CN116681313A - Land comprehensive renovation project supervision system - Google Patents
Land comprehensive renovation project supervision system Download PDFInfo
- Publication number
- CN116681313A CN116681313A CN202310962471.XA CN202310962471A CN116681313A CN 116681313 A CN116681313 A CN 116681313A CN 202310962471 A CN202310962471 A CN 202310962471A CN 116681313 A CN116681313 A CN 116681313A
- Authority
- CN
- China
- Prior art keywords
- land
- progress
- remediation
- project
- monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009418 renovation Methods 0.000 title claims abstract description 65
- 238000012544 monitoring process Methods 0.000 claims abstract description 75
- 238000004458 analytical method Methods 0.000 claims abstract description 28
- 230000005856 abnormality Effects 0.000 claims abstract description 25
- 238000000034 method Methods 0.000 claims abstract description 9
- 230000006872 improvement Effects 0.000 claims abstract description 6
- 239000002689 soil Substances 0.000 claims abstract description 3
- 238000005067 remediation Methods 0.000 claims description 71
- 230000002159 abnormal effect Effects 0.000 claims description 25
- 238000011156 evaluation Methods 0.000 claims description 9
- 238000004364 calculation method Methods 0.000 claims description 7
- 238000012937 correction Methods 0.000 claims description 6
- 238000012545 processing Methods 0.000 claims description 5
- 230000003321 amplification Effects 0.000 claims description 4
- 238000003199 nucleic acid amplification method Methods 0.000 claims description 4
- 238000003491 array Methods 0.000 claims description 3
- 230000008439 repair process Effects 0.000 claims description 3
- 230000008569 process Effects 0.000 abstract description 5
- 230000002354 daily effect Effects 0.000 description 26
- 238000010276 construction Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 239000003337 fertilizer Substances 0.000 description 1
- 238000003384 imaging method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Educational Administration (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a land comprehensive renovation project supervision system, belonging to the technical field of project supervision; by monitoring and analyzing whether the daily land renovation progress is normal or not and carrying out abnormality type analysis on the abnormality progress found by the monitoring and analyzing, all personnel can acquire the overall situation of daily land renovation in an omnibearing way; the follow-up treatment conditions of the treatment stage with the abnormality in the early stage are traced and monitored on the basis of the supervision and analysis data of the treatment stage in the early stage, the follow-up daily stage treatment conditions and the current overall treatment conditions in different periods can be intuitively and efficiently obtained, so that a manager can dynamically adjust the follow-up treatment work content in a targeted manner, and the comprehensive soil treatment project can be ensured to be completed according to the quality in time; the method and the device are used for solving the technical problems that the prior scheme cannot implement the stage supervision of the whole process and the whole supervision and self-adaptive dynamic prompt management of the land comprehensive improvement project.
Description
Technical Field
The invention relates to the technical field of project supervision, in particular to a land comprehensive renovation project supervision system.
Background
The comprehensive land renovation is to push the comprehensive land renovation of fields, water, roads, forests and villages by taking land arrangement, reclamation, development and urban and rural construction land increase and decrease hooks as a platform according to the target and the purpose determined by the overall land utilization plan in a certain area; by comprehensively remediating the whole land, not only can the farmland protection and the land conservation be promoted, but also the rural ecological environment can be improved.
In the implementation process of the conventional land comprehensive renovation project supervision scheme, the construction condition of the land comprehensive project basically depends on manual supervision, and the stage supervision and the overall supervision and self-adaptive dynamic prompt management of the whole process of the land comprehensive renovation project cannot be implemented, so that the land comprehensive renovation project supervision is incomplete and the supervision effect is poor.
Disclosure of Invention
The invention aims to provide a land comprehensive renovation project supervision system which is used for solving the technical problems that the existing scheme cannot implement the stage supervision of the whole process and the whole supervision and self-adaptive dynamic prompt management of the land comprehensive renovation project.
The aim of the invention can be achieved by the following technical scheme:
the comprehensive land renovation project supervision system comprises a project progress stage supervision module, a project progress stage supervision module and a management module, wherein the project progress stage supervision module is used for carrying out monitoring analysis on the daily local renovation progress of the land to be renovated according to project supervision information of monitoring statistics to obtain a monitoring analysis set consisting of a renovation monitoring sequence and progress qualified labels or progress unqualified labels;
the project progress overall supervision module is used for monitoring and evaluating overall remediation conditions of the remediated land according to the monitoring analysis set, and dynamically displaying and prompting the daily overall remediation progress according to the overall evaluation result; comprising the following steps:
traversing the monitoring analysis set corresponding to all the dates, marking the date corresponding to the first unqualified label obtained through traversing as a selected date, traversing the monitoring analysis set corresponding to each day when monitoring and evaluating the treatment condition in the subsequent daily stage of the selected date, and generating a prompt for abnormality in the current day according to the progress unqualified label obtained through traversing;
when monitoring and evaluating the overall daily remediation situation after the selected date, acquiring the actual daily remediation area in all periods according to the remediation monitoring sequence and acquiring the overall coefficient Zx of the day after the selected date through calculation;
when evaluating the overall treatment condition of the follow-up daily of the selected date according to the overall coefficient, comparing the overall coefficient with a preset standard overall range;
if the integral coefficient belongs to the standard integral range, generating an integral progress normal label; if the integral coefficient does not belong to the standard integral range, generating an integral progress abnormal label, and obtaining a difference Cl corresponding to the integral renovation of the current day through calculation according to the integral progress abnormal label;
and the overall progress normal label or the overall progress abnormal label forms an overall evaluation result and is uploaded to the cloud platform, and the overall progress abnormal label in the overall evaluation result prompts an alarm prompt of the abnormal overall treatment condition of the corresponding date.
Preferably, the system further comprises a project supervision and statistics module, which is used for carrying out data monitoring and statistics on the land aspect and the remediation aspect corresponding to the land comprehensive remediation project to obtain project supervision information and uploading the project supervision information to the cloud platform; comprising the following steps:
acquiring coordinates, length and width of the land to be remediated corresponding to the land comprehensive remediation project; acquiring a basic image before land rehabilitation to be rehabilitated by front-end monitoring equipment; the coordinates, length and width of the land to be remediated and the basic image before remediation form land monitoring data;
acquiring a remediation type and a remediation period corresponding to the land to be remediated; the corresponding renovation type and renovation period of the land to be renovated form renovation monitoring data, and the land monitoring data and the renovation monitoring data form project supervision information.
Preferably, the working steps of the project progress stage supervision module include:
the land occupation area is obtained according to the length and the width corresponding to the land to be remediated in the project supervision information, the land to be remediated is equally divided according to the land occupation area and a preset dividing proportion, a plurality of subareas are obtained, and the subareas are numbered and marked according to a preset arrangement sequence;
when monitoring and analyzing the real-time renovation progress of the land to be renovated according to the renovation conditions of the sub-areas, acquiring a corresponding renovation image after the land is renovated on the same day through front-end monitoring equipment;
and carrying out gray processing on the corrected image and the basic image before land correction to obtain a corresponding corrected gray image and a basic gray image, obtaining areas which are different from the basic gray image in the corrected gray image and marked as corrected areas, obtaining corresponding actual corrected areas according to the area areas and the amplification proportion corresponding to the corrected areas, and carrying out traversal matching on the actual corrected areas and the preset standard corrected area range to obtain progress qualified labels or progress unqualified labels.
Preferably, if the actual remediation area belongs to the standard remediation area range, generating a progress qualified label;
if the actual curing area does not belong to the standard curing area range, generating a progress disqualified label, and generating an alarm prompt for curing abnormality on the same day according to the progress disqualified label.
Preferably, by the formulaCalculating and obtaining delay Yx corresponding to the actual treatment area; wherein SM is the actual area of the current day, BM is the median of the standard area range;
when analyzing the abnormality type of the current treatment according to the delay degree, if the delay degree is smaller than a first threshold value, generating a first delay signal and prompting a manager to confirm the delay abnormality of the current treatment;
if the delay degree is not less than the first threshold value and is less than zero, generating a second delay signal and prompting an operator that the current day of repair has an abnormal prompt with slight delay;
if the delay degree is greater than zero and smaller than the second threshold value, generating a third delay signal and prompting an operator that the correction on the same day has an abnormal prompt of slight exceeding standard;
if the delay degree is not smaller than the second threshold value, generating a fourth delay signal and prompting a manager to confirm the exceeding standard abnormality of the daily improvement; the first threshold value is less than 0 and less than the second threshold value.
Preferably, the value of the actual curing area on the same day is extracted and set as a first element, the value of the delay degree corresponding to the actual curing area is extracted according to the unqualified label and set as an element mark, and the first element and the element mark form a curing array corresponding to the curing area; the delay degree corresponding to the actual curing area is marked as zero according to the qualified label;
the treatment arrays corresponding to different treatment dates are arranged and combined according to time sequence to obtain a treatment monitoring sequence; and (5) repairing the monitoring sequence and forming a monitoring analysis set by using the progress qualified label or the progress unqualified label.
Preferably, the calculation formula of the overall coefficient Zx is as followsThe method comprises the steps of carrying out a first treatment on the surface of the i is the different cure dates, i=1, 2,3, … …, n; n is a positive integer; SMi is the actual remediation area corresponding to different remediation dates, and BM is the median of the standard remediation area range.
Preferably, the difference Cl is calculated by the formula。
Compared with the prior art, the invention has the beneficial effects that:
according to the invention, by monitoring and data statistics on the land comprehensive renovation project from different aspects, data support in different aspects can be provided for the subsequent daily staged renovation state analysis and the overall renovation state analysis; by monitoring and analyzing whether the daily renovation progress is normal or not and carrying out abnormality type analysis on the abnormality progress found by the monitoring and analyzing, all personnel can acquire the overall situation of daily land renovation in an omnibearing manner, dynamic display and prompt of the daily stage renovation progress can be realized, and reliable local data support can be provided for dynamic display and prompt of the follow-up daily overall renovation progress;
according to the invention, on the basis of the early-stage rehabilitation supervision analysis data, the follow-up rehabilitation conditions of the rehabilitation stage with the abnormality in the early stage are traced and supervised, so that the follow-up daily-stage rehabilitation conditions and the current overall rehabilitation conditions in different stages can be intuitively and efficiently obtained, the follow-up rehabilitation work content can be adjusted in a targeted and dynamic manner by a manager, the comprehensive rehabilitation project of the land can be ensured to be completed according to the quality on time, and the stage supervision effect and the overall supervision effect of the whole flow of the comprehensive rehabilitation project of the land are improved.
Drawings
The invention is further described below with reference to the accompanying drawings.
FIG. 1 is a block diagram of a land integrated remediation project supervision system of the present invention.
Fig. 2 is a block flow diagram of the project supervision statistical module in the land comprehensive renovation project supervision system according to the invention.
Fig. 3 is a block flow diagram of the project progress stage supervision module in the land comprehensive improvement project supervision system according to the invention.
Fig. 4 is a block flow diagram of the project progress overall supervision module in the land comprehensive improvement project supervision system according to the invention.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
As shown in fig. 1, the invention relates to a land comprehensive renovation project supervision system, which comprises a project supervision statistics module, a project progress stage supervision module, a project progress overall supervision module and a cloud platform;
as shown in fig. 2, the project supervision statistics module: carrying out data monitoring statistics on land aspects and remediation aspects corresponding to the land comprehensive remediation projects to obtain project supervision information, and uploading the project supervision information to the cloud platform; comprising the following steps:
acquiring coordinates, length and width of the land to be remediated corresponding to the land comprehensive remediation project; the coordinates of the land to be remediated can be represented by the existing longitude and latitude, and the units of the length and the width of the land to be remediated are meters;
for example, the land is located in county D village of city B, and may specifically be county Zhuangcun of the lotus city; the total area of the demolished area is 20.388 hectares, which relates to the total number of demolished households of 780 households; the original house in the old removing area is removed and transported outwards, and ploughing and fertilizer cultivation are carried out according to the technical requirements of land arrangement and reclamation, so that the ploughing quality can be improved by 1 grade; after the project is completed, the agricultural land area 20.388 hectares can be reclaimed, the corresponding remediated land consists of a plurality of pieces, and the length and the width of one piece of land to be remediated are 220 meters and 300 meters respectively;
acquiring a basic image before land rehabilitation to be rehabilitated by front-end monitoring equipment; the front-end monitoring equipment can be a fixed camera or a mobile unmanned aerial vehicle camera device, and the unmanned aerial vehicle camera device shoots a video by flying to a fixed shooting position;
the coordinates, length and width of the land to be remediated and the basic image before remediation form land monitoring data;
the method comprises the steps that the land to be remediated is in a forest planting state before remediation, the land to be remediated is remediated to carry out forest withdrawal and cultivation, and the land is required to be tidied and reclaimed;
acquiring a remediation type and a remediation period corresponding to the land to be remediated, wherein the remediation type can be reclamation; the unit of the period of the treatment is day, and the specific period can be 60 days;
the corresponding renovation type and renovation period of the land to be renovated form renovation monitoring data, and the land monitoring data and the renovation monitoring data form project supervision information.
In the embodiment of the invention, the monitoring and the data statistics are implemented on the land comprehensive renovation project from different aspects, so that the data support of different aspects can be provided for the subsequent daily staged renovation state analysis and the whole renovation state analysis.
As shown in fig. 3, the project progress stage supervision module: monitoring and analyzing the daily local renovation progress of the land to be renovated according to project supervision information, and dynamically displaying and prompting the daily renovation progress in stages according to the local analysis result; comprising the following steps:
the land occupation area is obtained according to the length and the width corresponding to the land to be remediated in the project supervision information, the land to be remediated is equally divided according to the land occupation area and a preset dividing proportion, a plurality of subareas are obtained, and the subareas are numbered and marked according to a preset arrangement sequence; the dividing ratio is set according to the corresponding occupied area of the land to be remediated and the imaging condition of the front-end monitoring equipment; the arrangement sequence can be sequentially from top to bottom and from left to right;
in addition, the purpose of equally dividing the land to be remediated is to realize the accuracy of the monitoring analysis of the remediation image of the subsequent remediated land; the division ratio may be 2.2:3, a step of;
when monitoring and analyzing the real-time renovation progress of the land to be renovated according to the renovation conditions of the sub-areas, acquiring a corresponding renovation image after the land is renovated on the same day through front-end monitoring equipment;
carrying out gray processing on the corrected image and the basic image before land correction to obtain a corresponding corrected gray image and a corresponding basic gray image, and obtaining a region which is different from the basic gray image in the corrected gray image and is marked as a corrected region;
for example, the first day completes the land remediation, the remedied gray-scale image being different from the image area of the base gray-scale image in which one fifth exists;
wherein, the color of the soil surface before and after land reclamation can change, such as land reclamation, which is commonly understood as that the color of the land after reclamation is darker than that of the land before reclamation; the gray processing of the images and the identification of different areas among different images are conventional technical means, detailed description is omitted here, the corresponding actual treatment area is obtained according to the area corresponding to the treatment area and the amplification proportion, and the amplification proportion is determined according to the proportion relation between the occupied area of the land to be treated and the occupied area of the land to be treated in the treatment images;
the land reclamation arrangement of the reclamation area is required to be strictly carried out according to the design scheme, so that the quantity of the cultivated land of the reclamation area is ensured not to be reduced compared with the cultivated land occupied by the construction area; meanwhile, the number and quality of project acceptance are ensured, the position implementation of the project is not changed, the scale is not broken through, and smooth acceptance is ensured.
Performing traversal matching on the actual curing area and a preset standard curing area range; the standard renovation area range is determined according to the construction period requirement corresponding to the land comprehensive renovation project;
for example, in the embodiment of the invention, the land to be remediated occupies 66000 square meters, the corresponding construction period is 30 days, the standard remediation area corresponding to the land to be remediated every day is 2200 square meters, and the error range is set to be 10%, then the standard remediation area range is [1980, 2420];
if the actual curing area belongs to the standard curing area range, generating a progress qualified label;
if the actual curing area does not belong to the standard curing area range, generating a progress disqualified label, and generating an alarm prompt for curing abnormality on the same day according to the progress disqualified label;
and, by the formulaCalculating and obtaining delay Yx corresponding to the actual treatment area; wherein SM is the actual area of the current day, BM is the median of the standard area range; the delay degree can be positive or negative;
when analyzing the abnormality type of the current treatment according to the delay degree, if the delay degree is smaller than a first threshold value, generating a first delay signal and prompting a manager to confirm the delay abnormality of the current treatment;
if the delay degree is not less than the first threshold value and is less than zero, generating a second delay signal and prompting an operator that the current day of repair has an abnormal prompt with slight delay;
if the delay degree is greater than zero and smaller than the second threshold value, generating a third delay signal and prompting an operator that the correction on the same day has an abnormal prompt of slight exceeding standard;
if the delay degree is not smaller than the second threshold value, generating a fourth delay signal and prompting a manager to confirm the exceeding standard abnormality of the daily improvement; the first threshold value is more than 0 and less than the second threshold value; the first threshold value and the second threshold value are determined through the occupied area corresponding to the land to be remediated, the remediation period and the historical remediation efficiency;
it should be noted that, progress disqualification includes that there are mild delays and mild overstandard anomalies in the current day of the remediation, and popular understanding is that the current day of land remediation area is not up to standard and the excess is up to standard;
wherein, the land area is not up to standard and the excess is up to standard can be understood as the area of land on the same day is lower than 1980 square meter and exceeds 2420 square meter; in addition, the default land is not influenced by weather in the process of land remediation, namely the external environmental influence is eliminated;
extracting the value of the actual curing area on the same day and setting the value as a first element, extracting the value of the delay degree corresponding to the actual curing area according to the unqualified label and setting the value as an element mark, wherein the first element and the element mark form a curing array corresponding to the curing area; the delay degree corresponding to the actual curing area is marked as zero according to the qualified label;
for example, when the actual curing area is 2300 square meters on the same day, the corresponding curing array is [2300,0];
the treatment arrays corresponding to different treatment dates are arranged and combined according to time sequence to obtain a treatment monitoring sequence; the monitoring sequence is remedied, and the progress qualified labels or the progress unqualified labels form a monitoring analysis set and are uploaded to the cloud platform;
in the embodiment of the invention, whether the daily renovation progress is normal or not is monitored and analyzed, and the abnormal progress found by the monitoring and analyzing is analyzed by the abnormal type, so that all personnel can acquire the whole condition of daily land renovation in an omnibearing way, the dynamic display and prompt of the daily stage renovation progress can be realized, and the reliable local data support can be provided for the dynamic display and prompt of the follow-up daily whole renovation progress.
As shown in fig. 4, the project progress overall supervision module: monitoring and evaluating the overall remediation condition of the remediated land according to the monitoring analysis set, and dynamically displaying and prompting the overall remediation progress of each day according to the overall evaluation result; comprising the following steps:
acquiring a repairing monitoring sequence in a monitoring analysis set, traversing the monitoring analysis set corresponding to all dates, marking the date corresponding to the first disqualified label acquired by traversing as a selected date, traversing the monitoring analysis set corresponding to each day when monitoring and evaluating the repairing condition in the subsequent daily stage of the selected date, and generating a prompt of abnormality in the repairing of the current day according to the progress disqualified label acquired by traversing;
when monitoring and evaluating the overall daily remediation situation after the selected date, acquiring the actual daily remediation area in all periods according to the remediation monitoring sequence, and passing through the formulaCalculating and obtaining the integral coefficient Zx of the follow-up daily of the selected date; i is the different cure dates, i=1, 2,3, … …, n; n is a positive integer; SMi is the actual curing area corresponding to different curing dates;
it should be noted that, the overall coefficient can trace and monitor the subsequent treatment conditions of the treatment stage with the abnormality in the early stage, so as to determine whether the abnormality treatment progress in the early stage is effectively treated from the whole, and avoid the aggravation of the abnormality type corresponding to the abnormality treatment progress in the abnormal stage and further influence the overall treatment progress;
when evaluating the overall treatment condition of the follow-up daily of the selected date according to the overall coefficient, comparing the overall coefficient with a preset standard overall range; the standard whole range can be determined by the occupied area corresponding to the land to be remediated, the remediation period and the historical remediation efficiency;
if the integral coefficient belongs to the standard integral range, generating an integral progress normal label; if the integral coefficient does not belong to the standard integral range, generating an integral progress abnormal label, and passing through a formula according to the integral progress abnormal labelCalculating and obtaining a difference Cl corresponding to the overall treatment of the current day; the difference may be positive or negative, with positive representing the wholeThe problem that excessive remediation affects the remediation quality exists in remediation, and negative values indicate that the problem that the defect amount remediation affects the remediation period exists in overall remediation;
and the overall progress normal label or the overall progress abnormal label forms an overall evaluation result and is uploaded to the cloud platform, and the overall progress abnormal label in the overall evaluation result prompts an alarm prompt of the abnormal overall treatment condition of the corresponding date.
In the embodiment of the invention, the follow-up treatment conditions of the early abnormal treatment stage are traced and supervised on the basis of the early stage treatment supervision analysis data, so that the follow-up daily stage treatment conditions of different periods and the current overall treatment conditions can be intuitively and efficiently obtained, the follow-up treatment working contents can be dynamically adjusted in a targeted manner by a manager, the land comprehensive treatment project can be ensured to be completed according to quality on time, and the stage supervision effect and the overall supervision effect of the whole flow of the land comprehensive treatment project are improved.
In addition, the formulas related in the above are all formulas for removing dimensions and taking numerical calculation, and are one formula which is obtained by acquiring a large amount of data and performing software simulation through simulation software and is closest to the actual situation.
In the several embodiments provided by the present invention, it should be understood that the disclosed system may be implemented in other ways. For example, the above-described embodiments of the invention are merely illustrative, and for example, the division of modules is merely a logical function division, and other manners of division may be implemented in practice.
The modules illustrated as separate components may or may not be physically separate, and components shown as modules may or may not be physical modules, i.e., may be located in one place, or may be distributed over a plurality of network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
In addition, each functional module in each embodiment of the present invention may be integrated into one processing module, or each module may exist alone physically, or two or more modules may be integrated into one module. The integrated modules may be implemented in hardware or in hardware plus software functional modules.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the essential characteristics thereof.
Finally, it should be noted that the above-mentioned embodiments are merely for illustrating the technical solution of the present invention and not for limiting the same, and although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that modifications and equivalents may be made to the technical solution of the present invention without departing from the spirit and scope of the technical solution of the present invention.
Claims (8)
1. The project supervision system for comprehensive land remediation is characterized by comprising a project progress stage supervision module, a project supervision module and a project management module, wherein the project progress stage supervision module is used for carrying out monitoring analysis on daily local remediation progress of the land to be remedied according to project supervision information of monitoring statistics to obtain a monitoring analysis set consisting of a remediation monitoring sequence and progress qualified labels or progress unqualified labels;
the project progress overall supervision module is used for monitoring and evaluating overall remediation conditions of the remediated land according to the monitoring analysis set, and dynamically displaying and prompting the daily overall remediation progress according to the overall evaluation result; comprising the following steps:
traversing the monitoring analysis set corresponding to all the dates, marking the date corresponding to the first unqualified label obtained through traversing as a selected date, traversing the monitoring analysis set corresponding to each day when monitoring and evaluating the treatment condition in the subsequent daily stage of the selected date, and generating a prompt for abnormality in the current day according to the progress unqualified label obtained through traversing;
when monitoring and evaluating the overall daily remediation situation after the selected date, acquiring the actual daily remediation area in all periods according to the remediation monitoring sequence and acquiring the overall coefficient Zx of the day after the selected date through calculation;
when evaluating the overall treatment condition of the follow-up daily of the selected date according to the overall coefficient, comparing the overall coefficient with a preset standard overall range;
if the integral coefficient belongs to the standard integral range, generating an integral progress normal label; if the integral coefficient does not belong to the standard integral range, generating an integral progress abnormal label, and obtaining a difference Cl corresponding to the integral renovation of the current day through calculation according to the integral progress abnormal label;
and the overall progress normal label or the overall progress abnormal label forms an overall evaluation result and is uploaded to the cloud platform, and the overall progress abnormal label in the overall evaluation result prompts an alarm prompt of the abnormal overall treatment condition of the corresponding date.
2. The system for supervising the comprehensive land remediation project according to claim 1, further comprising a project supervision statistics module, configured to perform data monitoring statistics on land aspects and remediation aspects corresponding to the comprehensive land remediation project to obtain project supervision information, and upload the project supervision information to the cloud platform; comprising the following steps:
acquiring coordinates, length and width of the land to be remediated corresponding to the land comprehensive remediation project; acquiring a basic image before land rehabilitation to be rehabilitated by front-end monitoring equipment; the coordinates, length and width of the land to be remediated and the basic image before remediation form land monitoring data;
acquiring a remediation type and a remediation period corresponding to the land to be remediated; the corresponding renovation type and renovation period of the land to be renovated form renovation monitoring data, and the land monitoring data and the renovation monitoring data form project supervision information.
3. The land integrated remediation project supervision system of claim 1 wherein the project progress stage supervision module includes the steps of:
the land occupation area is obtained according to the length and the width corresponding to the land to be remediated in the project supervision information, the land to be remediated is equally divided according to the land occupation area and a preset dividing proportion, a plurality of subareas are obtained, and the subareas are numbered and marked according to a preset arrangement sequence;
when monitoring and analyzing the real-time renovation progress of the land to be renovated according to the renovation conditions of the sub-areas, acquiring a corresponding renovation image after the land is renovated on the same day through front-end monitoring equipment;
and carrying out gray processing on the corrected image and the basic image before land correction to obtain a corresponding corrected gray image and a basic gray image, obtaining areas which are different from the basic gray image in the corrected gray image and marked as corrected areas, obtaining corresponding actual corrected areas according to the area areas and the amplification proportion corresponding to the corrected areas, and carrying out traversal matching on the actual corrected areas and the preset standard corrected area range to obtain progress qualified labels or progress unqualified labels.
4. A land integrated remediation project supervision system according to claim 3, wherein if the actual remediation area falls within the standard remediation area range, a progress pass label is generated;
if the actual curing area does not belong to the standard curing area range, generating a progress disqualified label, and generating an alarm prompt for curing abnormality on the same day according to the progress disqualified label.
5. The soil integrated remediation project supervision system of claim 4 wherein the formula is passedCalculating and obtaining delay Yx corresponding to the actual treatment area; wherein SM is the actual area of the current day, BM is the median of the standard area range;
when analyzing the abnormality type of the current treatment according to the delay degree, if the delay degree is smaller than a first threshold value, generating a first delay signal and prompting a manager to confirm the delay abnormality of the current treatment;
if the delay degree is not less than the first threshold value and is less than zero, generating a second delay signal and prompting an operator that the current day of repair has an abnormal prompt with slight delay;
if the delay degree is greater than zero and smaller than the second threshold value, generating a third delay signal and prompting an operator that the correction on the same day has an abnormal prompt of slight exceeding standard;
if the delay degree is not smaller than the second threshold value, generating a fourth delay signal and prompting a manager to confirm the exceeding standard abnormality of the daily improvement; the first threshold value is less than 0 and less than the second threshold value.
6. The land comprehensive renovation project supervision system according to claim 5, wherein the numerical value of the actual renovation area on the same day is extracted and set as a first element, the numerical value of the delay corresponding to the actual renovation area is extracted according to the disqualified label and set as an element mark, and the first element and the element mark form a renovation array corresponding to the renovation area; the delay degree corresponding to the actual curing area is marked as zero according to the qualified label;
the treatment arrays corresponding to different treatment dates are arranged and combined according to time sequence to obtain a treatment monitoring sequence; and (5) repairing the monitoring sequence and forming a monitoring analysis set by using the progress qualified label or the progress unqualified label.
7. The land comprehensive renovation project supervision system of claim 1, wherein the calculation formula of the overall coefficient Zx isThe method comprises the steps of carrying out a first treatment on the surface of the i is the different cure dates, i=1, 2,3, … …, n; n is a positive integer; SMi is the actual remediation area corresponding to different remediation dates, and BM is the median of the standard remediation area range.
8. The land comprehensive remediation project supervision system of claim 7, wherein the formula for calculating the difference Cl is。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310962471.XA CN116681313B (en) | 2023-08-02 | 2023-08-02 | Land comprehensive renovation project supervision system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310962471.XA CN116681313B (en) | 2023-08-02 | 2023-08-02 | Land comprehensive renovation project supervision system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN116681313A true CN116681313A (en) | 2023-09-01 |
CN116681313B CN116681313B (en) | 2023-10-10 |
Family
ID=87791286
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310962471.XA Active CN116681313B (en) | 2023-08-02 | 2023-08-02 | Land comprehensive renovation project supervision system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116681313B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117408495A (en) * | 2023-12-12 | 2024-01-16 | 菏泽市自然资源和规划局 | Data analysis method and system based on comprehensive management of land resources |
CN117498560A (en) * | 2024-01-02 | 2024-02-02 | 中国电建集团山东电力建设第一工程有限公司 | Power supply cable lays intelligent monitoring system suitable for power plant construction |
CN118350788A (en) * | 2024-06-17 | 2024-07-16 | 山东同晟建设工程有限公司 | Territorial space planning processing system based on GIS |
Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20180001297A (en) * | 2016-06-27 | 2018-01-04 | 두산중공업 주식회사 | Project management apparatust |
CN108257068A (en) * | 2018-02-08 | 2018-07-06 | 马鞍山市赛迪智能科技有限公司 | A kind of accurate poverty alleviation supervisory systems and method based on GIS |
US20180341915A1 (en) * | 2017-05-29 | 2018-11-29 | Wipro Limited | Method and system for tracking and managing regulatory certificates of aircraft components |
CN109242716A (en) * | 2018-09-27 | 2019-01-18 | 大连亿辉科技有限公司 | Project management system is renovated in rural holding |
CN109636312A (en) * | 2018-11-15 | 2019-04-16 | 武汉市国土资源和规划信息中心 | Land control engineering online monitoring and management system |
CN111967856A (en) * | 2020-08-27 | 2020-11-20 | 享云智能网联(北京)科技有限公司 | Government affair project management method and device |
CN214332242U (en) * | 2021-02-20 | 2021-10-01 | 王明英 | On-line supervision device for land reclamation project |
KR102376912B1 (en) * | 2020-10-07 | 2022-03-23 | 한국국토정보공사 | Land management device and method based on spatial information using artificial intelligence |
CN216280354U (en) * | 2021-12-11 | 2022-04-12 | 赵影 | On-line supervision device for land reclamation project |
CN114912847A (en) * | 2022-06-24 | 2022-08-16 | 南京财经大学 | Land universe renovation online supervision method and system |
CN115170090A (en) * | 2022-07-27 | 2022-10-11 | 海南绿境高科环保有限公司 | Project management method and device, electronic equipment and readable storage medium |
CN115439100A (en) * | 2022-09-29 | 2022-12-06 | 山西大地环境投资控股有限公司太原分公司 | Method for supervising comprehensive land improvement project and management information system |
CN115841276A (en) * | 2022-12-12 | 2023-03-24 | 江西财经大学 | Method for analyzing influence factors of land reclamation project |
CN116227854A (en) * | 2023-01-20 | 2023-06-06 | 上海图源素数字科技有限公司 | Method and system for implementing supervision of comprehensive renovation of homeland space |
CN116485326A (en) * | 2023-03-17 | 2023-07-25 | 中国工商银行股份有限公司 | Project progress analysis method and device, electronic equipment and storage medium |
-
2023
- 2023-08-02 CN CN202310962471.XA patent/CN116681313B/en active Active
Patent Citations (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20180001297A (en) * | 2016-06-27 | 2018-01-04 | 두산중공업 주식회사 | Project management apparatust |
US20180341915A1 (en) * | 2017-05-29 | 2018-11-29 | Wipro Limited | Method and system for tracking and managing regulatory certificates of aircraft components |
CN108257068A (en) * | 2018-02-08 | 2018-07-06 | 马鞍山市赛迪智能科技有限公司 | A kind of accurate poverty alleviation supervisory systems and method based on GIS |
CN109242716A (en) * | 2018-09-27 | 2019-01-18 | 大连亿辉科技有限公司 | Project management system is renovated in rural holding |
CN109636312A (en) * | 2018-11-15 | 2019-04-16 | 武汉市国土资源和规划信息中心 | Land control engineering online monitoring and management system |
CN111967856A (en) * | 2020-08-27 | 2020-11-20 | 享云智能网联(北京)科技有限公司 | Government affair project management method and device |
KR102376912B1 (en) * | 2020-10-07 | 2022-03-23 | 한국국토정보공사 | Land management device and method based on spatial information using artificial intelligence |
CN214332242U (en) * | 2021-02-20 | 2021-10-01 | 王明英 | On-line supervision device for land reclamation project |
CN216280354U (en) * | 2021-12-11 | 2022-04-12 | 赵影 | On-line supervision device for land reclamation project |
CN114912847A (en) * | 2022-06-24 | 2022-08-16 | 南京财经大学 | Land universe renovation online supervision method and system |
CN115170090A (en) * | 2022-07-27 | 2022-10-11 | 海南绿境高科环保有限公司 | Project management method and device, electronic equipment and readable storage medium |
CN115439100A (en) * | 2022-09-29 | 2022-12-06 | 山西大地环境投资控股有限公司太原分公司 | Method for supervising comprehensive land improvement project and management information system |
CN115841276A (en) * | 2022-12-12 | 2023-03-24 | 江西财经大学 | Method for analyzing influence factors of land reclamation project |
CN116227854A (en) * | 2023-01-20 | 2023-06-06 | 上海图源素数字科技有限公司 | Method and system for implementing supervision of comprehensive renovation of homeland space |
CN116485326A (en) * | 2023-03-17 | 2023-07-25 | 中国工商银行股份有限公司 | Project progress analysis method and device, electronic equipment and storage medium |
Non-Patent Citations (5)
Title |
---|
冉艳艳: "无人机低空航摄技术 在土地综合整治项目动态监管中的应用研究", 江苏科技信息, no. 5, pages 62 - 64 * |
王燕鹏等: "土地整治项目科技化管理的探索研究", 山东国土资源, vol. 34, no. 03, pages 71 - 75 * |
田海英;: "农村土地整治监测监管系统应用技法", 西部资源, no. 05, pages 107 - 108 * |
肖碧军: "土地整治项目管理创新的思考与对策", 产业与科技论坛, vol. 19, no. 1, pages 236 - 237 * |
韦俊敏等: "土地整治项目综合监测指标体系研究", 广西师范学院学报(自然科学版), vol. 33, no. 04, pages 76 - 84 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117408495A (en) * | 2023-12-12 | 2024-01-16 | 菏泽市自然资源和规划局 | Data analysis method and system based on comprehensive management of land resources |
CN117408495B (en) * | 2023-12-12 | 2024-03-29 | 菏泽市自然资源和规划局 | Data analysis method and system based on comprehensive management of land resources |
CN117498560A (en) * | 2024-01-02 | 2024-02-02 | 中国电建集团山东电力建设第一工程有限公司 | Power supply cable lays intelligent monitoring system suitable for power plant construction |
CN117498560B (en) * | 2024-01-02 | 2024-04-09 | 中国电建集团山东电力建设第一工程有限公司 | Power supply cable lays intelligent monitoring system suitable for power plant construction |
CN118350788A (en) * | 2024-06-17 | 2024-07-16 | 山东同晟建设工程有限公司 | Territorial space planning processing system based on GIS |
Also Published As
Publication number | Publication date |
---|---|
CN116681313B (en) | 2023-10-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN116681313B (en) | Land comprehensive renovation project supervision system | |
Chi et al. | Impacts of anthropogenic land use/cover changes on soil wind erosion in China | |
Hoffmann et al. | Variability of effects of spatial climate data aggregation on regional yield simulation by crop models | |
CN113011993A (en) | Method for measuring and calculating water-entering load of agricultural pollution source based on standard data | |
CN110988306A (en) | Long-term monitoring, preventing, analyzing and managing system for soil based on electronic information technology | |
Kyllmar et al. | Model-based coefficient method for calculation of N leaching from agricultural fields applied to small catchments and the effects of leaching reducing measures | |
CN117770106A (en) | Digital twinning-based farmland irrigation method | |
Lou et al. | Combining multi-source data to explore a mechanism for the effects of micrometeorological elements on nutrient variations in paddy land water | |
CN113989086A (en) | Desert ecological restoration method based on plant greening and management analysis system | |
CN106373133B (en) | A kind of farmland rice transplanting detection method and its system based on dark defogging algorithm | |
CN116485174B (en) | Method and device for evaluating risk of ozone pollution on crop yield reduction | |
CN111583050B (en) | Crop pest and disease early warning method and system fusing multi-scale remote sensing images | |
CN117173668A (en) | Road pothole area measurement method combining chassis camera with example segmentation network | |
CN112464434A (en) | Method and system for predicting pollution discharge amount of agricultural irrigation ground source | |
CN112541611A (en) | Method and system for predicting pollution discharge amount of rain farming ground source | |
Tadesse et al. | Modeling landscape wind erosion processes on rangelands using the APEX model | |
CN115936264A (en) | Single-day engineering quantity calculation method, staged engineering quantity prediction method and prediction device | |
CN116307762A (en) | Method for preventing and controlling water and soil pollution of kaolin | |
Williams et al. | The matrix of good management: defining good management practices and associated nutrient losses across primary industries | |
CN117372224B (en) | Greening ecological restoration system | |
CN110737215A (en) | geographic information dynamic early warning deployment and control system and early warning deployment and control method | |
CN118503745B (en) | Agricultural heavy metal input flux calculation system under influence of flood | |
CN118171067B (en) | Ecological value assessment method and system based on natural resource assets | |
US20240321403A1 (en) | Method of Determining River Nitrous Oxide Emission based on Land-River-Atmosphere Simulation | |
CN115936267B (en) | Grape disease prediction method and device based on Internet of things |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |