CN1201052C - Construction method of walking typhlosole with integrally poured decorative concrete on site - Google Patents

Construction method of walking typhlosole with integrally poured decorative concrete on site Download PDF

Info

Publication number
CN1201052C
CN1201052C CN 03116318 CN03116318A CN1201052C CN 1201052 C CN1201052 C CN 1201052C CN 03116318 CN03116318 CN 03116318 CN 03116318 A CN03116318 A CN 03116318A CN 1201052 C CN1201052 C CN 1201052C
Authority
CN
China
Prior art keywords
sidewalk
blind
concrete
blind road
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 03116318
Other languages
Chinese (zh)
Other versions
CN1442580A (en
Inventor
郭四龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI GIANT ENERGY-SAVING MATERIALS Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 03116318 priority Critical patent/CN1201052C/en
Publication of CN1442580A publication Critical patent/CN1442580A/en
Application granted granted Critical
Publication of CN1201052C publication Critical patent/CN1201052C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The present invention relates to a method for construction of an integrally concrete casting decoration sidewalk for the blind. The present invention is characterized in that the method comprises the following steps: step 1, according to the designed intensity of the surface of a road in an area where the sidewalk for the blind needs to be laid, constructing a road bed and casting concrete; step 2, laying the sidewalk for the blind on the lately laid concrete surface; step 3, carrying out the sealing of the concrete surface on the surface of the dried and formed sidewalk for the blind; step 4, putting into operation, wherein the second step can be implemented by either of the following processes: process 1, firstly, putting a special mould on the concrete surface and carrying out the finishing operation after a chromatic concrete reinforcement material is spread on the surface, so that the glossed, roughcast or half-roughcast surface of the sidewalk for the blind is formed, and then, carrying out maintenance until the mould is removed; process 2, firstly, spreading the chromatic concrete reinforcement material on the concrete surface and smoothing and compacting the concrete surface, next, spreading a mould separating powder on the concrete surface, then, moulding patterns on the sidewalk for the blind with a mould for the sidewalk for the blind and washing out the mould separating powder after carrying out maintenance until the certain intensity of the concrete surface is reached, and lastly, carrying out maintenance until the formed concrete surface is dried. Consequently, by the present invention, the safety of the sidewalk for the blind is improved, and the construction of the sidewalk for the blind can be carried out in different environment.

Description

Construction method of integral cast-in-situ decorative concrete sidewalk blind road
Technical Field
The invention relates to a construction method of a blind sidewalk, in particular to a construction method of an integral cast-in-situ decorative concrete blind sidewalk.
Background
With the development of social civilization, the pedestrian blind sidewalk is increasingly paid attention to, and the pedestrian blind sidewalk becomes an essential component of pedestrian roads, public facilities and the like.
In the prior art, two construction methods of pedestrian blind sidewalks are provided, one is a product paving method, and the other is a thin blind sidewalk product surface pasting method.
The method for paving the products comprises the steps of reserving the width of a pedestrian blind road when the pedestrian road is built, and paving the blind road after other parts of the pedestrian road are made, wherein the blind road can be made of cement products, ceramic products or synthetic products of resin and cement; however, the method for paving the pedestrian blind sidewalk in the product class has the following defects in the actual manufacturing and using processes:
firstly, the method has the advantages that the basic universal part of the pedestrian road must be made first, and then the pedestrian blind road is laid, so that the period for building the pedestrian road is long;
secondly, because the sidewalk blind sidewalk is paved twice on the foundation, the sidewalk blind sidewalk has poor combination firmness with the sidewalk foundation, and the phenomena of loosening and falling off of blind sidewalk products are easily generated during use, so that the overall safety is poor, and if the blind sidewalk products are not repaired in time, the blind sidewalk products bring more inconvenience to the blind people (the paving effect of the blind sidewalk bricks on the urban sidewalk is the same at present).
The surface sticking method of the thin blind road product is that when a pedestrian road is built, after the pedestrian road is made, thin blind road products are stuck to the part where the pedestrian blind road needs to be laid, and the thin blind road products are usually rubber flexible products. However, the thin product surface pasting method has the following defects in the actual manufacturing and using processes:
firstly, the method needs to make the pedestrian road firstly, and then paste the blind road product on the part needing to be laid with the pedestrian blind road, so the period for building the pedestrian road is longer;
secondly, because the thin blind road product is usually a rubber flexible product and is an organic synthetic product, the weather resistance is poor;
the thin blind road product is glued with the pavement of the pedestrian road through glue, and the glue used for gluing has poor ultraviolet resistance under outdoor severe environment, can frequently generate degumming phenomenon and needs to be maintained and replaced in time, so the workload of maintenance is large, and the maintenance cost is high;
the cost of the method is quite expensive.
Disclosure of Invention
The invention aims to provide a construction method of an integral cast-in-situ decorative concrete sidewalk blind road, which can improve the integral safety and durability of the sidewalk blind road.
The purpose of the invention is realized as follows:
the construction method of the integral cast-in-situ decorative concrete sidewalk blind road is characterized by comprising the following steps of:
step one, building a roadbed and paving concrete according to the designed strength of a road surface in an area where a pedestrian blind road needs to be paved;
step two, paving a pedestrian blind road on the surface of the newly paved concrete;
step three, performing concrete surface sealing treatment on the dried and formed sidewalk blind road surface;
and step four, delivering for use.
In the construction method of the integral cast-in-situ decorative concrete sidewalk blind road, the step two of paving the sidewalk blind road on the concrete surface comprises the following steps:
1-1, placing a blind road model meeting the standard requirements on the surface of newly laid concrete:
1-2, scattering a colorful concrete strengthening material in the blind road model;
1-3, performing facing operation on the colored concrete reinforcing material by using a facing tool, and forming the surface of the sidewalk blind road according to the design requirements of a smooth surface, a rough surface or a semi-smooth semi-rough surface;
1-4, carrying out belt mold maintenance on the pedestrian blind sidewalk until the demolding strength is reached;
1-5, demolding the pedestrian blind sidewalk;
1-6, cleaning the pedestrian blind road after demolding, forming a molding surface, and curing until the concrete is dried.
In the construction method of the integral cast-in-situ decorative concrete sidewalk blind road, wherein in the steps 1-2 of the second step, the colored concrete reinforcing material distributed in the blind road model is a colored cement-based wear-resistant material.
In the construction method of the integral cast-in-place decorative concrete sidewalk blind sidewalk, wherein in the steps 1-3 of the second step, the surface of the sidewalk blind sidewalk is formed by performing facing operation on the color concrete reinforcing material, and the facing can be one of the following: smooth surface, rough surface, semi-smooth and semi-rough surface.
In the construction method of the integral cast-in-situ decorative concrete sidewalk blind road, the step two of paving the sidewalk blind road on the concrete surface comprises the following steps:
2-1, scattering a colorful concrete reinforcing material on the newly laid concrete surface, and leveling and compacting;
2-2, spraying demolding powder on the colored concrete reinforcing material, and then pressing a blind road pattern by using a mold of special blind road rubber or resin;
2-3, curing the pedestrian blind sidewalk with the blind sidewalk pattern pressed until a certain strength is achieved;
2-4, washing the pedestrian blind sidewalk with certain strength to wash the demolding powder;
and 2-5, maintaining the sidewalk blind sidewalk until the concrete molding surface is dried.
In the construction method of the integral cast-in-situ decorative concrete sidewalk blind sidewalk, wherein in the step 2-1 of the step two, the colored concrete reinforcing material sprayed on the concrete surface is a colored cement-based wear-resistant material.
In the construction method of the integral cast-in-situ decorative concrete sidewalk blind road, wherein in the step 2-2 of the step two, the special blind road mold is made of one of the following materials: rubber, resin, plastic.
In the construction method of the integral cast-in-situ decorative concrete sidewalk blind road, in the step one, after concrete is paved on an area where the sidewalk blind road is needed according to a road surface, the working procedures of vibration, compaction and trowelling are required.
The construction method of the integral cast-in-situ decorative concrete sidewalk blind road of the invention adopts the technical scheme, so that compared with the prior art, the construction method has the following advantages and positive effects:
1. the invention adopts the process of integrally casting the pedestrian blind road in situ, so that the overall safety of the pedestrian blind road is improved, unsafe phenomena such as looseness, falling and the like caused by a product paving method can not be generated, and frequent maintenance and replacement as a surface pasting method of rubber flexible products are not needed;
2. the invention has the advantages that the pedestrian blind sidewalk is cast in situ integrally, so that the durability of the pedestrian blind sidewalk is greatly improved, and the comprehensive manufacturing cost and the maintenance cost are greatly reduced;
3. the invention not only reduces the cost of constructing the pedestrian blind road, but also shortens the period of constructing the pedestrian road.
4. The invention has strong weather resistance and ultraviolet resistance because of the integral cast-in-place pedestrian blind road, thereby being suitable for building and arranging the pedestrian blind road in various environments and conditions.
Detailed Description
Fig. 1 is a block diagram of the construction method of the integral cast-in-situ decorative concrete sidewalk blind sidewalk according to the present invention. The invention relates to a construction method of an integral cast-in-situ decorative concrete sidewalk blind road, which is characterized in that a sidewalk blind road area is integrally cast through a special model, and the construction method comprises the following steps:
step one, building a roadbed according to the designed strength of the road surface in an area where the pedestrian blind sidewalk is to be laid, laying concrete, and carrying out the working procedures of vibration, compaction and trowelling.
Step two, paving a pedestrian blind road on the surface of the newly paved concrete; the laying step of the blind road has two methods; wherein,
the method I is characterized in that blind road laying by adopting a blind road model comprises the following steps:
1-1, placing a blind road model meeting the standard requirements on the surface of the newly laid concrete after the step one,
1-2, scattering a colorful concrete reinforcing material in the blind road model, wherein the colorful concrete reinforcing material is a colorful cement-based wear-resistant material and is used for increasing the wear-resistant strength of the blind road,
1-3, using facing tool (such as earth iron plate) to make facing operation on the above-mentioned colour concrete reinforcing material, according to the design requirements making the facing into smooth surface, rough surface or semi-smooth semi-rough surface effect,
1-4, carrying out mold maintenance on the pedestrian blind road until the demolding strength is reached,
1-5, demoulding the sidewalk blind road,
1-6, cleaning the pedestrian blind road after demolding, forming a molding surface, and then curing until the concrete is dried;
the second method adopts a blind road mold to press a blind road pattern, and comprises the following steps:
2-1, scattering a colorful concrete strengthening material on the surface of the newly laid concrete after the step one, wherein the colorful concrete strengthening material is also a colorful cement-based wear-resistant material and is used for increasing the wear-resistant strength of the blind road, then performing the working procedures of smoothing and compacting,
2-2, firstly spraying demoulding powder on the color concrete strengthening material, and then pressing a blind road pattern by using a special blind road mould, wherein the special blind road mould can be a rubber blind road mould or a resin blind road mould, and can also be made of other materials,
2-3, curing the pedestrian blind sidewalk with the blind sidewalk pattern until a certain strength is achieved,
2-4, washing the pedestrian blind sidewalk with certain strength to wash the demolding powder,
and 2-5, maintaining the sidewalk blind sidewalk until the concrete molding surface is dried.
And step three, performing concrete surface sealing treatment on the dried and formed sidewalk blind road surface.
And step four, delivering for use. In conclusion, the construction method of the integral cast-in-place decorative concrete sidewalk blind road adopts the process of integral cast-in-place sidewalk blind road, so that the integral safety of the sidewalk blind road is improved; meanwhile, the comprehensive cost and maintenance cost are reduced because frequent maintenance and replacement are not needed; moreover, the period of the building pedestrian road is shortened; in addition, the weather resistance and ultraviolet resistance of the pedestrian blind road are enhanced, so that the pedestrian blind road can be suitable for building and arranging the pedestrian blind road under various environments and conditions, and is extremely practical.

Claims (8)

1. A construction method of an integral cast-in-situ decorative concrete sidewalk blind road is characterized by comprising the following steps:
step one, building a roadbed and paving concrete according to the designed strength of a road surface in an area where a pedestrian blind road needs to be paved;
step two, paving a pedestrian blind road on the surface of the newly paved concrete;
step three, performing concrete surface sealing treatment on the dried and formed sidewalk blind road surface;
and step four, delivering for use.
2. The construction method of the integral cast-in-situ decorative concrete sidewalk blind road according to claim 1, characterized in that: step two, the step of paving the pedestrian blind sidewalk on the concrete surface comprises the following steps:
1-1, placing a blind road model on the surface of newly laid concrete;
1-2, scattering a colorful concrete strengthening material in the blind road model;
1-3, performing facing operation on the colored concrete reinforcing material by using a facing tool, and forming the surface of the sidewalk blind road according to the design requirements of a smooth surface, a rough surface or a semi-smooth semi-rough surface;
1-4, carrying out belt mold maintenance on the pedestrian blind sidewalk until the demolding strength is reached;
1-5, demolding the pedestrian blind sidewalk;
1-6, cleaning the pedestrian blind road after demolding, forming a molding surface, and curing until the concrete is dried.
3. The construction method of the integral cast-in-situ decorative concrete sidewalk blind road according to claim 2, characterized in that: in the step 1-2 of the second step, the colored concrete reinforcing material distributed in the blind road model is a colored cement-based wear-resistant material.
4. The construction method of the integral cast-in-situ decorative concrete sidewalk blind road according to claim 2, characterized in that: in the step 1-3 of the second step, the surface of the sidewalk blind road is formed by the facing operation on the color concrete reinforcing material, and the facing is one of the following: smooth surface, rough surface, semi-smooth and semi-rough surface.
5. The construction method of the integral cast-in-situ decorative concrete sidewalk blind road according to claim 1, characterized in that: step two, the step of paving the pedestrian blind sidewalk on the concrete surface comprises the following steps:
2-1, scattering a colorful concrete reinforcing material on the newly laid concrete surface, and leveling and compacting;
2-2, spraying demolding powder on the colored concrete reinforcing material, and then pressing a blind road pattern by using a mold of special blind road rubber or resin;
2-3, curing the pedestrian blind sidewalk with the blind sidewalk pattern pressed until the set strength is reached;
2-4, washing the pedestrian blind sidewalk with certain strength to wash the demolding powder;
and 2-5, maintaining the sidewalk blind sidewalk until the concrete molding surface is dried.
6. The construction method of the integral cast-in-situ decorative concrete sidewalk blind road according to claim 5, characterized in that: in the step 2-1 of the second step, the colored concrete reinforcing material sprayed on the surface of the concrete is a colored cement-based wear-resistant material.
7. The construction method of the integral cast-in-situ decorative concrete sidewalk blind road according to claim 1, characterized in that: in the second step 2-2, the special blind road mold is made of one of the following materials: rubber, resin, plastic.
8. The construction method of the integral cast-in-situ decorative concrete sidewalk blind road according to claim 1, characterized in that: in the first step, after concrete is paved according to the road surface in the area where the pedestrian blind sidewalk needs to be paved, the vibration, compaction and floating processes are required.
CN 03116318 2003-04-11 2003-04-11 Construction method of walking typhlosole with integrally poured decorative concrete on site Expired - Fee Related CN1201052C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 03116318 CN1201052C (en) 2003-04-11 2003-04-11 Construction method of walking typhlosole with integrally poured decorative concrete on site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 03116318 CN1201052C (en) 2003-04-11 2003-04-11 Construction method of walking typhlosole with integrally poured decorative concrete on site

Publications (2)

Publication Number Publication Date
CN1442580A CN1442580A (en) 2003-09-17
CN1201052C true CN1201052C (en) 2005-05-11

Family

ID=27797121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 03116318 Expired - Fee Related CN1201052C (en) 2003-04-11 2003-04-11 Construction method of walking typhlosole with integrally poured decorative concrete on site

Country Status (1)

Country Link
CN (1) CN1201052C (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1644799B (en) * 2005-01-21 2011-03-16 郑弘� Porous brickwalk laying method
JP2008127822A (en) * 2006-11-20 2008-06-05 Atomix Co Ltd Sheet for guiding visually impaired person, its manufacturing method, and construction method for facility for guiding visually impaired person
CN105002804A (en) * 2015-06-04 2015-10-28 保定维特瑞交通设施工程有限责任公司 Construction process of surface layer blind sidewalk of cement concrete sidewalk
CN105133461A (en) * 2015-06-19 2015-12-09 青岛海川建设集团有限公司 Concrete colored die floor construction process
CN107740334A (en) * 2017-10-13 2018-02-27 潍坊市市政工程股份有限公司 Pitch cotton ginning color spray pavement construction
CN108677652A (en) * 2018-06-26 2018-10-19 苏州望意阳环保科技有限公司 A kind of permeable people's row sidewalk for visually impaired people and its construction method
CN111041965A (en) * 2019-11-21 2020-04-21 江苏永联精筑建设集团有限公司 Novel blind road construction process

Also Published As

Publication number Publication date
CN1442580A (en) 2003-09-17

Similar Documents

Publication Publication Date Title
CN1948622A (en) Polymer modified cement hole concrete road surface structure and construction method
KR100716565B1 (en) road boundary block and method for manufacturing thesame
CN100529261C (en) Rolled polymer modified cement-concrete sprayed colour road surface structure, and its construction method
CN1888317A (en) Illuminating light reflective concrete curb and producing method thereof
CN100554584C (en) Spary forms on the porous polymer concrete facing colored road surface and job practices
CN1587162A (en) Luminous reflective concrete floor tile and its producing method
AU2020251790B2 (en) Paving block with improved illumination
US20230002279A1 (en) Photoluminescent sand
CN100552136C (en) Spary forms on the honeycombed cement concrete pavement colored road surface and job practices
CN102431246B (en) Skidproof permeable road pad and manufacturing technology thereof
CN1201052C (en) Construction method of walking typhlosole with integrally poured decorative concrete on site
CN111747695A (en) Durable luminous pavement brick or kerbstone and preparation method thereof
CN105803881A (en) Road brick with self-luminous function and preparation method of road brick
CN1108934C (en) Method for producing coating with decorative patterns, mineral coating and tool for implementing same
KR20020090974A (en) Paving method for pavement having high elasticity
CN111041929A (en) Light-emitting pervious concrete road based on recycled aggregate and construction method thereof
CN104878672A (en) Stone-planted cement concrete bridge deck paving structure and method
CN201354441Y (en) Imitated stone vein road surface brick
KR20120135841A (en) Concrete block
KR19980033706A (en) Collar Press Block
KR100376424B1 (en) Method for building a footway block using a waste glass
KR20140059104A (en) Method for manufacturing precast concrete panel with excellent slip resistance and durability
KR19980064941A (en) Soil floor packing method
CN219653422U (en) Rapid maintenance bituminous pavement structure
CN116180532B (en) Preparation method of composite pavement brick

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI QIANGTE ENERGY-SAVING MATERIALS CO., LTD

Free format text: FORMER OWNER: GUO SILONG

Effective date: 20081107

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20081107

Address after: Shanghai, Chongming County, along the north side of the public practice No. 29, building 305, room 2111 -2 (Chongming Forest Tourism Park)

Patentee after: Shanghai Giant Energy-saving Materials Co., Ltd.

Address before: East Building 17, Sinopec building, No. 1525, Pudong Road, Shanghai

Patentee before: Guo Silong

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050511

Termination date: 20200411

CF01 Termination of patent right due to non-payment of annual fee