) * | 2005-11-07 | 2007-05-16 | 王培福 | 一种采矿方法 |
CN101881169A (zh) * | 2010-06-25 | 2010-11-10 | 东北大学 | 一种分段留矿崩落阶段空场嗣后充填采矿法 |
CN102444403A (zh) * | 2011-12-27 | 2012-05-09 | 西南科技大学 | 缓倾斜矿体无底柱分段崩落法的垂直分区、组合放矿回采技术 |
CN103089266A (zh) * | 2012-12-18 | 2013-05-08 | 鞍钢集团矿业公司 | 露天转地下过渡期无底柱分段空场崩落采矿方法 |
CN104153780A (zh) * | 2014-07-28 | 2014-11-19 | 鞍钢集团矿业公司 | 薄矿体分段崩落留矿连续回采工艺 |
-
2014
- 2014-12-05 CN CN201410736176.3A patent/CN104481543B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3707307A (en) * | 1970-12-11 | 1972-12-26 | Harry Kristoffersson | Methods in mining by sublevel caving |
CN1963147A (zh) * | 2005-11-07 | 2007-05-16 | 王培福 | 一种采矿方法 |
CN101881169A (zh) * | 2010-06-25 | 2010-11-10 | 东北大学 | 一种分段留矿崩落阶段空场嗣后充填采矿法 |
CN102444403A (zh) * | 2011-12-27 | 2012-05-09 | 西南科技大学 | 缓倾斜矿体无底柱分段崩落法的垂直分区、组合放矿回采技术 |
CN103089266A (zh) * | 2012-12-18 | 2013-05-08 | 鞍钢集团矿业公司 | 露天转地下过渡期无底柱分段空场崩落采矿方法 |
CN104153780A (zh) * | 2014-07-28 | 2014-11-19 | 鞍钢集团矿业公司 | 薄矿体分段崩落留矿连续回采工艺 |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948819A (zh) * | 2017-05-09 | 2017-07-14 | 长春黄金研究院 | 一种自溜式矿石溜槽出矿的留矿全面采矿法 |
CN107448202A (zh) * | 2017-08-18 | 2017-12-08 | 西北矿冶研究院 | 一种适合急倾斜破碎矿体的连续开采方法 |
CN108005656A (zh) * | 2017-11-27 | 2018-05-08 | 西北矿冶研究院 | 一种超薄急倾斜矿体开采方法 |
CN108104818A (zh) * | 2017-11-27 | 2018-06-01 | 西北矿冶研究院 | 一种厚大块状矿体的地下开采方法 |
CN108590659A (zh) * | 2018-04-13 | 2018-09-28 | 武汉理工大学 | 一种脉内凿岩分层落矿留矿采矿方法 |
CN108561136B (zh) * | 2018-04-18 | 2019-07-30 | 西安建筑科技大学 | 自拉槽自然崩落采矿法 |
CN108561136A (zh) * | 2018-04-18 | 2018-09-21 | 西安建筑科技大学 | 自拉槽自然崩落采矿法 |
CN108678745A (zh) * | 2018-05-11 | 2018-10-19 | 长春黄金研究院有限公司 | 一种薄矿脉砼垫层削壁充填采矿法 |
CN108868768A (zh) * | 2018-08-08 | 2018-11-23 | 中国恩菲工程技术有限公司 | 矿体的出矿水平装矿巷道的布置结构 |
CN108868768B (zh) * | 2018-08-08 | 2023-09-29 | 中国恩菲工程技术有限公司 | 矿体的出矿水平装矿巷道的布置结构 |
CN109630118A (zh) * | 2018-11-16 | 2019-04-16 | 西北矿冶研究院 | 一种急倾斜不稳固薄矿体开采方法 |
CN113062741A (zh) * | 2021-04-26 | 2021-07-02 | 昆明理工大学 | 一种自然崩落采矿的底部受矿结构及采矿方法 |
CN113216963A (zh) * | 2021-05-18 | 2021-08-06 | 中钢集团马鞍山矿山研究总院股份有限公司 | 一种用于崩落法转充填法过渡开采中存窿矿的回采方法 |
CN113216963B (zh) * | 2021-05-18 | 2022-05-27 | 中钢集团马鞍山矿山研究总院股份有限公司 | 一种用于崩落法转充填法过渡开采中存窿矿的回采方法 |
Also Published As
Publication number | Publication date |
---|---|
CN104481543B (zh) | 2016-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104481543B (zh) | 阶段留矿崩落采矿法 | |
CN108612530B (zh) | 一种上盘围岩破碎倾斜中厚矿体的采矿方法 | |
CN101338674B (zh) | 直接装运矿石的无底柱分段崩落采矿法 | |
CN104989404B (zh) | 急倾斜薄矿体脉内伪倾斜落矿中深孔采矿法 | |
CN104481539B (zh) | 自拉槽挤压爆破崩落采矿法 | |
CN103590831B (zh) | 一种缓倾斜薄-中厚矿体的新型采矿方法 | |
CN105019904B (zh) | 基于采矿机的缓倾斜薄矿脉机械化连续开采方法 | |
CN102493806B (zh) | 一种壁式缓倾斜薄矿体机械化连续采矿方法 | |
CN107829742B (zh) | 一种崩落-充填-空场-崩落采矿方法 | |
CN103437769B (zh) | 组合再造结构体中深孔落矿协同锚索支护嗣后充填采矿法 | |
CN106761912B (zh) | 一种适合于不稳定岩层的高效上向进路分层充填采矿方法 | |
CN106223958A (zh) | 倾斜中厚矿体分区凿岩阶段落矿嗣后充填协同采矿法 | |
CN104453901A (zh) | 一种薄矿体中深孔崩矿分段空场嗣后充填采矿方法 | |
CN102953732A (zh) | 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法 | |
CN102168579A (zh) | 中厚倾斜破碎矿体脉内采准无间柱连续分段充填法 | |
CN1982649A (zh) | 一种采矿方法 | |
CN104533416A (zh) | 极厚大矿体大规模机械化无底柱分段崩落采矿方法 | |
CN101403304A (zh) | 一种大型空区残矿回收方法 | |
CN108590649A (zh) | 一种缓倾斜破碎薄矿脉中深孔开采方法 | |
CN105736009A (zh) | 用于急倾斜薄矿体的留矿堆浸嗣后充填采矿方法 | |
CN103206215A (zh) | 一种预控顶上向进路充填采矿法 | |
CN106194188A (zh) | 电耙‑爆力协同搬运伪倾斜房柱采矿法 | |
CN107829741A (zh) | 一种缓倾斜薄矿体开采方法 | |
CN101285384A (zh) | 大直径深孔不拉底采矿法 | |
CN106640080A (zh) | 一种深部高应力环境下自稳窿形采场布置采矿方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160706 Termination date: 20181205 |