CN118564103B - A method for renovating and utilizing a large-scale old building while retaining its appearance - Google Patents

A method for renovating and utilizing a large-scale old building while retaining its appearance Download PDF

Info

Publication number
CN118564103B
CN118564103B CN202411049990.8A CN202411049990A CN118564103B CN 118564103 B CN118564103 B CN 118564103B CN 202411049990 A CN202411049990 A CN 202411049990A CN 118564103 B CN118564103 B CN 118564103B
Authority
CN
China
Prior art keywords
building
wall
window
old building
old
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202411049990.8A
Other languages
Chinese (zh)
Other versions
CN118564103A (en
Inventor
赵来柱
张莉莉
王亮
张进红
罗洁
刘海涛
李东华
姚俊琴
孙汉霖
李汀滢
李萌
朱志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jinyu Xingfa Technology Co ltd
Beijing Fourth Construction & Engineering Co ltd
Original Assignee
Beijing Jinyu Xingfa Technology Co ltd
Beijing Fourth Construction & Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jinyu Xingfa Technology Co ltd, Beijing Fourth Construction & Engineering Co ltd filed Critical Beijing Jinyu Xingfa Technology Co ltd
Priority to CN202411049990.8A priority Critical patent/CN118564103B/en
Publication of CN118564103A publication Critical patent/CN118564103A/en
Application granted granted Critical
Publication of CN118564103B publication Critical patent/CN118564103B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明涉及对现有建筑物的施工措施技术领域,公开了一种保留建筑外形的大尺寸旧建筑改造利用方法,采用功能与外形分离的思路对大尺寸旧建筑进行改造,旧建筑仅保留外壳,建筑的功能由外壳内新建的建筑来实现,从而使得旧建筑不仅不需要承载新的荷载,其原先承载的荷载也仅剩屋盖和装饰材料,即使旧建筑的受力结构也能满足需求。利用特殊尺寸的幕墙窗和侧窗的窗洞,克服了新旧两层建筑嵌套对施工造成的干涉问题,使得嵌套建筑的施工可行且在施工后克服内部通风采光问题;采用仿照旧建筑外貌的新装饰材料对旧建筑进行包裹,从而使得旧建筑破旧的外表被彻底翻新的同时还得到了保护;以上3点结合,在保留建筑外形的前提下完成了大尺寸旧建筑改造。

The present invention relates to the technical field of construction measures for existing buildings, and discloses a method for renovating and utilizing large-scale old buildings while retaining the appearance of the buildings. The idea of separating function from appearance is adopted to renovate large-scale old buildings. Only the outer shell of the old building is retained, and the function of the building is realized by the newly built building inside the outer shell, so that the old building not only does not need to bear new loads, but also only the roof and decorative materials are left for the loads it originally carried, and even the load-bearing structure of the old building can meet the demand. The window openings of the curtain wall windows and side windows of special sizes are used to overcome the interference problem caused by the nesting of the new and old two-story buildings on the construction, so that the construction of the nested buildings is feasible and the internal ventilation and lighting problems are overcome after the construction; the old buildings are wrapped with new decorative materials that imitate the appearance of the old buildings, so that the dilapidated appearance of the old buildings is completely refurbished and protected at the same time; the above three points are combined to complete the renovation of large-scale old buildings while retaining the appearance of the buildings.

Description

Large-size old building reconstruction and utilization method capable of keeping building appearance
Technical Field
The invention relates to the technical field of construction measures of existing buildings, in particular to a large-size old building reconstruction and utilization method capable of retaining the appearance of a building.
Background
The vast majority of old buildings are left empty for new building construction after being dismantled, but some old buildings with special significance exist, and the purposes of the buildings need to be changed on the premise of keeping the original appearance of the old buildings, so that the deep reconstruction of the buildings is needed.
Considering that the old building itself has undergone serious aging, its structural strength is severely reduced, and its appearance has been very worn out. These problems are difficult to solve without deep modification of the building itself, so modification of the old building is often required to be performed in a form of reassembling after disassembling the building into parts, and in the process of disassembling the building parts, the building parts can be detected and replaced respectively, parts with unqualified strength or serious damage can be replaced, reinforcement treatment can be performed inside or the internal layout of the building can be changed, so that the building is adapted to the change of the use of the building. A typical case is an Tiananmen urban building, which is reformed in this way after construction from the original old and craving-to-shake appearance to the existing appearance that can stably carry a large number of people and equipment.
But for some large old buildings this way of dismantling is not applicable. The biggest problem is that in large-sized old buildings, because of the large size of the building, the rigidity is low, deformation is easy to occur, the strength is difficult to reach the standard, and in order to maintain the shape, components with high rigidity such as reinforced concrete beam columns/shear walls and the like, which are not suitable for being disassembled into parts, are often needed. In addition, since old buildings are old and old, specifications of building construction may change, and buildings in certain places may not be allowed to be assembled into buildings of the original size again after being disassembled into parts due to factors such as height limitation.
Taking Beijing Huaiyou science urban and north area Jin Yuxing of the invention as an example, the project is in Xingfu cement factory, which is established in the early 90 s, and contributes a large amount of building materials to Beijing urban construction, which is an important industrial site. Therefore, the construction in this place needs to be modified to a research facility of the applied mathematics institute of Beijing Yan perch lake nearby while retaining the external shape. The warehouse needs to be reconstructed into a multi-layer supercomputer room, is a typical single-layer large-span building, has very weak bearing capacity, is very worn out, cannot bear the added floor slabs and complex electronic equipment, cannot meet the requirements of supercomputer equipment on the environment, and cannot be disassembled and reassembled. Similar problems are prevalent in the modification of three industrial sites nationwide. Even though the protection of industrial sites is not considered, even if the building is to be dismantled and then a building is to be reconstructed according to the shape of the original building, the building is not feasible due to the local height limiting policy.
Disclosure of Invention
The invention provides a large-size old building reconstruction and utilization method capable of keeping the appearance of a building.
The technical problem to be solved is that in the reconstruction and utilization process of the large-size old building, the building shape is maintained due to the fact that high-rigidity components such as reinforced concrete beams and columns or shear walls which cannot be broken and disassembled are needed, and maintenance and reconstruction cannot be carried out in a mode of reassembling after the components are disassembled.
In order to solve the technical problems, the invention adopts the following technical scheme that the method for reforming and utilizing the large-size old building which keeps the appearance of the building comprises the following steps:
reinforcing the old building to ensure that the bearing capacity of the old building is qualified in the subsequent outer wall hole opening process and after the outer wall hole opening;
Step two, opening window holes of curtain wall windows and window holes of side windows on the outer wall of the old building;
the curtain wall window is a window formed by installing a transparent curtain wall in a window hole, and the window hole of the curtain wall window meets the following conditions:
firstly, all vehicles and machines required by the construction in the old building can be passed through;
the second condition is that the building is arranged on the sunny side of the old building;
thirdly, the old building components around the window hole do not fall off;
the window hole of the side window meets the following conditions:
fourthly, setting the outer wall of the old building at intervals around a circle;
The second condition is that the top is higher than the top floor of the new building to be built in the old building, and the bottom is lower than the bottom ceiling of the new building to be built in the old building;
step three, vehicles and machinery required by the internal construction of the old building are driven into the old building along a window hole of a curtain wall window, and a new building is constructed in the old building, wherein the new building is not connected with the old building, a gap for passing personnel exists between an outer wall of the new building and an outer wall of the old building, and a top layer of the new building is of an open roof structure without a roof;
The materials required in the construction process of the new building and the concrete pump pipe are hung into the old building along the window hole of the side window closest to the current construction position, the muck loading truck is transported out along the window hole of the curtain wall window, and the waste materials except muck are hung out along the window hole of the side window closest to the waste materials;
And fourthly, installing a curtain wall in a window hole of a curtain wall window, installing glass window sashes and/or shutters in a window hole of a side window, cleaning the outer wall of the old building, and then wrapping a layer of decorative material which is used for simulating the original appearance of the outer wall of the old building and protecting the outer wall of the old building on the outer wall of the old building.
In the first step, according to the difference of the outer wall structures of the old building, the reinforcement process of the building is divided into the following three working conditions:
if the outer wall of the old building is a non-bearing wall, a wall body at the top of a window hole of a side window is provided with a girder in a grooving way, and the window hole of the curtain wall window extends upwards to a roof;
If the outer wall of the old building is a bearing wall and is of a reinforced concrete structure, a hidden column is arranged in a groove in the outer wall of the old building, and a lintel is arranged at the top of a window hole of a curtain wall window for reinforcement;
if the outer wall of the old building is a bearing wall and is of a masonry structure, a hidden column is slotted in the outer wall of the old building, a lintel is slotted in a wall body at the top of a window hole of a side window for reinforcement, and the window hole of the curtain wall window extends upwards to a roof;
And in the working conditions one to three, if the beam is broken in the process of opening a hole in the outer wall of the old building, a new beam is installed on the broken beam and is abutted against the roof.
Further, the curtain wall in the curtain wall window is fixed in the following manner:
a reinforced concrete ground beam is buried below the curtain wall, a roof beam is arranged at the position, adjacent to the roof, of the top of the curtain wall, inner columns are arranged in the curtain wall at intervals, and the upper end and the lower end of each inner column are fixedly connected with the ground beam and the roof beam respectively;
the ground beam is provided with an embedded groove for fixing the bottom of the curtain wall or is anchored with a bracket for fixing the bottom of the curtain wall;
the left side and the right side of the curtain wall are fixedly connected with the outer wall of the old building.
Furthermore, the keel grid of the curtain wall window is provided with a door frame, a glass door leaf is arranged in the door frame to serve as a new door of an old building, and the original door of the old building is removed and replaced by the glass door.
In the third step, the floor slab of the new building horizontally extends outwards to the outer wall of the old building to form a suspended indoor corridor, the indoor corridor is a cantilever corridor, joints between the cantilever end of the cantilever corridor and the outer wall of the old building are shielded by flexible decorative plates, and the decorative plates are fixedly connected with the cantilever end of the cantilever corridor and are not connected with the outer wall of the old building;
the gap between the curtain wall window and the new building is arranged as a hall.
Further, if the old building is a multi-storey building, the second step further comprises a step of dismantling the floor slab of the second floor, and in the third step, a new building is constructed layer by layer upwards from bottom to top, and every time a new building is constructed, the floor slab of the old building is dismantled.
Further, the window hole of the side window is cut by a water saw, the wall of the hole is smooth and flat, and the glass window sash of the side window is directly propped against the wall of the hole.
Further, the outer wall of the old building is a clear water brick wall, and the decoration material in the fourth step is PK bricks attached to the outer wall of the old building.
Furthermore, the non-top layer of the new building is a machine room for intensively installing cabinets of computers and/or data centers, the air inlet and the air outlet of the radiator of the cabinet are all shutters at the tops of side windows, and glass windows are arranged at the bottoms of the side windows provided with the shutters.
Compared with the prior art, the large-size old building reconstruction utilization method for retaining the building appearance has the following beneficial effects:
In the invention, the idea of separating functions from appearance is adopted to reform the large-size old building, the old building only keeps the outer shell to maintain the appearance of the building, and the functions of the building are realized by the newly built building in the outer shell, so that the old building is not only required to bear new load, but also only remains the roof and the decorative material for the original load, and even the stressed structure of the old building can meet the requirement
Meanwhile, the window holes of curtain wall windows and side windows with special sizes are utilized, so that the interference problem caused by nesting of new and old two-layer buildings on construction (construction vehicles and equipment cannot be started, building materials and waste materials cannot be lifted, a concrete pouring pump pipe is blocked) is solved, the construction of the nested building is feasible, and the ventilation and lighting problems in the nested building are solved after the construction;
Wrapping the old building by adopting a new decoration material imitating the appearance of the old building, so that the worn appearance of the old building is thoroughly renovated and simultaneously protected;
The 3-point combination completes the transformation of a large-size old building on the premise of keeping the appearance of the building, and meanwhile, the double-layer nested structure enables the internal environment of the new building to be more stable (the new building does not need direct sunlight, wind, rain, snow and dust) and can better meet various occasions with higher requirements on environmental stability, including a computer room.
Drawings
FIG. 1 is a plan view of a building in a large-size old building retrofit utilization method of the present invention which retains the appearance of the building;
FIG. 2 is a schematic view of an old building exterior wall including side windows;
FIG. 3 is a schematic view of the structure of a curtain wall window;
in the figure, 1-old building, 11-curtain wall window, 12-side window, 2-new building, 3-hall, 4-indoor corridor.
Detailed Description
Taking Beijing-Huaiyou science urban and north area Jin Yuxing as an example, as shown in fig. 1, a large-size old building reconstruction and utilization method for retaining the appearance of a building comprises the following steps:
reinforcing the old building 1 to ensure that the bearing capacity of the old building is qualified in the subsequent outer wall hole opening process and after the outer wall hole opening;
Since holes are needed to be drilled on the outer wall of the old building 1 later to avoid interference caused by nesting of the inner building and the outer building, the bearing capacity of the outer wall of the old building 1 is reduced, and therefore reinforcement needs to be performed in advance before the holes are drilled. At the same time, if the old building 1 itself is already a dangerous house, additional reinforcement can be made during this process. The reinforcement scheme is established according to the prior exploration and simulation calculation process.
Step two, opening window holes of curtain wall windows 11 and window holes of side windows 12 on the outer wall of the old building 1;
As shown in fig. 2, the curtain wall window 11 is a window formed by installing a transparent curtain wall (usually glass curtain wall or sunlight panel curtain wall) in a window hole, and the window hole of the curtain wall window 11 meets the following conditions:
The second condition is that all vehicles and machines required by the internal construction of the old building 1 can pass through;
The old building 1 is usually selected from a narrower wall, and the whole wall is removed to be changed into a glass curtain wall.
The second condition is that the first building is arranged on the sunny side of the old building 1;
The glass curtain wall is a main lighting channel, and is positioned on the south side of a building in a northern hemisphere and on the north side of the building in a southern hemisphere.
Thirdly, the old building 1 components around the window hole do not fall off;
The curtain wall window 11 is a very special structure which is not attached to the wall surface like a conventional curtain wall but is installed like a window. Its glass therefore needs to be fixed by means of the grid of keels and the perimeter also needs to be fixed. The old building 1 components around the window hole need to fix the edge of the curtain wall window 11, and it must be ensured that the building can stably exist after the window hole is opened.
As shown in fig. 3, the window opening of the side window 12 satisfies the following condition:
Condition two is four: the outer wall of the old building 1 is arranged at intervals around the circumference;
one requires that a closer side window 12 opening be found for ventilation and lighting, and that all construction sites be ensured.
The second condition is that the top is higher than the top floor of the new building 2 to be built in the old building 1, and the bottom is lower than the bottom ceiling of the new building 2 to be built in the old building 1;
since the window opening of the side window 12 needs to transport various materials, it needs to be high enough and low enough to meet the needs of all floor construction.
And thirdly, driving vehicles and machinery required by the internal construction of the old building 1 into the old building 1 along the window holes of the curtain wall windows 11, and constructing the new building 2 in the old building 1, wherein no connection exists between the new building 2 and the old building 1 so as to ensure that the load on the new building 2 cannot be transferred to the old building 1.
There is a gap between the outer wall of the new building 2 and the outer wall of the old building 1 for the passage of personnel, here there is a gap between the new building 2 and the old building 1 because there is no connection between them, here it is ensured that the gap can pass through the personnel, so that these gaps can be utilized as hallways to compensate for the problem of the new building 2 being reduced in size due to its being inside the old building 1.
The top layer of the new building 2 is of an open structure without a roof;
Here, the construction of the roof on the top layer of the new building 2 is severely interfered by the uncapped of the old building 1, and the construction cannot be completed normally, so that the roof of the new building 2 is simply discarded and the roof of the old building 1 is directly utilized. If there is a breakage of the roof of the old building 1, a refurbishment, i.e. a replacement of the roof deck, should be performed here. Unlike the outer wall, the roof itself does not need to bear a load other than its own weight, so that the roof panel can be replaced easily.
The materials required in the construction process of the new building 2 and the concrete pump pipe are hung into the old building 1 along the window hole of the side window 12 closest to the current construction position, the muck loading truck is transported out along the window hole of the curtain wall window 11, and the waste materials except muck are hung out along the window hole of the side window 12 closest to the waste materials;
the dense and specially-adjusted window holes in size and position can prevent the construction process of the new building 2 from being interfered by the old building 1 outside.
And fourthly, installing a curtain wall in a window hole of the curtain wall window 11, installing glass window sashes and/or shutters in a window hole of the side window 12, cleaning the outer wall of the old building 1, and then wrapping a layer of decorative material which is used for simulating the original appearance of the outer wall of the old building 1 and protecting the outer wall of the old building 1 on the outer wall of the old building 1.
The old building 1 is not only worn but also is being continuously weathered, so that the direct wrapping of a layer of decorative material is selected here, not only the renovation of the building exterior can be completed thoroughly with lower cost and shorter time, but also the weathering process of the building can be interrupted.
In the first step, according to the difference of the outer wall structures of the old building 1, the reinforcement process of the building is divided into the following three working conditions:
If the outer wall of the old building 1 is a non-bearing wall, a wall body at the top of a window hole of a side window 12 is provided with a lintel in a grooving way, and the window hole of a curtain wall window 11 extends upwards to a roof;
In this embodiment, which is the working condition, the outer wall of the old building 1 is a brick-concrete structure, which comprises a brick wall and reinforced concrete hidden columns embedded in the brick wall, and the brick wall is not load-bearing, but is load-bearing with a roof by the reinforced concrete hidden columns. The roof is provided with a row of plane trusses, and two ends of each plane truss respectively fall on a reinforced concrete hidden column.
The lintel is installed here because the non-load bearing wall is weak in whatever form, and the roof position of the window opening after the opening is not self-sustaining. The installation of the lintel at the hole of the curtain wall window 11 to support the fragile wall above is too costly, so that the outer wall where the hole of the curtain wall window is located is chosen to be directly detached to the top. The lintel here is not substantially load-bearing and therefore the ends may not be connected to the reinforced concrete dark columns of the old building 1.
If the outer wall of the old building 1 is a bearing wall and is of a reinforced concrete structure, a hidden column is arranged in a groove in the outer wall of the old building 1, and a lintel is arranged at the top of a window hole of the curtain wall window 11 for reinforcement;
here, the bearing capacity is reduced due to the fact that holes are formed in the bearing wall, and a hidden column is required to be installed in the bearing wall for reinforcement. However, the reinforced concrete wall cannot fall down the building blocks after the opening, so that a lintel is not required to be installed at the top of the window hole after the window hole is opened.
And in the third working condition, if the outer wall of the old building 1 is a bearing wall and is of a masonry structure, a hidden column is arranged in the outer wall of the old building 1 in a slotting way, and a lintel is arranged on the wall body at the top of the window hole of the side window 12 in a slotting way to strengthen the wall body, so that the building blocks are prevented from falling down, the window hole of the curtain wall window 11 extends upwards to a roof all the time, and the excessive cost of supporting the fragile wall body above by the large-span lintel is avoided.
In addition to reinforced concrete walls and masonry walls, there are slab walls and rammed earth walls, etc., but these are applied to temporary buildings, whereas the old building 1 can become the old building 1, with a hidden premise, i.e. it is a permanent building. Therefore, the outer wall of the old building 1 is usually only provided with two masonry structures and reinforced concrete structures, but if structures other than the masonry structures and the reinforced concrete structures are encountered, the outer wall is uniformly treated according to the working condition III.
And in the working conditions one to three, if a beam is broken in the process of opening a hole in the outer wall of the old building 1, a new beam is installed above the broken beam and is abutted against the roof to solve the problem of bearing capacity reduction caused by the broken beam.
The curtain wall in the curtain wall window 11 is fixed in the following manner:
as shown in fig. 2, reinforced concrete ground beams are buried on the ground below the curtain wall, a roof beam is arranged at the top of the curtain wall and adjacent to the roof, inner columns are arranged in the curtain wall at intervals, and the upper end and the lower end of each inner column are fixedly connected with the ground beam and the roof beam respectively;
The ground beam is provided with an embedded groove for fixing the bottom of the curtain wall or is anchored with a bracket for fixing the bottom of the curtain wall;
The left side and the right side of the curtain wall are fixedly connected with the outer wall of the old building 1.
The curtain wall is fixed in this form in a stable frame like a window frame, and the grid of the keel is arranged in the stable frame, and the glass in the curtain wall is inlaid in the grid of the keel in a soft inlaid edge wrapping mode. The keel grids are used for fixing glass, and soft mosaic edges are used for ensuring that the glass in the curtain wall is not damaged when the curtain wall expands with heat and contracts with cold. Of course, if the sunlight plate curtain wall is adopted, the soft mosaic edge covering mode can be omitted.
The keel grid of the curtain wall window 11 is provided with a door frame, a glass door leaf is arranged in the door frame to serve as a new door of the old building 1, and the original door of the old building 1 is removed and replaced by the glass door.
The door also serves as a lighting window for the building.
In the third step, the floor slab of the new building 2 horizontally extends outwards to the outer wall of the old building 1 to form a suspended indoor corridor 4, the indoor corridor 4 is a cantilever corridor, joints between the cantilever ends of the cantilever corridor and the outer wall of the old building 1 are shielded by flexible decorative plates, and the decorative plates are fixedly connected with the cantilever ends of the cantilever corridor and are not connected with the outer wall of the old building 1.
The gap between the curtain wall window 11 and the new building 2 is arranged as the hall 3.
If the old building 1 is a multi-storey building, the second step further comprises the step of dismantling the floor slab of the second floor, so that the vehicle can be driven into the old building 1;
In the construction process of the third step, new buildings 2 are constructed layer by layer from bottom to top, and each time a new building 2 is constructed, the floor slab of an old building 1 is removed.
This process is not only to ensure normal construction but also to remove loads other than the finishing materials on the roof and the housing in the old building 1. In the case of a single-layer building, the outer wall is subjected to loads other than the decorative material, and the removal is carried out at the same time.
In this embodiment, the window hole of the side window 12 is cut by a water saw, so that the wall of the hole is smooth and flat, and the glass window sash of the side window 12 is directly propped against the wall of the hole.
The outer wall of the old building 1 is a clear water brick wall, and the decoration material in the fourth step is PK bricks attached to the outer wall of the old building 1. The PK tile panel was used here to simulate the appearance of a clear water brick wall.
If the external wall of the old building 1 is stuck with ceramic tiles, the tiles can be re-stuck, if the external wall of the old building 1 is stuck with stone plates, the stone plates can be cleaned and repaired, then the stone plates can be painted, if the external wall surface of the external wall of the old building 1 is a bare concrete wall surface, a layer of bare concrete can be re-painted, and if the external wall of the old building 1 is a lime-painted surface, the stone plates can be cleaned and re-painted.
The non-top layer of the new building 2 is a machine room for intensively installing cabinets of computers and/or data centers, the air inlets and the air outlets of the radiators of the cabinets are shutters at the tops of the side windows 12, and the bottom of the side windows 12 provided with the shutters is a glass window.
The feature that the non-topped internal environment of such a nested building is more stable than that of a conventional building is fully utilized herein, and in order to ensure the aesthetic appearance of the building, it is chosen here not to additionally open the louvers to vent the radiator, but to select a portion of the area in the side window 12 to vent as a louver.
The above examples are only illustrative of the preferred embodiments of the present invention and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art to the technical solution of the present invention should fall within the scope of protection defined by the claims of the present invention without departing from the spirit of the present invention.

Claims (9)

1.一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:包括以下步骤:1. A method for renovating and utilizing a large-sized old building while retaining its appearance, characterized in that it comprises the following steps: 步骤一:对旧建筑(1)进行加固,使其在后续的外墙开洞过程中及开洞后承载力合格;Step 1: Strengthen the old building (1) to ensure that it has a qualified bearing capacity during and after the subsequent opening of the exterior wall; 步骤二:在旧建筑(1)的外墙上开设幕墙窗(11)的窗洞及侧窗(12)的窗洞;Step 2: Opening window openings for curtain wall windows (11) and side windows (12) on the exterior wall of the old building (1); 所述幕墙窗(11)为在窗洞内安装透明的幕墙形成的窗户,所述幕墙窗(11)的窗洞满足以下条件:The curtain wall window (11) is a window formed by installing a transparent curtain wall in a window opening, and the window opening of the curtain wall window (11) meets the following conditions: 条件二一:能够通行旧建筑(1)内部施工所需的所有车辆及机械;Condition 21: Access to all vehicles and machinery required for construction inside the old building (1); 条件二二:设置在旧建筑(1)的向阳面;Condition 22: Set up on the sunny side of the old building (1); 条件二三:窗洞一周的旧建筑(1)构件不发生掉落;Condition 23: Old buildings around window openings (1) No components fall off; 所述侧窗(12)的窗洞满足以下条件:The window opening of the side window (12) satisfies the following conditions: 条件二四:绕旧建筑(1)外墙一周间隔设置;Condition 24: Set at intervals around the exterior wall of the old building (1); 条件二五:顶部高于旧建筑(1)内部待修建的新建筑(2)的顶层地板,底部低于旧建筑(1)内部待修建的新建筑(2)的底层天花板;Condition 25: The top is higher than the top floor of the new building (2) to be built inside the old building (1), and the bottom is lower than the bottom ceiling of the new building (2) to be built inside the old building (1); 步骤三:将旧建筑(1)内部施工所需的车辆及机械沿幕墙窗(11)的窗洞开入旧建筑(1),在旧建筑(1)内施工新建筑(2);所述新建筑(2)与旧建筑(1)之间无连接,在新建筑(2)的外墙与旧建筑(1)的外墙之间存在能够供人员通行的间隙,且新建筑(2)的顶层为无屋盖的敞篷结构;Step 3: driving vehicles and machinery required for the internal construction of the old building (1) into the old building (1) along the window opening of the curtain wall window (11), and constructing the new building (2) inside the old building (1); the new building (2) is not connected to the old building (1), there is a gap between the outer wall of the new building (2) and the outer wall of the old building (1) for people to pass, and the top floor of the new building (2) is an open-top structure without a roof; 新建筑(2)施工过程中所需的物料以及混凝土泵管沿离当前施工位置最近的侧窗(12)的窗洞吊入旧建筑(1)内,渣土装车沿幕墙窗(11)的窗洞运出,渣土之外的废料沿离废料最近的侧窗(12)的窗洞吊出;The materials and concrete pump pipes required for the construction of the new building (2) are hoisted into the old building (1) through the window opening of the side window (12) closest to the current construction position, the muck is loaded and transported out through the window opening of the curtain wall window (11), and the waste materials other than the muck are hoisted out through the window opening of the side window (12) closest to the waste materials; 步骤四:在幕墙窗(11)的窗洞内安装幕墙,在侧窗(12)的窗洞内安装玻璃窗扇和/或百叶窗,对旧建筑(1)的外墙进行清洗,然后在旧建筑(1)的外墙上包裹一层用于模仿旧建筑(1)外墙原貌并对旧建筑(1)外墙进行保护的装饰材料。Step 4: Install a curtain wall in the window opening of the curtain wall window (11), install glass window sashes and/or shutters in the window opening of the side window (12), clean the exterior wall of the old building (1), and then wrap the exterior wall of the old building (1) with a layer of decorative material that imitates the original appearance of the exterior wall of the old building (1) and protects the exterior wall of the old building (1). 2.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:步骤一中,根据旧建筑(1)外墙结构的不同,对建筑的加固过程分为以下三种工况:2. A method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 1, characterized in that: in step 1, according to the different exterior wall structures of the old building (1), the reinforcement process of the building is divided into the following three working conditions: 工况一:若旧建筑(1)的外墙为非承重墙,则在侧窗(12)的窗洞顶部位置的墙体开槽安装过梁,且幕墙窗(11)的窗洞一直向上延伸到屋盖;Working condition 1: If the exterior wall of the old building (1) is a non-load-bearing wall, a lintel is installed in a groove in the wall at the top of the window opening of the side window (12), and the window opening of the curtain wall window (11) extends upward to the roof; 工况二:若旧建筑(1)的外墙为承重墙且为钢筋混凝土结构,则在旧建筑(1)的外墙中开槽安装暗柱并在幕墙窗(11)的窗洞顶部安装过梁进行加固;Working condition 2: If the outer wall of the old building (1) is a load-bearing wall and is a reinforced concrete structure, grooves are cut in the outer wall of the old building (1) to install concealed columns and lintels are installed at the tops of the window openings of the curtain wall windows (11) for reinforcement; 工况三:若旧建筑(1)的外墙为承重墙且为砌体结构,则在旧建筑(1)的外墙中开槽安装暗柱并在侧窗(12)的窗洞顶部位置的墙体开槽安装过梁进行加固,且幕墙窗(11)的窗洞一直向上延伸到屋盖;Working condition 3: If the outer wall of the old building (1) is a load-bearing wall and is a masonry structure, a groove is made in the outer wall of the old building (1) to install a concealed column, and a groove is made in the wall at the top of the window opening of the side window (12) to install a lintel for reinforcement, and the window opening of the curtain wall window (11) extends upward to the roof; 且在工况一到三中,若在旧建筑(1)的外墙上开洞过程中有梁被打断,则在被打断的梁上方贴靠屋盖安装新的梁。Furthermore, in working conditions 1 to 3, if a beam is broken during the process of drilling a hole in the outer wall of the old building (1), a new beam is installed above the broken beam close to the roof. 3.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:所述幕墙窗(11)中的幕墙采用以下方式进行固定:3. A method for renovating and utilizing a large-sized old building while retaining the building appearance according to claim 1, characterized in that the curtain wall in the curtain wall window (11) is fixed in the following manner: 幕墙下方地面埋设钢筋混凝土地梁,幕墙顶部与屋盖相邻的位置设置天梁,幕墙中间隔设置内柱,所述内柱上下两端分别与地梁和天梁固定连接;A reinforced concrete ground beam is buried in the ground below the curtain wall, a sky beam is set at the top of the curtain wall adjacent to the roof, and inner columns are set at intervals in the curtain wall. The upper and lower ends of the inner columns are fixedly connected to the ground beam and the sky beam respectively; 所述地梁上开设有用于固定幕墙底部的镶嵌槽,或锚固有用于固定幕墙底部的支架;The ground beam is provided with an inlay groove for fixing the bottom of the curtain wall, or is anchored with a bracket for fixing the bottom of the curtain wall; 所述幕墙左右两侧与旧建筑(1)的外墙固定连接。The left and right sides of the curtain wall are fixedly connected to the outer wall of the old building (1). 4.根据权利要求3所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:所述幕墙窗(11)的龙骨网格中带有门框,并在门框内安装玻璃门扇作为旧建筑(1)的新门;旧建筑(1)原有的门拆除并更换为玻璃门。4. A method for renovating and utilizing a large-sized old building while retaining its exterior shape according to claim 3, characterized in that: a door frame is provided in the keel grid of the curtain wall window (11), and a glass door leaf is installed in the door frame as a new door of the old building (1); the original door of the old building (1) is removed and replaced with a glass door. 5.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:步骤三中,新建筑(2)的楼板水平向外延伸到旧建筑(1)的外墙位置,形成悬空的室内走廊(4),所述室内走廊(4)为挑廊,挑廊的悬挑端与旧建筑(1)的外墙之间的接缝采用柔性的装饰板进行遮挡,所述装饰板与挑廊的悬挑端固定连接,与旧建筑(1)的外墙无连接;5. A method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 1, characterized in that: in step 3, the floor slab of the new building (2) is horizontally extended outward to the position of the outer wall of the old building (1), forming a suspended indoor corridor (4), wherein the indoor corridor (4) is a cantilevered corridor, and the joint between the cantilevered end of the cantilevered corridor and the outer wall of the old building (1) is shielded by a flexible decorative panel, wherein the decorative panel is fixedly connected to the cantilevered end of the cantilevered corridor and has no connection with the outer wall of the old building (1); 幕墙窗(11)与新建筑(2)之间的间隙布置为门厅(3)。The gap between the curtain wall window (11) and the new building (2) is arranged as a lobby (3). 6.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:若旧建筑(1)为多层建筑,则步骤二中还包括拆除二楼的楼板的步骤,步骤三施工过程中,自下而上逐层向上施工新建筑(2),每施工一层新建筑(2),就拆除一层旧建筑(1)的楼板。6. A method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 1, characterized in that: if the old building (1) is a multi-story building, step 2 further comprises the step of demolishing the floor slab of the second floor, and during the construction process of step 3, the new building (2) is constructed layer by layer from bottom to top, and each time a layer of the new building (2) is constructed, a layer of the floor slab of the old building (1) is demolished. 7.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:所述侧窗(12)的窗洞采用水锯切割的方式开洞并使洞壁光滑平整,侧窗(12)的玻璃窗扇直接顶撑在洞壁上。7. A method for renovating and utilizing a large-sized old building while retaining the building's appearance according to claim 1, characterized in that: the window opening of the side window (12) is opened by cutting with a water saw and the hole wall is made smooth and flat, and the glass window sash of the side window (12) is directly supported on the hole wall. 8.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:所述旧建筑(1)的外墙为清水砖墙,步骤四中的装饰材料为贴在旧建筑(1)的外墙上的PK砖。8. A method for renovating and utilizing a large-sized old building while retaining its appearance according to claim 1, characterized in that the outer wall of the old building (1) is a plain brick wall, and the decorative material in step 4 is a PK brick attached to the outer wall of the old building (1). 9.根据权利要求1所述的一种保留建筑外形的大尺寸旧建筑改造利用方法,其特征在于:新建筑(2)的非顶层为用于集中安装计算机和/或数据中心的机柜的机房,机柜的散热器的进风口及出风口均为侧窗(12)顶部的百叶窗,安装有百叶窗的侧窗(12)中,底部为玻璃窗。9. A method for renovating and utilizing a large-sized old building while retaining its exterior shape according to claim 1, characterized in that: the non-top floor of the new building (2) is a computer room for centrally installing computer and/or data center cabinets, the air inlet and air outlet of the cabinet radiator are both shutters at the top of the side window (12), and the bottom of the side window (12) with the shutter is a glass window.
CN202411049990.8A 2024-08-01 2024-08-01 A method for renovating and utilizing a large-scale old building while retaining its appearance Active CN118564103B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202411049990.8A CN118564103B (en) 2024-08-01 2024-08-01 A method for renovating and utilizing a large-scale old building while retaining its appearance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202411049990.8A CN118564103B (en) 2024-08-01 2024-08-01 A method for renovating and utilizing a large-scale old building while retaining its appearance

Publications (2)

Publication Number Publication Date
CN118564103A CN118564103A (en) 2024-08-30
CN118564103B true CN118564103B (en) 2024-12-06

Family

ID=92471538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202411049990.8A Active CN118564103B (en) 2024-08-01 2024-08-01 A method for renovating and utilizing a large-scale old building while retaining its appearance

Country Status (1)

Country Link
CN (1) CN118564103B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118564104A (en) * 2024-08-01 2024-08-30 北京建工四建工程建设有限公司 New and old building nested composite structure capable of utilizing old and stable in internal environment

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114673377B (en) * 2022-04-09 2024-01-26 中建八局第三建设有限公司 Construction methods of retaining the exterior walls of historic buildings and hollowing out the interior and rebuilding them
CN115387516A (en) * 2022-10-08 2022-11-25 中建八局装饰工程有限公司 Newly-built curtain wall system of existing building and construction method thereof

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118564104A (en) * 2024-08-01 2024-08-30 北京建工四建工程建设有限公司 New and old building nested composite structure capable of utilizing old and stable in internal environment

Also Published As

Publication number Publication date
CN118564103A (en) 2024-08-30

Similar Documents

Publication Publication Date Title
CN204940928U (en) Packaged type aluminium alloys house
CN112144791B (en) Building unit combined type heat-insulation and decoration integrated exterior wall cladding and installation method
CN116044106A (en) Integrated construction method for assembled phase-change heat-preservation decorative plate
CN105421816A (en) Heat-preservation energy-saving assembly type house and construction method
CN118564104B (en) New and old building nested composite structure capable of utilizing old and stable in internal environment
CN118564103B (en) A method for renovating and utilizing a large-scale old building while retaining its appearance
CN109826443B (en) Method for building house by using prefabricated building modules
CN204919802U (en) Preceding facade system in aluminum alloy house
CN204940537U (en) A kind of packaged type aluminium alloys house
CN117306876B (en) A construction process for installing lead plates on the walls and ceilings of radiology rooms.
CN111088858B (en) Prefabricated gable capable of being recycled and connection structure thereof
CN118564105B (en) A method for rebuilding a new floor slab when there is interference with the original load-bearing exterior wall
CN205153585U (en) Portable aluminum alloy house
CN116591529A (en) Underground garage and construction method
CN219638123U (en) Detachable building
CN116201239B (en) Detachable building and construction method thereof
CN117188810B (en) A method for renovating the roof of an old building
CN202882464U (en) Portable house
CN118601374A (en) A method for reconstructing rows of small-section buildings by making full use of old buildings
Brunone et al. Timber-Based Transformations of the Built Environment: A Portfolio of Case Studies
KR20110063219A (en) Public building structure with open floor where theme green space and neighborhood living space are provided
Jeżowski Budowa dźwigu w pałacu Izraela Poznańskiego w Łodzi–studium przypadku
JPH0112889B2 (en)
Ana-Maria et al. Structural analysis and damage assessment of a fortified church–A case study: The Evangelical Church of Apos, Sibiu County
Jensen Design and Construction of the Danish Cancer Center

Legal Events

Date Code Title Description