CN1256485C - 钢制人孔 - Google Patents

钢制人孔 Download PDF

Info

Publication number
CN1256485C
CN1256485C CN00121506.XA CN00121506A CN1256485C CN 1256485 C CN1256485 C CN 1256485C CN 00121506 A CN00121506 A CN 00121506A CN 1256485 C CN1256485 C CN 1256485C
Authority
CN
China
Prior art keywords
hole
steel
manhole
height control
control valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN00121506.XA
Other languages
English (en)
Other versions
CN1337501A (zh
Inventor
安炳武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to US09/630,050 priority Critical patent/US6385913B1/en
Priority to SG200004350A priority patent/SG87147A1/en
Application filed by Individual filed Critical Individual
Priority to CN00121506.XA priority patent/CN1256485C/zh
Priority to JP2000242793A priority patent/JP3436916B2/ja
Priority to BR0005430-5A priority patent/BR0005430A/pt
Publication of CN1337501A publication Critical patent/CN1337501A/zh
Application granted granted Critical
Publication of CN1256485C publication Critical patent/CN1256485C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories
    • E03F5/021Connection of sewer pipes to manhole shaft
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/02Manhole shafts or other inspection chambers; Snow-filling openings; accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Sewage (AREA)

Abstract

一种钢制人孔,包括:一个钢箱,具有在其上部形成的一个孔,所述孔带螺栓孔;一个高度控制管,插入到孔的内径部分,有一个竖长孔;一个多孔盖,盖住高度控制管的上部;一个阳螺丝,在钢箱左右部,具有一阳螺丝部;和一个阴螺丝,有与阳螺丝管螺纹接合的螺纹部分。

Description

钢制人孔
技术领域
本发明涉及一种钢制人孔,特别涉及一种能使地下通讯电缆安装方便和下水管线的检查及维修方便的钢制人孔。
背景技术
一般来说,人孔是由向一定形状的框中浇注水泥,然后待浇注水泥硬化制成。在它的左右部分上形成孔,在孔中形成一个管路,然后用水泥填满孔和管路之间的间隙。
但是,上述工作复杂,在水泥硬化前不开展工作。另外,因为人孔的形成时间长,行人必须绕行。
另外,人孔的建设地点是危险的,处理人孔制造后产生的废物的费用很大。
因为在人孔的孔和管路的连接部分之间不能保证防水,雨水会渗入到人孔。此时,在维修电力系统或通讯系统时必须将水除去。
发明内容
因此,本发明的一个目的是提供一种钢制人孔,它能显著降低建筑周期,可回收再利用,并降低原料用量。
为达到上述目的,提供的一种钢制人孔,包括:一个钢箱,具有在其上部形成的一个孔,所述孔有螺栓孔;一个高度控制管,有一个竖长孔;插入到孔的内径部分,一个多孔盖盖住高度控制管的上部;一个阳螺丝,在钢箱左右部并具有一阳螺丝部;和一个阴螺丝,有一个与阳螺丝管接合的螺纹部分。
钢箱的前后面突出,并在外表面上焊接钢加强筋。
为达到上述目的,提供的一种钢制人孔,包括:一个波形钢管;一个在波形钢管的中间上表面部分上的孔,所述孔在侧面上具有多个孔;一个高度控制管,插入孔中并有在与孔相应部分上的多个高度控制孔;和多孔盖,插入孔上部且盖住孔上部。
所述波形管包括在上表面形成的孔的相对底部上的一个收集腔。
以下说明将使本发明的其它优点、目的和特征更明了。
附图说明
通过以下详细说明和附图将会更好理解本发明,这些详细说明和附图仅是为了说明,而不是限制本发明。
图1是本发明第一实施例钢制人孔的分解透视图;
图2是本发明第一实施例钢制人孔的剖视图;
图3是本发明第二实施例钢制人孔的分解透视图;和
图4是本发明第二实施例钢制人孔的剖视图。
具体实施方式
下面参照附图说明本发明第一实施例。
图1是本发明第一实施例钢制人孔的分解透视图。图2是本发明第一实施例钢制人孔的剖视图。
如图所示,一个钢制人孔15包括一个在一个六面体钢箱1的上表面上的孔2。工作人员可通过孔2进入地下建筑部分。在孔2每个面上下部分上形成两个螺栓孔3和3’。在孔2的上内径部分上安装一个高度控制管4。
在高度控制管4的每个面上形成多个竖长孔5。螺栓6插入螺栓孔3和3’和坚长孔5中,从而正确控制高度控制管4的高度,并且螺母与螺栓6接合,将高度控制管4组装上去。
钢阳螺丝管7和7’焊在钢箱1的左右部上,树脂阴螺丝连接管8和8’与阳螺丝7和7’螺纹接合。
用阳螺丝管7和7’和阴螺丝管8和8’连接成一个树脂管路,钢箱1的前后面向外突出,在外表面上焊接多个加强钢筋9。
另外,在高度控制管4的上部的内径部上形成一个台阶部11,起人孔盖作用的多孔盖10盖在台阶11上。
下面参照附图说明本发明第二实施例。
图3是本发明第二实施例钢制人孔的分解透视图。图4是本发明第二实施例钢制人孔的剖视图。
如图所示,钢制人孔30包括一个孔22,它形成在波形钢管21中间上表面上,使工作人员可通过孔22进入地下建筑部分。
孔22的形状可以是矩形或圆形的,一个与孔22有相同形状的高度控制管23插入孔22。
在孔22上形成多个孔24,并在高度控制管23的壁上与孔24的间隔一致地形成高度控制孔25。
在建筑一条道路时,螺栓26固定在孔24和高度控制孔25中,孔24和高度控制孔25是通过将高度控制管23插入到孔22中,使得人孔的高度与道路的高度一致。
在高度控制管23的上部的内径部上形成一个台阶23,起人孔盖作用的盖27盖在台阶23上。
另外,在与孔22相对的底部形成一个收集腔28,废物收集在收集腔28中,从而防止阻塞现象。在本发明的另外一个实施例也可以不形成收集腔。
在安装排水管时,用连接带在钢波形管1的两端连接波形管。
因此,只是将本发明的钢制人孔移动到建筑工地便完成该项建筑。根据本发明,可在冬季施工。建筑周期大为减少。在建筑时行人不必绕行。另外也防止任何意外事故。
在电力和通讯电缆路间的连接部分完全密封。因此,雨不会渗到连接部分。人孔可回收利用,并不需要废物处理的费用。
另外,本发明在软地层和下陷地区可很好地应用。
通过螺栓接合控制在孔中的高度控制件,可控制人孔的高度,从而实现精确构筑。因为不在建筑现场而是在工厂制造人孔,所以产品质量好,并可以按用户的要术进行设计。
由于分开高度控制管和盖,人孔重量轻,易于移动,并可避免损坏和破裂。
虽然已说明了本发明的优选实施例,但业内人士会在不离开权利要求的本发明范围和精神下提出修改、增加和替换的方案。

Claims (4)

1.一种钢制人孔,包括:
一个钢箱,具有在其上部形成的一个孔,所述孔有一个螺栓孔;
一个高度控制管,插入到孔的内径部分并有一个竖长孔;
一个多孔盖,盖住高度控制管的上部;
一个阳螺丝,做在钢箱左右部并具有一阳螺丝部;和
一个阴螺丝,有一个与阳螺丝管螺纹接合的螺纹部分。
2.根据权利要求1所述的人孔,其特征在于,钢箱的前后面突出,并在外表面焊接上钢加强筋。
3.一种钢制人孔,包括:
一个波形钢管;
一个在波形钢管的中间上表面部分上的孔,所述孔在侧面上具有多个孔;
一个高度控制管,插入孔中并在与孔相应部分上有多个高度控制孔;和
多孔盖,插入孔上部而盖住孔上部。
4.根据权利要求3所述的人孔,其特征在于,所述波形管包括一个在上表面孔的相对底部上的收集腔。
CN00121506.XA 2000-08-01 2000-08-08 钢制人孔 Expired - Fee Related CN1256485C (zh)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US09/630,050 US6385913B1 (en) 2000-08-01 2000-08-01 Steel manhole
SG200004350A SG87147A1 (en) 2000-08-01 2000-08-03 Steel manhole
CN00121506.XA CN1256485C (zh) 2000-08-01 2000-08-08 钢制人孔
JP2000242793A JP3436916B2 (ja) 2000-08-01 2000-08-10 鉄製マンホール
BR0005430-5A BR0005430A (pt) 2000-08-01 2000-11-17 Bueiro de aço

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US09/630,050 US6385913B1 (en) 2000-08-01 2000-08-01 Steel manhole
SG200004350A SG87147A1 (en) 2000-08-01 2000-08-03 Steel manhole
CN00121506.XA CN1256485C (zh) 2000-08-01 2000-08-08 钢制人孔
JP2000242793A JP3436916B2 (ja) 2000-08-01 2000-08-10 鉄製マンホール
BR0005430-5A BR0005430A (pt) 2000-08-01 2000-11-17 Bueiro de aço

Publications (2)

Publication Number Publication Date
CN1337501A CN1337501A (zh) 2002-02-27
CN1256485C true CN1256485C (zh) 2006-05-17

Family

ID=27507803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN00121506.XA Expired - Fee Related CN1256485C (zh) 2000-08-01 2000-08-08 钢制人孔

Country Status (5)

Country Link
US (1) US6385913B1 (zh)
JP (1) JP3436916B2 (zh)
CN (1) CN1256485C (zh)
BR (1) BR0005430A (zh)
SG (1) SG87147A1 (zh)

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6116813A (en) * 1999-08-17 2000-09-12 Pate; Richard Cover for in-ground meter enclosures used in traffic loading conditions, and method for making
ITMI20020659A1 (it) * 2002-03-28 2003-09-29 I C E A S R L Dispositivo per segnaletica orizzontale e pavimentazione stradale peruna incrementata sicurezza ed una migliorata viabilita'
US20040040221A1 (en) * 2002-08-26 2004-03-04 Michael Airheart Molded manhole unit
US7413372B2 (en) * 2005-04-20 2008-08-19 Tuf-Tite, Inc. Trench drain frame and grate assembly
CN100410457C (zh) * 2005-06-02 2008-08-13 周佰兴 组合管件式检查井
US20070122234A1 (en) * 2005-11-29 2007-05-31 Smet-Weiss Judith A Attachment plate for dewatering device
US20070177942A1 (en) * 2006-01-31 2007-08-02 Tuf-Tite, Inc. Trench pan and grate assembly
US7802402B2 (en) * 2006-09-26 2010-09-28 Turtl Enterprises Llc Crawl space access device
US8573883B2 (en) 2008-11-14 2013-11-05 Munro Ltd. Integrated frame and cover system
EP2199469B1 (en) * 2008-12-16 2012-06-06 Vestas Wind Systems A/S Foundation for enabling anchoring of a wind turbine tower thereto by means of replaceable through-bolts
RU2491469C2 (ru) * 2011-08-08 2013-08-27 Александр Иванович Конев Способ гидроизоляции колодца трубопровода в болотах и озерах
US10214345B1 (en) * 2011-12-12 2019-02-26 Cameron Gordon Howie Entryway protective collar
USD722678S1 (en) 2012-12-12 2015-02-17 Canada Pipe Company ULC Grate
US9290968B2 (en) 2012-12-18 2016-03-22 Canada Pipe Company ULC Locking mechanism for a cover
US9127447B2 (en) 2013-01-24 2015-09-08 Canada Pipe Company ULC Frame for an inlet of a catch basin or manhole
US9157213B2 (en) 2013-03-05 2015-10-13 Canada Pipe Company ULC Eccentric frame for an inlet of a catch basin or manhole
KR20180039852A (ko) * 2016-10-11 2018-04-19 주식회사 호성건설 콘크리트 강화구조를 갖는 하수도용 금속맨홀
USD872838S1 (en) 2017-10-31 2020-01-14 David Callaghan Gate box safety riser
US10563373B1 (en) 2018-04-05 2020-02-18 Predl Systems North America Inc Manhole assembly
CN108445995A (zh) * 2018-05-30 2018-08-24 红火牛公司 便于diy的伸缩调节式机箱
US10822766B1 (en) * 2018-08-29 2020-11-03 Predl Systems North America Inc. Manhole saddle tee
US10968594B1 (en) 2018-11-20 2021-04-06 Predl Systems North America Inc. Manhole rehabilitation system
US11377863B1 (en) 2019-11-13 2022-07-05 Predl Systems North America Inc. Aggregate panel system
CN115369921B (zh) * 2022-09-29 2023-06-16 国网河南省电力公司宜阳县供电公司 一种易填埋电力窨井

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4805920A (en) * 1986-05-01 1989-02-21 Norman Gavin Pipe seal and closure member
DE3815365A1 (de) * 1987-05-05 1989-08-17 Hoos Hubert Dipl Ing Fh Einbauteil fuer schaechte und entwaesserungsteile und vorrichtung zur handhabung desselben
US5852901A (en) * 1994-12-29 1998-12-29 Tuf-Tite, Inc. Stackable riser for on-site waste and drainage systems
DE59913773D1 (de) * 1998-04-30 2006-09-28 Gerhard Schone Vorrichtung zum Höhenausgleich zwischen Schachthals und Fahrbahnoberfläche und Anordnung der Vorrichtung in einer Fahrbahnkonstruktion
US6106196A (en) * 1998-06-05 2000-08-22 Hantz, Jr.; Clyde Liquid drain system, components therefor and method for using same
US6234711B1 (en) * 1999-07-23 2001-05-22 Donald B. Beaman Curb and gutter frame and funnel drain
DE20009136U1 (de) * 2000-04-19 2000-11-23 ICS Industrie Consult & Service Planungsgesellschaft mbH, 47608 Geldern Schachtabdeckung zur Adaptierung herkömmlicher Betonschachtsysteme mit in Höhe,Lage und Neigung verstellbaren Abdeckungen aus Metall oder Kunststoff

Also Published As

Publication number Publication date
JP2002061215A (ja) 2002-02-28
US6385913B1 (en) 2002-05-14
BR0005430A (pt) 2002-06-25
CN1337501A (zh) 2002-02-27
SG87147A1 (en) 2002-03-19
JP3436916B2 (ja) 2003-08-18

Similar Documents

Publication Publication Date Title
CN1256485C (zh) 钢制人孔
KR100877328B1 (ko) 가로등 설치방법 및 이에 사용되는 매립박스
CN206721928U (zh) 一种方便打开的市政道路雨水检查井盖
CN2546500Y (zh) 预制装配式混凝土检查井
CN205453058U (zh) 预制式电缆沟
KR20050015899A (ko) 가로등 기초
CN210163943U (zh) 白改黑市政道路检查井加固升级结构
CN108894255B (zh) 地下混凝土结构变形缝的止水方法
CN202227461U (zh) 一种快速组合检查井组件
CN1699703A (zh) 组合管件式检查井
CN2346096Y (zh) 电缆管道密封器
JPH0346071Y2 (zh)
KR100717714B1 (ko) 맨홀 조립체
CN216640227U (zh) 一种道路桥梁工程的道路防渗结构
CN214994092U (zh) 一种防脱落型混泥土井圈
CN208767757U (zh) 一种电缆管道密封装置
CN2680735Y (zh) 组合式钢筋混凝土窨井
CN212908542U (zh) 预制舱用可拆卸式防风沙门斗
KR102678778B1 (ko) 맨홀블록
CN218437198U (zh) 一种可周转式临时井盖替代盖
CN211849021U (zh) 预制框架式箱涵单元
KR200407181Y1 (ko) 방수밀폐형 맨홀
CN216713926U (zh) 免后浇预埋钢盒干式连接节点的预制混凝土电梯结构
CN207582516U (zh) 隐形井盖
CN107130798A (zh) 一种木模板防爆螺栓安装方法

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060517

Termination date: 20110808