CN118564104A - New and old building nested composite structure capable of utilizing old and stable in internal environment - Google Patents

New and old building nested composite structure capable of utilizing old and stable in internal environment Download PDF

Info

Publication number
CN118564104A
CN118564104A CN202411049992.7A CN202411049992A CN118564104A CN 118564104 A CN118564104 A CN 118564104A CN 202411049992 A CN202411049992 A CN 202411049992A CN 118564104 A CN118564104 A CN 118564104A
Authority
CN
China
Prior art keywords
window
building
old
wall
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202411049992.7A
Other languages
Chinese (zh)
Other versions
CN118564104B (en
Inventor
赵来柱
李素霞
张莉莉
王杨
杨大国
黄蕾
李海旭
程杰
朱家敬
白玉石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Fourth Construction & Engineering Co ltd
Original Assignee
Beijing Fourth Construction & Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Fourth Construction & Engineering Co ltd filed Critical Beijing Fourth Construction & Engineering Co ltd
Priority to CN202411049992.7A priority Critical patent/CN118564104B/en
Publication of CN118564104A publication Critical patent/CN118564104A/en
Application granted granted Critical
Publication of CN118564104B publication Critical patent/CN118564104B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/94Protection against other undesired influences or dangers against fire
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

本发明涉及对现有建筑物的施工措施技术领域,公开了一种可利旧且内部环境稳定的新旧建筑嵌套复式结构,采用建筑功能和建筑外形分离对大尺寸旧建筑进行改造,装饰外罩仅保留外壳,建筑的功能由外壳内新建筑来实现,从而使得旧建筑的总荷载不增反减,即使旧建筑的受力结构也能满足需求,利用特殊尺寸的幕墙窗和侧窗的窗洞,克服了新旧两层建筑嵌套对施工造成的干涉问题,使嵌套建筑的施工可行且在施工后克服内部通风采光问题;并利用装饰外罩和新建筑之间走道为环状的特点,布置区域电动挡烟垂壁和通道电动挡烟垂壁,能够快速对火灾区域进行隔离和排烟;以上3点结合,在保留建筑外形前提下形成可利旧且内部环境稳定的新旧建筑嵌套复式结构。

The invention relates to the technical field of construction measures for existing buildings, and discloses a nested duplex structure of old and new buildings that can be reused and has a stable internal environment. The large-sized old building is renovated by separating the building function and the building appearance, and only the outer shell is retained for the decorative outer cover, and the building function is realized by the new building in the outer shell, so that the total load of the old building is reduced instead of increased, and even the force-bearing structure of the old building can meet the demand. The window openings of the curtain wall windows and side windows of special sizes are utilized to overcome the interference problem caused by the nesting of the new and old two-story buildings on the construction, so that the construction of the nested building is feasible and the internal ventilation and lighting problems are overcome after the construction; and the characteristic that the walkway between the decorative outer cover and the new building is annular is utilized to arrange the regional electric smoke barrier vertical wall and the channel electric smoke barrier vertical wall, so that the fire area can be quickly isolated and smoke exhausted; the above three points are combined to form a nested duplex structure of old and new buildings that can be reused and has a stable internal environment under the premise of retaining the building appearance.

Description

一种可利旧且内部环境稳定的新旧建筑嵌套复式结构A nested duplex structure of old and new buildings that can be reused and has a stable internal environment

技术领域Technical Field

本发明涉及对现有建筑物的施工措施技术领域,特别是涉及一种可利旧且内部环境稳定的新旧建筑嵌套复式结构。The invention relates to the technical field of construction measures for existing buildings, and in particular to a new and old building nested duplex structure which can utilize old buildings and has a stable internal environment.

背景技术Background Art

绝大部分旧建筑的归宿是被拆除后腾出空地用于修建新建筑,但存在一些有特殊意义的旧建筑,需要在保留其原貌的前提下改变建筑用途,为此需要对建筑进行深度改造。The fate of most old buildings is to be demolished to make way for the construction of new buildings, but there are some old buildings with special significance that need to be changed in use while retaining their original appearance, which requires in-depth renovation of the buildings.

考虑到旧建筑本身已发生严重的老化,其结构强度严重下降,且外观已非常破旧。这些问题难以在不对建筑本身进行深度改造的前提下解决,因此对旧建筑的改造往往需要采用拆为零件后重新组装的形式进行,拆为零件的过程中可对建筑零件分别进行检测并更换其中强度不达标或破损严重的零件,并在内部进行补强处理或改变建筑内部布局,从而适应建筑用途的变化。Considering that the old building itself has been seriously aged, its structural strength has seriously declined, and its appearance has become very dilapidated. These problems are difficult to solve without deep transformation of the building itself. Therefore, the transformation of old buildings often needs to be carried out in the form of dismantling into parts and reassembling. During the dismantling process, the building parts can be tested separately and the parts that do not meet the strength standards or are seriously damaged can be replaced. The internal reinforcement treatment can be carried out or the internal layout of the building can be changed to adapt to the changes in the use of the building.

但对于一些大尺寸旧建筑而言,这种拆改方式并不适用。最大的问题在于,大尺寸的旧建筑中,由于建筑尺寸较大,因此刚度较低,容易发生形变且强度难以达标,为维持形状,往往需要用到诸如钢筋混凝土梁柱/剪力墙这类高刚度但不适合拆成零件的构件。此外,由于旧建筑年深日久,建筑施工的规范可能发生变化,某些地方的建筑可能因为限高等因素,而在拆成零件后不允许再次组装为原有尺寸的建筑。However, this method of demolition and modification is not applicable to some large-scale old buildings. The biggest problem is that in large-scale old buildings, due to their large size, they have low rigidity, are prone to deformation, and have difficulty meeting strength standards. In order to maintain their shape, they often need to use components such as reinforced concrete beams and columns/shear walls that have high rigidity but are not suitable for disassembly into parts. In addition, as old buildings have been around for a long time, construction specifications may change. Buildings in some places may not be allowed to be reassembled into their original size after being disassembled into parts due to height restrictions and other factors.

以本发明涉及的北京怀柔科学城北区金隅兴发科技园项目为例,该项目所在地为兴发水泥厂,兴建于90年代初,为北京的城建贡献了大量的建材,是一处重要的工业遗址。因此,该处的建筑需要在保留外形的情况下改造为附近北京雁栖湖应用数学研究院的研究设施。其中的库房需要改建为多层超算机房,该库房为典型的单体单层大跨度建筑,本身承载力很弱且已十分破旧,完全无法承载其中增加的楼板以及复杂的电子设备,同时其内部也无法满足超算设备对环境的要求,其砖混复合结构也不允许拆碎后重新组装,此外在工业遗址内建设新建筑,不同于直接在地基上起建,需要考虑如何使旧建筑不会对施工过程产生干涉或如何利用旧建筑完成顺利施工,其内部布置和通风采用常规建筑的方式也有诸多不适用之处。类似的问题在全国三批工业遗址的改造过程中普遍存在。更为致命的是,哪怕不考虑工业遗址的保护,由于当地的限高政策,即使想要把该建筑拆除后仿照原有建筑的外形重新建造一栋建筑也不可行。Take the Jinyu Xingfa Science Park project in the northern area of Beijing Huairou Science City as an example. The project site is Xingfa Cement Factory, which was built in the early 1990s and contributed a large amount of building materials to Beijing's urban construction. It is an important industrial heritage site. Therefore, the buildings there need to be transformed into research facilities of the nearby Beijing Yanqi Lake Institute of Applied Mathematics while retaining their appearance. The warehouse needs to be converted into a multi-story supercomputer room. The warehouse is a typical single-story large-span building with weak bearing capacity and is very dilapidated. It is completely unable to bear the added floor slabs and complex electronic equipment. At the same time, its interior cannot meet the environmental requirements of supercomputer equipment. Its brick-concrete composite structure is not allowed to be dismantled and reassembled. In addition, building new buildings in industrial heritage sites is different from building directly on the foundation. It is necessary to consider how to prevent the old buildings from interfering with the construction process or how to use the old buildings to complete the smooth construction. There are also many inapplicable aspects of its internal layout and ventilation using conventional buildings. Similar problems are common in the transformation of the three batches of industrial heritage sites across the country. What is even more fatal is that even if we do not consider the protection of industrial heritage sites, due to the local height limit policy, it is not feasible to demolish the building and rebuild a new one in the same appearance as the original one.

除了以上影响建筑改造的问题外,旧建筑还存在影响使用的问题。旧建筑施工的年代里,尚未有如今的建筑被动保温、大面积自然采光等追求高舒适性以及节能的设计理念,且消防方面的适配也往往跟不上现代的自动消防系统。其本身往往还在多处采用了砌体结构这种不利于在表面悬挂重物的结构形式。In addition to the above problems that affect building renovation, old buildings also have problems that affect their use. When old buildings were constructed, there was no design concept that pursues high comfort and energy saving, such as passive insulation and large-area natural lighting. In addition, the fire protection adaptation often cannot keep up with the modern automatic fire protection system. They often use masonry structures in many places, which is not conducive to hanging heavy objects on the surface.

发明内容Summary of the invention

本发明提供一种可利旧且内部环境稳定的新旧建筑嵌套复式结构。The invention provides a new and old building nested duplex structure which can utilize old buildings and has a stable internal environment.

解决的技术问题是:大尺寸旧建筑的改造利用过程中,由于需要用到诸如钢筋混凝土梁柱或剪力墙这类高刚度但不能破拆的构件来维持建筑形状,导致无法采用拆为零件后重新组装的方式进行维修改造以及如何实现大尺寸旧建筑内合理防火和通风。The technical problem to be solved is: during the renovation and utilization of large-scale old buildings, it is impossible to maintain the shape of the buildings by dismantling them into parts and then reassembling them, because high-rigidity but non-demolishable components such as reinforced concrete beams and columns or shear walls are needed. How to achieve reasonable fire protection and ventilation in large-scale old buildings?

为解决上述技术问题,本发明采用如下技术方案:一种可利旧且内部环境稳定的新旧建筑嵌套复式结构,包括由旧建筑加固后形成的装饰外罩和设置于所述装饰外罩内的新建筑,所述装饰外罩的俯视图为矩形状,装饰外罩长度方向的任一端墙体开设有用于安装幕墙窗的窗洞,装饰外罩长度方向的两侧墙体及幕墙窗相对的一侧墙体开设有用于安装侧窗的窗洞,所述幕墙窗的窗洞内安装有玻璃幕墙,侧窗的窗洞内安装有透明玻璃和/或百叶窗,所述侧窗的顶面高于新建筑的顶层地板,侧窗的底面高度低于新建筑的低层天花板,装饰外罩除幕墙窗的窗洞和侧窗的窗洞的其余外墙上包裹一层用于模仿旧建筑外墙原貌并对旧建筑外墙进行保护的装饰材料;In order to solve the above technical problems, the present invention adopts the following technical scheme: a nested duplex structure of old and new buildings that can be reused and has a stable internal environment, comprising a decorative cover formed by reinforcing the old building and a new building arranged in the decorative cover, wherein the top view of the decorative cover is rectangular, a wall at either end in the length direction of the decorative cover is provided with a window hole for installing a curtain wall window, and two side walls in the length direction of the decorative cover and a wall on the side opposite to the curtain wall window are provided with a window hole for installing a side window, a glass curtain wall is installed in the window hole of the curtain wall window, and transparent glass and/or blinds are installed in the window hole of the side window, the top surface of the side window is higher than the top floor of the new building, and the bottom surface of the side window is lower than the low ceiling of the new building, and the remaining outer walls of the decorative cover except the window holes of the curtain wall window and the window holes of the side window are wrapped with a layer of decorative material for imitating the original appearance of the outer wall of the old building and protecting the outer wall of the old building;

所述旧建筑的加固结构包括非承重墙加固结构,其侧窗的窗洞顶部位置的墙体开设有加固槽,所述加固槽内安装有过梁,幕墙窗的窗洞竖向延伸至旧建筑的屋盖;钢筋混凝土承重墙加固结构,其外墙中开槽,槽内安装有暗柱,幕墙窗的窗洞顶部安装有过梁;砌体承重墙加固结构,其外墙中开槽,槽内安装有暗柱,侧窗的窗洞顶部位置的墙体开设有加固槽,所述加固槽内安装有过梁,幕墙窗的窗洞竖向延伸至旧建筑的屋盖,所述新建筑的楼板水平向外延伸至装饰外罩的外墙位置,形成悬空的室内走廊,所述室内走廊为挑廊。The reinforcement structure of the old building includes a non-load-bearing wall reinforcement structure, in which a reinforcement groove is opened in the wall at the top of the window opening of the side window, a lintel is installed in the reinforcement groove, and the window opening of the curtain wall window vertically extends to the roof of the old building; a reinforced concrete load-bearing wall reinforcement structure, in which a groove is opened in the outer wall, a hidden column is installed in the groove, and a lintel is installed at the top of the window opening of the curtain wall window; a masonry load-bearing wall reinforcement structure, in which a groove is opened in the outer wall, a hidden column is installed in the groove, a reinforcement groove is opened in the wall at the top of the window opening of the side window, a lintel is installed in the reinforcement groove, and the window opening of the curtain wall window vertically extends to the roof of the old building, and the floor slab of the new building extends horizontally outward to the outer wall position of the decorative cover to form a suspended indoor corridor, and the indoor corridor is a cantilevered corridor.

进一步,所述新建筑包括多个下层功能区,设置于下层功能区与幕墙窗之间的门厅,设置于多个所述下层功能区的上层功能区,设置于相邻所述下层功能区之间以及下层功能区与装饰外罩之间的走道,所述上层功能区和下层功能区内均设置有IT数据机房,IT数据机房的一侧利用墙体隔断有新风机房、事故后通风机房、配电间和排烟机房,所述排烟机房内向外侧延伸有抽烟管和排烟管,所述抽烟管延伸至任一其他机房内,排烟管延伸至侧窗,所述侧窗内上部设置有排风百叶,排烟管的出口与排风百叶相连通,下层功能区和上层功能区内的任一独立房间的门朝向侧窗。Furthermore, the new building includes multiple lower functional areas, a lobby arranged between the lower functional areas and the curtain wall windows, an upper functional area arranged between the multiple lower functional areas, and aisles arranged between adjacent lower functional areas and between the lower functional areas and the decorative cover. IT data rooms are arranged in the upper and lower functional areas. A fresh air room, a post-accident ventilation room, a power distribution room and a smoke exhaust room are separated on one side of the IT data room by walls. A smoke extraction pipe and an exhaust pipe are extended outward from the smoke exhaust room. The smoke extraction pipe extends into any other machine room, and the exhaust pipe extends to the side window. Exhaust shutters are arranged on the upper part of the side window, and the outlet of the exhaust pipe is connected to the exhaust shutters. The door of any independent room in the lower functional area and the upper functional area faces the side window.

进一步,所述新建筑内还包括区域电动挡烟垂壁和通道电动挡烟垂壁,区域电动挡烟垂壁设置于下层功能区的相邻支撑柱之间以及下层功能区和上层功能区的楼梯出口,通道电动挡烟垂壁设置于新建筑和装饰外罩的走道之间。Furthermore, the new building also includes regional electric smoke barriers and channel electric smoke barriers. The regional electric smoke barriers are arranged between adjacent supporting columns of the lower functional area and at the stair exits of the lower functional area and the upper functional area, and the channel electric smoke barriers are arranged between the new building and the walkway of the decorative cover.

进一步,所述新建筑的非顶层为用于集中安装计算机和/或数据中心的机柜的机房,机柜的散热器的进风口及出风口均为侧窗顶部的百叶窗,安装有百叶窗的侧窗中,底部为玻璃窗。Furthermore, the non-top floor of the new building is a computer room for centrally installing computer and/or data center cabinets. The air inlet and outlet of the cabinet radiator are both shutters on the top of the side windows, and the bottom of the side windows with shutters is a glass window.

进一步,所述幕墙窗底部地面埋设有钢筋混凝土地梁,幕墙窗顶部与屋盖相邻的位置设置有天梁,幕墙窗中间隔设置有内柱,所述内柱上下两端分别与天梁和地梁固定连接,幕墙窗中的玻璃边缘设置有软镶嵌包边结构,所述软镶嵌包边结构用于保证发生幕墙热胀冷缩时幕墙窗的玻璃不发生损坏。Furthermore, a reinforced concrete ground beam is buried in the ground at the bottom of the curtain wall window, a sky beam is arranged at the top of the curtain wall window adjacent to the roof, inner columns are arranged at intervals in the curtain wall window, and the upper and lower ends of the inner columns are respectively fixedly connected to the sky beam and the ground beam, and a soft inlaid edging structure is arranged on the edge of the glass in the curtain wall window, and the soft inlaid edging structure is used to ensure that the glass of the curtain wall window is not damaged when the curtain wall expands or contracts due to heat.

进一步,所述幕墙窗的龙骨网格中带有门框,门框内安装有玻璃门扇。Furthermore, the keel grid of the curtain wall window is provided with a door frame, and a glass door leaf is installed in the door frame.

进一步,所述挑廊的悬挑端与装饰外罩的外墙之间的接缝处设置有柔性装饰板,所述柔性装饰板与挑廊的悬挑端固定连接,柔性装饰板与装饰外罩的内墙内侧无连接,幕墙窗与新建筑之间的间隙设置为门厅。Furthermore, a flexible decorative panel is provided at the joint between the cantilevered end of the cantilevered corridor and the outer wall of the decorative outer cover, the flexible decorative panel is fixedly connected to the cantilevered end of the cantilevered corridor, the flexible decorative panel is not connected to the inner side of the inner wall of the decorative outer cover, and the gap between the curtain wall window and the new building is set as a foyer.

进一步,所述装饰外罩包括四周竖向设置的墙体,设置于墙体顶部的屋盖,以及设置于屋盖内顶部的平面三脚架,所述平面三脚架沿装饰外罩的长度方向间隔设置为多个,多个平面三脚架长度方向的两端固定于墙体的顶部,平面三脚架和装饰外罩的地面之间为空腔,多个平面三脚架的底面标高高于新建筑的顶面标高。Furthermore, the decorative cover includes walls arranged vertically on all sides, a roof arranged on the top of the walls, and a plane tripod arranged on the top inside the roof. The plane tripods are arranged in multiple intervals along the length direction of the decorative cover, and both ends of the length direction of the multiple plane tripods are fixed to the top of the wall. There is a cavity between the plane tripod and the ground of the decorative cover, and the bottom elevation of the multiple plane tripods is higher than the top elevation of the new building.

进一步,所述侧窗的窗洞开设有洞壁光滑平整的安装洞,侧窗的玻璃窗扇顶撑于安装洞的洞壁上。Furthermore, the window opening of the side window is provided with an installation hole with a smooth and flat hole wall, and the glass window sash of the side window is supported on the hole wall of the installation hole.

进一步,装饰外罩的外墙为清水砖墙,装饰外罩外墙上的装饰材料为PK砖。Furthermore, the outer wall of the decorative outer cover is a plain brick wall, and the decorative material on the outer wall of the decorative outer cover is a PK brick.

本发明一种可利旧且内部环境稳定的新旧建筑嵌套复式结构与现有技术相比,具有如下有益效果:Compared with the prior art, the nested duplex structure of old and new buildings of the present invention, which can reuse old buildings and has a stable internal environment, has the following beneficial effects:

本发明中,采用功能与外形分离的思路对大尺寸旧建筑进行改造,旧建筑仅保留其外壳作为装饰外罩来维持建筑外形,建筑的功能由装饰外罩内新建的建筑来实现,从而使得旧建筑不仅不需要承载新的荷载,其原先承载的荷载也仅剩屋盖和装饰材料,即使旧建筑的受力结构也能满足需求In the present invention, the idea of separating function from appearance is adopted to renovate large-scale old buildings. The old building only retains its outer shell as a decorative cover to maintain the building appearance, and the function of the building is realized by the newly built building inside the decorative cover, so that the old building not only does not need to bear new loads, but its original load is only left with the roof and decorative materials, and even the load-bearing structure of the old building can meet the demand.

同时利用特殊尺寸的幕墙窗和侧窗的窗洞,克服了新旧两层建筑嵌套对施工造成的干涉问题(施工车辆及设备开不进去,建材和废料无法吊运,混凝土浇筑泵管被挡),使得这种嵌套建筑的施工可行,且在施工后克服嵌套建筑内部的通风及采光问题;At the same time, by using the special-sized curtain wall windows and side window openings, the interference problem caused by the nesting of the old and new buildings was overcome (construction vehicles and equipment could not enter, building materials and waste materials could not be hoisted, and the concrete pouring pump pipe was blocked), making the construction of this nested building feasible, and overcoming the ventilation and lighting problems inside the nested building after construction;

采用仿照旧建筑外貌的新装饰材料对旧建筑进行包裹,从而使得旧建筑破旧的外表被彻底翻新的同时还得到了保护;The old building is wrapped with new decorative materials that imitate the appearance of the old building, so that the dilapidated appearance of the old building is completely renovated and protected at the same time;

利用装饰外罩和新建筑之间走道为环状的特点,布置区域电动挡烟垂壁和通道电动挡烟垂壁,能迅速将走道的某一部分隔离为独立小空间,配合排烟机房即排烟管路,实现高效防火和排烟的效果,极大地保护机房设备;Taking advantage of the circular shape of the corridor between the decorative cover and the new building, the regional electric smoke shielding wall and the passage electric smoke shielding wall are arranged to quickly isolate a part of the corridor into an independent small space. Together with the smoke exhaust room and the smoke exhaust pipeline, efficient fire prevention and smoke exhaust effects can be achieved, greatly protecting the equipment in the room.

以上4点结合,在保留建筑外形的前提下完成了大尺寸旧建筑改造,同时双层嵌套结构使得新建筑内部环境更为稳定(新建筑无需直面太阳直射、风、雨、雪、尘),兼备良好的通风和防火功能,能更好满足包括计算机机房在内的各种对环境稳定性要求较高的场合。By combining the above four points, the renovation of a large-scale old building was completed while retaining the building's appearance. At the same time, the double-layer nested structure makes the internal environment of the new building more stable (the new building does not need to face direct sunlight, wind, rain, snow, and dust), and has good ventilation and fire protection functions, which can better meet various occasions with high requirements for environmental stability, including computer rooms.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本发明一种可利旧且内部环境稳定的新旧建筑嵌套复式结构中的建筑的平面图;FIG1 is a plan view of a building in a duplex structure of old and new buildings that can be reused and has a stable internal environment according to the present invention;

图2为幕墙窗的结构示意图;FIG2 is a schematic diagram of the structure of a curtain wall window;

图3为一种可利旧且内部环境稳定的新旧建筑嵌套复式结构中的上层功能区的平面图;FIG3 is a plan view of the upper functional area in a duplex structure of old and new buildings that can be reused and has a stable internal environment;

图4为一段包含了侧窗的装饰外罩外墙的结构示意图。FIG. 4 is a schematic structural diagram of a section of the outer wall of the decorative housing including the side windows.

图中,1、装饰外罩;11、幕墙窗;111、玻璃幕墙;112、门框;12、侧窗;121、透明玻璃;122、百叶窗;2、新建筑;21、下层功能区;22、门厅;23、上层功能区;24、走道;25、排烟机房;26、区域电动挡烟垂壁;27、通道电动挡烟垂壁;3、室内走廊。In the figure, 1. decorative cover; 11. curtain wall window; 111. glass curtain wall; 112. door frame; 12. side window; 121. transparent glass; 122. shutters; 2. new building; 21. lower functional area; 22. foyer; 23. upper functional area; 24. walkway; 25. smoke exhaust room; 26. regional electric smoke barrier vertical wall; 27. channel electric smoke barrier vertical wall; 3. indoor corridor.

具体实施方式DETAILED DESCRIPTION

以北京怀柔科学城北区金隅兴发科技园项目为例,如图1和4所示,一种可利旧且内部环境稳定的新旧建筑嵌套复式结构,包括由旧建筑加固后形成的装饰外罩1和设置于装饰外罩1内的新建筑2,装饰外罩1的俯视图为矩形状,装饰外罩1长度方向的任一端墙体开设有用于安装幕墙窗11的窗洞,装饰外罩1长度方向的两侧墙体及幕墙窗11相对的一侧墙体开设有用于安装侧窗12的窗洞,幕墙窗11的窗洞内安装有玻璃幕墙111,侧窗12的窗洞内安装有透明玻璃121和/或百叶窗122,侧窗12的顶面高于新建筑2的顶层地板,侧窗12的底面高度低于新建筑2的低层天花板,装饰外罩1除幕墙窗11的窗洞和侧窗12的窗洞的其余外墙上包裹一层用于模仿旧建筑外墙原貌并对旧建筑外墙进行保护的装饰材料;Taking the Jinyuxingfa Science Park project in the northern area of Huairou Science City in Beijing as an example, as shown in Figures 1 and 4, a nested duplex structure of old and new buildings that can be reused and has a stable internal environment includes a decorative cover 1 formed by reinforcing the old building and a new building 2 arranged in the decorative cover 1. The top view of the decorative cover 1 is rectangular, and a window hole for installing a curtain wall window 11 is opened on the wall at either end of the length direction of the decorative cover 1. The walls on both sides of the length direction of the decorative cover 1 and the wall on the side opposite to the curtain wall window 11 are opened. There is a window opening for installing a side window 12, a glass curtain wall 111 is installed in the window opening of the curtain wall window 11, a transparent glass 121 and/or a shutter 122 is installed in the window opening of the side window 12, the top surface of the side window 12 is higher than the top floor of the new building 2, and the bottom surface of the side window 12 is lower than the lower ceiling of the new building 2. The decorative cover 1 is wrapped with a layer of decorative material for imitating the original appearance of the old building's exterior wall and protecting the old building's exterior wall except the window openings of the curtain wall window 11 and the window openings of the side window 12.

旧建筑的加固结构包括非承重墙加固结构,其侧窗12的窗洞顶部位置的墙体开设有加固槽,加固槽内安装有过梁,幕墙窗11的窗洞竖向延伸至旧建筑的屋盖;钢筋混凝土承重墙加固结构,其外墙中开槽,槽内安装有暗柱,幕墙窗11的窗洞顶部安装有过梁;砌体承重墙加固结构,其外墙中开槽,槽内安装有暗柱,侧窗12的窗洞顶部位置的墙体开设有加固槽,加固槽内安装有过梁,幕墙窗11的窗洞竖向延伸至旧建筑的屋盖,新建筑2的楼板水平向外延伸至装饰外罩1的外墙位置,形成悬空的室内走廊3,室内走廊3为挑廊,在旧建筑的外墙上打洞,避免内外两层建筑产生干涉时,旧建筑外墙承载力会下降,因此在在打洞前提前布置加固结构能够有效提高旧建筑外墙的承载力,保证施工安全。The reinforcement structure of the old building includes a non-load-bearing wall reinforcement structure, in which a reinforcement groove is opened in the wall at the top of the window opening of the side window 12, a lintel is installed in the reinforcement groove, and the window opening of the curtain wall window 11 extends vertically to the roof of the old building; a reinforced concrete load-bearing wall reinforcement structure, in which a groove is opened in the outer wall, a hidden column is installed in the groove, and a lintel is installed at the top of the window opening of the curtain wall window 11; a masonry load-bearing wall reinforcement structure, in which a groove is opened in the outer wall, a hidden column is installed in the groove, and a wall at the top of the window opening of the side window 12 is opened. A reinforcement groove is provided, in which a lintel is installed. The window opening of the curtain wall window 11 extends vertically to the roof of the old building, and the floor slab of the new building 2 extends horizontally outward to the outer wall of the decorative cover 1 to form a suspended indoor corridor 3. The indoor corridor 3 is a cantilevered corridor. When holes are drilled on the outer wall of the old building to avoid interference between the inner and outer buildings, the bearing capacity of the outer wall of the old building will decrease. Therefore, arranging the reinforcement structure in advance before drilling the holes can effectively improve the bearing capacity of the outer wall of the old building and ensure construction safety.

在此需要说明的是,幕墙窗11的窗洞在施工过程中的作用是物料运输,施工完成后作为建筑采光的一部分,因此幕墙窗11的窗洞需要满足以下条件:It should be noted that the window opening of the curtain wall window 11 is used for material transportation during the construction process and as part of the building lighting after the construction is completed. Therefore, the window opening of the curtain wall window 11 needs to meet the following conditions:

1.能够通行旧建筑内部施工所需的所有车辆及机械;1. All vehicles and machinery required for construction inside the old building can pass through;

这里通常选择旧建筑一面较窄的墙,把整面墙都拆掉改为玻璃幕墙111。Here, a narrow wall of an old building is usually chosen, and the entire wall is demolished and replaced with a glass curtain wall111.

2.设置在建筑的向阳面;2. Installed on the sunny side of the building;

这里的玻璃幕墙111是主要的采光通道,其在北半球位于建筑南侧,在南半球位于建筑北侧。The glass curtain wall 111 here is the main lighting channel, which is located on the south side of the building in the northern hemisphere and on the north side of the building in the southern hemisphere.

3.窗洞一周的旧建筑构件不发生掉落;3. The old building components around the window opening will not fall off;

幕墙窗11是一个很特殊的结构,它并没有像常规的幕墙那样贴在墙面上,而是像窗户那样安装。因此它的玻璃需要依靠龙骨来网格来固定,且周边也需要固定。而窗洞一周的旧建筑构件需要就是对幕墙窗11的边沿进行固定的,必须确保能够在开洞后能够稳定存在。The curtain wall window 11 is a very special structure. It is not attached to the wall like a conventional curtain wall, but installed like a window. Therefore, its glass needs to be fixed by the keel grid, and the periphery also needs to be fixed. The old building components around the window hole need to fix the edge of the curtain wall window 11, and must ensure that it can be stable after the hole is opened.

侧窗12的窗洞也需要进行物料运输,施工完成后作为建筑采光的一部分以及通风,因此侧窗12的窗洞满足以下条件:1.绕旧建筑外墙一周间隔设置;这一条要求一则为了通风及采光,二则为了确保所有的施工位置都能找到一个较近的侧窗12窗洞。The window openings of the side windows 12 also require material transportation. After construction is completed, they serve as part of the building's lighting and ventilation. Therefore, the window openings of the side windows 12 meet the following conditions: 1. They are set at intervals around the exterior wall of the old building; this requirement is for ventilation and lighting, and secondly, to ensure that all construction locations can find a relatively close side window 12 window opening.

2.顶部高于旧建筑内部待修建的新建筑2的顶层地板,底部低于旧建筑内部待修建的新建筑2的低层天花板;2. The top is higher than the top floor of the new building 2 to be built inside the old building, and the bottom is lower than the lower ceiling of the new building 2 to be built inside the old building;

由于侧窗12的窗洞需要运输各种物料,因此其需要足够高且足够低,能够满足所有楼层施工的需要。Since the window openings of the side windows 12 need to transport various materials, they need to be high enough and low enough to meet the needs of construction on all floors.

在新建筑2的外墙与旧建筑的外墙之间存在能够供人员通行的间隙,这里由于新建筑2与旧建筑之间无连接,因此二者之间存在间隙,这里确保间隙能够通行人,从而使这些间隙能够作为走廊而被利用,以弥补新建筑2由于在旧建筑内而尺寸减小造成的问题。There is a gap between the outer wall of the new building 2 and the outer wall of the old building for people to pass through. Since there is no connection between the new building 2 and the old building, there is a gap between the two. Here, it is ensured that the gap can be passed by pedestrians so that these gaps can be used as corridors to make up for the problem caused by the reduced size of the new building 2 due to being inside the old building.

新建筑2的顶层为无屋盖的敞篷结构;The top floor of New Building 2 is an open structure without a roof;

新建筑2的顶层屋盖的施工会收到装饰外罩1的屋盖的严重干涉,无法正常完成施工,这里可利用装饰外罩1和新建筑2嵌套的结构特征,直接利用装饰外罩1的屋盖,如果装饰外罩1的屋盖存在破损,可提前进行修补或替换,屋盖本身不需要承受自重以外的荷载,因此,屋盖板可放心进行更换。The construction of the top roof of the new building 2 will be seriously interfered by the roof of the decorative outer cover 1, and the construction cannot be completed normally. Here, the nested structural characteristics of the decorative outer cover 1 and the new building 2 can be utilized to directly utilize the roof of the decorative outer cover 1. If the roof of the decorative outer cover 1 is damaged, it can be repaired or replaced in advance. The roof itself does not need to bear loads other than its own weight. Therefore, the roof panels can be replaced with confidence.

新建筑2的物料可根据自身尺寸选择在幕墙窗11的窗洞或侧窗12的窗洞进行运输或吊运,装饰外罩1内的渣土装车沿幕墙窗11的窗洞转运,其余废料由离废料最近的侧窗12的窗洞吊出;The materials of the new building 2 can be transported or hoisted through the window openings of the curtain wall window 11 or the window openings of the side windows 12 according to their own sizes. The slag in the decorative cover 1 is loaded and transported along the window openings of the curtain wall window 11, and the remaining waste is hoisted out from the window openings of the side windows 12 closest to the waste;

侧窗12的窗洞具有密集,顶部位置高且底部位置低的特点,可使新建筑2的施工过程不受装饰外罩1的干涉。The side windows 12 have the characteristics of being densely arranged, with the top being high and the bottom being low, so that the construction process of the new building 2 is not interfered with by the decorative cover 1 .

如图1和3所示,新建筑2包括多个下层功能区21,设置于下层功能区21与幕墙窗11之间的门厅22,设置于多个下层功能区21的上层功能区23,设置于相邻下层功能区21之间以及下层功能区21与装饰外罩1之间的走道24,上层功能区23和下层功能区21内均设置有IT数据机房,IT数据机房的一侧利用墙体隔断有新风机房、事故后通风机房、配电间和排烟机房25,排烟机房25内向外侧延伸有抽烟管和排烟管,抽烟管延伸至任一其他机房内,排烟管延伸至侧窗12,侧窗12内上部设置有排风百叶,排烟管的出口与排风百叶相连通,下层功能区21和上层功能区23内的任一独立房间的门朝向侧窗12,新建筑2的顶层为无屋盖的敞篷结构,这里新建筑2的顶层的屋盖的施工会受到旧建筑的无盖的严重干涉,无法正常完成施工,因此这里干脆抛弃新建筑2的屋盖,直接利用旧建筑的屋盖。如果旧建筑的屋盖存在破损,这里应进行翻新,也即更换屋盖板。不同于外墙,屋盖本身不需要承受自重以外的荷载,因此屋盖板可方便地进行更换。As shown in FIGS. 1 and 3 , the new building 2 includes a plurality of lower functional areas 21, a lobby 22 arranged between the lower functional areas 21 and the curtain wall windows 11, an upper functional area 23 arranged between the plurality of lower functional areas 21, and a walkway 24 arranged between adjacent lower functional areas 21 and between the lower functional areas 21 and the decorative cover 1. Both the upper functional area 23 and the lower functional area 21 are provided with IT data rooms. One side of the IT data room is separated by a wall with a fresh air room, a post-accident ventilation room, a power distribution room and a smoke exhaust room 25. The smoke exhaust room 25 faces outward. A smoking pipe and a smoke exhaust pipe are extended on the side. The smoking pipe extends to any other machine room, and the smoke exhaust pipe extends to the side window 12. An exhaust louver is arranged on the upper part of the side window 12. The outlet of the smoke exhaust pipe is connected to the exhaust louver. The door of any independent room in the lower functional area 21 and the upper functional area 23 faces the side window 12. The top floor of the new building 2 is an open-top structure without a roof. The construction of the roof of the top floor of the new building 2 will be seriously interfered by the lack of a roof in the old building, and the construction cannot be completed normally. Therefore, the roof of the new building 2 is simply abandoned here, and the roof of the old building is directly used. If the roof of the old building is damaged, it should be renovated here, that is, the roof board should be replaced. Unlike the exterior wall, the roof itself does not need to bear loads other than its own weight, so the roof board can be easily replaced.

如图2和3所示,新建筑2内还包括区域电动挡烟垂壁26和通道电动挡烟垂壁27,区域电动挡烟垂壁26设置于下层功能区21的相邻支撑柱之间以及下层功能区21和上层功能区23的楼梯出口,通道电动挡烟垂壁27设置于新建筑2和装饰外罩1的走道24之间,利用装饰外罩1和新建筑2不接触的特点,在装饰外罩1和新建筑2之间形成环状走道24,降低电动挡烟垂壁的布置难度,同时区域电动挡烟垂壁26和通道电动挡烟垂壁27都可以通过人为控制进行起降,当某一区域发生火灾时可通过控制此区域周围最近的区域电动挡烟垂壁26和通道电动挡烟垂壁27,将火灾区域隔离成独立的小空间并进行排烟,提高防止烟气蔓延,提高排烟效率,减小火灾对建筑整体的影响。两种挡烟垂壁的主要区别在于其隔断的位置不同,通道电动挡烟垂壁27用来把走道24分隔开来,区域电动挡烟垂壁26用来把各个区域分割开来。As shown in Figures 2 and 3, the new building 2 also includes a regional electric smoke barrier 26 and a channel electric smoke barrier 27. The regional electric smoke barrier 26 is arranged between adjacent supporting columns of the lower functional area 21 and at the staircase exits of the lower functional area 21 and the upper functional area 23. The channel electric smoke barrier 27 is arranged between the new building 2 and the walkway 24 of the decorative cover 1. By utilizing the fact that the decorative cover 1 and the new building 2 are not in contact, a ring-shaped walkway 24 is formed between the decorative cover 1 and the new building 2, thereby reducing the difficulty of arranging the electric smoke barrier. At the same time, the regional electric smoke barrier 26 and the channel electric smoke barrier 27 can be taken off and lowered by human control. When a fire occurs in a certain area, the fire area can be isolated into an independent small space and smoke can be exhausted by controlling the regional electric smoke barrier 26 and the channel electric smoke barrier 27 nearest to the area, thereby preventing the spread of smoke, improving the smoke exhaust efficiency, and reducing the impact of the fire on the entire building. The main difference between the two types of smoke barrier walls is the different positions of their partitions. The channel electric smoke barrier wall 27 is used to separate the aisle 24, and the area electric smoke barrier wall 26 is used to separate each area.

新建筑2的非顶层为用于集中安装计算机和/或数据中心的机柜的机房,机柜的散热器的进风口及出风口均为侧窗12顶部的百叶窗122,安装有百叶窗122的侧窗12中,底部为玻璃窗。The non-top floor of the new building 2 is a computer room for centrally installing computer and/or data center cabinets. The air inlet and outlet of the cabinet radiator are both shutters 122 at the top of the side window 12. The bottom of the side window 12 with the shutter 122 is a glass window.

如图2所示,幕墙窗11底部地面埋设有钢筋混凝土地梁,幕墙窗11顶部与屋盖相邻的位置设置有天梁,幕墙窗11中间隔设置有内柱,内柱上下两端分别与天梁和地梁固定连接,幕墙窗11中的玻璃边缘设置有软镶嵌包边结构,软镶嵌包边结构用于保证发生幕墙窗11热胀冷缩时幕墙的玻璃不发生损坏。As shown in Figure 2, a reinforced concrete ground beam is buried in the ground at the bottom of the curtain wall window 11, a sky beam is arranged at the top of the curtain wall window 11 adjacent to the roof, inner columns are arranged at intervals in the curtain wall window 11, and the upper and lower ends of the inner columns are fixedly connected to the sky beam and the ground beam respectively. A soft inlaid edging structure is arranged on the edge of the glass in the curtain wall window 11, and the soft inlaid edging structure is used to ensure that the glass of the curtain wall is not damaged when the curtain wall window 11 expands and contracts due to heat.

地梁上开设有用于固定幕墙窗11底部的镶嵌槽,或锚固有用于固定幕墙窗11底部的支架;The ground beam is provided with an inlay groove for fixing the bottom of the curtain wall window 11, or a bracket for fixing the bottom of the curtain wall window 11 is anchored;

幕墙窗11左右两侧与旧建筑的外墙固定连接。The left and right sides of the curtain wall window 11 are fixedly connected with the outer wall of the old building.

幕墙窗11固定于类似于窗框的稳定方框内,同时这个稳定方框中安装有龙骨网格,幕墙窗11中的玻璃,以软镶嵌包边的方式镶嵌在龙骨网格中,形成玻璃幕墙的安装框架。The curtain wall window 11 is fixed in a stable frame similar to a window frame, and a keel grid is installed in the stable frame. The glass in the curtain wall window 11 is inlaid in the keel grid in a soft inlay edging manner to form an installation frame for the glass curtain wall.

幕墙窗11的龙骨网格中带有门框112,门框112内安装有玻璃门扇,门也可最为采光口。The keel grid of the curtain wall window 11 is provided with a door frame 112, and a glass door leaf is installed in the door frame 112, and the door can also serve as a lighting opening.

挑廊的悬挑端与装饰外罩1的外墙之间的接缝处设置有柔性装饰板,柔性装饰板与挑廊的悬挑端固定连接,柔性装饰板与装饰外罩1的内墙内侧无连接,幕墙窗11与新建筑2之间的间隙设置为门厅22。A flexible decorative panel is provided at the joint between the cantilevered end of the cantilevered corridor and the outer wall of the decorative outer cover 1. The flexible decorative panel is fixedly connected to the cantilevered end of the cantilevered corridor, and the flexible decorative panel is not connected to the inner side of the inner wall of the decorative outer cover 1. The gap between the curtain wall window 11 and the new building 2 is set as a foyer 22.

装饰外罩1包括四周竖向设置的墙体,设置于墙体顶部的屋盖,以及设置于屋盖内顶部的平面三脚架,平面三脚架沿装饰外罩1的长度方向间隔设置为多个,多个平面三脚架长度方向的两端固定于墙体的顶部,平面三脚架和装饰外罩1的地面之间为空腔,多个平面三脚架的底面标高高于新建筑2的顶面标高,平面三脚架和装饰外罩1的地面之间设为空腔,目的是让车辆能够开入旧建筑。The decorative outer cover 1 includes walls arranged vertically on all sides, a roof arranged on the top of the walls, and a plane tripod arranged on the top of the roof. The plane tripod is arranged in multiple intervals along the length direction of the decorative outer cover 1, and both ends of the multiple plane tripods in the length direction are fixed to the top of the wall. There is a cavity between the plane tripod and the ground of the decorative outer cover 1. The bottom elevations of the multiple plane tripods are higher than the top elevation of the new building 2. A cavity is set between the plane tripod and the ground of the decorative outer cover 1, so that vehicles can drive into the old building.

侧窗12的窗洞开设有洞壁光滑平整的安装洞,侧窗12的玻璃窗扇顶撑于安装洞的洞壁上。The window opening of the side window 12 is provided with an installation hole with a smooth and flat hole wall, and the glass window sash of the side window 12 is supported on the hole wall of the installation hole.

装饰外罩1的外墙为清水砖墙,装饰外罩1外墙上的装饰材料为PK砖,由于旧建筑的外表破旧且年久失修,利用装饰材料可在低成本短时间的前提下彻底完成对建筑外观的翻新,同时保护旧墙,减少风化影响,提高建筑外观的美观性,PK砖能够模拟清水砖墙的外形。The outer wall of the decorative cover 1 is a plain brick wall, and the decorative material on the outer wall of the decorative cover 1 is PK brick. Since the appearance of the old building is shabby and has fallen into disrepair, the decorative material can be used to completely complete the renovation of the building appearance at a low cost and in a short time. At the same time, the old wall can be protected, the impact of weathering can be reduced, and the aesthetics of the building appearance can be improved. The PK brick can simulate the appearance of the plain brick wall.

如果旧建筑的外墙上贴有瓷砖的话,则可重新贴瓷砖,如果旧建筑的外墙上贴有石材板的话,则可清洗修补后刷真石漆;如果旧建筑的外墙上外墙墙面是清水混凝土墙面,则重新涂抹一层清水混凝土;如果旧建筑的外墙上为石灰抹面的话,则清除后重新抹面。If there are tiles on the exterior walls of the old building, you can re-tile them. If there are stone slabs on the exterior walls of the old building, you can clean and repair them and then apply real stone paint. If the exterior walls of the old building are plain concrete walls, re-apply a layer of plain concrete. If the exterior walls of the old building are lime plastered, remove the lime and re-plaster them.

以上所述的实施例仅仅是对本发明的优选实施方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通技术人员对本发明的技术方案作出的各种变形和改进,均应落入本发明权利要求书确定的保护范围内。The embodiments described above are merely descriptions of preferred implementation modes of the present invention and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims (10)

1. The utility model provides a new and old building nested duplex structure that can utilize old and inside stable environment which characterized in that: the building decoration structure comprises a decoration outer cover (1) formed by reinforcing an old building and a new building (2) arranged in the decoration outer cover (1), wherein the top view of the decoration outer cover (1) is rectangular, a window hole for installing a curtain wall window (11) is formed in any one wall body in the length direction of the decoration outer cover (1), window holes for installing side windows (12) are formed in two wall bodies in the length direction of the decoration outer cover (1) and one wall body opposite to the curtain wall window (11), glass curtain walls (111) are arranged in the window holes of the curtain wall window (11), transparent glass (121) and/or shutter (122) are arranged in the window holes of the side windows (12), the top surface of the side windows (12) is higher than the top floor of the new building (2), the bottom surface of the side windows (12) is lower than the bottom ceiling of the new building (2), and a layer of the outer cover (1) except the window holes of the curtain wall (11) and the rest outer walls of the window holes of the side windows (12) is wrapped with decorative materials for simulating the original appearance of the building and protecting the old building outer wall;
The reinforcing structure of the old building comprises a non-bearing wall reinforcing structure, a reinforcing groove is formed in a wall body at the top of a window hole of a side window (12), a lintel is arranged in the reinforcing groove, and the window hole of a curtain wall window (11) vertically extends to a roof of the old building; the reinforced concrete bearing wall reinforcing structure is characterized in that a slot is formed in an outer wall of the reinforced concrete bearing wall reinforcing structure, a hidden column is arranged in the slot, and a lintel is arranged at the top of a window hole of a curtain wall window (11); masonry bearing wall reinforced structure, fluting in its outer wall, the blind column is installed to the inslot, and the reinforcement groove has been seted up to the wall body of the window hole top position of side window (12), install the lintel in the reinforcement groove, the window hole of curtain window (11) vertically extends to the roof of decorating dustcoat (1), the floor level of newly-built (2) outwards extends to the outer wall position of decorating dustcoat (1), forms unsettled indoor corridor (3), indoor corridor (3) are the gathering corridor.
2. A new and old building nest composite structure which is old and stable in internal environment as claimed in claim 1, wherein: the novel building (2) comprises a plurality of lower functional areas (21), a hall (22) arranged between the lower functional areas (21) and curtain wall windows (11), a plurality of upper functional areas (23) arranged in the lower functional areas (21), a pavement (24) arranged between the lower functional areas (21) and the decorative outer cover (1), IT data machine rooms are arranged in the upper functional areas (23) and the lower functional areas (21), a fresh air machine room, a post-accident ventilation machine room, a distribution room and a smoke exhaust machine room (25) are partitioned by walls on one side of the IT data machine rooms, smoke exhaust pipes and smoke exhaust pipes extend outwards in the smoke exhaust machine room (25), the smoke exhaust pipes extend into any other machine room, the outlet of the smoke exhaust pipes are communicated with a shutter (122), and any independent room in the lower functional areas (21) and the upper functional areas (23) faces the side window (12).
3. A new and old building nest composite structure which is old and stable in internal environment as claimed in claim 2, wherein: the novel building (2) further comprises an area electric smoke blocking vertical wall (26) and a channel electric smoke blocking vertical wall (27), the area electric smoke blocking vertical wall (26) is arranged between adjacent support columns of the lower layer functional area (21) and a stair outlet of the upper layer functional area (23), and the channel electric smoke blocking vertical wall (27) is arranged between the novel building (2) and a pavement (24) of the decorative outer cover (1).
4. A new and old building nest composite structure which is old and stable in internal environment according to claim 3, wherein: the non-top layer of the new building (2) is a machine room for intensively installing cabinets of computers and/or data centers, an air inlet and an air outlet of a radiator of the cabinet are both louver windows (122) at the top of the side window (12), the side window (12) provided with the louver windows (122) is provided with glass windows at the bottom.
5. A new and old building nest composite structure which is old and stable in internal environment as claimed in claim 1, wherein: reinforced concrete ground beam has been buried underground to curtain window (11) bottom ground, and curtain window (11) top is provided with the roof beam with the position that the roof is adjacent, is provided with the inner column in the middle of curtain window (11), both ends respectively with roof beam and ground beam fixed connection about the inner column, glass edge in curtain window (11) is provided with soft mosaic bordure structure, soft mosaic bordure structure is used for guaranteeing that the glass of curtain window (11) does not take place to damage when taking place curtain expend with heat and contract with cold.
6. A new and old building nest composite structure which is old and stable in internal environment as claimed in claim 1, wherein: the keel grid of the curtain wall window (11) is provided with a door frame (112), and a glass door leaf is arranged in the door frame (112).
7. A new and old building nest composite structure which is old and stable in internal environment as claimed in claim 1, wherein: the flexible decorative board is arranged at the joint between the overhanging end of the overhanging corridor and the outer wall of the decorative outer cover (1), the flexible decorative board is fixedly connected with the overhanging end of the overhanging corridor, and the flexible decorative board is not connected with the inner side of the inner wall of the decorative outer cover (1).
8. A new and old building nest composite structure which is old and stable in internal environment as claimed in claim 1, wherein: the decoration outer cover (1) comprises walls which are vertically arranged around, a roof which is arranged at the top of the walls, and plane tripods which are arranged at the inner top of the roof, wherein the plane tripods are arranged into a plurality of planes along the length direction of the decoration outer cover (1) at intervals, the two ends of the length direction of the planes tripods are fixed at the top of the walls, a cavity is formed between the planes tripods and the ground of the decoration outer cover (1), and the elevation of the bottom surfaces of the planes tripods is higher than that of the newly-built building (2).
9. A new and old building nest composite structure which is old and stable in internal environment as claimed in claim 1, wherein: the window hole of the side window (12) is provided with a mounting hole with a smooth and flat hole wall, and the glass window sash of the side window (12) is propped against the hole wall of the mounting hole.
10. A new and old building nest composite structure which is old and stable in internal environment as claimed in claim 1, wherein: the outer wall of the decorative outer cover (1) is a clear water brick wall, and the decorative material on the outer wall of the decorative outer cover (1) is PK bricks.
CN202411049992.7A 2024-08-01 2024-08-01 New and old building nested composite structure capable of utilizing old and stable in internal environment Active CN118564104B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202411049992.7A CN118564104B (en) 2024-08-01 2024-08-01 New and old building nested composite structure capable of utilizing old and stable in internal environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202411049992.7A CN118564104B (en) 2024-08-01 2024-08-01 New and old building nested composite structure capable of utilizing old and stable in internal environment

Publications (2)

Publication Number Publication Date
CN118564104A true CN118564104A (en) 2024-08-30
CN118564104B CN118564104B (en) 2024-12-06

Family

ID=92468472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202411049992.7A Active CN118564104B (en) 2024-08-01 2024-08-01 New and old building nested composite structure capable of utilizing old and stable in internal environment

Country Status (1)

Country Link
CN (1) CN118564104B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118564103A (en) * 2024-08-01 2024-08-30 北京建工四建工程建设有限公司 Large-size old building reconstruction and utilization method capable of keeping building appearance

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0049566A1 (en) * 1980-08-27 1982-04-14 Sheltered Systems Building construction systems and methods
DE202008008807U1 (en) * 2008-08-01 2008-10-16 Heffner, Rolf-Dieter Building outer wall shell
CN202500346U (en) * 2011-11-11 2012-10-24 黄文诗 Reconstruction structures for old building zone multi-unit underground space
JP2013092006A (en) * 2011-10-27 2013-05-16 Kajima Corp New/old building integrated building-movement method
CN105464397A (en) * 2015-11-16 2016-04-06 上海建工五建集团有限公司 Existing hole retaining reinforcing method of external wall of protective historical building
CN215291608U (en) * 2020-12-25 2021-12-24 汤泱工程顾问(上海)中心(有限合伙) Reinforced structure of newly-increased entrance to a cave lintel of geomorphic building outer wall
CN114482594A (en) * 2021-12-19 2022-05-13 中交四公局第一工程有限公司 Construction method for retaining support of historical landscape civil-improvement commercial building structure
CN114673377A (en) * 2022-04-09 2022-06-28 中建八局第三建设有限公司 Reservation of exterior walls of historic buildings and construction methods for interior hollowing out and remaking
CN115596242A (en) * 2022-11-08 2023-01-13 上海建工二建集团有限公司(Cn) A support system for retaining exterior walls of existing buildings and its construction method
CN115613848A (en) * 2022-11-08 2023-01-17 长沙市规划设计院有限责任公司 A construction method for retaining the internal structure of the exterior wall for reinforcement and reconstruction

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0049566A1 (en) * 1980-08-27 1982-04-14 Sheltered Systems Building construction systems and methods
DE202008008807U1 (en) * 2008-08-01 2008-10-16 Heffner, Rolf-Dieter Building outer wall shell
JP2013092006A (en) * 2011-10-27 2013-05-16 Kajima Corp New/old building integrated building-movement method
CN202500346U (en) * 2011-11-11 2012-10-24 黄文诗 Reconstruction structures for old building zone multi-unit underground space
CN105464397A (en) * 2015-11-16 2016-04-06 上海建工五建集团有限公司 Existing hole retaining reinforcing method of external wall of protective historical building
CN215291608U (en) * 2020-12-25 2021-12-24 汤泱工程顾问(上海)中心(有限合伙) Reinforced structure of newly-increased entrance to a cave lintel of geomorphic building outer wall
CN114482594A (en) * 2021-12-19 2022-05-13 中交四公局第一工程有限公司 Construction method for retaining support of historical landscape civil-improvement commercial building structure
CN114673377A (en) * 2022-04-09 2022-06-28 中建八局第三建设有限公司 Reservation of exterior walls of historic buildings and construction methods for interior hollowing out and remaking
CN115596242A (en) * 2022-11-08 2023-01-13 上海建工二建集团有限公司(Cn) A support system for retaining exterior walls of existing buildings and its construction method
CN115613848A (en) * 2022-11-08 2023-01-17 长沙市规划设计院有限责任公司 A construction method for retaining the internal structure of the exterior wall for reinforcement and reconstruction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118564103A (en) * 2024-08-01 2024-08-30 北京建工四建工程建设有限公司 Large-size old building reconstruction and utilization method capable of keeping building appearance
CN118564103B (en) * 2024-08-01 2024-12-06 北京建工四建工程建设有限公司 A method for renovating and utilizing a large-scale old building while retaining its appearance

Also Published As

Publication number Publication date
CN118564104B (en) 2024-12-06

Similar Documents

Publication Publication Date Title
CN204940928U (en) Packaged type aluminium alloys house
CN205012458U (en) Simple and easy basic timber structure local -style dwelling houses
CN105649207A (en) Construction method and structure of spliced type standard temporary houses
US4586299A (en) Building system of interconnected block elements
CN101457552A (en) Composite hollow slab house and building method thereof
CN101476401B (en) Semi-opened underground garage
CN118564104A (en) New and old building nested composite structure capable of utilizing old and stable in internal environment
US20230332396A1 (en) Method For Assembling A Modular Building
CN204919801U (en) Aluminum alloy house
CN204919802U (en) Preceding facade system in aluminum alloy house
CN114753675A (en) Assembled steel module system country villa and construction method thereof
CN204940529U (en) The side elevation system in aluminium alloys house
RU2140509C1 (en) Domestic house of the first mass series with attic floor of volumetric block-rooms, method for arrangement of attic floor and complex reconstruction of house
CN205153585U (en) Portable aluminum alloy house
CN118564103B (en) A method for renovating and utilizing a large-scale old building while retaining its appearance
CN216476012U (en) Assembled steel construction modularization building composite insulation decorative structure
JP2003105976A (en) Extension method for building, and building constructed using the method
CN118564105B (en) A method for rebuilding a new floor slab when there is interference with the original load-bearing exterior wall
CN215888430U (en) Novel circulating water pump room structure of power plant
CN205875384U (en) Outer containment system of stand alone type combination
CN211691624U (en) Assembled green family blockhouse of hiding
Brunone et al. Timber-Based Transformations of the Built Environment: A Portfolio of Case Studies
Jeżowski Budowa dźwigu w pałacu Izraela Poznańskiego w Łodzi–studium przypadku
Wong Building Enclosure in Hong Kong: Environmental Considerations
CN117661717A (en) A kind of cantilever building construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant