CN1207178C - Vehicle for transporting bulk material - Google Patents

Vehicle for transporting bulk material Download PDF

Info

Publication number
CN1207178C
CN1207178C CNB021440603A CN02144060A CN1207178C CN 1207178 C CN1207178 C CN 1207178C CN B021440603 A CNB021440603 A CN B021440603A CN 02144060 A CN02144060 A CN 02144060A CN 1207178 C CN1207178 C CN 1207178C
Authority
CN
China
Prior art keywords
car
belt conveyor
freight container
accumulating
container
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB021440603A
Other languages
Chinese (zh)
Other versions
CN1410330A (en
Inventor
约瑟夫·陶依尔
赫伯特·沃戈特
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Franz Plasser Bahnbaumaschinen Industrie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Franz Plasser Bahnbaumaschinen Industrie GmbH filed Critical Franz Plasser Bahnbaumaschinen Industrie GmbH
Publication of CN1410330A publication Critical patent/CN1410330A/en
Application granted granted Critical
Publication of CN1207178C publication Critical patent/CN1207178C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61DBODY DETAILS OR KINDS OF RAILWAY VEHICLES
    • B61D15/00Other railway vehicles, e.g. scaffold cars; Adaptations of vehicles for use on railways
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/03Displacing or storing ballast
    • E01B2203/032Displacing or storing ballast with special use or configuration of conveyor belts

Landscapes

  • Engineering & Computer Science (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Loading Or Unloading Of Vehicles (AREA)
  • Warehouses Or Storage Devices (AREA)
  • Handcart (AREA)
  • Structure Of Belt Conveyors (AREA)
  • Framework For Endless Conveyors (AREA)
  • Intermediate Stations On Conveyors (AREA)
  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Abstract

The railway freight wagon (1), to carry and transport loose materials (21), has a rail chassis (2) with a wagon frame (4) and a bonded container (6). A conveyor belt (9), which moves along the vehicle longitudinal direction and which has an ejection end (8) and entry end (19) of the container, is at the container (6) floor. A transfer conveyor belt (11) is at the leading end (13) of the wagon frame (4), in the direction of travel (5), projecting over the end, with it's the start point (10) under the ejection end (8) of the container conveyor belt (9) at a transfer point (20). A second container (7) with a second container conveyor belt (15) is arranged to follow the first container (6) with the first container conveyor belt (9) and linked with the transfer conveyor belt (11). The second container conveyor belt is arranged above the entry end (19) of the first container conveyor belt (9) to form a second transfer point (18).

Description

Bulk granular material accumulating car
Technical field
The present invention relates to a kind of accumulating car that bulk granular material is used that transports.
Background technology
No. 5221172 patents of US have been introduced a kind of accumulating car.This car can be with good mode Self-loading ﹠ self-unloading, thereby accumulating capacity that can be on demand connects any accumulating car and hangs into car team.The batch feeding end of wherein passing on belt conveyor is positioned at the top of belt conveyor rear end at the bottom of the car and forms the conveyor line of a perforation.
Summary of the invention
Purpose of the present invention will provide a kind of accumulating car exactly, and this accumulating car can strengthen the accumulating capacity under the situation that keeps well-known advantage.
According to the present invention, the object of the present invention is achieved like this, and a kind of accumulating car promptly is provided, and has one and utilize the under-carriage rail travelling mechanism traveling, that link to each other with freight container; Article one, according to longitudinal direction of car running, form the freight container bottom surface and batch feeding end is arranged and the car of storage end at the bottom of belt conveyor, and one stretched out the transmission belt conveyor under-carriage front end, that storage end is arranged according to direction of transfer, storage end is positioned at the bottom of the car under the belt conveyor batch feeding end and forms the transmission point, wherein, there is second freight container with belt conveyor at the bottom of second car back with first freight container of belt conveyor at the bottom of first car that is connected with the transmission belt conveyor according to direction of transfer, the preceding batch feeding end of belt conveyor is positioned at the top of transmitting the band storage end at the bottom of first car at the bottom of second car, forms the second transmission point.
Take this terms of settlement, in fact just can make the accumulating capabilities double, and the accumulating unit is divided into two, just can avoid belt conveyor overload at the bottom of the car reliably.In addition can be in the place of second transmission point installing framework joint, so that obtain better maneuverability during by curve.
Other advantage of the present invention and version can be referring to claim and legends.
Hereinafter will utilize graphic structure example further to illustrate the present invention.
Description of drawings
In the accompanying drawing,
Fig. 1 is the lateral plan of accumulating car;
The lateral plan that Fig. 2 amplifies for accumulating car middle part;
The birds-eye view that Fig. 3 very simplifies for accumulating car middle part;
Figure 4 and 5 are respectively other structure examples of accumulating car.
The specific embodiment
The accumulating car 1 that transports bulk granular material 21 usefulness shown in Fig. 1 and 2 has a under-carriage 4 that utilizes rail travelling mechanism 2 traveling on track 3.Under-carriage 4 according to direction of transfer 5 and first freight container 6 be right after after second freight container 7 link to each other.At the bottom of first car in first freight container 6 belt conveyor 9 batch feeding ends 8 below be the storage end 10 of transmission belt conveyor 11, form the first transmission point 20 with this.The batch feeding end 12 of transmission belt conveyor 11 stretches out the front end 13 of under-carriage 4, and can pivot around vertical axis 14.
Second freight container 7 is equipped with according to belt conveyor 15 at the bottom of second car of longitudinal direction of car extension.Transmit at the bottom of this car and have back storage end 16 and preceding batch feeding end 17.Before batch feeding end 17 be located immediately at the top of belt conveyor 9 storage ends 19 at the bottom of first car, form the second transmission point 18 thus. Belt conveyor 9,15 and transmission belt conveyor 11 are equipped with the actuating device 22 that can start separately respectively at the bottom of every car.
Under-carriage 4 by three tandem, utilize framework joint 23 bonded assembly frame sections 24 to form.Intermediate frame part 24 links to each other with two rail travelling mechanisms 2, preceding and rear frame section 24 then respectively have one with framework joint 23 rail travelling mechanism 2 separated by a distance.Forward second transmission point, 18 the tops that vertically are positioned at intermediate frame part 24 middle parts of bulk granular material 21 usefulness, or exactly be positioned at the centre in two framework joints 23 according to vehicle.
As Fig. 2 and 3 concrete shown in, an end of each freight container 6,7 links to each other with under-carriage 4 by step bearing 25 (St  tzlager), can center on 26 rotations of vertical pivot center.Respectively there is an elastic supporting element 27 to be positioned at the both sides of step bearing 25, is used for freight container 6 is supported on frame section 24 according to lateral direction of car.In order further to transmit load to intermediate frame part 24, two vertical ends of intermediate frame part respectively have two according to lateral direction of car supporting member 28 separated by a distance.Freight container 6,7 links to each other with under-carriage 4 by the support 29 in the middle of being positioned at according to lateral direction of car respectively in the end on step bearing 25 opposites.Utilize this support can make a little between freight container 6,7 and the frame section 24 relative motion.
As shown in Figure 4, under-carriage 4 is made up of three frame sections 24 that even hang, that each links to each other with two rail travelling mechanisms 2.Wherein intermediate frame part 24 links to each other with the rear end of first freight container 6 and the front end 31 of second freight container 7.
Accumulating car 1 shown in Figure 5 have only two that even hang, respectively the frame section 24 of two rail travelling mechanisms 2 arranged.Each frame section 24 is equipped with belt conveyor 9,15 at the bottom of freight container 6,7 and the car respectively.
In the accompanying drawings, 1 is the accumulating car; 2 is rail travelling mechanism; 3 is track; 4 is under-carriage; 5 is direction of transfer; 6 is first freight container; 7 is second freight container; 8 is batch feeding end; 9 is belt conveyor at the bottom of first car; 10 is storage end; 11 are the transmission belt conveyor; 12 is batch feeding end; 13 is front end; 14 is axis; 15 is belt conveyor at the bottom of second car; 16 is the back storage end; 17 is preceding batch feeding end; 18 is the second transmission point; 19 is storage end; 20 is the first transmission point; 21 is bulk granular material; 22 is actuating device; 23 is the framework joint; 24 is frame section; 25 is step bearing; 26 is pivot center; 27 is supporting member; 28 is supporting member; 29 is midship mounting; 30 is the rear end; 31 is front end.

Claims (9)

1. accumulating car (1) that transports bulk granular material (21) usefulness, comprise that is utilized rail travelling mechanism (a 2) traveling, the ground under-carriage (4) that links to each other with freight container (6), article one, turn round according to longitudinal direction of car, form freight container (6) bottom surface and batch feeding end (8) is arranged and the car of storage end (19) at the bottom of belt conveyor (9), and one stretched out under-carriage (4) front end (13) according to direction of transfer (5), the transmission belt conveyor (11) that storage end (10) is arranged, described storage end (10) is positioned under the batch feeding end (8) of belt conveyor (9) at the bottom of the car and forms and transmit point (20), it is characterized in that, there is second freight container (7) with belt conveyor (15) at the bottom of second car back with first freight container (6) of belt conveyor (9) at the bottom of first car that is connected with transmission belt conveyor (11) according to direction of transfer (5), the preceding batch feeding end (17) of belt conveyor at the bottom of second car (15) is positioned at the top of the storage end (19) of belt conveyor (9) at the bottom of first car, forms the second transmission point (18) thus.
2. accumulating car according to claim 1, it is characterized in that, under-carriage (4) utilizes hinged, the tandem frame section in framework joint (23) (24) to form by three, wherein intermediate frame part (24) links to each other with two rail travelling mechanisms (2), and two other frame section (24) then links to each other with framework joint (23) rail travelling mechanism (2) separated by a distance with one respectively.
3. accumulating car according to claim 1 is characterized in that, the second transmission point (18) is according to the middle part that vertically is positioned at intermediate frame part (24) of vehicle.
4. accumulating car according to claim 1 is characterized in that, each freight container (6,7) one vertically end can link to each other with under-carriage (4) rotationally by having step bearing (25) vertical pivot center (26), in the middle of being positioned at according to lateral direction of car.
5. accumulating car according to claim 4 is characterized in that, the supporting member (27) that laterally respectively has according to vehicle between freight container (6) and frame section (24) is positioned at the both sides of step bearing (25).
6. accumulating car according to claim 4 is characterized in that, the end that is positioned at step bearing (25) opposite on each freight container (6,7) is positioned at middle support (29) by one according to lateral direction of car and links to each other with frame section (24).
7. according to each described accumulating car in the claim 1 to 6, it is characterized in that, each is vertically held and has two supporting members separated by a distance according to lateral direction of car (28) to be installed between frame section (24) and the freight container (6,7) in intermediate frame part (24).
8. according to each described accumulating car in the claim 1 to 6, it is characterized in that belt conveyor (9,15) has independent actuating device (22) at the bottom of every car, so that can start independently of one another.
9. accumulating car according to claim 1, it is characterized in that, under-carriage (4) is made up of three frame sections (24) that even hang, that each links to each other with two rail travelling mechanisms (2), and wherein intermediate frame part (24) links to each other with the rear end (30) of first freight container (6) and the front end (31) of second freight container (7).
CNB021440603A 2001-10-03 2002-09-29 Vehicle for transporting bulk material Expired - Fee Related CN1207178C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AT0075701U AT4841U3 (en) 2001-10-03 2001-10-03 STORAGE TROLLEY FOR TRANSPORTING BULK MATERIAL
ATGM757/2001 2001-10-03

Publications (2)

Publication Number Publication Date
CN1410330A CN1410330A (en) 2003-04-16
CN1207178C true CN1207178C (en) 2005-06-22

Family

ID=3498979

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB021440603A Expired - Fee Related CN1207178C (en) 2001-10-03 2002-09-29 Vehicle for transporting bulk material

Country Status (6)

Country Link
EP (1) EP1300312B1 (en)
JP (1) JP2003176014A (en)
CN (1) CN1207178C (en)
AT (2) AT4841U3 (en)
DE (1) DE50211131D1 (en)
ES (1) ES2294096T3 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT504497B1 (en) * 2007-02-19 2008-06-15 Plasser Bahnbaumasch Franz Storage cart is equipped with loading container and with transfer conveyor belt, where loading container has rear wall which is modified according to position in relation to floor conveyor belt
DE102008003951A1 (en) * 2008-01-11 2009-07-16 Werner Stark Device for transferring building materials for a substructure and / or superstructure of a roadway
CN102826355B (en) * 2012-09-18 2015-01-21 四川自贡长桥运输机械工程有限公司 Combine conveyer and assembly method thereof
FR3014066B1 (en) * 2013-12-02 2017-10-27 Gtf WAGON LOADER OF BULK PRODUCTS WITH UNLOADING MEANS
MX354836B (en) 2014-11-05 2018-03-21 Herzog Railroad Services Inc Material transport and distribution consist with controlled gated hopper cars and conveyor systems.
CN108313769B (en) * 2018-04-08 2023-08-22 大连华锐重工集团股份有限公司 Box turning machine for railway flatcar transportation top-open container
CN109051879A (en) * 2018-07-17 2018-12-21 芜湖固高自动化技术有限公司 A kind of bag-pack cement loading machine structure
CN111376926A (en) * 2018-12-29 2020-07-07 中国铁建高新装备股份有限公司 Material trolley with telescopic throwing belt and operation method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE58902388D1 (en) * 1989-12-01 1992-11-05 Plasser Bahnbaumasch Franz TRACKABLE PLANT FOR THE TRANSPORT OF SCHUETTGUT.
ES2041557T3 (en) 1990-12-14 1993-11-16 Franz Plasser Bahnbaumaschinen- Industriegesellschaft M.B.H. LOADING WAGON FOR BULK MATERIAL.
AT398993B (en) * 1992-03-16 1995-02-27 Plasser Bahnbaumasch Franz TRANSPORT TROLLEYS WITH A TROLLEY FRAME BASED ON RAIL TROLLEY
EP0841232B1 (en) * 1996-11-07 2002-04-10 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Bulk goods handling wagon
EP1083262A3 (en) * 1999-09-10 2001-08-01 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Method for loading and unloading a vehicle of a transport train and vehicle therefor
AT3579U3 (en) * 2000-02-18 2001-01-25 Plasser Bahnbaumasch Franz BULK LOADING CARRIAGE

Also Published As

Publication number Publication date
AT4841U2 (en) 2001-12-27
EP1300312B1 (en) 2007-10-31
JP2003176014A (en) 2003-06-24
EP1300312A1 (en) 2003-04-09
AT4841U3 (en) 2002-07-25
ES2294096T3 (en) 2008-04-01
CN1410330A (en) 2003-04-16
DE50211131D1 (en) 2007-12-13
ATE376953T1 (en) 2007-11-15

Similar Documents

Publication Publication Date Title
CN1075452C (en) Bulk material loading wagon
CN1200861C (en) Conveyer
KR850700023A (en) Combined transport
CN1207178C (en) Vehicle for transporting bulk material
CN1054048A (en) Transport wagon for loose bulk goods
CN1171769C (en) Bulk granular material loading vehicle
CN1065187C (en) Vehicle for carrying bulk material
CA1266016A (en) Apparatus for the overhead transportation of heavy loads on a monorail
EP0701936B1 (en) Deformable bridge between two loading platforms carried by adjacent underframes, especially railway underframes
FR2515595A1 (en) DIRECTIONAL FORCE GUIDE SYSTEM FOR BOGIE CONNECTING AND SUPPORTING TWO COUPLES OF RAIL VEHICLES
RU2152320C1 (en) Freight car for bulk material
CN102039902B (en) Trolley conveying device
US4117906A (en) Linear travel device for self-propelled articulated vehicle
CN1076293C (en) Two vehicles flexibly connected to each other, e. g. railway coaches or underground coaches
FR2717435A1 (en) Method and system for loading and unloading wagons for the transport of road vehicles and adapted wagons
AT504497A4 (en) Storage cart is equipped with loading container and with transfer conveyor belt, where loading container has rear wall which is modified according to position in relation to floor conveyor belt
EP1775203B1 (en) Semitrailer
CN114074808A (en) Garbage transfer truck
CN102686502B (en) Straddle carrier for use in container terminals and for general transport tasks
CN214086709U (en) Grain conveying device with double conveyors
SK120298A3 (en) Articulated wagon for combined transport, especially of road vehicles
CN216917287U (en) Grain distribution vehicle for warehousing bulk grains in horizontal warehouse and grain distribution vehicle frame thereof
CN102464196A (en) Loading vehicle
EP0174975A1 (en) Sealing device for a set of wagons having laterally tiltable bodies
JPH0728774U (en) Single-rail carrier transport cart connection structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050622

Termination date: 20200929